Deck 12: Pricing the Proposed Design

ملء الشاشة (f)
exit full mode
سؤال
Price and cost do not always mean the same thing.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
If a landscape project is really large, it will need more than drawings to explain the design and acceptable standards.
سؤال
Overhead costs are generated by the clients and passed along to the landscape company.
سؤال
There are many things that can wipe out the landscaper's expected profit including weather, labor problems, miscalculations, and poor materials.
سؤال
The general overhead costs are charged only to large projects and are included in their price.
سؤال
The price is binding on the landscape company only when the work starts.
سؤال
Price overruns result in disappointment of the client and a waste of time.
سؤال
Overhead costs are both general and project-specific.
سؤال
If unforeseen conditions delay the project or costs increase for other reasons, the bid price can be adjusted to protect the contractor's profit.
سؤال
Specifications should be exact and precise to prevent client disappointment.
سؤال
To which person(s) is the term price most appropriately applied?

A) the designer
B) the client
C) the contractor
D) the architect
سؤال
Determining the cost of a landscape project has what objective?

A) getting the job
B) establishing completion dates
C) financing the project
D) recovering expenses
سؤال
Price equals landscape design services plus what else?

A) landscape contracting services
B) labor and management costs
C) material and supply costs
D) equipment costs
سؤال
What describes an approximation of the price that a customer is charged for a project?

A) estimate
B) bid
C) offer
D) assessment
سؤال
Some states require what qualification of landscape architects that prevents others from charging for their design services?

A) bonding
B) incorporation
C) accreditation
D) insurance
سؤال
What two items are used by a landscape contractor to prepare a bid?

A) insurance forms and credit references
B) drawings and catalogues
C) drawings and specifications
D) bank records and client profiles
سؤال
What identifying notations must be included on a bid?

A) client's name and address
B) name of the estimator
C) date of preparation
D) All answers are correct
سؤال
Where in a bid are administrative salaries, advertising costs, rent, and office expenses included?

A) labor
B) contingency costs
C) overhead
D) materials
سؤال
What component of a bid provides for unpredictable things that can disrupt a construction schedule and increase costs?

A) overhead costs
B) specifications
C) liability insurance
D) contingency allowance
سؤال
A listing of the materials, quality standards, and time schedules required to build a particular project is called what?

A) specifications
B) building materials
C) work order
D) measurements
سؤال
A ____________________ is a definite commitment to provide services and materials specified in a contract for an agreed upon price.
سؤال
____________________ is what the client pays to have the landscape built.
سؤال
Expenses incurred by a landscaper who hires an outside firm to perform a portion of the work are ____________________ costs.
سؤال
Compared to a bid, the price figure given to a client in an estimate is ____________________.
سؤال
When bidding involves only one company, the discussions between the client and company are usually informal and ____________________.
سؤال
Precisely written ____________________ prevent client disappointment and discourage deceptive bidding.
سؤال
When factoring the cost of equipment into a bid, its time of ____________________ must be included.
سؤال
The form of measurement used to count and quantify materials is termed the ____________________ of measurement.
سؤال
The overhead and profit allowance for plant material is usually greater than that for hardscape materials because of the ____________________ of plants.
سؤال
When describing the plant materials to be used at the time of installation, each plant's size and ____________________ must be included in the description for complete clarity of what is expected.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Pricing the Proposed Design
1
Price and cost do not always mean the same thing.
True
2
If a landscape project is really large, it will need more than drawings to explain the design and acceptable standards.
True
3
Overhead costs are generated by the clients and passed along to the landscape company.
False
4
There are many things that can wipe out the landscaper's expected profit including weather, labor problems, miscalculations, and poor materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
5
The general overhead costs are charged only to large projects and are included in their price.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
6
The price is binding on the landscape company only when the work starts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
7
Price overruns result in disappointment of the client and a waste of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
8
Overhead costs are both general and project-specific.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
9
If unforeseen conditions delay the project or costs increase for other reasons, the bid price can be adjusted to protect the contractor's profit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
10
Specifications should be exact and precise to prevent client disappointment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
11
To which person(s) is the term price most appropriately applied?

A) the designer
B) the client
C) the contractor
D) the architect
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
12
Determining the cost of a landscape project has what objective?

A) getting the job
B) establishing completion dates
C) financing the project
D) recovering expenses
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
13
Price equals landscape design services plus what else?

A) landscape contracting services
B) labor and management costs
C) material and supply costs
D) equipment costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
14
What describes an approximation of the price that a customer is charged for a project?

A) estimate
B) bid
C) offer
D) assessment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
15
Some states require what qualification of landscape architects that prevents others from charging for their design services?

A) bonding
B) incorporation
C) accreditation
D) insurance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
16
What two items are used by a landscape contractor to prepare a bid?

A) insurance forms and credit references
B) drawings and catalogues
C) drawings and specifications
D) bank records and client profiles
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
17
What identifying notations must be included on a bid?

A) client's name and address
B) name of the estimator
C) date of preparation
D) All answers are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
18
Where in a bid are administrative salaries, advertising costs, rent, and office expenses included?

A) labor
B) contingency costs
C) overhead
D) materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
19
What component of a bid provides for unpredictable things that can disrupt a construction schedule and increase costs?

A) overhead costs
B) specifications
C) liability insurance
D) contingency allowance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
20
A listing of the materials, quality standards, and time schedules required to build a particular project is called what?

A) specifications
B) building materials
C) work order
D) measurements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
21
A ____________________ is a definite commitment to provide services and materials specified in a contract for an agreed upon price.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
22
____________________ is what the client pays to have the landscape built.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
23
Expenses incurred by a landscaper who hires an outside firm to perform a portion of the work are ____________________ costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
24
Compared to a bid, the price figure given to a client in an estimate is ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
25
When bidding involves only one company, the discussions between the client and company are usually informal and ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
26
Precisely written ____________________ prevent client disappointment and discourage deceptive bidding.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
27
When factoring the cost of equipment into a bid, its time of ____________________ must be included.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
28
The form of measurement used to count and quantify materials is termed the ____________________ of measurement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
29
The overhead and profit allowance for plant material is usually greater than that for hardscape materials because of the ____________________ of plants.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
30
When describing the plant materials to be used at the time of installation, each plant's size and ____________________ must be included in the description for complete clarity of what is expected.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 30 في هذه المجموعة.