Deck 5: Systems Analysis

ملء الشاشة (f)
exit full mode
سؤال
Systems analysis is a problem-solving technique that decomposes a system into its component pieces for the purpose of studying how well those component parts work and interact to accomplish their purpose.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Systems design is a complementary problem solving technique to systems analysis that reassembles a system's component pieces into a (hopefully improved) complete system.
سؤال
Information systems analysis is defined as those development phases in a project that primarily focus on the business problem, independent of any technology that can or will be used to implement a solution to that problem.
سؤال
A repository is a location (or set of locations) where systems analysts, systems designers and system builders keep the documentation associated with one or more systems or projects.
سؤال
Model driven analysis emphasizes the drawing of pictorial system models to document and validate both existing and/or proposed systems. Ultimately the system model becomes the blueprint for designing and constructing an improved system.
سؤال
Model driven analysis emphasizes the development of application prototypes to quickly implement a new system without the need for requirements analysis.
سؤال
Data Flow Diagrams (DFDs) can only be used to depict proposed new processes in a system, along with their inputs, outputs and files.
سؤال
CASE tools offer the advantage of consistency and completeness analysis as well as rule-based error checking.
سؤال
Structured analysis is a traditional approach to system analysis and design.
سؤال
Information engineering (IE) is a data-driven, process-centered, but model-sensitive technique to plan, analyze and design information systems.
سؤال
Objected oriented analysis (OOA) is model-driven technique that integrates Data and Process concerns into constructs called Objects. OOA models are pictures that illustrate the system's objects from various perspectives such as structure and behavior.
سؤال
The Unified Modeling Language (UML) is used in information engineering.
سؤال
Accelerated analysis approaches emphasize the construction of prototypes to more rapidly identify business and user requirements for a new system.
سؤال
A prototype is a small-scale, incomplete, but working sample of a desired system.
سؤال
Discovery prototyping is used to identify the user's business requirements by having them react to a quick and dirty implementation of those requirements.
سؤال
Many analysts use parts of structured analysis and information engineering in a complementary way to model an information system.
سؤال
Rapid architecture analysis attempts to derive system models from existing systems or discovery prototypes.
سؤال
Reverse engineering technology reads the program code for an existing database, application program, and/or user interface and automatically generates the equivalent system model.
سؤال
Requirements discovery is the process of identifying system problems and solution requirements from the user community.
سؤال
Analytical discovery includes those techniques to be used by a systems analyst to identify or extract system problems and solution requirements from the user community.
سؤال
Examples of fact-finding techniques include: sampling of existing documentation; research of relevant literature; observation of the current system; questionnaires and surveys of the management and user community; and interviews of appropriate managers, users, and technical staff.
سؤال
Joint requirements planning (JRP) techniques use facilitated workshops to bring together all the system owners, system users, systems analysts and some systems designers and builders to jointly perform systems analysis.
سؤال
Joint application development (JAD) is considered a part of Joint Requirements Planning (JRP), which is a more comprehensive application of the techniques to the entire system development process.
سؤال
Business process redesign is the application of systems analysis methods to the goal of dramatically changing and improving the fundamental business processes of an organization, independent of information technology.
سؤال
An agile method integrates various approaches of systems analysis and design..
سؤال
BPR is often triggerd by total quality management and continuous process improvement.
سؤال
Business process redesign is often applied within the context of information systems development when the projects include a study of existing business processes to identify problems, bureaucracy and inefficiencies that need to be addressed in requirements for new and improved information systems.
سؤال
The purpose of a context diagram is to analyze how the system interacts with the world around it.
سؤال
The scope definition phase is the first phase of the classic systems development process. It is also known as initial study phase, survey phase, or planning phase.
سؤال
The scope definition phase looks at the question "Is this project worth looking at?"
سؤال
The scope definition phase looks at the economic and operational feasibility of the project under consideration.
سؤال
The final deliverable for the scope definition phases is the project charter..
سؤال
A problem statements matrix lists each problem, opportunity, or directive related to the project.
سؤال
Scope defies the boundary of the project.
سؤال
The final deliverable of the scope definition phase is a working prototype to demonstrate system requirements.
سؤال
The scope definition phase typically includes the following tasks: (1) identify baseline problems and opportunities; (2) negotiate baseline scope; (3) assess baseline worthiness; (4) develop baseline schedule
& budget; (5) communicate the project plan.
سؤال
The first FAST phase is the problem analysis phase.
سؤال
The PIECES framework can be used to categorize problems, opportunities, directives, and constraints.
سؤال
During the scope definition phase, each problem, opportunity and directive is assessed with respect to urgency, visibility, tangible benefits and priority.
سؤال
In the scope definition phase, urgency is used to represent what time frame the problem needs to be solved or the opportunity or directive to be realized.
سؤال
In the scope definition phase, urgency is used to represent the prioritization and documentation requirements for the problem that needs to be solved, or the opportunity or directive to be realized.
سؤال
In the scope definition phase, visibility is used to assess the degree to which a project solution is made visual through the use of modeling tools such as data flow diagrams or entity relationship diagrams.
سؤال
In the scope definition phase, benefits are measured in terms of how a new system could increase annual revenues, or reduce annual costs.
سؤال
In the scope definition phase, benefits need to be measured optimistically if the project is to be a success.
سؤال
In the scope definition phase, a consensus of priorities is arrived at to help adjust the project scope.
سؤال
In the scope definition phase, possible solutions are expressed in simple terms to facilitate high level-discussion of options such as (a) leave well enough alone; (b) a quick fix; (c) a simple to moderate enhancement of the system; (d) redesign the existing system, or (e) design a new system.
سؤال
In the scope definition phase, possible solutions need to be expressed in as much detail as possible so that an accurate picture of the feasibility of the project can be determined.
سؤال
Developing the baseline schedule and budget is the responsibility of the system owner.
سؤال
Scope can change during the life cycle of a project, however, the initial project plan needs to establish the preliminary scope to provide a context for the budget and schedule.
سؤال
The preliminary master plan is also known as the baseline plan.
سؤال
A steering body is a committee of executive business and system managers that studies and prioritizes competing project proposals to determine which projects will return the most value to the organization and thus should be approved for continued system development.
سؤال
The facilitator for the joint requirements planning process determines which projects will return the most value to the organization and thus should be approved for continued system development.
سؤال
The problem analysis phase is best described by the statement, "Don't try to fix it unless you understand it."
سؤال
The goal of the problem analysis phase is to study and understand the problem domain well enough to thoroughly analyze its problems, opportunities and constraints.
سؤال
The problem analysis phase typically includes the following tasks: (1) understand the problem domain;
(2) analyze problems and opportunities; (3) analyze business processes; (4) establish system improvement objectives; (5) update or refine the project plan; (6) communicate findings and recommendations.
سؤال
The scope definition phase typically included the following tasks: (1) study the problem domain; (2) analyzed problems and opportunities; (3) analyze business processes; (4) establish system improvement objectives; (5) update the project plan; (6) present findings and recommendations.
سؤال
The deliverables of the problem analysis phase include an understanding of the problem domain and business vocabulary.
سؤال
Cause-and-effect analysis leads to true understanding of problems and can lead to not-so-obvious, but more creative and valuable solutions.
سؤال
Cause-and-effect analysis is an out-of-date technique that is unnecessary today given the complete nature of the scope definition phase that makes such problems and their solutions obvious.
سؤال
An objective is a measure of success. It is something that you expect to achieve, if given sufficient resources.
سؤال
An objective is something that will limit your flexibility in defining a solution to your constraints. Essentially, objectives cannot be changed.
سؤال
Objectives fall into four categories: schedule, cost, technology and policy.
سؤال
The final deliverable for the problem analysis phase is the completion of an updated project plan, including problem analyses, any system models, the system improvement objectives, and any other documentation that was produced during this phase.
سؤال
Interpersonal and communication skills are critical to the problem analysis phase.
سؤال
Interpersonal and communication skills are not essential to the problem analysis phase.
سؤال
One of three possible decisions are made at the end of the problem analysis phase: (1) authorize the project to continue to the next phase (requirements analysis); (2) adjust the scope, cost and/or schedule for the project, and then continue with the next phase (requirements analysis); OR (3) cancel the project due to either the lack of resources or the realization that the problems and opportunities are not simply as important as anticipated.
سؤال
The requirements analysis phase comes after the problem analysis phase and defines the business requirements for a new system.
سؤال
The requirements analysis phase comes directly after the scope definition phase and is used to specify the model for the existing system, as well as the business requirements for the new system.
سؤال
The requirements analysis phase answers the question, "What do the users need and want from a new system?"
سؤال
The requirements analysis phase answers the question, "Is this system worth looking at?"
سؤال
The final deliverable and milestone of the requirements analysis phase is the production of a business requirements statement that will fulfill the system improvement objectives identified in the prior phase.
سؤال
The requirements phase typically includes a task to update or refine the project plan.
سؤال
Security is an example of a functional requirement.
سؤال
A nonfunctional requirement is a description of other features, characteristics and constraints that define a satisfactory system.
سؤال
A nonfunctional requirement is a description of other features, characteristics and constraints that will make the system unsatisfactory.
سؤال
The deliverables of the requirements analysis phase are the draft functional and non-functional requirements.
سؤال
Use cases evolved out of object-oriented analysis but have become common in many other methodologies.
سؤال
Requirements are often documented with use cases.
سؤال
All desirable requirements should be included in version 1.0.
سؤال
Requirements analysis never really ends.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/161
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Systems Analysis
1
Systems analysis is a problem-solving technique that decomposes a system into its component pieces for the purpose of studying how well those component parts work and interact to accomplish their purpose.
True
2
Systems design is a complementary problem solving technique to systems analysis that reassembles a system's component pieces into a (hopefully improved) complete system.
True
3
Information systems analysis is defined as those development phases in a project that primarily focus on the business problem, independent of any technology that can or will be used to implement a solution to that problem.
True
4
A repository is a location (or set of locations) where systems analysts, systems designers and system builders keep the documentation associated with one or more systems or projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
5
Model driven analysis emphasizes the drawing of pictorial system models to document and validate both existing and/or proposed systems. Ultimately the system model becomes the blueprint for designing and constructing an improved system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
6
Model driven analysis emphasizes the development of application prototypes to quickly implement a new system without the need for requirements analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
7
Data Flow Diagrams (DFDs) can only be used to depict proposed new processes in a system, along with their inputs, outputs and files.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
8
CASE tools offer the advantage of consistency and completeness analysis as well as rule-based error checking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
9
Structured analysis is a traditional approach to system analysis and design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
10
Information engineering (IE) is a data-driven, process-centered, but model-sensitive technique to plan, analyze and design information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
11
Objected oriented analysis (OOA) is model-driven technique that integrates Data and Process concerns into constructs called Objects. OOA models are pictures that illustrate the system's objects from various perspectives such as structure and behavior.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
12
The Unified Modeling Language (UML) is used in information engineering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
13
Accelerated analysis approaches emphasize the construction of prototypes to more rapidly identify business and user requirements for a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
14
A prototype is a small-scale, incomplete, but working sample of a desired system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
15
Discovery prototyping is used to identify the user's business requirements by having them react to a quick and dirty implementation of those requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
16
Many analysts use parts of structured analysis and information engineering in a complementary way to model an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
17
Rapid architecture analysis attempts to derive system models from existing systems or discovery prototypes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
18
Reverse engineering technology reads the program code for an existing database, application program, and/or user interface and automatically generates the equivalent system model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
19
Requirements discovery is the process of identifying system problems and solution requirements from the user community.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
20
Analytical discovery includes those techniques to be used by a systems analyst to identify or extract system problems and solution requirements from the user community.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
21
Examples of fact-finding techniques include: sampling of existing documentation; research of relevant literature; observation of the current system; questionnaires and surveys of the management and user community; and interviews of appropriate managers, users, and technical staff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
22
Joint requirements planning (JRP) techniques use facilitated workshops to bring together all the system owners, system users, systems analysts and some systems designers and builders to jointly perform systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
23
Joint application development (JAD) is considered a part of Joint Requirements Planning (JRP), which is a more comprehensive application of the techniques to the entire system development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
24
Business process redesign is the application of systems analysis methods to the goal of dramatically changing and improving the fundamental business processes of an organization, independent of information technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
25
An agile method integrates various approaches of systems analysis and design..
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
26
BPR is often triggerd by total quality management and continuous process improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
27
Business process redesign is often applied within the context of information systems development when the projects include a study of existing business processes to identify problems, bureaucracy and inefficiencies that need to be addressed in requirements for new and improved information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
28
The purpose of a context diagram is to analyze how the system interacts with the world around it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
29
The scope definition phase is the first phase of the classic systems development process. It is also known as initial study phase, survey phase, or planning phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
30
The scope definition phase looks at the question "Is this project worth looking at?"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
31
The scope definition phase looks at the economic and operational feasibility of the project under consideration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
32
The final deliverable for the scope definition phases is the project charter..
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
33
A problem statements matrix lists each problem, opportunity, or directive related to the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
34
Scope defies the boundary of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
35
The final deliverable of the scope definition phase is a working prototype to demonstrate system requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
36
The scope definition phase typically includes the following tasks: (1) identify baseline problems and opportunities; (2) negotiate baseline scope; (3) assess baseline worthiness; (4) develop baseline schedule
& budget; (5) communicate the project plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
37
The first FAST phase is the problem analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
38
The PIECES framework can be used to categorize problems, opportunities, directives, and constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
39
During the scope definition phase, each problem, opportunity and directive is assessed with respect to urgency, visibility, tangible benefits and priority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
40
In the scope definition phase, urgency is used to represent what time frame the problem needs to be solved or the opportunity or directive to be realized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
41
In the scope definition phase, urgency is used to represent the prioritization and documentation requirements for the problem that needs to be solved, or the opportunity or directive to be realized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
42
In the scope definition phase, visibility is used to assess the degree to which a project solution is made visual through the use of modeling tools such as data flow diagrams or entity relationship diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
43
In the scope definition phase, benefits are measured in terms of how a new system could increase annual revenues, or reduce annual costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
44
In the scope definition phase, benefits need to be measured optimistically if the project is to be a success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
45
In the scope definition phase, a consensus of priorities is arrived at to help adjust the project scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
46
In the scope definition phase, possible solutions are expressed in simple terms to facilitate high level-discussion of options such as (a) leave well enough alone; (b) a quick fix; (c) a simple to moderate enhancement of the system; (d) redesign the existing system, or (e) design a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
47
In the scope definition phase, possible solutions need to be expressed in as much detail as possible so that an accurate picture of the feasibility of the project can be determined.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
48
Developing the baseline schedule and budget is the responsibility of the system owner.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
49
Scope can change during the life cycle of a project, however, the initial project plan needs to establish the preliminary scope to provide a context for the budget and schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
50
The preliminary master plan is also known as the baseline plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
51
A steering body is a committee of executive business and system managers that studies and prioritizes competing project proposals to determine which projects will return the most value to the organization and thus should be approved for continued system development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
52
The facilitator for the joint requirements planning process determines which projects will return the most value to the organization and thus should be approved for continued system development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
53
The problem analysis phase is best described by the statement, "Don't try to fix it unless you understand it."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
54
The goal of the problem analysis phase is to study and understand the problem domain well enough to thoroughly analyze its problems, opportunities and constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
55
The problem analysis phase typically includes the following tasks: (1) understand the problem domain;
(2) analyze problems and opportunities; (3) analyze business processes; (4) establish system improvement objectives; (5) update or refine the project plan; (6) communicate findings and recommendations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
56
The scope definition phase typically included the following tasks: (1) study the problem domain; (2) analyzed problems and opportunities; (3) analyze business processes; (4) establish system improvement objectives; (5) update the project plan; (6) present findings and recommendations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
57
The deliverables of the problem analysis phase include an understanding of the problem domain and business vocabulary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
58
Cause-and-effect analysis leads to true understanding of problems and can lead to not-so-obvious, but more creative and valuable solutions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
59
Cause-and-effect analysis is an out-of-date technique that is unnecessary today given the complete nature of the scope definition phase that makes such problems and their solutions obvious.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
60
An objective is a measure of success. It is something that you expect to achieve, if given sufficient resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
61
An objective is something that will limit your flexibility in defining a solution to your constraints. Essentially, objectives cannot be changed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
62
Objectives fall into four categories: schedule, cost, technology and policy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
63
The final deliverable for the problem analysis phase is the completion of an updated project plan, including problem analyses, any system models, the system improvement objectives, and any other documentation that was produced during this phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
64
Interpersonal and communication skills are critical to the problem analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
65
Interpersonal and communication skills are not essential to the problem analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
66
One of three possible decisions are made at the end of the problem analysis phase: (1) authorize the project to continue to the next phase (requirements analysis); (2) adjust the scope, cost and/or schedule for the project, and then continue with the next phase (requirements analysis); OR (3) cancel the project due to either the lack of resources or the realization that the problems and opportunities are not simply as important as anticipated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
67
The requirements analysis phase comes after the problem analysis phase and defines the business requirements for a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
68
The requirements analysis phase comes directly after the scope definition phase and is used to specify the model for the existing system, as well as the business requirements for the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
69
The requirements analysis phase answers the question, "What do the users need and want from a new system?"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
70
The requirements analysis phase answers the question, "Is this system worth looking at?"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
71
The final deliverable and milestone of the requirements analysis phase is the production of a business requirements statement that will fulfill the system improvement objectives identified in the prior phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
72
The requirements phase typically includes a task to update or refine the project plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
73
Security is an example of a functional requirement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
74
A nonfunctional requirement is a description of other features, characteristics and constraints that define a satisfactory system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
75
A nonfunctional requirement is a description of other features, characteristics and constraints that will make the system unsatisfactory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
76
The deliverables of the requirements analysis phase are the draft functional and non-functional requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
77
Use cases evolved out of object-oriented analysis but have become common in many other methodologies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
78
Requirements are often documented with use cases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
79
All desirable requirements should be included in version 1.0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
80
Requirements analysis never really ends.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 161 في هذه المجموعة.