Deck 10: Systems Development

ملء الشاشة (f)
exit full mode
سؤال
Systems development efforts refer to large undertakings. Smaller projects are not classified as systems development.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Activities in a later phase of the SDLC may uncover a need to change the results of previous steps.
سؤال
If an organization uses the SDLC steps, systems development efforts cannot fail.
سؤال
The programmer takes the plans from the systems analyst and builds or modifies the necessary hardware.
سؤال
Organizations may start a systems development project for many reasons, including problems with the existing system, mergers, competition, and even pressure from government agencies.
سؤال
Many systems are developed simply because someone in the organization comes up with a good idea.
سؤال
Google Phone is a service that allows users to manage their phone lines in a whole new way.
سؤال
Questioning users about their needs and being skeptical and doubtful about initial responses can result in better systems and more accurate predictions of how those systems will work.
سؤال
Systems development projects often originate because new technologies provide new opportunities.
سؤال
Flowcharts can display only a small amount of detail.
سؤال
Both PERT and Gantt techniques can be automated using project management software, such as Microsoft Project and Open Workbench.
سؤال
Many organizations hire an outside consulting firm that specializes in systems development to perform some or all of their computer and information systems development activities.
سؤال
Much of U.S. outsourcing is being provided from developed countries where the work can be done by more educated personnel.
سؤال
OO development follows a defined system development life cycle, much like the SDLC.
سؤال
The primary result of systems analysis is a completed system redesign.
سؤال
Data collected in its raw form is usually adequate to determine the effectiveness and efficiency of an existing system.
سؤال
Systems design results in a new or modified system, and thus results in change.
سؤال
A request for bid asks an IT vendor to provide information about its products or services.
سؤال
Maintenance can involve all aspects of a system, including hardware, software, databases, telecommunications, personnel, and other system components.
سؤال
System maintenance often involves comparing the expected performance and benefits of the system as it was designed with the actual performance and benefits of the system in operation.
سؤال
Systems design and review involve modifying an existing system or developing a new one and placing it into operation. _________________________
سؤال
A systems analyst is a professional who specializes in analyzing and designing systems. _________________________
سؤال
In the wake of financial scandals, for example, the U.S. government instituted corporate financial reporting rules under the Sarbanes-Oakley Act. _________________________
سؤال
Critical analysis means being skeptical and doubtful, and requires questioning whether the current system is still effective and efficient. _________________________
سؤال
End-user systems development is the development of information systems by individuals outside of the formal information systems planning and departmental structure. _________________________
سؤال
When there are a large number of branches or paths within a software program, decision lists are particularly useful. _________________________
سؤال
A Gantt chart is essentially a(n) grid that lists activities and deadlines. _________________________
سؤال
A prominent example of a(n) object-oriented technique for systems development is prototyping. _________________________
سؤال
Systems implementation starts by clarifying the overall goals of the individual or organization and determining how the existing or proposed information system helps meet these goals. _________________________
سؤال
Data analysis involves identifying and locating the various sources of data. _________________________
سؤال
The purpose of systems design is to select and plan a system that meets the requirements defined in the reporting analysis. _________________________
سؤال
A request for quotes asks the vendor to give prices for its products or services. _________________________
سؤال
A user proposal document is a formal agreement signed by the user that approves a phase of the installation or the complete system. _________________________
سؤال
Systems maintenance involves checking, changing, and enhancing the system to make it more useful in achieving user and organizational goals. _________________________
سؤال
Systems review, the final phase of the systems development life cycle, is the process of analyzing systems to make sure that they are operating as intended. _________________________
سؤال
The systems development process is a(n) ____ activity.

A) ongoing
B) cyclic
C) both a. and b.
D) neither a. nor b.
سؤال
<strong>   -The accompanying figure illustrates the systems ____ life cycle.</strong> A) hierarchy B) development C) management D) integration <div style=padding-top: 35px>

-The accompanying figure illustrates the systems ____ life cycle.

A) hierarchy
B) development
C) management
D) integration
سؤال
<strong>   -Referring to the accompanying figure, if the system needs significant improvement beyond the scope of maintenance, ____.</strong> A) a new systems development project is initiated B) system development efforts move back to a previous phase C) system development efforts move forward to a future phase D) system development efforts are abandoned completely <div style=padding-top: 35px>

-Referring to the accompanying figure, if the system needs significant improvement beyond the scope of maintenance, ____.

A) a new systems development project is initiated
B) system development efforts move back to a previous phase
C) system development efforts move forward to a future phase
D) system development efforts are abandoned completely
سؤال
Systems ____ and analysis look at an existing system and determine if the existing system can and should be improved.

A) investigation
B) design
C) design.
D) implementation
سؤال
At each step of the SDLC, there are checkpoints to determine ____.

A) if the step has been successfully completed
B) if additional work is needed
C) if the systems development process should continue
D) all of the above
سؤال
A 2009 study found that over a one-year period only ____ percent of IT projects were considered successful.

A) 32
B) 42
C) 52
D) 62
سؤال
____ are individuals who will be interacting with the system on a regular basis.

A) Managers
B) Users
C) Programmers
D) Analysts
سؤال
____ are people within an organization most capable of initiating and maintaining change.

A) Managers
B) Users
C) Programmers
D) Analysts
سؤال
A project ____ is the individual in charge of the systems development effort. This person coordinates all aspects of the systems development effort and is responsible for its success.

A) leader
B) coordinator
C) assistant
D) architect
سؤال
Like an architect developing blueprints for a new building, a systems ____ develops detailed plans for the new or modified system.

A) programmer
B) manager
C) analyst
D) coordinator
سؤال
The software ____, sometimes called a computer programmer, is responsible for modifying existing programs or developing new programs to satisfy user requirements.

A) user
B) manager
C) security manager
D) engineer
سؤال
Computer systems management can include the ____ and other computer and information systems executives.

A) CIO
B) CFO
C) CEO
D) CMO
سؤال
The systems ____ process often begins with gathering information on users' needs.

A) development
B) implementation
C) maintenance
D) analysis
سؤال
Systems development tools most often used include ____ tools, flowcharts, decision tables, project management software, prototyping, outsourcing, and object-oriented systems development.

A) CASE
B) CAD
C) CAT
D) CAPE
سؤال
The iPhone software ____ kit is freely available for download to anyone who wants to develop an iPhone app, and many are taking advantage of it.

A) testing
B) development
C) security
D) licensing
سؤال
Software ____, a formal way of conducting systems development, typically employs systems development software commonly referred to as CASE tools.

A) engineering
B) analysis
C) testing
D) quality control
سؤال
To help address coordination problems, CASE tools allow more than one person to work on the same system at the same time via a ____ interface, which coordinates and integrates the work of all team members.

A) multiuser
B) single user
C) protected
D) proprietary
سؤال
Flowcharts use ____ to show the logical relationships between system components.

A) logos
B) symbols
C) text
D) tables
سؤال
When developing a system, a flowchart is used to describe the overall purpose and structure of the system. This is usually called the ____ flowchart.

A) system
B) application
C) either a. or b.
D) neither a. nor b.
سؤال
Detailed flowcharts, called ____ flowcharts, are needed to reveal how each software program is to be developed.

A) program
B) user
C) requirement
D) implementation
سؤال
A decision ____ can be used as an alternative to or in conjunction with flowcharts.

A) grid
B) table
C) list
D) worksheet
سؤال
Project management software helps people determine the best way to reduce project completion time at the least cost. Reducing project completion time is called project ____.

A) cashing
B) crashing
C) zooming
D) zipping
سؤال
____ occurs when a business uses an outside company to take over portions of its workload.

A) Offshoring
B) Outsourcing
C) Globalizing
D) Project management
سؤال
____ is when, instead of hiring programmers, a company holds a competition for the best code.

A) Outsourcing
B) Insourcing
C) Crowdsourcing
D) Mobsourcing
سؤال
The object-oriented approach views components of an information system as objects, each object with attributes (____).

A) characteristics
B) actions
C) problems
D) solutions
سؤال
The object-oriented views components of an information system as objects, each object with methods (____).

A) characteristics
B) actions
C) problems
D) solutions
سؤال
____ cases, how people interact with the system, are often examined to define the objects in a system.

A) Media
B) Use
C) Help
D) Outcome
سؤال
The overall purpose of systems ____ is to determine whether or not the objectives met by an existing system are satisfying the goals of the organization.

A) maintenance
B) analysis
C) investigation
D) implementation
سؤال
<strong>   -Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational charts, procedure manuals, and stakeholders are examples of ____ sources.</strong> A) external B) internal C) both a. and b. D) neither a. nor b. <div style=padding-top: 35px>

-Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational charts, procedure manuals, and stakeholders are examples of ____ sources.

A) external
B) internal
C) both a. and b.
D) neither a. nor b.
سؤال
<strong>   -Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational customers, suppliers, and stockholders are examples of ____ sources.</strong> A) external B) internal C) both a. and b. D) neither a. nor b. <div style=padding-top: 35px>

-Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational customers, suppliers, and stockholders are examples of ____ sources.

A) external
B) internal
C) both a. and b.
D) neither a. nor b.
سؤال
<strong>   -Referring to the accompanying figure, there are a number of data collection tools and techniques. Telephone calls, simulations of actual events and activities, and random samples of data are examples of ____.</strong> A) other data collection methods B) the questionnaire method C) the output method D) the direct observation method <div style=padding-top: 35px>

-Referring to the accompanying figure, there are a number of data collection tools and techniques. Telephone calls, simulations of actual events and activities, and random samples of data are examples of ____.

A) other data collection methods
B) the questionnaire method
C) the output method
D) the direct observation method
سؤال
____ feasibility determines whether or not hardware, software, and other system components can be acquired or developed.

A) Operational
B) Technical
C) Legal
D) Economic
سؤال
____ feasibility determines if a project makes financial sense.

A) Operational
B) Technical
C) Legal
D) Economic
سؤال
____ feasibility determines whether laws or regulations may prevent or limit a systems development project.

A) Operational
B) Technical
C) Legal
D) Schedule
سؤال
____ feasibility measures whether or not a project can be put into action or operation.

A) Operational
B) Technical
C) Legal
D) Schedule
سؤال
____ feasibility determines if a project can be completed in a reasonable amount of time.

A) Operational
B) Technical
C) Legal
D) Schedule
سؤال
Systems analysis attempts to answer the question "What must the information system do to ____ the problem?"

A) solve
B) help
C) delay
D) identify
سؤال
The purpose of data collection is to seek additional information about the problems or needs identified during systems ____.

A) implementation
B) analysis
C) investigation
D) maintenance
سؤال
In a(n) ____ interview, questions are written in advance.

A) structured
B) unstructured
C) both a. and b.
D) neither a. nor b.
سؤال
In a(n) ____ interview, the questions are not written in advance.

A) structured
B) unstructured
C) both a. and b.
D) neither a. nor b.
سؤال
____ observation is when one or more members of the analysis team directly observe the existing system in action.

A) Direct
B) Indirect
C) Output
D) Input
سؤال
____ from the existing system, both manual and computerized, are obtained during data collection.

A) Outputs
B) Samples
C) Reports
D) Questionnaires
سؤال
Questionnaires are ____.

A) structured
B) unstructured
C) either a. or b.
D) neither a. nor b.
سؤال
Questions that should be asked during ____ analysis include the following: "Are these stakeholders satisfied with the current accounts payable application?" and "What improvements could be made to satisfy suppliers and help the purchasing department?"

A) implementation
B) requirements
C) data
D) output
سؤال
The ____ method of capturing system requirements is when some or all users and stakeholders are asked what they want and expect from a new or modified system.

A) direct questions
B) critical success factors
C) Joint application development
D) Rapid application development
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/148
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Systems Development
1
Systems development efforts refer to large undertakings. Smaller projects are not classified as systems development.
False
2
Activities in a later phase of the SDLC may uncover a need to change the results of previous steps.
True
3
If an organization uses the SDLC steps, systems development efforts cannot fail.
False
4
The programmer takes the plans from the systems analyst and builds or modifies the necessary hardware.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
5
Organizations may start a systems development project for many reasons, including problems with the existing system, mergers, competition, and even pressure from government agencies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
6
Many systems are developed simply because someone in the organization comes up with a good idea.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
7
Google Phone is a service that allows users to manage their phone lines in a whole new way.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
8
Questioning users about their needs and being skeptical and doubtful about initial responses can result in better systems and more accurate predictions of how those systems will work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
9
Systems development projects often originate because new technologies provide new opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
10
Flowcharts can display only a small amount of detail.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
11
Both PERT and Gantt techniques can be automated using project management software, such as Microsoft Project and Open Workbench.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
12
Many organizations hire an outside consulting firm that specializes in systems development to perform some or all of their computer and information systems development activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
13
Much of U.S. outsourcing is being provided from developed countries where the work can be done by more educated personnel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
14
OO development follows a defined system development life cycle, much like the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
15
The primary result of systems analysis is a completed system redesign.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
16
Data collected in its raw form is usually adequate to determine the effectiveness and efficiency of an existing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
17
Systems design results in a new or modified system, and thus results in change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
18
A request for bid asks an IT vendor to provide information about its products or services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
19
Maintenance can involve all aspects of a system, including hardware, software, databases, telecommunications, personnel, and other system components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
20
System maintenance often involves comparing the expected performance and benefits of the system as it was designed with the actual performance and benefits of the system in operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
21
Systems design and review involve modifying an existing system or developing a new one and placing it into operation. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
22
A systems analyst is a professional who specializes in analyzing and designing systems. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the wake of financial scandals, for example, the U.S. government instituted corporate financial reporting rules under the Sarbanes-Oakley Act. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
24
Critical analysis means being skeptical and doubtful, and requires questioning whether the current system is still effective and efficient. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
25
End-user systems development is the development of information systems by individuals outside of the formal information systems planning and departmental structure. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
26
When there are a large number of branches or paths within a software program, decision lists are particularly useful. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
27
A Gantt chart is essentially a(n) grid that lists activities and deadlines. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
28
A prominent example of a(n) object-oriented technique for systems development is prototyping. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
29
Systems implementation starts by clarifying the overall goals of the individual or organization and determining how the existing or proposed information system helps meet these goals. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
30
Data analysis involves identifying and locating the various sources of data. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
31
The purpose of systems design is to select and plan a system that meets the requirements defined in the reporting analysis. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
32
A request for quotes asks the vendor to give prices for its products or services. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
33
A user proposal document is a formal agreement signed by the user that approves a phase of the installation or the complete system. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
34
Systems maintenance involves checking, changing, and enhancing the system to make it more useful in achieving user and organizational goals. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
35
Systems review, the final phase of the systems development life cycle, is the process of analyzing systems to make sure that they are operating as intended. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
36
The systems development process is a(n) ____ activity.

A) ongoing
B) cyclic
C) both a. and b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
37
<strong>   -The accompanying figure illustrates the systems ____ life cycle.</strong> A) hierarchy B) development C) management D) integration

-The accompanying figure illustrates the systems ____ life cycle.

A) hierarchy
B) development
C) management
D) integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
38
<strong>   -Referring to the accompanying figure, if the system needs significant improvement beyond the scope of maintenance, ____.</strong> A) a new systems development project is initiated B) system development efforts move back to a previous phase C) system development efforts move forward to a future phase D) system development efforts are abandoned completely

-Referring to the accompanying figure, if the system needs significant improvement beyond the scope of maintenance, ____.

A) a new systems development project is initiated
B) system development efforts move back to a previous phase
C) system development efforts move forward to a future phase
D) system development efforts are abandoned completely
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
39
Systems ____ and analysis look at an existing system and determine if the existing system can and should be improved.

A) investigation
B) design
C) design.
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
40
At each step of the SDLC, there are checkpoints to determine ____.

A) if the step has been successfully completed
B) if additional work is needed
C) if the systems development process should continue
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
41
A 2009 study found that over a one-year period only ____ percent of IT projects were considered successful.

A) 32
B) 42
C) 52
D) 62
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
42
____ are individuals who will be interacting with the system on a regular basis.

A) Managers
B) Users
C) Programmers
D) Analysts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
43
____ are people within an organization most capable of initiating and maintaining change.

A) Managers
B) Users
C) Programmers
D) Analysts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
44
A project ____ is the individual in charge of the systems development effort. This person coordinates all aspects of the systems development effort and is responsible for its success.

A) leader
B) coordinator
C) assistant
D) architect
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
45
Like an architect developing blueprints for a new building, a systems ____ develops detailed plans for the new or modified system.

A) programmer
B) manager
C) analyst
D) coordinator
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
46
The software ____, sometimes called a computer programmer, is responsible for modifying existing programs or developing new programs to satisfy user requirements.

A) user
B) manager
C) security manager
D) engineer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
47
Computer systems management can include the ____ and other computer and information systems executives.

A) CIO
B) CFO
C) CEO
D) CMO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
48
The systems ____ process often begins with gathering information on users' needs.

A) development
B) implementation
C) maintenance
D) analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
49
Systems development tools most often used include ____ tools, flowcharts, decision tables, project management software, prototyping, outsourcing, and object-oriented systems development.

A) CASE
B) CAD
C) CAT
D) CAPE
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
50
The iPhone software ____ kit is freely available for download to anyone who wants to develop an iPhone app, and many are taking advantage of it.

A) testing
B) development
C) security
D) licensing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
51
Software ____, a formal way of conducting systems development, typically employs systems development software commonly referred to as CASE tools.

A) engineering
B) analysis
C) testing
D) quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
52
To help address coordination problems, CASE tools allow more than one person to work on the same system at the same time via a ____ interface, which coordinates and integrates the work of all team members.

A) multiuser
B) single user
C) protected
D) proprietary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
53
Flowcharts use ____ to show the logical relationships between system components.

A) logos
B) symbols
C) text
D) tables
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
54
When developing a system, a flowchart is used to describe the overall purpose and structure of the system. This is usually called the ____ flowchart.

A) system
B) application
C) either a. or b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
55
Detailed flowcharts, called ____ flowcharts, are needed to reveal how each software program is to be developed.

A) program
B) user
C) requirement
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
56
A decision ____ can be used as an alternative to or in conjunction with flowcharts.

A) grid
B) table
C) list
D) worksheet
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
57
Project management software helps people determine the best way to reduce project completion time at the least cost. Reducing project completion time is called project ____.

A) cashing
B) crashing
C) zooming
D) zipping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
58
____ occurs when a business uses an outside company to take over portions of its workload.

A) Offshoring
B) Outsourcing
C) Globalizing
D) Project management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
59
____ is when, instead of hiring programmers, a company holds a competition for the best code.

A) Outsourcing
B) Insourcing
C) Crowdsourcing
D) Mobsourcing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
60
The object-oriented approach views components of an information system as objects, each object with attributes (____).

A) characteristics
B) actions
C) problems
D) solutions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
61
The object-oriented views components of an information system as objects, each object with methods (____).

A) characteristics
B) actions
C) problems
D) solutions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
62
____ cases, how people interact with the system, are often examined to define the objects in a system.

A) Media
B) Use
C) Help
D) Outcome
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
63
The overall purpose of systems ____ is to determine whether or not the objectives met by an existing system are satisfying the goals of the organization.

A) maintenance
B) analysis
C) investigation
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
64
<strong>   -Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational charts, procedure manuals, and stakeholders are examples of ____ sources.</strong> A) external B) internal C) both a. and b. D) neither a. nor b.

-Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational charts, procedure manuals, and stakeholders are examples of ____ sources.

A) external
B) internal
C) both a. and b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
65
<strong>   -Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational customers, suppliers, and stockholders are examples of ____ sources.</strong> A) external B) internal C) both a. and b. D) neither a. nor b.

-Referring to the accompanying figure, the first step in data collection is identifying data sources. Organizational customers, suppliers, and stockholders are examples of ____ sources.

A) external
B) internal
C) both a. and b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
66
<strong>   -Referring to the accompanying figure, there are a number of data collection tools and techniques. Telephone calls, simulations of actual events and activities, and random samples of data are examples of ____.</strong> A) other data collection methods B) the questionnaire method C) the output method D) the direct observation method

-Referring to the accompanying figure, there are a number of data collection tools and techniques. Telephone calls, simulations of actual events and activities, and random samples of data are examples of ____.

A) other data collection methods
B) the questionnaire method
C) the output method
D) the direct observation method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
67
____ feasibility determines whether or not hardware, software, and other system components can be acquired or developed.

A) Operational
B) Technical
C) Legal
D) Economic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
68
____ feasibility determines if a project makes financial sense.

A) Operational
B) Technical
C) Legal
D) Economic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
69
____ feasibility determines whether laws or regulations may prevent or limit a systems development project.

A) Operational
B) Technical
C) Legal
D) Schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
70
____ feasibility measures whether or not a project can be put into action or operation.

A) Operational
B) Technical
C) Legal
D) Schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
71
____ feasibility determines if a project can be completed in a reasonable amount of time.

A) Operational
B) Technical
C) Legal
D) Schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
72
Systems analysis attempts to answer the question "What must the information system do to ____ the problem?"

A) solve
B) help
C) delay
D) identify
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
73
The purpose of data collection is to seek additional information about the problems or needs identified during systems ____.

A) implementation
B) analysis
C) investigation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
74
In a(n) ____ interview, questions are written in advance.

A) structured
B) unstructured
C) both a. and b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
75
In a(n) ____ interview, the questions are not written in advance.

A) structured
B) unstructured
C) both a. and b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
76
____ observation is when one or more members of the analysis team directly observe the existing system in action.

A) Direct
B) Indirect
C) Output
D) Input
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
77
____ from the existing system, both manual and computerized, are obtained during data collection.

A) Outputs
B) Samples
C) Reports
D) Questionnaires
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
78
Questionnaires are ____.

A) structured
B) unstructured
C) either a. or b.
D) neither a. nor b.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
79
Questions that should be asked during ____ analysis include the following: "Are these stakeholders satisfied with the current accounts payable application?" and "What improvements could be made to satisfy suppliers and help the purchasing department?"

A) implementation
B) requirements
C) data
D) output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
80
The ____ method of capturing system requirements is when some or all users and stakeholders are asked what they want and expect from a new or modified system.

A) direct questions
B) critical success factors
C) Joint application development
D) Rapid application development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 148 في هذه المجموعة.