Deck 10: Building Successful Information Systems

ملء الشاشة (f)
exit full mode
سؤال
During the planning phase of the systems development life cycle (SDLC),the systems designer must define the symptoms rather than the underlying problem.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
During the implementation phase of the systems development life cycle (SDLC),in phased-in-phased-out conversion,an analyst introduces an information system in only a limited area of an organization.
سؤال
Only tangible benefits should be included in an economic feasibility study since intangible benefits cannot be quantified.
سؤال
Using the joint application design (JAD) approach results in the collected requirements for the application being too narrow and one-dimensional in focus.
سؤال
The creation of a system specifications document indicates the beginning of the analysis phase of the systems development life cycle (SDLC).
سؤال
External users are normally part of a company's task force.
سؤال
It is easier to modify a complete system than a prototype.
سؤال
During the planning phase of the systems development life cycle (SDLC),analysts investigate a proposed solution's feasibility and determine how best to present the solution to management to get funding.
سؤال
Normally,a task force for the planning phase of the systems development life cycle (SDLC) only includes representatives from the IT department along with the top management.
سؤال
Establishing evaluation criteria often gives rise to subjectivity issues during the systems development life cycle (SDLC) process.
سؤال
While using PERT (Program Evaluation Review Technique) and CPM (Critical Path Method) techniques,activities that are not on the critical path are more inflexible than those activities on the critical path.
سؤال
Flowcharts are tools used in the structured systems analysis and design (SSAD) model for data analysis.
سؤال
It is important to project an organization's growth rate when designing information systems.
سؤال
Examples of tangible benefits include improved employee morale,better customer satisfaction,and improved communication.
سؤال
In a PERT (Program Evaluation Review Technique) or CPM (Critical Path Method) network,the critical path takes the shortest time to be completed.
سؤال
The object-oriented approach treats process and data independently and is a sequential approach that requires completing the analysis before beginning the design.
سؤال
Workflow plans,floor plans,statistical information,project sequence diagrams,and timelines or milestone charts are all useful supporting documentation for an economic feasibility study.
سؤال
Information system projects are often an extension of existing systems or involve replacing an old technology with a new one.
سؤال
An example of an externally identified problem would be management voicing concern about an organization's lack of a competitive edge in the marketplace.
سؤال
Users and top management should not be included in the construction phase of a prototype because construction is purely a technical matter.
سؤال
____ feasibility is the measure of how well a proposed solution will work in an organization and how internal and external customers will react to it.

A) Economic
B) Technical
C) Operational
D) Scheduling
سؤال
Service-oriented architecture (SOA) advocates that core business functions and the dynamic functions that change all the time should be decoupled.
سؤال
In comparison to extreme programming (XP),in agile methodology,there is more emphasis on team coding and less emphasis on limiting the project's scope.
سؤال
_____ feasibility assesses an information system's costs and benefits.

A) Economic
B) Technical
C) Operational
D) Scheduling
سؤال
A disadvantage of extreme programming (XP) is lack of feedback from users.
سؤال
The systems development life cycle (SDLC) is also known as the _____.

A) ad hoc cycle
B) self-sourcing model
C) agile cycle
D) waterfall model
سؤال
The systems development life cycle (SDLC) model is likely to be used if a particular problem is "ad hoc," meaning it is a one-time problem.
سؤال
_____ feasibility is concerned with whether a new system can be completed on time.

A) Economic
B) Technical
C) Operational
D) Scheduling
سؤال
During the _____ phase of the systems development life cycle (SDLC) model,an information systems designer must define the problem an organization faces,taking care not to define symptoms rather than the underlying problem.

A) planning
B) requirements-gathering and analysis
C) design
D) implementation
سؤال
A request for information (RFI) is not suitable for complex projects.
سؤال
A major advantage of a request for proposal (RFP) is its short time frame that makes it quite appealing.
سؤال
_____ costs measure what an individual would miss by not having an information system or feature.

A) Opportunity
B) Operating
C) Development
D) Investment
سؤال
_____ centers on a structured workshop in which users and system professionals come together to develop an application.

A) Extreme programming (XP)
B) Joint application design (JAD)
C) Service-oriented architecture (SOA)
D) Rapid application development (RAD)
سؤال
Which of the following is an example of a tangible benefit of an information system?

A) Improved employee morale
B) Better customer satisfaction
C) Increased company profits
D) Increased flexibility in business operations
سؤال
External users of an organization's information system are:

A) refrained from providing feedback.
B) its customers, contractors, and suppliers.
C) typically part of a task force.
D) the employees who use the system.
سؤال
Systems development life cycle (SDLC) develops the entire system at once,whereas extreme programming (XP) uses incremental steps to improve an information system's quality.
سؤال
Self-sourcing improves flexibility in responding to users' information needs.
سؤال
_____ are employees who will use an information system regularly,and they can offer important feedback on the system's strengths and weaknesses.

A) Internal users
B) Customers
C) Suppliers
D) Business partners
سؤال
Outsourcing decreases the risk of leaking confidential information to competitors.
سؤال
An advantage of rapid application development (RAD) is its broad focus,which often facilitates future development.
سؤال
During the design phase of the systems development life cycle (SDLC),the _____ design is created for a specific platform,such as choosing Dell servers running Ubuntu Linux and Java for the programming language.

A) layout
B) physical
C) conceptual
D) logical
سؤال
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,as each module of a new system is converted,the corresponding part of an old system is retired.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
سؤال
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,the analyst introduces an information system in only a limited area of an organization,such as a division or department.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
سؤال
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,the old and new systems run simultaneously for a short time to ensure the new system works correctly.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
سؤال
A _____ prototype shows users how a particular task that was not technically feasible can be done.

A) proof-of-concept
B) computer-aided
C) requirements-based
D) phased-in-phased-out
سؤال
During the ____ phase of the systems development life cycle (SDLC),a solution is transferred from paper to action,and a team configures the system and procures components for it.

A) requirements-gathering and analysis
B) design
C) implementation
D) maintenance
سؤال
A _____ is a tool used in structured systems analysis and design (SSAD) analysis model that shows a process at a more general level and is helpful for showing top management and the task force how a process works.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
سؤال
In the design phase of the systems development life cycle (SDLC),the _____ design indicates hardware and software,such as specifying Linux servers and Windows clients.

A) layout
B) physical
C) conceptual
D) logical
سؤال
During the _____ phase of the systems development life cycle (SDLC),analysts choose the solution that is the most realistic and offers the highest payoff for an organization.

A) planning
B) requirements-gathering and analysis
C) design
D) implementation
سؤال
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,an old system is stopped and a new system is implemented.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
سؤال
A _____ is a tool used in structured systems analysis and design (SSAD) analysis model that helps break down a complex process into simpler,more manageable,and more understandable subprocesses.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
سؤال
In the _____ phase of the systems development life cycle (SDLC),a problem is defined and alternatives are generated for solving it.

A) planning
B) requirements-gathering and analysis
C) design
D) implementation and maintenance
سؤال
In the design phase of the systems development life cycle (SDLC),the _____ design is an overview of the system and does not include hardware or software choices.

A) layout
B) physical
C) conceptual
D) logical
سؤال
Computer-aided systems engineering (CASE) tools are typically used during the _____ phase of the of the systems development life cycle (SDLC).

A) planning
B) design
C) implementation
D) maintenance
سؤال
With _____ outsourcing,an organization chooses an outsourcing company in the same country.

A) onshore
B) nearshore
C) offshore
D) farshore
سؤال
With _____ outsourcing,an organization chooses an outsourcing company in a neighboring country,such as when a U.S.organization chooses a company in Canada or Mexico.

A) onshore
B) nearshore
C) offshore
D) onsite
سؤال
A _____ is a tool used in structured systems analysis and design (SSAD) analysis model that illustrates the logical steps in a process but does not show data elements and associations.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
سؤال
A ____ is a tool used in structured systems analysis and design (SSAD) analysis model that helps analysts understand the data requirements an information system must meet by defining data elements and showing the associations between them.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
سؤال
_____ feasibility is concerned with issues such as political repercussions of using an information system and whether the system takes the Information Privacy Act into account.

A) Economic
B) Technical
C) Operational
D) Legal
سؤال
The _____ document,which indicates the start of the design phase,is created during the requirements-gathering and analysis phase of the systems development life cycle (SDLC).

A) maintenance plan
B) system specifications
C) design
D) screening
سؤال
_____ is a method for developing software applications and information system projects in which a project is divided into smaller functions and developers cannot go on to the next phase until the current phase is finished.

A) Extreme programming (XP)
B) Rapid application development (RAD)
C) Joint application design (JAD)
D) Service-oriented architecture (SOA)
سؤال
A(n) _____ is a written document with detailed specifications that is used to request bids for equipment,supplies,or services from vendors.
سؤال
_____ is a series of well-defined phases performed in sequence that serves as a framework for developing an information system or project.
سؤال
_____ is an incremental development process,which focuses on setting a minimum number of requirements and turning them into a working product.
سؤال
_____ refers to the trend of end users developing their own information systems with little or no formal assistance from an information systems team.
سؤال
During the _____ phase of the systems development life cycle (SDLC),an information system is operating,enhancements and modifications to the system have been developed and tested,and hardware and software components have been added or replaced.

A) planning
B) design
C) implementation
D) maintenance
سؤال
_____ is similar to extreme programming (XP) in focusing on an incremental development process and timely delivery of working software,which has less emphasis on team coding and more emphasis on limiting a project's scope.
سؤال
The end result of the _____ phase of the systems development life cycle (SDLC) should give users and top management a clear view of what the problem is and how the information system will solve the problem.
سؤال
In the context of systems development life cycle (SDLC),the tool used by analysts for the purpose of investigating a proposed solution's viability and determine how best to present the solution to management in order to obtain funding is called _____.
سؤال
In the extreme programming (XP) environment,a method where programmers are usually organized into teams of two,sharing a workstation and working on the same code is known as _____.
سؤال
The _____ approach treats process and data independently and is a sequential approach that requires completing the analysis before beginning the design of information systems.
سؤال
_____ are small-scale versions of information systems,which are built before building the entire system,and are used to illustrate the system's benefits and allow users to offer feedback.
سؤال
The fundamental principle behind _____ is that the "blocks of codes" can be reused in a variety of different applications,allowing new business processes to be created from a pool of existing services.
سؤال
A(n) _____ chart,which is a project management technique,can be established using the critical path to list the completion time of a project on the x-axis and all the activities on the y-axis.
سؤال
_____ is a philosophy and a software and system development methodology that focuses on the development,use,and reuse of small,self-contained blocks of codes to meet the software needs of an organization.

A) Extreme programming (XP)
B) Rapid application development (RAD)
C) Service-oriented architecture (SOA)
D) Joint application design (JAD)
سؤال
_____ is an approach where an organization's team develops an information system internally.
سؤال
With _____ outsourcing,an organization chooses an outsourcing company in any part of the world (usually a country farther away than a neighboring country),as long as it can provide the needed services.

A) onshore
B) nearshore
C) offshore
D) onsite
سؤال
The project management technique PERT stands for _____
سؤال
_____ uses an iterative process that repeats the design,development,and testing steps as needed,based on feedback from users.

A) Extreme programming (XP)
B) Rapid application development (RAD)
C) Joint application design (JAD)
D) Service-oriented architecture (SOA)
سؤال
_____ prototypes are used to market a proposed system to users and management by showing some of its features and demonstrating how beneficial it could be to an organization.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/100
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Building Successful Information Systems
1
During the planning phase of the systems development life cycle (SDLC),the systems designer must define the symptoms rather than the underlying problem.
False
2
During the implementation phase of the systems development life cycle (SDLC),in phased-in-phased-out conversion,an analyst introduces an information system in only a limited area of an organization.
False
3
Only tangible benefits should be included in an economic feasibility study since intangible benefits cannot be quantified.
False
4
Using the joint application design (JAD) approach results in the collected requirements for the application being too narrow and one-dimensional in focus.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
5
The creation of a system specifications document indicates the beginning of the analysis phase of the systems development life cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
6
External users are normally part of a company's task force.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
7
It is easier to modify a complete system than a prototype.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
8
During the planning phase of the systems development life cycle (SDLC),analysts investigate a proposed solution's feasibility and determine how best to present the solution to management to get funding.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
9
Normally,a task force for the planning phase of the systems development life cycle (SDLC) only includes representatives from the IT department along with the top management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
10
Establishing evaluation criteria often gives rise to subjectivity issues during the systems development life cycle (SDLC) process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
11
While using PERT (Program Evaluation Review Technique) and CPM (Critical Path Method) techniques,activities that are not on the critical path are more inflexible than those activities on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
12
Flowcharts are tools used in the structured systems analysis and design (SSAD) model for data analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
13
It is important to project an organization's growth rate when designing information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
14
Examples of tangible benefits include improved employee morale,better customer satisfaction,and improved communication.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
15
In a PERT (Program Evaluation Review Technique) or CPM (Critical Path Method) network,the critical path takes the shortest time to be completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
16
The object-oriented approach treats process and data independently and is a sequential approach that requires completing the analysis before beginning the design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
17
Workflow plans,floor plans,statistical information,project sequence diagrams,and timelines or milestone charts are all useful supporting documentation for an economic feasibility study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
18
Information system projects are often an extension of existing systems or involve replacing an old technology with a new one.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
19
An example of an externally identified problem would be management voicing concern about an organization's lack of a competitive edge in the marketplace.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
20
Users and top management should not be included in the construction phase of a prototype because construction is purely a technical matter.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
21
____ feasibility is the measure of how well a proposed solution will work in an organization and how internal and external customers will react to it.

A) Economic
B) Technical
C) Operational
D) Scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
22
Service-oriented architecture (SOA) advocates that core business functions and the dynamic functions that change all the time should be decoupled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
23
In comparison to extreme programming (XP),in agile methodology,there is more emphasis on team coding and less emphasis on limiting the project's scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
24
_____ feasibility assesses an information system's costs and benefits.

A) Economic
B) Technical
C) Operational
D) Scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
25
A disadvantage of extreme programming (XP) is lack of feedback from users.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
26
The systems development life cycle (SDLC) is also known as the _____.

A) ad hoc cycle
B) self-sourcing model
C) agile cycle
D) waterfall model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
27
The systems development life cycle (SDLC) model is likely to be used if a particular problem is "ad hoc," meaning it is a one-time problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
28
_____ feasibility is concerned with whether a new system can be completed on time.

A) Economic
B) Technical
C) Operational
D) Scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
29
During the _____ phase of the systems development life cycle (SDLC) model,an information systems designer must define the problem an organization faces,taking care not to define symptoms rather than the underlying problem.

A) planning
B) requirements-gathering and analysis
C) design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
30
A request for information (RFI) is not suitable for complex projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
31
A major advantage of a request for proposal (RFP) is its short time frame that makes it quite appealing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
32
_____ costs measure what an individual would miss by not having an information system or feature.

A) Opportunity
B) Operating
C) Development
D) Investment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
33
_____ centers on a structured workshop in which users and system professionals come together to develop an application.

A) Extreme programming (XP)
B) Joint application design (JAD)
C) Service-oriented architecture (SOA)
D) Rapid application development (RAD)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is an example of a tangible benefit of an information system?

A) Improved employee morale
B) Better customer satisfaction
C) Increased company profits
D) Increased flexibility in business operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
35
External users of an organization's information system are:

A) refrained from providing feedback.
B) its customers, contractors, and suppliers.
C) typically part of a task force.
D) the employees who use the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
36
Systems development life cycle (SDLC) develops the entire system at once,whereas extreme programming (XP) uses incremental steps to improve an information system's quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
37
Self-sourcing improves flexibility in responding to users' information needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
38
_____ are employees who will use an information system regularly,and they can offer important feedback on the system's strengths and weaknesses.

A) Internal users
B) Customers
C) Suppliers
D) Business partners
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
39
Outsourcing decreases the risk of leaking confidential information to competitors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
40
An advantage of rapid application development (RAD) is its broad focus,which often facilitates future development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
41
During the design phase of the systems development life cycle (SDLC),the _____ design is created for a specific platform,such as choosing Dell servers running Ubuntu Linux and Java for the programming language.

A) layout
B) physical
C) conceptual
D) logical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
42
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,as each module of a new system is converted,the corresponding part of an old system is retired.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
43
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,the analyst introduces an information system in only a limited area of an organization,such as a division or department.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
44
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,the old and new systems run simultaneously for a short time to ensure the new system works correctly.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
45
A _____ prototype shows users how a particular task that was not technically feasible can be done.

A) proof-of-concept
B) computer-aided
C) requirements-based
D) phased-in-phased-out
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
46
During the ____ phase of the systems development life cycle (SDLC),a solution is transferred from paper to action,and a team configures the system and procures components for it.

A) requirements-gathering and analysis
B) design
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
47
A _____ is a tool used in structured systems analysis and design (SSAD) analysis model that shows a process at a more general level and is helpful for showing top management and the task force how a process works.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
48
In the design phase of the systems development life cycle (SDLC),the _____ design indicates hardware and software,such as specifying Linux servers and Windows clients.

A) layout
B) physical
C) conceptual
D) logical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
49
During the _____ phase of the systems development life cycle (SDLC),analysts choose the solution that is the most realistic and offers the highest payoff for an organization.

A) planning
B) requirements-gathering and analysis
C) design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
50
During the implementation phase of the systems development life cycle (SDLC),in _____ conversion,an old system is stopped and a new system is implemented.

A) parallel
B) phased-in-phased-out
C) plunge
D) pilot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
51
A _____ is a tool used in structured systems analysis and design (SSAD) analysis model that helps break down a complex process into simpler,more manageable,and more understandable subprocesses.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
52
In the _____ phase of the systems development life cycle (SDLC),a problem is defined and alternatives are generated for solving it.

A) planning
B) requirements-gathering and analysis
C) design
D) implementation and maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
53
In the design phase of the systems development life cycle (SDLC),the _____ design is an overview of the system and does not include hardware or software choices.

A) layout
B) physical
C) conceptual
D) logical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
54
Computer-aided systems engineering (CASE) tools are typically used during the _____ phase of the of the systems development life cycle (SDLC).

A) planning
B) design
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
55
With _____ outsourcing,an organization chooses an outsourcing company in the same country.

A) onshore
B) nearshore
C) offshore
D) farshore
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
56
With _____ outsourcing,an organization chooses an outsourcing company in a neighboring country,such as when a U.S.organization chooses a company in Canada or Mexico.

A) onshore
B) nearshore
C) offshore
D) onsite
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
57
A _____ is a tool used in structured systems analysis and design (SSAD) analysis model that illustrates the logical steps in a process but does not show data elements and associations.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
58
A ____ is a tool used in structured systems analysis and design (SSAD) analysis model that helps analysts understand the data requirements an information system must meet by defining data elements and showing the associations between them.

A) data flow diagram
B) flowchart
C) context diagram
D) conceptual data model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
59
_____ feasibility is concerned with issues such as political repercussions of using an information system and whether the system takes the Information Privacy Act into account.

A) Economic
B) Technical
C) Operational
D) Legal
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
60
The _____ document,which indicates the start of the design phase,is created during the requirements-gathering and analysis phase of the systems development life cycle (SDLC).

A) maintenance plan
B) system specifications
C) design
D) screening
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
61
_____ is a method for developing software applications and information system projects in which a project is divided into smaller functions and developers cannot go on to the next phase until the current phase is finished.

A) Extreme programming (XP)
B) Rapid application development (RAD)
C) Joint application design (JAD)
D) Service-oriented architecture (SOA)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
62
A(n) _____ is a written document with detailed specifications that is used to request bids for equipment,supplies,or services from vendors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
63
_____ is a series of well-defined phases performed in sequence that serves as a framework for developing an information system or project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
64
_____ is an incremental development process,which focuses on setting a minimum number of requirements and turning them into a working product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
65
_____ refers to the trend of end users developing their own information systems with little or no formal assistance from an information systems team.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
66
During the _____ phase of the systems development life cycle (SDLC),an information system is operating,enhancements and modifications to the system have been developed and tested,and hardware and software components have been added or replaced.

A) planning
B) design
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
67
_____ is similar to extreme programming (XP) in focusing on an incremental development process and timely delivery of working software,which has less emphasis on team coding and more emphasis on limiting a project's scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
68
The end result of the _____ phase of the systems development life cycle (SDLC) should give users and top management a clear view of what the problem is and how the information system will solve the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
69
In the context of systems development life cycle (SDLC),the tool used by analysts for the purpose of investigating a proposed solution's viability and determine how best to present the solution to management in order to obtain funding is called _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
70
In the extreme programming (XP) environment,a method where programmers are usually organized into teams of two,sharing a workstation and working on the same code is known as _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
71
The _____ approach treats process and data independently and is a sequential approach that requires completing the analysis before beginning the design of information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
72
_____ are small-scale versions of information systems,which are built before building the entire system,and are used to illustrate the system's benefits and allow users to offer feedback.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
73
The fundamental principle behind _____ is that the "blocks of codes" can be reused in a variety of different applications,allowing new business processes to be created from a pool of existing services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
74
A(n) _____ chart,which is a project management technique,can be established using the critical path to list the completion time of a project on the x-axis and all the activities on the y-axis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
75
_____ is a philosophy and a software and system development methodology that focuses on the development,use,and reuse of small,self-contained blocks of codes to meet the software needs of an organization.

A) Extreme programming (XP)
B) Rapid application development (RAD)
C) Service-oriented architecture (SOA)
D) Joint application design (JAD)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
76
_____ is an approach where an organization's team develops an information system internally.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
77
With _____ outsourcing,an organization chooses an outsourcing company in any part of the world (usually a country farther away than a neighboring country),as long as it can provide the needed services.

A) onshore
B) nearshore
C) offshore
D) onsite
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
78
The project management technique PERT stands for _____
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
79
_____ uses an iterative process that repeats the design,development,and testing steps as needed,based on feedback from users.

A) Extreme programming (XP)
B) Rapid application development (RAD)
C) Joint application design (JAD)
D) Service-oriented architecture (SOA)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
80
_____ prototypes are used to market a proposed system to users and management by showing some of its features and demonstrating how beneficial it could be to an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 100 في هذه المجموعة.