Deck 7: Quality and Innovation in Product and Process Design

ملء الشاشة (f)
exit full mode
سؤال
________ involves the usage of heat-transfer calculations, stress calculations, or differential equations to determine the dynamic behavior of the system being designed.

A) Process modeling
B) Geometric modeling
C) Concurrent engineering
D) Engineering analysis
E) Multilevel prototyping
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is an external source for product ideas?

A) marketing
B) employee suggestions
C) research and development
D) management
E) industry experts
سؤال
The acronym QFD stands for ________.

A) Quality Function Deployment
B) Quality Feasibility Development
C) Quality Function Design
D) Quality Factors for Development
E) Quality Feasibility Data
سؤال
A particular customer requirement has a strong association with a technical requirement, an importance of 9, a target value of 3, and a sales point value of 1. The absolute weight of this customer requirement is ________.

A) 1
B) 3
C) 9
D) 27
E) 243
سؤال
A particular customer requirement is associated with a technical requirement, has an importance of 3, a target value of 1, and a sales point value of 3. The absolute weight of this customer requirement is ________.

A) 9
B) 45
C) 6
D) 90
E) 81
سؤال
During ________ stage of the product development process, preliminary work can be performed to identify key quality characteristics and potential for variability with each of the different materials.

A) product marketing and supply chain preparation
B) technology selection for product development
C) technology development for process selection
D) final product definition
E) manufacturing system design
سؤال
________ describes a method for translating customer requirements into functional design.

A) Manufacturing system design
B) Final product definition
C) Quality function deployment
D) Product design specification
E) Customer future projection
سؤال
The ________ stage of the product development process often requires the design of after-sales processes such as maintenance, warranties, and repair processes that occur after the customer owns the product.

A) final product definition
B) product design and evaluation
C) manufacturing system design
D) technology selection for product development
E) product marketing and supply chain preparation
سؤال
During the ________ stage of the project development process, external and internal sources brainstorm new concepts.

A) product marketing and supply chain preparation
B) technology development for process selection
C) customer future needs projection
D) product idea generation
E) technology selection for product development
سؤال
A particular customer requirement has a strong association with a technical requirement, an importance of 6, a target value of 3, and a sales point value of 2. The absolute weight of this customer requirement is ________.

A) 1
B) 6
C) 9
D) 18
E) 36
سؤال
A particular customer requirement is associated with a technical requirement, has an importance of 3, a target value of 5, and a sales point value of 2. The absolute weight of this customer requirement is ________.

A) 15
B) 30
C) 6
D) 10
E) 25
سؤال
R&D-generated ideas can be differentiated from marketing-generated ideas in that the latter ________.

A) tend to be risky
B) are less aligned with customer needs
C) build on existing designs
D) tend to be groundbreaking
E) tend to be technologically innovative
سؤال
What is the final step in the product development process?

A) project customer needs
B) manufacture, delivery, and use
C) final product definition
D) product evaluation
E) manufacturing system design
سؤال
________ is used to develop a computer compatible mathematical description of a part.

A) Geometric modeling
B) Engineering analysis
C) Multilevel prototyping
D) Process modeling
E) Concurrent engineering
سؤال
The ________ stage of the product development process requires definition of the product architecture, the design, production, testing of subassemblies, and testing of the system for production.

A) manufacturing system design
B) final product definition
C) product design and evaluation
D) technology development for process selection
E) technology selection for product development
سؤال
The ________ stage of the product development process involves the selection of the process technologies that will result in a low-cost, high-quality product.

A) final product definition
B) technology selection for product development
C) technology development for process selection
D) product design and evaluation
E) manufacturing system design
سؤال
In the product development process, the acronym PDS stands for ________.

A) Product Development System
B) Product Distribution System
C) Product Design and Selection
D) Product Design Specification
E) Product Definition and Specification
سؤال
What is the first step in the product development process?

A) project customer needs
B) generate product ideas
C) process technology selection
D) manufacturing system design
E) marketing plan design
سؤال
Which of the following is an internal source for product ideas?

A) management
B) industry experts
C) competitors
D) inventors
E) customers
سؤال
What is the first step in performing quality function deployment?

A) prioritize technical requirements
B) identify the correlations between design elements in the roof of the house
C) prioritize customer requirements
D) develop a listing of technical design elements along the roof of the house
E) develop a list of customer requirements
سؤال
What is the final step in failure modes and effects analysis?

A) describe effects of each failure mode
B) estimate likelihood of failure
C) eliminate or reduce highest risks
D) estimate failure detection
E) determine hazard likelihood and categorize
سؤال
________ systems are used to integrate financial, planning, and control systems into a single architecture.

A) Product data management
B) Enterprise resource planning
C) Computer-aided design
D) Business process management
E) Information technology management
سؤال
________ means to design products so that they are cost-effective and simple to build.

A) Design for maintenance
B) Design for control
C) Design for reliability
D) Design for engineering
E) Design for manufacture
سؤال
________ products are new products using similar technologies that can coexist in a family of products.

A) Contiguous
B) Complementary
C) Differentiated
D) Concurrent
E) Variable
سؤال
The life-cycle approach to product design has led to practices known as ________.

A) design for aesthetics, design for performance, and design for quality
B) design for ease of manufacture, design for optimal pricing, and design for quality
C) design for cost containment, design for quality, and design for conformance
D) design for reuse, design for disassembly, and design for remanufacture
E) design for reliability, design for dependability, and design for conformance
سؤال
A method of manufacturing that minimizes waste and pollution is referred to as ________.

A) renewable manufacturing
B) clean manufacturing
C) green manufacturing
D) ecofriendly manufacturing
E) sustainable manufacturing
سؤال
The primary source for external product ideas is research and development.
سؤال
________ refers to the differences in products that are produced and marketed by a single firm at any given time.

A) Change
B) Criticality
C) Nonuniformity
D) Variety
E) Differentiation
سؤال
________ refers to how often a failure will occur, how easy it is to diagnose, and whether it can be fixed.

A) Reliability
B) Criticality
C) Traceability
D) Feasibility
E) Maintainability
سؤال
________ reliability is defined as the propensity for a part to fail over a given time.

A) System
B) Concurrent
C) Component
D) Process
E) Perpetual
سؤال
________ is the magnitude of the differences in a product when measured at two different times.

A) Criticality
B) Variety
C) Differentiation
D) Nonuniformity
E) Change
سؤال
What is the first step in failure modes and effects analysis?

A) assign each component an identifier
B) list functions for each part
C) identify highest risks
D) list one or two failure modes for each function
E) estimate likelihood of failure
سؤال
The ________ component of a CAD system allows for the cataloging and standardization of parts and components for complex products.

A) group technology
B) geometric modeling
C) multilevel prototyping
D) product testing
E) concurrent engineering
سؤال
________ means standardizing parts, modularizing, and using as few parts as possible in a design.

A) Designing for engineering
B) Designing for reliability
C) Designing for manufacture
D) Designing for simplicity
E) Designing for control
سؤال
________ refers to the performance of all the design process steps simultaneously.

A) Just-in-time engineering
B) Lean engineering
C) Concurrent engineering
D) Reengineering
E) Reverse engineering
سؤال
Examining a design to see if different components in a product occupy the same space is called ________.

A) process evaluation
B) design analysis
C) interference checking
D) multilevel evaluation
E) product testing
سؤال
Over-the-wall syndrome refers to the difficulties that arise when ________.

A) different types of engineers work in totally different departments
B) firms integrate financial, planning, and control systems into a single architecture
C) translating customer requirements into functional design
D) environmental issues become key considerations for companies designing products
E) the design products become complicated to build
سؤال
Industry experts are external sources for product ideas.
سؤال
Product idea generation is the first step in the project development process.
سؤال
The principles for ________ include using fewer parts and fewer materials, and using snap-fits instead of screws.

A) design for disassembly
B) design for conformance
C) design for reuse
D) design for remanufacturing
E) design for performance
سؤال
Variety refers to the differences in products that are produced and marketed by a single firm at any given time.
سؤال
Computer-aided inspection is performed by infrared and noncontact sensors.
سؤال
Customer requirements with high competitive assessments and low importance are candidates for improvement.
سؤال
Design for manufacture means to design products so that they are cost-effective and simple to build.
سؤال
The first step in performing quality function deployment is to develop a listing of technical design elements along the roof of the house.
سؤال
Reengineering refers to the performance of all the design process steps simultaneously.
سؤال
Concurrent engineering leads to increased interaction with the customer.
سؤال
R&D-generated ideas tend to be more incremental than marketing-generated ideas, and are better aligned with customer needs.
سؤال
Change is the magnitude of the differences in a product when measured at two different times.
سؤال
Complementary products are new products using different technologies that can coexist in a family of products.
سؤال
Marketing-generated ideas tend to be groundbreaking, risky, and technologically innovative as compared to R&D-generated ideas.
سؤال
Manufacturing system design is the selection of the product technologies that will result in a low-cost, high-quality product.
سؤال
The multilevel prototyping component of the CAD system allows for the cataloging and standardization of parts and components for complex products.
سؤال
Designing for reliability means standardizing parts, modularizing, and using as few parts as possible in a design.
سؤال
Examining a design to see if different components in a product occupy the same space is called interference checking.
سؤال
Quality function deployment (QFD) describes a method for translating customer requirements into functional design.
سؤال
Automated drafting results in the creation of a final drawing of the designed product and its components.
سؤال
During the technology selection for product development stage of the product development process, preliminary work can be performed to identify key quality characteristics and potential for variability with each of the different materials.
سؤال
Geometric modeling is used to develop a hand-drawn mathematical description of a part.
سؤال
As product life cycles become longer, product variety and change become much more important to a successful competitor.
سؤال
The over-the-wall syndrome refers to difficulties that arise when the design products become complicated to build.
سؤال
How are the values for absolute and relative weights established?
سؤال
Failure modes and effects analysis begins at the highest level of detail to which the system is designed and works downward.
سؤال
Enterprise resource planning systems are used to integrate financial, planning, and control systems into a single architecture.
سؤال
Design for manufacture methods are designed to radically increase cycle times.
سؤال
What are the steps in performing quality function deployment?
سؤال
System reliability is defined as the propensity for a part to fail over a given time.
سؤال
Failure modes and effects analysis is an analytical tool that graphically renders the combinations of faults that lead to failure of a system.
سؤال
What is quality function deployment (QFD)?
سؤال
Criticality prioritizes how the design team should be spending its resources.
سؤال
The primary goal of failure modes, effects, and criticality analysis is to develop priorities for corrective action based on estimated risk.
سؤال
The principles for design for reuse include using fewer parts and fewer materials, and using snap-fits instead of screws.
سؤال
The over-the-wall syndrome is demonstrated by looking at the design process sequentially.
سؤال
The first step in failure modes and effects analysis is to estimate the likelihood of failure.
سؤال
Failure modes and effects analysis results in reduction in product development cost.
سؤال
A method of manufacturing that minimizes waste and pollution is referred to as green manufacturing.
سؤال
Product traceability increases product liability relating to safety hazards.
سؤال
Component reliability is computed from the aggregation of multiple components.
سؤال
What are multi-user CAD systems?
سؤال
State the nine phases of a product development process.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/93
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Quality and Innovation in Product and Process Design
1
________ involves the usage of heat-transfer calculations, stress calculations, or differential equations to determine the dynamic behavior of the system being designed.

A) Process modeling
B) Geometric modeling
C) Concurrent engineering
D) Engineering analysis
E) Multilevel prototyping
D
2
Which of the following is an external source for product ideas?

A) marketing
B) employee suggestions
C) research and development
D) management
E) industry experts
E
3
The acronym QFD stands for ________.

A) Quality Function Deployment
B) Quality Feasibility Development
C) Quality Function Design
D) Quality Factors for Development
E) Quality Feasibility Data
A
4
A particular customer requirement has a strong association with a technical requirement, an importance of 9, a target value of 3, and a sales point value of 1. The absolute weight of this customer requirement is ________.

A) 1
B) 3
C) 9
D) 27
E) 243
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
5
A particular customer requirement is associated with a technical requirement, has an importance of 3, a target value of 1, and a sales point value of 3. The absolute weight of this customer requirement is ________.

A) 9
B) 45
C) 6
D) 90
E) 81
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
6
During ________ stage of the product development process, preliminary work can be performed to identify key quality characteristics and potential for variability with each of the different materials.

A) product marketing and supply chain preparation
B) technology selection for product development
C) technology development for process selection
D) final product definition
E) manufacturing system design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
7
________ describes a method for translating customer requirements into functional design.

A) Manufacturing system design
B) Final product definition
C) Quality function deployment
D) Product design specification
E) Customer future projection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
8
The ________ stage of the product development process often requires the design of after-sales processes such as maintenance, warranties, and repair processes that occur after the customer owns the product.

A) final product definition
B) product design and evaluation
C) manufacturing system design
D) technology selection for product development
E) product marketing and supply chain preparation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
9
During the ________ stage of the project development process, external and internal sources brainstorm new concepts.

A) product marketing and supply chain preparation
B) technology development for process selection
C) customer future needs projection
D) product idea generation
E) technology selection for product development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
10
A particular customer requirement has a strong association with a technical requirement, an importance of 6, a target value of 3, and a sales point value of 2. The absolute weight of this customer requirement is ________.

A) 1
B) 6
C) 9
D) 18
E) 36
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
11
A particular customer requirement is associated with a technical requirement, has an importance of 3, a target value of 5, and a sales point value of 2. The absolute weight of this customer requirement is ________.

A) 15
B) 30
C) 6
D) 10
E) 25
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
12
R&D-generated ideas can be differentiated from marketing-generated ideas in that the latter ________.

A) tend to be risky
B) are less aligned with customer needs
C) build on existing designs
D) tend to be groundbreaking
E) tend to be technologically innovative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
13
What is the final step in the product development process?

A) project customer needs
B) manufacture, delivery, and use
C) final product definition
D) product evaluation
E) manufacturing system design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
14
________ is used to develop a computer compatible mathematical description of a part.

A) Geometric modeling
B) Engineering analysis
C) Multilevel prototyping
D) Process modeling
E) Concurrent engineering
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ________ stage of the product development process requires definition of the product architecture, the design, production, testing of subassemblies, and testing of the system for production.

A) manufacturing system design
B) final product definition
C) product design and evaluation
D) technology development for process selection
E) technology selection for product development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
16
The ________ stage of the product development process involves the selection of the process technologies that will result in a low-cost, high-quality product.

A) final product definition
B) technology selection for product development
C) technology development for process selection
D) product design and evaluation
E) manufacturing system design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
17
In the product development process, the acronym PDS stands for ________.

A) Product Development System
B) Product Distribution System
C) Product Design and Selection
D) Product Design Specification
E) Product Definition and Specification
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
18
What is the first step in the product development process?

A) project customer needs
B) generate product ideas
C) process technology selection
D) manufacturing system design
E) marketing plan design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is an internal source for product ideas?

A) management
B) industry experts
C) competitors
D) inventors
E) customers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
20
What is the first step in performing quality function deployment?

A) prioritize technical requirements
B) identify the correlations between design elements in the roof of the house
C) prioritize customer requirements
D) develop a listing of technical design elements along the roof of the house
E) develop a list of customer requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
21
What is the final step in failure modes and effects analysis?

A) describe effects of each failure mode
B) estimate likelihood of failure
C) eliminate or reduce highest risks
D) estimate failure detection
E) determine hazard likelihood and categorize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
22
________ systems are used to integrate financial, planning, and control systems into a single architecture.

A) Product data management
B) Enterprise resource planning
C) Computer-aided design
D) Business process management
E) Information technology management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
23
________ means to design products so that they are cost-effective and simple to build.

A) Design for maintenance
B) Design for control
C) Design for reliability
D) Design for engineering
E) Design for manufacture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
24
________ products are new products using similar technologies that can coexist in a family of products.

A) Contiguous
B) Complementary
C) Differentiated
D) Concurrent
E) Variable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
25
The life-cycle approach to product design has led to practices known as ________.

A) design for aesthetics, design for performance, and design for quality
B) design for ease of manufacture, design for optimal pricing, and design for quality
C) design for cost containment, design for quality, and design for conformance
D) design for reuse, design for disassembly, and design for remanufacture
E) design for reliability, design for dependability, and design for conformance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
26
A method of manufacturing that minimizes waste and pollution is referred to as ________.

A) renewable manufacturing
B) clean manufacturing
C) green manufacturing
D) ecofriendly manufacturing
E) sustainable manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
27
The primary source for external product ideas is research and development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
28
________ refers to the differences in products that are produced and marketed by a single firm at any given time.

A) Change
B) Criticality
C) Nonuniformity
D) Variety
E) Differentiation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
29
________ refers to how often a failure will occur, how easy it is to diagnose, and whether it can be fixed.

A) Reliability
B) Criticality
C) Traceability
D) Feasibility
E) Maintainability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
30
________ reliability is defined as the propensity for a part to fail over a given time.

A) System
B) Concurrent
C) Component
D) Process
E) Perpetual
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
31
________ is the magnitude of the differences in a product when measured at two different times.

A) Criticality
B) Variety
C) Differentiation
D) Nonuniformity
E) Change
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
32
What is the first step in failure modes and effects analysis?

A) assign each component an identifier
B) list functions for each part
C) identify highest risks
D) list one or two failure modes for each function
E) estimate likelihood of failure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
33
The ________ component of a CAD system allows for the cataloging and standardization of parts and components for complex products.

A) group technology
B) geometric modeling
C) multilevel prototyping
D) product testing
E) concurrent engineering
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
34
________ means standardizing parts, modularizing, and using as few parts as possible in a design.

A) Designing for engineering
B) Designing for reliability
C) Designing for manufacture
D) Designing for simplicity
E) Designing for control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
35
________ refers to the performance of all the design process steps simultaneously.

A) Just-in-time engineering
B) Lean engineering
C) Concurrent engineering
D) Reengineering
E) Reverse engineering
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
36
Examining a design to see if different components in a product occupy the same space is called ________.

A) process evaluation
B) design analysis
C) interference checking
D) multilevel evaluation
E) product testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
37
Over-the-wall syndrome refers to the difficulties that arise when ________.

A) different types of engineers work in totally different departments
B) firms integrate financial, planning, and control systems into a single architecture
C) translating customer requirements into functional design
D) environmental issues become key considerations for companies designing products
E) the design products become complicated to build
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
38
Industry experts are external sources for product ideas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
39
Product idea generation is the first step in the project development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
40
The principles for ________ include using fewer parts and fewer materials, and using snap-fits instead of screws.

A) design for disassembly
B) design for conformance
C) design for reuse
D) design for remanufacturing
E) design for performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
41
Variety refers to the differences in products that are produced and marketed by a single firm at any given time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
42
Computer-aided inspection is performed by infrared and noncontact sensors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
43
Customer requirements with high competitive assessments and low importance are candidates for improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
44
Design for manufacture means to design products so that they are cost-effective and simple to build.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
45
The first step in performing quality function deployment is to develop a listing of technical design elements along the roof of the house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
46
Reengineering refers to the performance of all the design process steps simultaneously.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
47
Concurrent engineering leads to increased interaction with the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
48
R&D-generated ideas tend to be more incremental than marketing-generated ideas, and are better aligned with customer needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
49
Change is the magnitude of the differences in a product when measured at two different times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
50
Complementary products are new products using different technologies that can coexist in a family of products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
51
Marketing-generated ideas tend to be groundbreaking, risky, and technologically innovative as compared to R&D-generated ideas.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
52
Manufacturing system design is the selection of the product technologies that will result in a low-cost, high-quality product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
53
The multilevel prototyping component of the CAD system allows for the cataloging and standardization of parts and components for complex products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
54
Designing for reliability means standardizing parts, modularizing, and using as few parts as possible in a design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
55
Examining a design to see if different components in a product occupy the same space is called interference checking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
56
Quality function deployment (QFD) describes a method for translating customer requirements into functional design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
57
Automated drafting results in the creation of a final drawing of the designed product and its components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
58
During the technology selection for product development stage of the product development process, preliminary work can be performed to identify key quality characteristics and potential for variability with each of the different materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
59
Geometric modeling is used to develop a hand-drawn mathematical description of a part.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
60
As product life cycles become longer, product variety and change become much more important to a successful competitor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
61
The over-the-wall syndrome refers to difficulties that arise when the design products become complicated to build.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
62
How are the values for absolute and relative weights established?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
63
Failure modes and effects analysis begins at the highest level of detail to which the system is designed and works downward.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
64
Enterprise resource planning systems are used to integrate financial, planning, and control systems into a single architecture.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
65
Design for manufacture methods are designed to radically increase cycle times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
66
What are the steps in performing quality function deployment?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
67
System reliability is defined as the propensity for a part to fail over a given time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
68
Failure modes and effects analysis is an analytical tool that graphically renders the combinations of faults that lead to failure of a system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
69
What is quality function deployment (QFD)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
70
Criticality prioritizes how the design team should be spending its resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
71
The primary goal of failure modes, effects, and criticality analysis is to develop priorities for corrective action based on estimated risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
72
The principles for design for reuse include using fewer parts and fewer materials, and using snap-fits instead of screws.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
73
The over-the-wall syndrome is demonstrated by looking at the design process sequentially.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
74
The first step in failure modes and effects analysis is to estimate the likelihood of failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
75
Failure modes and effects analysis results in reduction in product development cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
76
A method of manufacturing that minimizes waste and pollution is referred to as green manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
77
Product traceability increases product liability relating to safety hazards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
78
Component reliability is computed from the aggregation of multiple components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
79
What are multi-user CAD systems?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
80
State the nine phases of a product development process.