Deck 3: Information Systems Development

ملء الشاشة (f)
exit full mode
سؤال
Increasingly, organizations adopt and follow a standardized systems development process.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Most information systems meet expectations and come in within budget.
سؤال
Organizations that develop software for the U.S. government must adhere to certain quality management requirements.
سؤال
The Capability Quality Model (CQM) is a framework to assess the quality level of an organization's information systems development and management processes and products.
سؤال
A system life cycle divides the life of an information system into two major stages: (1) systems development; and (2) systems operation and support. First you build it; then you use it, keep it running and support it.
سؤال
A systems development methodology is a formal approach to the system development process that defines a set of activities, methods, best practices, deliverables and automated tools for system developers and project managers to use to develop and maintain most or all information systems and software.
سؤال
The first principle of a systems development methodology is to get the system owners and system users involved.
سؤال
Some organizations develop their own system development methodologies.
سؤال
A problem could be a real problem, an opportunity for improvement or a directive from management.
سؤال
The number and scope of phases and activities in a methodology varies.
سؤال
All life cycle methodologies prescribe phases and activities.
سؤال
The final phase in most system development methodologies is documentation.
سؤال
Process management involves the scoping, planning, staffing, organizing, directing, and controlling a project to develop an information system.
سؤال
Project management ensures that an information system is developed at minimum cost, within a specific time frame, and with acceptable quality.
سؤال
Cost effectiveness is the result obtained by striking a balance between the lifetime costs of developing, maintaining, and operating an information system and the benefits derived from the system.
سؤال
A feasibility study is done to determine if a system development project is cost-effective. After that point, the project will not be cancelled.
سؤال
The first solution an analyst finds is usually the best solution. It is not cost effective to consider alternatives.
سؤال
Project management is defined as the result obtained by striking a balance between the cost of developing and operating information systems and the benefits derived from that system.
سؤال
Risk management is the process of identifying, evaluating and controlling what might go wrong in a project before it becomes a threat to the successful completion of the project or implementation of the information system.
سؤال
By dividing a larger problem (system) into more easily manage pieces (subsystems); the analyst can simplify the problem-solving process.
سؤال
According to best practices, it is important to consider the information system as a whole if one is going to get the best solution. Dividing it into smaller pieces is an obsolete way to design and develop the system.
سؤال
Information systems should be designed for growth and change. Where possible, flexibility and adaptability are important to the overall success and longevity of an information system.
سؤال
The sole focus of system development should be to meet today's user requirements. It is impossible to anticipate ways to meet future needs since they are unknown. It is better to develop the system as quickly as possible with the requirements that are known today.
سؤال
Problems are undesirable situations that prevent the organization from fully achieving its purpose, goals and/or objectives.
سؤال
Opportunities are chances to improve the organization in the absence of specific problems.
سؤال
A directive is a new requirement that's imposed by management, government or some external influence.
سؤال
FAST is a leading commercial methodology.
سؤال
Projects are always planned.
سؤال
A steering committee is comprised of system owners and IT managers who determine which requests and projects get approved and scheduled.
سؤال
Requests that are approved and placed on the schedule are considered to be backlogged because the resources are available to implement them.
سؤال
The scope definition phase must consider the question, "Is this project worth looking at?"
سؤال
Scope frequently changes during a project.
سؤال
Scope defines how big the project is or will be.
سؤال
Given the initial scope of the project, the analyst can staff the project team, estimate the budget for systems development and prepare a schedule for the remaining phases of development.
سؤال
The earliest that a systems analyst can project the staffing for a project, estimate its budget and prepare a schedule is during the requirements analysis phase.
سؤال
The problem analysis phase provides for a study and analysis of the requirements for the new system.
سؤال
The primary deliverable of the problem analysis phase is system improvement objectives. These objectives do not define inputs, outputs or processes. Instead, they define the business criteria on which any new system will be evaluated.
سؤال
System designers and system builders can frequently skip the requirements analysis phase because they have performed this step in the past and know what the users need.
سؤال
The decision analysis phase (1) identifies candidate solutions that fulfill system requirements, (2) analyzes those solutions for feasibility, and (3) recommends a candidate system as the target solution.
سؤال
The purpose for the decision analysis phase is to identify all of the decision-making situations potentially faced by management that must be addressed in the design and development of a new system.
سؤال
Technical feasibility is used to determine if a solution is technically feasible and if the staff has the technical expertise to design and build the solution.
سؤال
Operational feasibility is used to determine if the design team has the technical skills needed to actually get the proposed solution into operation.
سؤال
Economic feasibility is used to determine if a solution is cost-effective, which means that there is a favorable balance between the cost of developing the solution and the benefits derived from that solution.
سؤال
Schedule feasibility is used to determine if the performance of the proposed system will fit into the users' working schedules.
سؤال
Risk feasibility is the probability of a successful implementation using the chosen technology and approach.
سؤال
System support is the ongoing technical support for users, as well as the maintenance required to fix any errors, omissions or new requirements that may arise.
سؤال
System support is the operating system and technology architecture used in the design of the information system.
سؤال
Cross life cycle activities are activities that overlap many or all phases of the methodology.
سؤال
Fact-finding is the formal process of using research, interviews, meetings, questionnaires, sampling and other techniques to collect information about systems, requirements, and preferences.
سؤال
Documentation is the activity of recording facts and specifications for a system for current and future reference.
سؤال
Documentation is the formal process of using research, interviews, meetings, questionnaires, sampling and other techniques to collect information about systems, requirements and preferences.
سؤال
Presentation is the activity of communicating findings, recommendations, and documentation for review by interested users and managers. It may be written or verbal.
سؤال
A repository is a database or other filing mechanism where system developers store all documentation, knowledge, and products for one or more information systems or projects.
سؤال
Feasibility is a measure of how beneficial the development of an information system would be to an organization.
سؤال
A repository is a measure of how beneficial the development of an information system would be to an organization.
سؤال
An iterative development methodology is often called a waterfall development approach.
سؤال
Process management is an ongoing activity that documents, manages the use of, and improves an organization's chosen methodology for systems development. It is concerned with the activities, deliverables, and quality standards to be applied to all projects.
سؤال
Project management is the activity of defining, planning, directing, monitoring and controlling a project to develop an acceptable system within the allotted time and budget.
سؤال
Project management is an ongoing activity that documents, manages the use of, and improves an organization's chosen methodology for systems development. It is concerned with the activities, deliverables, and quality standards to be applied to all projects.
سؤال
A logical model does not include implementation details.
سؤال
The sequential development approach has lost favor with most system developers..
سؤال
Timeboxing is the imposition of a nonextendable period of time, usually 6 to 9 days.
سؤال
Data modeling is a process-centered technique popularized .by the structured analysis and design methodology.
سؤال
Time-boxing fits with the iterative approach.
سؤال
An advantage of the model-driven approach is that it makes it easier to identify, conceptualize, and analyze alternative technical solutions.
سؤال
Object-oriented analysis and design attempts to merge the data and process concerns into singular constructs called objects. A system is documented in terms of its objects and their interactions.
سؤال
Object-oriented analysis and design is an object-centered, data-sensitive technique used to model business requirements in terms of objects and entities using entity relationship diagrams to prototype an information system.
سؤال
Commercial off-the-shelf software is a software package or solution that is purchased to support one or more business functions and information systems.
سؤال
An enterprise resource planning (ERP) software product is a fully integrated collection of information systems that span most basic business functions required by a major corporation.
سؤال
When using a COTS solution a gap analysis is often performed.
سؤال
Computer aided systems engineering (CASE) tools are software programs that automate or support the drawing and analysis of system models and provide for the translation of system models into application programs.
سؤال
Forward engineering allows a CASE tool to read existing program code and transform that code into a representative system model that can be edited and refined by the systems analyst.
سؤال
Reverse engineering requires the systems analyst to draw system models, either from scratch or from templates. The resulting models are subsequently transformed into program code.
سؤال
Which of the following is NOT one of the principles of Systems Development?

A) Use a problem-solving approach
B) Divide and conquer
C) Establish phases and activities
D) Establish standards for consistent development and documentation
E) Leave the users alone until you have a product they can use.
سؤال
RAD stands for:

A) Readily available deliveries
B) Rapid Application Data
C) Rapid Application Development
D) Real Analogy Data
E) None of these
سؤال
Which one is NOT an ongoing activity of systems support?

A) Assisting users
B) Continuing analysis of the system
C) Recovering the system
D) Fixing software bugs
E) Adapting the system to new requirements
سؤال
Which one is NOT one of the common facilities of CASE tools?

A) diagramming tools
B) dictionary tools
C) quality management tools
D) application development environment (ADE) tools
E) testing tools
سؤال
The definition of feasibility is:

A) An ongoing activity by which an analyst plans an acceptable system
B) Measure of how beneficial the development of an information system would be to an organization
C) An activity of measuring and analyzing developer productivity
D) An activity of approximating the time, effort, costs, and benefits of developing systems.
E) None of these
سؤال
The first CMM level at which consistent project management is practiced is:

A) Level 1
B) Level 2
C) Level 3
D) Level 4
E) Level 5
سؤال
Which of the following accurately identifies the categories of problems represented by the PIECES framework?

A) Performance, information, economics, control, efficiency, and service
B) Performance, information, economics, cost, efficiency and security
C) Performance, information, efficiency, costs, effectiveness, and services
D) Performance, information, economy, control, efficiency, and security
E) People, information, economy, costs, efficiency, and service
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/113
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: Information Systems Development
1
Increasingly, organizations adopt and follow a standardized systems development process.
True
2
Most information systems meet expectations and come in within budget.
False
3
Organizations that develop software for the U.S. government must adhere to certain quality management requirements.
True
4
The Capability Quality Model (CQM) is a framework to assess the quality level of an organization's information systems development and management processes and products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
5
A system life cycle divides the life of an information system into two major stages: (1) systems development; and (2) systems operation and support. First you build it; then you use it, keep it running and support it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
6
A systems development methodology is a formal approach to the system development process that defines a set of activities, methods, best practices, deliverables and automated tools for system developers and project managers to use to develop and maintain most or all information systems and software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
7
The first principle of a systems development methodology is to get the system owners and system users involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
8
Some organizations develop their own system development methodologies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
9
A problem could be a real problem, an opportunity for improvement or a directive from management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
10
The number and scope of phases and activities in a methodology varies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
11
All life cycle methodologies prescribe phases and activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
12
The final phase in most system development methodologies is documentation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
13
Process management involves the scoping, planning, staffing, organizing, directing, and controlling a project to develop an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
14
Project management ensures that an information system is developed at minimum cost, within a specific time frame, and with acceptable quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
15
Cost effectiveness is the result obtained by striking a balance between the lifetime costs of developing, maintaining, and operating an information system and the benefits derived from the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
16
A feasibility study is done to determine if a system development project is cost-effective. After that point, the project will not be cancelled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
17
The first solution an analyst finds is usually the best solution. It is not cost effective to consider alternatives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
18
Project management is defined as the result obtained by striking a balance between the cost of developing and operating information systems and the benefits derived from that system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
19
Risk management is the process of identifying, evaluating and controlling what might go wrong in a project before it becomes a threat to the successful completion of the project or implementation of the information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
20
By dividing a larger problem (system) into more easily manage pieces (subsystems); the analyst can simplify the problem-solving process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
21
According to best practices, it is important to consider the information system as a whole if one is going to get the best solution. Dividing it into smaller pieces is an obsolete way to design and develop the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
22
Information systems should be designed for growth and change. Where possible, flexibility and adaptability are important to the overall success and longevity of an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
23
The sole focus of system development should be to meet today's user requirements. It is impossible to anticipate ways to meet future needs since they are unknown. It is better to develop the system as quickly as possible with the requirements that are known today.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
24
Problems are undesirable situations that prevent the organization from fully achieving its purpose, goals and/or objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
25
Opportunities are chances to improve the organization in the absence of specific problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
26
A directive is a new requirement that's imposed by management, government or some external influence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
27
FAST is a leading commercial methodology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
28
Projects are always planned.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
29
A steering committee is comprised of system owners and IT managers who determine which requests and projects get approved and scheduled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
30
Requests that are approved and placed on the schedule are considered to be backlogged because the resources are available to implement them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
31
The scope definition phase must consider the question, "Is this project worth looking at?"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
32
Scope frequently changes during a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
33
Scope defines how big the project is or will be.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
34
Given the initial scope of the project, the analyst can staff the project team, estimate the budget for systems development and prepare a schedule for the remaining phases of development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
35
The earliest that a systems analyst can project the staffing for a project, estimate its budget and prepare a schedule is during the requirements analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
36
The problem analysis phase provides for a study and analysis of the requirements for the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
37
The primary deliverable of the problem analysis phase is system improvement objectives. These objectives do not define inputs, outputs or processes. Instead, they define the business criteria on which any new system will be evaluated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
38
System designers and system builders can frequently skip the requirements analysis phase because they have performed this step in the past and know what the users need.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
39
The decision analysis phase (1) identifies candidate solutions that fulfill system requirements, (2) analyzes those solutions for feasibility, and (3) recommends a candidate system as the target solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
40
The purpose for the decision analysis phase is to identify all of the decision-making situations potentially faced by management that must be addressed in the design and development of a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
41
Technical feasibility is used to determine if a solution is technically feasible and if the staff has the technical expertise to design and build the solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
42
Operational feasibility is used to determine if the design team has the technical skills needed to actually get the proposed solution into operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
43
Economic feasibility is used to determine if a solution is cost-effective, which means that there is a favorable balance between the cost of developing the solution and the benefits derived from that solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
44
Schedule feasibility is used to determine if the performance of the proposed system will fit into the users' working schedules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
45
Risk feasibility is the probability of a successful implementation using the chosen technology and approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
46
System support is the ongoing technical support for users, as well as the maintenance required to fix any errors, omissions or new requirements that may arise.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
47
System support is the operating system and technology architecture used in the design of the information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
48
Cross life cycle activities are activities that overlap many or all phases of the methodology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
49
Fact-finding is the formal process of using research, interviews, meetings, questionnaires, sampling and other techniques to collect information about systems, requirements, and preferences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
50
Documentation is the activity of recording facts and specifications for a system for current and future reference.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
51
Documentation is the formal process of using research, interviews, meetings, questionnaires, sampling and other techniques to collect information about systems, requirements and preferences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
52
Presentation is the activity of communicating findings, recommendations, and documentation for review by interested users and managers. It may be written or verbal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
53
A repository is a database or other filing mechanism where system developers store all documentation, knowledge, and products for one or more information systems or projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
54
Feasibility is a measure of how beneficial the development of an information system would be to an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
55
A repository is a measure of how beneficial the development of an information system would be to an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
56
An iterative development methodology is often called a waterfall development approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
57
Process management is an ongoing activity that documents, manages the use of, and improves an organization's chosen methodology for systems development. It is concerned with the activities, deliverables, and quality standards to be applied to all projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
58
Project management is the activity of defining, planning, directing, monitoring and controlling a project to develop an acceptable system within the allotted time and budget.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
59
Project management is an ongoing activity that documents, manages the use of, and improves an organization's chosen methodology for systems development. It is concerned with the activities, deliverables, and quality standards to be applied to all projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
60
A logical model does not include implementation details.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
61
The sequential development approach has lost favor with most system developers..
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
62
Timeboxing is the imposition of a nonextendable period of time, usually 6 to 9 days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
63
Data modeling is a process-centered technique popularized .by the structured analysis and design methodology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
64
Time-boxing fits with the iterative approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
65
An advantage of the model-driven approach is that it makes it easier to identify, conceptualize, and analyze alternative technical solutions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
66
Object-oriented analysis and design attempts to merge the data and process concerns into singular constructs called objects. A system is documented in terms of its objects and their interactions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
67
Object-oriented analysis and design is an object-centered, data-sensitive technique used to model business requirements in terms of objects and entities using entity relationship diagrams to prototype an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
68
Commercial off-the-shelf software is a software package or solution that is purchased to support one or more business functions and information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
69
An enterprise resource planning (ERP) software product is a fully integrated collection of information systems that span most basic business functions required by a major corporation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
70
When using a COTS solution a gap analysis is often performed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
71
Computer aided systems engineering (CASE) tools are software programs that automate or support the drawing and analysis of system models and provide for the translation of system models into application programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
72
Forward engineering allows a CASE tool to read existing program code and transform that code into a representative system model that can be edited and refined by the systems analyst.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
73
Reverse engineering requires the systems analyst to draw system models, either from scratch or from templates. The resulting models are subsequently transformed into program code.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following is NOT one of the principles of Systems Development?

A) Use a problem-solving approach
B) Divide and conquer
C) Establish phases and activities
D) Establish standards for consistent development and documentation
E) Leave the users alone until you have a product they can use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
75
RAD stands for:

A) Readily available deliveries
B) Rapid Application Data
C) Rapid Application Development
D) Real Analogy Data
E) None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
76
Which one is NOT an ongoing activity of systems support?

A) Assisting users
B) Continuing analysis of the system
C) Recovering the system
D) Fixing software bugs
E) Adapting the system to new requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which one is NOT one of the common facilities of CASE tools?

A) diagramming tools
B) dictionary tools
C) quality management tools
D) application development environment (ADE) tools
E) testing tools
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
78
The definition of feasibility is:

A) An ongoing activity by which an analyst plans an acceptable system
B) Measure of how beneficial the development of an information system would be to an organization
C) An activity of measuring and analyzing developer productivity
D) An activity of approximating the time, effort, costs, and benefits of developing systems.
E) None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
79
The first CMM level at which consistent project management is practiced is:

A) Level 1
B) Level 2
C) Level 3
D) Level 4
E) Level 5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
80
Which of the following accurately identifies the categories of problems represented by the PIECES framework?

A) Performance, information, economics, control, efficiency, and service
B) Performance, information, economics, cost, efficiency and security
C) Performance, information, efficiency, costs, effectiveness, and services
D) Performance, information, economy, control, efficiency, and security
E) People, information, economy, costs, efficiency, and service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 113 في هذه المجموعة.