Deck 5: Systems Development and Program Change Activities

ملء الشاشة (f)
exit full mode
سؤال
Intangible benefits are not physical, but can be measured and expressed in financial terms.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Programs in their compiled state are very susceptible to the threat of unauthorized modification.
سؤال
Recurring costs include: hardware maintenance, software acquisition, software maintenance, insurance, supplies and personnel costs.
سؤال
All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.
سؤال
A tangible benefit can be measured and expressed in financial terms.
سؤال
Instead of implementing an application in a single big-bang release, modern systems are delivered in parts continuously and quickly
سؤال
Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities
سؤال
When determining the operational feasibility of a new system, the expected ease of transition from the old system to the new system should be considered.
سؤال
Maintenance access to systems increases the risk that logic will be corrupted either by the accident or intent to defraud.
سؤال
When preparing a cost-benefit analysis, design costs incurred in the systems planning, systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.
سؤال
Source program library controls should prevent and detect unauthorized access to application programs.
سؤال
An accountant's responsibility in the SDLC is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.
سؤال
The objective of systems planning is to link systems projects to the strategic objectives of the firm.
سؤال
One-time costs include operating and maintenance costs.
سؤال
During the detailed feasibility study of the project, the systems professional who proposed the project should be involved in performing the study.
سؤال
When the nature of the project and the needs of the user permit, most organizations will seek a pre-coded commercial software package rather than develop a system in-house.
سؤال
In the conceptual design phase of the Systems Development Life Cycle (SDLC), task force members are focused on selecting the new system design.
سؤال
The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information system tend to be short and shorter payback projects are often desirable.
سؤال
The Systems Development Life Cycle (SDLC) concept applies to specific applications and not to strategic systems planning.
سؤال
The user test and acceptance procedure is the last point at which the user can determine the system's acceptability prior to it going into service.
سؤال
A cost-benefit analysis is a part of the detailed

A) operational feasibility study
B) schedule feasibility study
C) legal feasibility study
D) economic feasibility study
سؤال
The output of the detailed design phase of the Systems Development Life Cycle (SDLC) is a

A) fully documented system report
B) systems selection report
C) detailed system design report
D) systems analysis report
سؤال
Evaluators of the detailed feasibility study should not include

A) the internal auditor
B) the project manager
C) a user representative
D) the system designer
سؤال
Which control ensures that production files cannot be accessed without specific permission?

A) Database Management System
B) Recovery Operations Function
C) Source Program Library Management System
D) Computer Services Function
سؤال
Which statement is correct?

A) compiled programs are very susceptible to unauthorized modification
B) the source program library stores application programs in source code form
C) modifications are made to programs in machine code language
D) the source program library management system increases operating efficiency
سؤال
Which step is least likely to occur when choosing a commercial software package?

A) a detailed review of the source code
B) contact with user groups
C) preparation of a request for proposal
D) comparison of the results of a benchmark problem
سؤال
The benefits of the object-oriented approach to systems design include all of the following except

A) this approach does not require input from accountants and auditors
B) development time is reduced
C) a standard module once tested does not have to be retested until changes are made
D) system maintenance activities are simplified
سؤال
Which is not a level of a data flow diagram?

A) conceptual level
B) context level
C) intermediate level
D) elementary level
سؤال
Examples of one-time costs include all of the following except

A) hardware acquisition
B) insurance
C) site preparation
D) programming
سؤال
A commercial software system that is completely finished, tested, and ready for implementation is called a

A) backbone system
B) vendor-supported system
C) benchmark system
D) turnkey system
سؤال
Which test of controls will provide evidence that the system as originally implemented was free from material errors and free from fraud? Review of the documentation indicates that

A) a cost-benefit analysis was conducted
B) the detailed design was an appropriate solution to the user's problem
C) tests were conducted at the individual module and total system levels prior to implementation
D) problems detected during the conversion period were corrected in the maintenance phase
سؤال
Which control is not associated with new systems development activities?

A) reconciling program version numbers
B) program testing
C) user involvement
D) internal audit participation
سؤال
Examples of recurring costs include

A) software acquisition
B) data conversion
C) personnel costs
D) systems design
سؤال
Which of the following is not an advantage of commercial software? Commercial software

A) can be installed faster than a custom system
B) can be easily modified to the user's exact specifications
C) is significantly less expensive than a system developed in-house
D) is less likely to have errors than an equivalent system developed in-house
سؤال
Which statement is not correct? The structured design approach

A) is a top-down approach
B) is documented by data flow diagrams and structure diagrams
C) assembles reusable modules rather than creating systems from scratch
D) starts with an abstract description of the system and redefines it to produce a more detailed description of the system
سؤال
Program testing

A) involves individual modules only, not the full system
B) requires creation of meaningful test data
C) need not be repeated once the system is implemented
D) is primarily concerned with usability
سؤال
When the auditor reconciles the program version numbers, which audit objective is being tested?

A) protect applications from unauthorized changes
B) ensure applications are free from error
C) protect production libraries from unauthorized access
D) ensure incompatible functions have been identified and segregated
سؤال
Routine maintenance activities require all of the following controls except

A) documentation updates
B) testing
C) formal authorization
D) internal audit approval
سؤال
The detailed design report contains all of the following except

A) input screen formats
B) alternative conceptual designs
C) report layouts
D) process logic
سؤال
Which statement is not true?

A) An audit objective for systems maintenance is to detect unauthorized access to application databases.
B) An audit objective for systems maintenance is to ensure that applications are free from errors.
C) An audit objective for systems maintenance is to verify that user requests for maintenance reconcile to program version numbers.
D) An audit objective for systems maintenance is to ensure that the production libraries are protected from unauthorized access.
سؤال
Which task is not essential during a data conversion procedure?

A) decomposing the system
B) validating the database
C) reconciliation of new and old databases
D) backing up the original files
سؤال
Typical contents of a run manual include all of the following except

A) run schedule
B) logic flowchart
C) file requirements
D) explanation of error messages
سؤال
When converting to a new system, which cutover method is the most conservative?

A) cold turkey cutover
B) phased cutover
C) parallel operation cutover
D) data coupling cutover
سؤال
An example of a tangible benefit is

A) increased customer satisfaction
B) more current information
C) reduced inventories
D) faster response to competitor actions
سؤال
The testing of individual program modules is a part of

A) software acquisition costs
B) systems design costs
C) data conversion costs
D) programming costs
سؤال
Typically a systems analysis

A) results in a formal project schedule
B) does not include a review of the current system
C) identifies user needs and specifies system requirements
D) is performed by the internal auditor
سؤال
System documentation is designed for all of the following groups except

A) systems designers and programmers
B) end users
C) accountants
D) all of the above require systems documentation
سؤال
A tangible benefit

A) can be measured and expressed in financial terms
B) might increase revenues
C) might decrease costs
D) all of the above
سؤال
Intangible benefits

A) are easily measured
B) are of relatively little importance in making information system decisions
C) are sometimes estimated using customer satisfaction surveys
D) when measured, do not lend themselves to manipulation
سؤال
Site preparation costs include all of the following except

A) crane used to install equipment
B) freight charges
C) supplies
D) reinforcement of the building floor
سؤال
The systems analysis report does not

A) identify user needs
B) specify requirements for the new system
C) formally state the goals and objectives of the system
D) specify the system processing methods
سؤال
Computer operators should have access to all of the following types of documentation except

A) a list of users who receive output
B) a program code listing
C) a list of all master files used in the system
D) a list of required hardware devices
سؤال
Which type of documentation shows the detailed relationship of input files, programs, and output files?

A) structure diagrams
B) overview diagram
C) system flowchart
D) program flowchart
سؤال
Which technique is least likely to be used to quantify intangible benefits?

A) opinion surveys
B) simulation models
C) professional judgment
D) review of accounting transaction data
سؤال
Systems analysis involves all of the following except

A) gathering facts
B) surveying the current system
C) redesigning bottleneck activities
D) reviewing key documents
سؤال
When implementing a new system, the costs associated with transferring data from one storage medium to another is an example of

A) a recurring cost
B) a data conversion cost
C) a systems design cost
D) a programming cost
سؤال
A disadvantage of surveying the current system is

A) it constrains the generation of ideas about the new system
B) it highlights elements of the current system that are worth preserving
C) it pinpoints the causes of the current problems
D) all of the above are advantages of surveying the current system
سؤال
The role of the steering committee includes

A) designing the system outputs
B) resolving conflicts that arise from a new system
C) selecting the programming techniques to be used
D) approving the accounting procedures to be implemented
سؤال
An example of an intangible benefit is

A) expansion into other markets
B) reduction in supplies and overhead
C) more efficient operations
D) reduced equipment maintenance
سؤال
The formal product of the systems evaluation and selection phase of the Systems Development Life Cycle is

A) the report of systems analysis
B) the systems selection report
C) the detailed system design
D) the systems plan
سؤال
Which of the following is not a tool of systems analysts?

A) observation
B) task participation
C) audit reports
D) personal interviews
سؤال
Describe a test of controls that would provide evidence that only authorized program maintenance is occurring.
سؤال
When developing the conceptual design of a system,

A) all similarities and differences between competing systems are highlighted
B) structure diagrams are commonly used
C) the format for input screens and source documents is decided
D) inputs, processes, and outputs that distinguish one alternative from another are identified
سؤال
List three advantages and one disadvantage of commercial software.
سؤال
What is a systems selection report?
سؤال
List three methods used to control the source program library.
سؤال
____________________ benefits can be measured and expressed in financial terms, while ____________________ benefits cannot be easily measured and/or quantified.
سؤال
New system development activity controls must focus on the authorization, development, and implementation of new systems and its maintenance. Discuss at least five control activities that are found in an effective system development life cycle.
سؤال
Why is it important that the systems professionals who design a project not perform the detailed feasibility study of the project?
سؤال
Explain why accountants are interested in the legal feasibility of a new systems project.
سؤال
What are program version numbers and how are the used?
سؤال
The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except

A) the accountant is responsible for designing the physical system
B) the accountant is responsible to ensure that audit trails are preserved
C) the internal auditor is responsible to confirm that embedded audit modules are included in the conceptual design
D) the accountant is responsible to make sure that the accounting conventions that apply to the module are considered by the system designers
سؤال
Strategic systems planning is important because the plan

A) provides authorization control for the Systems Development Life Cycle
B) will eliminate any crisis component in systems development
C) provides a static goal to be attained within a five-year period
D) all of the above
سؤال
Project feasibility includes all of the following except

A) technical feasibility
B) conceptual feasibility
C) operational feasibility
D) schedule feasibility
سؤال
Why is the payback method often more useful than the net present value method for evaluating systems projects?
سؤال
What are the auditor's objectives relating to systems development?
سؤال
Aspects of project feasibility include all of the following except

A) technical feasibility
B) economic feasibility
C) logistic feasibility
D) schedule feasibility
سؤال
Project planning includes all of the following except

A) specifying system objectives
B) preparing a formal project proposal
C) selecting hardware vendors
D) producing a project schedule
سؤال
Describe a risk associated with the phased cutover procedure for data conversion.
سؤال
Contrast the source program library (SPL) management system to the database management system (DBMS).
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Systems Development and Program Change Activities
1
Intangible benefits are not physical, but can be measured and expressed in financial terms.
False
2
Programs in their compiled state are very susceptible to the threat of unauthorized modification.
False
3
Recurring costs include: hardware maintenance, software acquisition, software maintenance, insurance, supplies and personnel costs.
False
4
All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
5
A tangible benefit can be measured and expressed in financial terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
6
Instead of implementing an application in a single big-bang release, modern systems are delivered in parts continuously and quickly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
7
Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
8
When determining the operational feasibility of a new system, the expected ease of transition from the old system to the new system should be considered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
9
Maintenance access to systems increases the risk that logic will be corrupted either by the accident or intent to defraud.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
10
When preparing a cost-benefit analysis, design costs incurred in the systems planning, systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
11
Source program library controls should prevent and detect unauthorized access to application programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
12
An accountant's responsibility in the SDLC is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
13
The objective of systems planning is to link systems projects to the strategic objectives of the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
14
One-time costs include operating and maintenance costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
15
During the detailed feasibility study of the project, the systems professional who proposed the project should be involved in performing the study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
16
When the nature of the project and the needs of the user permit, most organizations will seek a pre-coded commercial software package rather than develop a system in-house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
17
In the conceptual design phase of the Systems Development Life Cycle (SDLC), task force members are focused on selecting the new system design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
18
The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information system tend to be short and shorter payback projects are often desirable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
19
The Systems Development Life Cycle (SDLC) concept applies to specific applications and not to strategic systems planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
20
The user test and acceptance procedure is the last point at which the user can determine the system's acceptability prior to it going into service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
21
A cost-benefit analysis is a part of the detailed

A) operational feasibility study
B) schedule feasibility study
C) legal feasibility study
D) economic feasibility study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
22
The output of the detailed design phase of the Systems Development Life Cycle (SDLC) is a

A) fully documented system report
B) systems selection report
C) detailed system design report
D) systems analysis report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
23
Evaluators of the detailed feasibility study should not include

A) the internal auditor
B) the project manager
C) a user representative
D) the system designer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which control ensures that production files cannot be accessed without specific permission?

A) Database Management System
B) Recovery Operations Function
C) Source Program Library Management System
D) Computer Services Function
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which statement is correct?

A) compiled programs are very susceptible to unauthorized modification
B) the source program library stores application programs in source code form
C) modifications are made to programs in machine code language
D) the source program library management system increases operating efficiency
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which step is least likely to occur when choosing a commercial software package?

A) a detailed review of the source code
B) contact with user groups
C) preparation of a request for proposal
D) comparison of the results of a benchmark problem
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
27
The benefits of the object-oriented approach to systems design include all of the following except

A) this approach does not require input from accountants and auditors
B) development time is reduced
C) a standard module once tested does not have to be retested until changes are made
D) system maintenance activities are simplified
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which is not a level of a data flow diagram?

A) conceptual level
B) context level
C) intermediate level
D) elementary level
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
29
Examples of one-time costs include all of the following except

A) hardware acquisition
B) insurance
C) site preparation
D) programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
30
A commercial software system that is completely finished, tested, and ready for implementation is called a

A) backbone system
B) vendor-supported system
C) benchmark system
D) turnkey system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which test of controls will provide evidence that the system as originally implemented was free from material errors and free from fraud? Review of the documentation indicates that

A) a cost-benefit analysis was conducted
B) the detailed design was an appropriate solution to the user's problem
C) tests were conducted at the individual module and total system levels prior to implementation
D) problems detected during the conversion period were corrected in the maintenance phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which control is not associated with new systems development activities?

A) reconciling program version numbers
B) program testing
C) user involvement
D) internal audit participation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
33
Examples of recurring costs include

A) software acquisition
B) data conversion
C) personnel costs
D) systems design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is not an advantage of commercial software? Commercial software

A) can be installed faster than a custom system
B) can be easily modified to the user's exact specifications
C) is significantly less expensive than a system developed in-house
D) is less likely to have errors than an equivalent system developed in-house
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which statement is not correct? The structured design approach

A) is a top-down approach
B) is documented by data flow diagrams and structure diagrams
C) assembles reusable modules rather than creating systems from scratch
D) starts with an abstract description of the system and redefines it to produce a more detailed description of the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
36
Program testing

A) involves individual modules only, not the full system
B) requires creation of meaningful test data
C) need not be repeated once the system is implemented
D) is primarily concerned with usability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
37
When the auditor reconciles the program version numbers, which audit objective is being tested?

A) protect applications from unauthorized changes
B) ensure applications are free from error
C) protect production libraries from unauthorized access
D) ensure incompatible functions have been identified and segregated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
38
Routine maintenance activities require all of the following controls except

A) documentation updates
B) testing
C) formal authorization
D) internal audit approval
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
39
The detailed design report contains all of the following except

A) input screen formats
B) alternative conceptual designs
C) report layouts
D) process logic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which statement is not true?

A) An audit objective for systems maintenance is to detect unauthorized access to application databases.
B) An audit objective for systems maintenance is to ensure that applications are free from errors.
C) An audit objective for systems maintenance is to verify that user requests for maintenance reconcile to program version numbers.
D) An audit objective for systems maintenance is to ensure that the production libraries are protected from unauthorized access.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which task is not essential during a data conversion procedure?

A) decomposing the system
B) validating the database
C) reconciliation of new and old databases
D) backing up the original files
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
42
Typical contents of a run manual include all of the following except

A) run schedule
B) logic flowchart
C) file requirements
D) explanation of error messages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
43
When converting to a new system, which cutover method is the most conservative?

A) cold turkey cutover
B) phased cutover
C) parallel operation cutover
D) data coupling cutover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
44
An example of a tangible benefit is

A) increased customer satisfaction
B) more current information
C) reduced inventories
D) faster response to competitor actions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
45
The testing of individual program modules is a part of

A) software acquisition costs
B) systems design costs
C) data conversion costs
D) programming costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
46
Typically a systems analysis

A) results in a formal project schedule
B) does not include a review of the current system
C) identifies user needs and specifies system requirements
D) is performed by the internal auditor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
47
System documentation is designed for all of the following groups except

A) systems designers and programmers
B) end users
C) accountants
D) all of the above require systems documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
48
A tangible benefit

A) can be measured and expressed in financial terms
B) might increase revenues
C) might decrease costs
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
49
Intangible benefits

A) are easily measured
B) are of relatively little importance in making information system decisions
C) are sometimes estimated using customer satisfaction surveys
D) when measured, do not lend themselves to manipulation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
50
Site preparation costs include all of the following except

A) crane used to install equipment
B) freight charges
C) supplies
D) reinforcement of the building floor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
51
The systems analysis report does not

A) identify user needs
B) specify requirements for the new system
C) formally state the goals and objectives of the system
D) specify the system processing methods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
52
Computer operators should have access to all of the following types of documentation except

A) a list of users who receive output
B) a program code listing
C) a list of all master files used in the system
D) a list of required hardware devices
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which type of documentation shows the detailed relationship of input files, programs, and output files?

A) structure diagrams
B) overview diagram
C) system flowchart
D) program flowchart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which technique is least likely to be used to quantify intangible benefits?

A) opinion surveys
B) simulation models
C) professional judgment
D) review of accounting transaction data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
55
Systems analysis involves all of the following except

A) gathering facts
B) surveying the current system
C) redesigning bottleneck activities
D) reviewing key documents
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
56
When implementing a new system, the costs associated with transferring data from one storage medium to another is an example of

A) a recurring cost
B) a data conversion cost
C) a systems design cost
D) a programming cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
57
A disadvantage of surveying the current system is

A) it constrains the generation of ideas about the new system
B) it highlights elements of the current system that are worth preserving
C) it pinpoints the causes of the current problems
D) all of the above are advantages of surveying the current system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
58
The role of the steering committee includes

A) designing the system outputs
B) resolving conflicts that arise from a new system
C) selecting the programming techniques to be used
D) approving the accounting procedures to be implemented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
59
An example of an intangible benefit is

A) expansion into other markets
B) reduction in supplies and overhead
C) more efficient operations
D) reduced equipment maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
60
The formal product of the systems evaluation and selection phase of the Systems Development Life Cycle is

A) the report of systems analysis
B) the systems selection report
C) the detailed system design
D) the systems plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
61
Which of the following is not a tool of systems analysts?

A) observation
B) task participation
C) audit reports
D) personal interviews
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
62
Describe a test of controls that would provide evidence that only authorized program maintenance is occurring.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
63
When developing the conceptual design of a system,

A) all similarities and differences between competing systems are highlighted
B) structure diagrams are commonly used
C) the format for input screens and source documents is decided
D) inputs, processes, and outputs that distinguish one alternative from another are identified
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
64
List three advantages and one disadvantage of commercial software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
65
What is a systems selection report?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
66
List three methods used to control the source program library.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
67
____________________ benefits can be measured and expressed in financial terms, while ____________________ benefits cannot be easily measured and/or quantified.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
68
New system development activity controls must focus on the authorization, development, and implementation of new systems and its maintenance. Discuss at least five control activities that are found in an effective system development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
69
Why is it important that the systems professionals who design a project not perform the detailed feasibility study of the project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
70
Explain why accountants are interested in the legal feasibility of a new systems project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
71
What are program version numbers and how are the used?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
72
The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except

A) the accountant is responsible for designing the physical system
B) the accountant is responsible to ensure that audit trails are preserved
C) the internal auditor is responsible to confirm that embedded audit modules are included in the conceptual design
D) the accountant is responsible to make sure that the accounting conventions that apply to the module are considered by the system designers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
73
Strategic systems planning is important because the plan

A) provides authorization control for the Systems Development Life Cycle
B) will eliminate any crisis component in systems development
C) provides a static goal to be attained within a five-year period
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
74
Project feasibility includes all of the following except

A) technical feasibility
B) conceptual feasibility
C) operational feasibility
D) schedule feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
75
Why is the payback method often more useful than the net present value method for evaluating systems projects?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
76
What are the auditor's objectives relating to systems development?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
77
Aspects of project feasibility include all of the following except

A) technical feasibility
B) economic feasibility
C) logistic feasibility
D) schedule feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
78
Project planning includes all of the following except

A) specifying system objectives
B) preparing a formal project proposal
C) selecting hardware vendors
D) producing a project schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
79
Describe a risk associated with the phased cutover procedure for data conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
80
Contrast the source program library (SPL) management system to the database management system (DBMS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 94 في هذه المجموعة.