Deck 12: Information Systems Development

ملء الشاشة (f)
exit full mode
سؤال
Not all information systems have applications or software components.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
An as-is model documents the desired outcome of a business process.
سؤال
In a business process, only a single resource is assigned to a role.
سؤال
Dimensions of process quality are effectiveness and efficiency.
سؤال
An information system need not relate to any business process, but a business process should relate to at least one information system.
سؤال
The systems development life cycle (SDLC) is a process that can be used to develop both information systems and applications.
سؤال
In business processes, a data flow directs the order of activities.
سؤال
An application is a combination of hardware, software, and data components that accomplishes a set of requirements.
سؤال
Business process management is a cyclic process for systematically creating, assessing, and altering business processes.
سؤال
An inventory is an example of a data repository.
سؤال
The activities in a business process often involve information systems.
سؤال
In a business process, roles are collections of activities.
سؤال
Implementing the new or changed process is the third activity in business process management.
سؤال
All business processes must include one or more information systems.
سؤال
The actors or participants in a business process are the users of information systems.
سؤال
The business process management cycle begins by creating a model of the existing business processes.
سؤال
Business processes, information systems, and applications have the same characteristics and components.
سؤال
Information systems and business processes are synonymous terms.
سؤال
In business processes, resources are collections of procedures.
سؤال
The effectiveness of a new business process is usually assessed by creating policies, procedures, and committees.
سؤال
The Control Objectives for Information and related Technology (COBIT) practices were created by the Object Management Group (OMG) for documenting business processes.
سؤال
The systems development life cycle is the traditional process used to develop information systems and applications.
سؤال
In the system definition phase of the systems development life cycle (SDLC), technical feasibility refers to whether existing information technology is likely to be able to meet the needs of a new system.
سؤال
As information systems (IS) development projects are difficult to budget and schedule, technical and organizational feasibilities are only approximate analyses.
سؤال
The swim-lane layout for modeling business processes is used to draw attention to interactions among components of the diagram.
سؤال
Business Process Modeling Notation (BPMN) diagrams cannot be used to document processes for training employees.
سؤال
The process of assessing a project's feasibility occurs during the component design phase of the systems development life cycle (SDLC).
سؤال
In the system definition phase of the systems development life cycle (SDLC), cost feasibility is an assessment of whether the anticipated benefits of the system are likely to justify the estimated development and operational costs.
سؤال
Developers in the system definition phase of the systems development life cycle (SDLC) use management's statement of the system needs in order to begin to define the new system.
سؤال
Business process management applies only to commercial, profit-making organizations.
سؤال
A project team that develops an information system (IS) will comprise business and systems analysts during the requirements definition phase.
سؤال
In the system definition phase of the systems development life cycle (SDLC), organizational feasibility concerns whether a new system fits within an organization's customs, culture, charter, or legal requirements.
سؤال
In the swim-lane layout for modeling business processes, each role is given its own swim lane.
سؤال
In Business Process Modeling Notation (BPMN), diamonds represent decisions and usually contain a question that is answered with yes or no.
سؤال
In Business Process Modeling Notation (BPMN), solid arrows depict the flow of messages and data.
سؤال
In Business Process Modeling Notation (BPMN), dotted arrows depict the flow or sequence of the activities in a process.
سؤال
Once the as-is model has been documented, that model can then be analyzed for problems or for improvement opportunities.
سؤال
Unlike business analysts, systems analysts work more with managers and executives.
سؤال
Systems analysts integrate the work of programmers, testers, and users.
سؤال
In the system definition phase of the systems development life cycle (SDLC), schedule feasibility is difficult to determine because it is hard to estimate the time it will take to build the system.
سؤال
If a scrum project terminates because of budget or time limitations, the customer will not receive any result for the time and money expended.
سؤال
________ are information system (IS) professionals who understand both business and information technology.

A) Development analysts
B) Systems analysts
C) Network administrators
D) Database designers
سؤال
A work breakdown structure (WBS) is a hierarchy of tasks required to complete a project.
سؤال
In the system implementation phase of the systems development life cycle (SDLC), with pilot installation, the new system/business processes are installed in phases across an entire organization.
سؤال
The critical path is the sequence of activities that determine the earliest date by which the project can be completed.
سؤال
A work breakdown structure (WBS) shows tasks, dates, and dependencies.
سؤال
Brooks' Law states that adding more people to a late project reduces the need for coordination.
سؤال
The total number of points of work a team can accomplish in each scrum period is called velocity.
سؤال
Agile development methodologies welcome changes in requirements.
سؤال
In a business process, an inventory or a database is an example of a ________.

A) decision tree
B) repository
C) botnet
D) cookie
سؤال
In the system implementation phase of the systems development life cycle (SDLC), with plunge installation, existing systems are used by the organization until the new one is fully operational.
سؤال
Which of the following statements is True about the relationship between business processes and information systems?

A) A business process need not relate to any information system, but an information system relates to at least one business process.
B) Information systems incorporate all business process activities and hence, should be developed before business processes.
C) The relationship between business processes and information systems is one-to-one.
D) Developing information systems before business processes ensures that all activities are considered in the development process.
سؤال
While constructing a database during the component design phase of the systems development life cycle (SDLC), if a project involves off-the-shelf programs, then procedure design should be created.
سؤال
Which of the following statements is True of information systems?

A) Information systems include all business process activities.
B) Every information system has at least one application.
C) Information systems should be bought entirely off-the-shelf.
D) Every business process should include at least one information system.
سؤال
User involvement is critical throughout the system development process.
سؤال
A ________ is a network of activities, repositories, roles, resources, and flows that interact to accomplish a business function.

A) business stature
B) business analysis
C) business process
D) business policy
سؤال
A project plan is a list of work breakdown structure (WBS) tasks, arranged to account for task dependencies, with durations and resources applied.
سؤال
In a business process, ________ are defined as collections of related tasks that receive inputs and produce outputs.

A) activities
B) databases
C) resources
D) presentations
سؤال
A project team that opts for custom-developed programs during the component design phase of the systems development life cycle (SDLC) must determine candidate products and evaluate them against the requirements.
سؤال
A ________ is a person who is well versed in an organization's strategy and focuses on ensuring that business processes and information systems meet the organization's competitive strategies.

A) business analyst
B) business application programmer
C) business administrator
D) business supervisor
سؤال
In a Business Process Modeling Notation (BPMN) diagram, dotted arrows depict the flow of ________ in the process.

A) resources
B) messages and data
C) tasks and activities
D) control
سؤال
________ set the stage for the requirements for any information systems and applications that need to be created or adapted.

A) Business repositories
B) Business policies
C) Business reports
D) Business process models
سؤال
In a Business Process Modeling Notation (BPMN) diagram, ________ represent decisions and usually contain a question that is answered with yes or no.

A) diamonds
B) circles
C) rectangles
D) squares
سؤال
The first phase of the systems development life cycle (SDLC) is ________.

A) defining the system
B) implementing the system
C) determining the requirements
D) maintaining the system
سؤال
In business process management (BPM), once the as-is model is created, the very next step that a team must take is to ________.

A) obtain feedback about implementation
B) assess the results of the changes
C) look for improvement opportunities
D) implement changes in the organization
سؤال
Control Objectives for Information and related Technology (COBIT) is often used in the ________ stage of the business process management (BPM) cycle.

A) component creation
B) implementation
C) assessment
D) process modeling
سؤال
In a business process, resources are ________.

A) people or computer applications that are assigned to roles
B) collections of procedures and activities
C) the total number of points of work that can be accomplished in each scrum period
D) collections of related tasks that receive inputs and produce outputs
سؤال
The first step in the system definition phase of the systems development life cycle (SDLC) is to ________.

A) plan the project
B) conduct a feasibility study
C) define the goals and scope
D) form the project team
سؤال
The traditional process for developing information systems is ________.

A) software testing life cycle
B) the systems development life cycle
C) the software defect life cycle
D) product life cycle
سؤال
In business process management (BPM), an as-is model ________.

A) documents the existing business process
B) contrasts the former and current states of a business process
C) represents the desired state of a business process
D) represents the ideal state of a business process
سؤال
In Business Process Modeling Notation (BPMN) diagrams, a square with a plus sign means that ________.

A) a question can be answered with no
B) it is the end of the process
C) a question can be answered with yes
D) an activity is considered to be a subprocess of a process
سؤال
________ is a standard set of terms and graphical notations for documenting business processes.

A) Business Process Modeling Notation (BPMN)
B) Business Process Execution Language (BPEL)
C) Component Object Model (COM)
D) International Organization for Standardization (ISO) 9000
سؤال
Which of the following can be represented using the Business Process Modeling Notation (BPMN)?

A) Gantt charts
B) as-is models
C) scatter plots
D) PERT charts showing the critical path
سؤال
In a Business Process Modeling Notation (BPMN) diagram, a ________ represents an activity.

A) dotted arrow
B) rectangle
C) diamond
D) solid arrow
سؤال
The project plan which results from defining the system is the input to ________, which is the second phase of the SDLC.

A) system design
B) requirement collection
C) requirements analysis
D) system maintenance
سؤال
The final phase of the systems development life cycle (SDLC) is ________.

A) implementing the system
B) determining the requirements
C) maintaining the system
D) designing system components
سؤال
Which of the following are the steps in the business process management (BPM) cycle?

A) model processes; implement processes; assess results; create components
B) create components; model processes; implement processes; assess results
C) implement processes; create components; model processes; assess results
D) model processes; create components; implement processes; assess results
سؤال
In a Business Process Modeling Notation (BPMN) diagram, ________ depict the flow or sequence of activities in a process.

A) dotted arrows
B) diamonds
C) solid arrows
D) circles
سؤال
Which of the following statements is True of the swim-lane layout used for modeling business processes?

A) It complicates the process diagrams.
B) It draws attention to the interactions among components of the diagram.
C) Each role in the business process has to share the swim-lane with other roles.
D) All activities for a given role are repeated in all the swim-lanes.
سؤال
In a business process, a role refers to ________.

A) a physical repository
B) the movement of data
C) a collection of data
D) a collection of activities
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/122
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Information Systems Development
1
Not all information systems have applications or software components.
False
2
An as-is model documents the desired outcome of a business process.
False
3
In a business process, only a single resource is assigned to a role.
False
4
Dimensions of process quality are effectiveness and efficiency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
5
An information system need not relate to any business process, but a business process should relate to at least one information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
6
The systems development life cycle (SDLC) is a process that can be used to develop both information systems and applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
7
In business processes, a data flow directs the order of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
8
An application is a combination of hardware, software, and data components that accomplishes a set of requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
9
Business process management is a cyclic process for systematically creating, assessing, and altering business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
10
An inventory is an example of a data repository.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
11
The activities in a business process often involve information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
12
In a business process, roles are collections of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
13
Implementing the new or changed process is the third activity in business process management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
14
All business processes must include one or more information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
15
The actors or participants in a business process are the users of information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
16
The business process management cycle begins by creating a model of the existing business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
17
Business processes, information systems, and applications have the same characteristics and components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
18
Information systems and business processes are synonymous terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
19
In business processes, resources are collections of procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
20
The effectiveness of a new business process is usually assessed by creating policies, procedures, and committees.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
21
The Control Objectives for Information and related Technology (COBIT) practices were created by the Object Management Group (OMG) for documenting business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
22
The systems development life cycle is the traditional process used to develop information systems and applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
23
In the system definition phase of the systems development life cycle (SDLC), technical feasibility refers to whether existing information technology is likely to be able to meet the needs of a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
24
As information systems (IS) development projects are difficult to budget and schedule, technical and organizational feasibilities are only approximate analyses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
25
The swim-lane layout for modeling business processes is used to draw attention to interactions among components of the diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
26
Business Process Modeling Notation (BPMN) diagrams cannot be used to document processes for training employees.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
27
The process of assessing a project's feasibility occurs during the component design phase of the systems development life cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
28
In the system definition phase of the systems development life cycle (SDLC), cost feasibility is an assessment of whether the anticipated benefits of the system are likely to justify the estimated development and operational costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
29
Developers in the system definition phase of the systems development life cycle (SDLC) use management's statement of the system needs in order to begin to define the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
30
Business process management applies only to commercial, profit-making organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
31
A project team that develops an information system (IS) will comprise business and systems analysts during the requirements definition phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
32
In the system definition phase of the systems development life cycle (SDLC), organizational feasibility concerns whether a new system fits within an organization's customs, culture, charter, or legal requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
33
In the swim-lane layout for modeling business processes, each role is given its own swim lane.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
34
In Business Process Modeling Notation (BPMN), diamonds represent decisions and usually contain a question that is answered with yes or no.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
35
In Business Process Modeling Notation (BPMN), solid arrows depict the flow of messages and data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
36
In Business Process Modeling Notation (BPMN), dotted arrows depict the flow or sequence of the activities in a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
37
Once the as-is model has been documented, that model can then be analyzed for problems or for improvement opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
38
Unlike business analysts, systems analysts work more with managers and executives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
39
Systems analysts integrate the work of programmers, testers, and users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
40
In the system definition phase of the systems development life cycle (SDLC), schedule feasibility is difficult to determine because it is hard to estimate the time it will take to build the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
41
If a scrum project terminates because of budget or time limitations, the customer will not receive any result for the time and money expended.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
42
________ are information system (IS) professionals who understand both business and information technology.

A) Development analysts
B) Systems analysts
C) Network administrators
D) Database designers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
43
A work breakdown structure (WBS) is a hierarchy of tasks required to complete a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
44
In the system implementation phase of the systems development life cycle (SDLC), with pilot installation, the new system/business processes are installed in phases across an entire organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
45
The critical path is the sequence of activities that determine the earliest date by which the project can be completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
46
A work breakdown structure (WBS) shows tasks, dates, and dependencies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
47
Brooks' Law states that adding more people to a late project reduces the need for coordination.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
48
The total number of points of work a team can accomplish in each scrum period is called velocity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
49
Agile development methodologies welcome changes in requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
50
In a business process, an inventory or a database is an example of a ________.

A) decision tree
B) repository
C) botnet
D) cookie
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
51
In the system implementation phase of the systems development life cycle (SDLC), with plunge installation, existing systems are used by the organization until the new one is fully operational.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
52
Which of the following statements is True about the relationship between business processes and information systems?

A) A business process need not relate to any information system, but an information system relates to at least one business process.
B) Information systems incorporate all business process activities and hence, should be developed before business processes.
C) The relationship between business processes and information systems is one-to-one.
D) Developing information systems before business processes ensures that all activities are considered in the development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
53
While constructing a database during the component design phase of the systems development life cycle (SDLC), if a project involves off-the-shelf programs, then procedure design should be created.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following statements is True of information systems?

A) Information systems include all business process activities.
B) Every information system has at least one application.
C) Information systems should be bought entirely off-the-shelf.
D) Every business process should include at least one information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
55
User involvement is critical throughout the system development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
56
A ________ is a network of activities, repositories, roles, resources, and flows that interact to accomplish a business function.

A) business stature
B) business analysis
C) business process
D) business policy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
57
A project plan is a list of work breakdown structure (WBS) tasks, arranged to account for task dependencies, with durations and resources applied.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
58
In a business process, ________ are defined as collections of related tasks that receive inputs and produce outputs.

A) activities
B) databases
C) resources
D) presentations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
59
A project team that opts for custom-developed programs during the component design phase of the systems development life cycle (SDLC) must determine candidate products and evaluate them against the requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
60
A ________ is a person who is well versed in an organization's strategy and focuses on ensuring that business processes and information systems meet the organization's competitive strategies.

A) business analyst
B) business application programmer
C) business administrator
D) business supervisor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
61
In a Business Process Modeling Notation (BPMN) diagram, dotted arrows depict the flow of ________ in the process.

A) resources
B) messages and data
C) tasks and activities
D) control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
62
________ set the stage for the requirements for any information systems and applications that need to be created or adapted.

A) Business repositories
B) Business policies
C) Business reports
D) Business process models
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
63
In a Business Process Modeling Notation (BPMN) diagram, ________ represent decisions and usually contain a question that is answered with yes or no.

A) diamonds
B) circles
C) rectangles
D) squares
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
64
The first phase of the systems development life cycle (SDLC) is ________.

A) defining the system
B) implementing the system
C) determining the requirements
D) maintaining the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
65
In business process management (BPM), once the as-is model is created, the very next step that a team must take is to ________.

A) obtain feedback about implementation
B) assess the results of the changes
C) look for improvement opportunities
D) implement changes in the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
66
Control Objectives for Information and related Technology (COBIT) is often used in the ________ stage of the business process management (BPM) cycle.

A) component creation
B) implementation
C) assessment
D) process modeling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
67
In a business process, resources are ________.

A) people or computer applications that are assigned to roles
B) collections of procedures and activities
C) the total number of points of work that can be accomplished in each scrum period
D) collections of related tasks that receive inputs and produce outputs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
68
The first step in the system definition phase of the systems development life cycle (SDLC) is to ________.

A) plan the project
B) conduct a feasibility study
C) define the goals and scope
D) form the project team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
69
The traditional process for developing information systems is ________.

A) software testing life cycle
B) the systems development life cycle
C) the software defect life cycle
D) product life cycle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
70
In business process management (BPM), an as-is model ________.

A) documents the existing business process
B) contrasts the former and current states of a business process
C) represents the desired state of a business process
D) represents the ideal state of a business process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
71
In Business Process Modeling Notation (BPMN) diagrams, a square with a plus sign means that ________.

A) a question can be answered with no
B) it is the end of the process
C) a question can be answered with yes
D) an activity is considered to be a subprocess of a process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
72
________ is a standard set of terms and graphical notations for documenting business processes.

A) Business Process Modeling Notation (BPMN)
B) Business Process Execution Language (BPEL)
C) Component Object Model (COM)
D) International Organization for Standardization (ISO) 9000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which of the following can be represented using the Business Process Modeling Notation (BPMN)?

A) Gantt charts
B) as-is models
C) scatter plots
D) PERT charts showing the critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
74
In a Business Process Modeling Notation (BPMN) diagram, a ________ represents an activity.

A) dotted arrow
B) rectangle
C) diamond
D) solid arrow
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
75
The project plan which results from defining the system is the input to ________, which is the second phase of the SDLC.

A) system design
B) requirement collection
C) requirements analysis
D) system maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
76
The final phase of the systems development life cycle (SDLC) is ________.

A) implementing the system
B) determining the requirements
C) maintaining the system
D) designing system components
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of the following are the steps in the business process management (BPM) cycle?

A) model processes; implement processes; assess results; create components
B) create components; model processes; implement processes; assess results
C) implement processes; create components; model processes; assess results
D) model processes; create components; implement processes; assess results
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
78
In a Business Process Modeling Notation (BPMN) diagram, ________ depict the flow or sequence of activities in a process.

A) dotted arrows
B) diamonds
C) solid arrows
D) circles
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following statements is True of the swim-lane layout used for modeling business processes?

A) It complicates the process diagrams.
B) It draws attention to the interactions among components of the diagram.
C) Each role in the business process has to share the swim-lane with other roles.
D) All activities for a given role are repeated in all the swim-lanes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
80
In a business process, a role refers to ________.

A) a physical repository
B) the movement of data
C) a collection of data
D) a collection of activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 122 في هذه المجموعة.