Deck 6: The Landscape Process

ملء الشاشة (f)
exit full mode
سؤال
One of the best generators of call back for the landscape company is when homeowners compare their landscape to someone else's landscape.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The landscaping process is noncyclic like the manufacturing process.
سؤال
Developing creativity usually comes in a flash of inspiration.
سؤال
Once a wish list is generated, the landscape design process is finished.
سؤال
Often, the completion of the landscape project at a client's present level of satisfaction sows the seed for upgrading of the same project to a higher level of satisfaction.
سؤال
The landscape contractor arranges for suppliers and subcontractors to provide materials needed to accomplish the project.
سؤال
The desire for continuous maintenance of a property also involves a series and sequence of activities.
سؤال
The design process occurs in two stages that are going on at the same time.
سؤال
Before the designer develops specific designs, he must fit the program to the site.
سؤال
The landscape process is designed to discover the client's needs and desires and the characteristics of a specific site in order that the two fit one another.
سؤال
What term is often used to describe the functional arrangement that begins the fitting of the client's program to the site?

A) bubble diagrams
B) sketches
C) balloons
D) tagging
سؤال
At what point in the landscape process are the client's program and the site's potential for development brought together?

A) analysis
B) presentation
C) termination
D) synthesis
سؤال
The design process occurs in what stage(s)?

A) site analysis
B) design analysis
C) program analysis
D) both "site analysis" and "program analysis"
سؤال
Which of the choices is most significant to the client's visualization and understanding of how the completed landscape will appear?

A) functional styling
B) site analysis
C) graphic styling
D) synthesis
سؤال
When all suggestions and reactions of the client are incorporated into a master drawing, graphically detailed and specific in its intent, what is the final product of the landscape process?

A) preliminary design
B) program portfolio
C) functional diagram
D) final plans
سؤال
What drawing reveals the designer's first drafted vision of how each area of the landscape should be shaped?

A) preliminary design
B) final design
C) functional diagram
D) program analysis
سؤال
A sequence of steps in the form of decisions or activities that result in meeting a goal is given what term?

A) conclusion
B) process
C) function
D) client expectation
سؤال
Which part of the landscape process organizes the client's separate wish lists into related groupings?

A) site analysis
B) landscape cycle
C) site inventory
D) program analysis
سؤال
What is usually the first step in a typical sequence of the project development process?

A) The project is built
B) The client formulates a series of needs or objectives to be accomplished by a particular time
C) The client accepts the design
D) A designer is contracted
سؤال
Why would it be foolish to carry a design past the preliminary stage without getting feedback from the client?

A) Few preliminary designs pass the client test without modification
B) The preliminary design is a final stage
C) It could interfere with maintenance of the program
D) Most local ordinances require contacting the client
سؤال
A process may be a sequence of ____________________ during which something is created, modified, or transformed.
سؤال
The best source of information about the desired uses of a proposed landscape is ____________________.
سؤال
The most impartial observer of the potential uses and limitations of a site should be ____________________.
سؤال
Many client idiosyncrasies can be observed during the ____________________.
سؤال
To ensure maximum benefit from a visit to the site and/or an interview with the client, it is appropriate to use a ____________________ for gathering and recording information.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: The Landscape Process
1
One of the best generators of call back for the landscape company is when homeowners compare their landscape to someone else's landscape.
True
2
The landscaping process is noncyclic like the manufacturing process.
False
3
Developing creativity usually comes in a flash of inspiration.
False
4
Once a wish list is generated, the landscape design process is finished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
Often, the completion of the landscape project at a client's present level of satisfaction sows the seed for upgrading of the same project to a higher level of satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
The landscape contractor arranges for suppliers and subcontractors to provide materials needed to accomplish the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
The desire for continuous maintenance of a property also involves a series and sequence of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
The design process occurs in two stages that are going on at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
Before the designer develops specific designs, he must fit the program to the site.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
The landscape process is designed to discover the client's needs and desires and the characteristics of a specific site in order that the two fit one another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
What term is often used to describe the functional arrangement that begins the fitting of the client's program to the site?

A) bubble diagrams
B) sketches
C) balloons
D) tagging
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
At what point in the landscape process are the client's program and the site's potential for development brought together?

A) analysis
B) presentation
C) termination
D) synthesis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
The design process occurs in what stage(s)?

A) site analysis
B) design analysis
C) program analysis
D) both "site analysis" and "program analysis"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the choices is most significant to the client's visualization and understanding of how the completed landscape will appear?

A) functional styling
B) site analysis
C) graphic styling
D) synthesis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
When all suggestions and reactions of the client are incorporated into a master drawing, graphically detailed and specific in its intent, what is the final product of the landscape process?

A) preliminary design
B) program portfolio
C) functional diagram
D) final plans
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
What drawing reveals the designer's first drafted vision of how each area of the landscape should be shaped?

A) preliminary design
B) final design
C) functional diagram
D) program analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
A sequence of steps in the form of decisions or activities that result in meeting a goal is given what term?

A) conclusion
B) process
C) function
D) client expectation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which part of the landscape process organizes the client's separate wish lists into related groupings?

A) site analysis
B) landscape cycle
C) site inventory
D) program analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
What is usually the first step in a typical sequence of the project development process?

A) The project is built
B) The client formulates a series of needs or objectives to be accomplished by a particular time
C) The client accepts the design
D) A designer is contracted
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
Why would it be foolish to carry a design past the preliminary stage without getting feedback from the client?

A) Few preliminary designs pass the client test without modification
B) The preliminary design is a final stage
C) It could interfere with maintenance of the program
D) Most local ordinances require contacting the client
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
A process may be a sequence of ____________________ during which something is created, modified, or transformed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
The best source of information about the desired uses of a proposed landscape is ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
The most impartial observer of the potential uses and limitations of a site should be ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
Many client idiosyncrasies can be observed during the ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
To ensure maximum benefit from a visit to the site and/or an interview with the client, it is appropriate to use a ____________________ for gathering and recording information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.