Deck 27: Systems Development Project Management

ملء الشاشة (f)
exit full mode
سؤال
Each task in a systems development project should culminate in one or more ________.

A) deliverables
B) zones
C) segments
D) designs
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
With respect to work breakdown structure (WBS),________ means to define the boundaries of a system.

A) trade-off
B) code
C) scope
D) scale
سؤال
________ is a knowledge area that concerns the creation of contracts with outside vendors for services,materials,and outsourcing of functions.

A) Communications management
B) Quality management
C) Project integration
D) Procurement management
سؤال
The challenges of managing large-scale systems development projects arise from ________.

A) economies of scale
B) economies of scope
C) increase in configuration control
D) lack of coordination
سؤال
A(n)________ is a hierarchy of the tasks required to complete a project.

A) scatter plot
B) work breakdown structure
C) encryption algorithm
D) V-Model
سؤال
Which of the following shows the tasks,dates,and task dependencies in a project?

A) Gantt chart
B) exception report
C) push report
D) scatter plot
سؤال
Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

A) economies of scale
B) diseconomies of scale
C) economies of scope
D) diseconomies of scope
سؤال
In the Project Management Body of Knowledge (PMBOK®)Guide,________ refer to the different stages in the life of a project.

A) configuration controls
B) knowledge areas
C) process groups
D) resource zones
سؤال
Which of the following statements is true of large-scale systems development projects?

A) They use simple computer programs to ensure consistency and speed in development.
B) They use small development teams of less than 20 members to reduce complexity.
C) Their development involves the integration of services from several companies.
D) Their development is carried out in a single site to ensure consistency.
سؤال
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A) Gantt chart
B) critical path
C) encryption algorithm
D) scatter plot
سؤال
Which of the following is a characteristic of large-scale systems development projects?

A) short development intervals
B) single development site
C) avoidance of system localization
D) 50-100 development team members
سؤال
In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

A) Increasing the time for the completion of a project always increases the cost of the project.
B) Increasing the cost of a project can always reduce the time required to finish the project.
C) Reducing the requirements in a project rarely affects the time required to finish the project.
D) Reducing the number of requirements in a project reduces the overall cost of the project.
سؤال
________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with a project's sponsors and others who have an interest in the progress of the project.

A) Procurement management
B) Communications management
C) Quality management
D) Project integration
سؤال
Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

A) scope
B) time
C) performance
D) value
سؤال
________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

A) Perceptual mapping
B) Coordination control
C) Critical path analysis
D) Configuration control
سؤال
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A) Project integration
B) Communications management
C) Procurement management
D) Quality management
سؤال
A plan that stipulates the tasks to be accomplished in a project,the labor and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

A) baseline
B) data model
C) line of code
D) scatter plot
سؤال
Which of the following activities is the biggest challenge in planning systems development?

A) creating
B) scheduling
C) analyzing
D) testing
سؤال
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS),but does not address the management of large-scale projects?

A) systems development life cycle
B) rapid application development
C) agile software development
D) structured system analysis
سؤال
________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

A) Requirements creep
B) Diseconomies of scale
C) Configuration control
D) Coordination
سؤال
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
سؤال
Large-scale systems development requires extended development intervals that extend up to 5 years.
سؤال
The biggest challenge in planning systems development is scheduling.
سؤال
Requirements creep is the process by which a project manager reduces his/her responsibilities for requirements through miniscule rollbacks.
سؤال
A well-managed project will never face problems of diseconomies of scale.
سؤال
In case of task dependencies in a project,all tasks must begin and end at the same time.
سؤال
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
سؤال
Larger projects with longer development intervals will find it easier to meet baseline requirements.
سؤال
What are the trade-offs in a systems development project's requirements,cost,and time?
سؤال
The development of large-scale systems can involve the integration of products and services from different companies.
سؤال
What are the characteristics of large-scale systems development projects?
سؤال
A function point is a feature or function of a new program.
سؤال
The critical path is a hierarchy of the tasks required to complete a project.
سؤال
The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.
سؤال
Knowledge areas refer to the factors in a project that need to be managed throughout the life of the project.
سؤال
A loss of control over a project's configuration can be easily fixed through remedial measures.
سؤال
The time involved in a project can always be reduced by increasing cost.
سؤال
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
سؤال
Prototypes are examples of deliverables in a systems development project.
سؤال
Baseline WBS can be used for monitoring a project.
سؤال
What is a critical path? How is a critical path analysis done?
سؤال
The biggest challenge in planning large-scale systems development is scheduling: Describe the three approaches that organizations can take to address this challenge.
سؤال
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
سؤال
What are the biggest challenges for managing a large-scale systems development project?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/44
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 27: Systems Development Project Management
1
Each task in a systems development project should culminate in one or more ________.

A) deliverables
B) zones
C) segments
D) designs
A
2
With respect to work breakdown structure (WBS),________ means to define the boundaries of a system.

A) trade-off
B) code
C) scope
D) scale
C
3
________ is a knowledge area that concerns the creation of contracts with outside vendors for services,materials,and outsourcing of functions.

A) Communications management
B) Quality management
C) Project integration
D) Procurement management
D
4
The challenges of managing large-scale systems development projects arise from ________.

A) economies of scale
B) economies of scope
C) increase in configuration control
D) lack of coordination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
5
A(n)________ is a hierarchy of the tasks required to complete a project.

A) scatter plot
B) work breakdown structure
C) encryption algorithm
D) V-Model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following shows the tasks,dates,and task dependencies in a project?

A) Gantt chart
B) exception report
C) push report
D) scatter plot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
7
Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

A) economies of scale
B) diseconomies of scale
C) economies of scope
D) diseconomies of scope
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
8
In the Project Management Body of Knowledge (PMBOK®)Guide,________ refer to the different stages in the life of a project.

A) configuration controls
B) knowledge areas
C) process groups
D) resource zones
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following statements is true of large-scale systems development projects?

A) They use simple computer programs to ensure consistency and speed in development.
B) They use small development teams of less than 20 members to reduce complexity.
C) Their development involves the integration of services from several companies.
D) Their development is carried out in a single site to ensure consistency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
10
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A) Gantt chart
B) critical path
C) encryption algorithm
D) scatter plot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is a characteristic of large-scale systems development projects?

A) short development intervals
B) single development site
C) avoidance of system localization
D) 50-100 development team members
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

A) Increasing the time for the completion of a project always increases the cost of the project.
B) Increasing the cost of a project can always reduce the time required to finish the project.
C) Reducing the requirements in a project rarely affects the time required to finish the project.
D) Reducing the number of requirements in a project reduces the overall cost of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
13
________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with a project's sponsors and others who have an interest in the progress of the project.

A) Procurement management
B) Communications management
C) Quality management
D) Project integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
14
Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

A) scope
B) time
C) performance
D) value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
15
________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

A) Perceptual mapping
B) Coordination control
C) Critical path analysis
D) Configuration control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
16
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A) Project integration
B) Communications management
C) Procurement management
D) Quality management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
17
A plan that stipulates the tasks to be accomplished in a project,the labor and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

A) baseline
B) data model
C) line of code
D) scatter plot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following activities is the biggest challenge in planning systems development?

A) creating
B) scheduling
C) analyzing
D) testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS),but does not address the management of large-scale projects?

A) systems development life cycle
B) rapid application development
C) agile software development
D) structured system analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
20
________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

A) Requirements creep
B) Diseconomies of scale
C) Configuration control
D) Coordination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
21
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
22
Large-scale systems development requires extended development intervals that extend up to 5 years.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
23
The biggest challenge in planning systems development is scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
24
Requirements creep is the process by which a project manager reduces his/her responsibilities for requirements through miniscule rollbacks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
25
A well-managed project will never face problems of diseconomies of scale.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
26
In case of task dependencies in a project,all tasks must begin and end at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
27
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
28
Larger projects with longer development intervals will find it easier to meet baseline requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
29
What are the trade-offs in a systems development project's requirements,cost,and time?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
30
The development of large-scale systems can involve the integration of products and services from different companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
31
What are the characteristics of large-scale systems development projects?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
32
A function point is a feature or function of a new program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
33
The critical path is a hierarchy of the tasks required to complete a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
34
The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
35
Knowledge areas refer to the factors in a project that need to be managed throughout the life of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
36
A loss of control over a project's configuration can be easily fixed through remedial measures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
37
The time involved in a project can always be reduced by increasing cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
38
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
39
Prototypes are examples of deliverables in a systems development project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
40
Baseline WBS can be used for monitoring a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is a critical path? How is a critical path analysis done?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
42
The biggest challenge in planning large-scale systems development is scheduling: Describe the three approaches that organizations can take to address this challenge.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
43
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
44
What are the biggest challenges for managing a large-scale systems development project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.