Deck 20: Value at Risk and Expected Shortfall

ملء الشاشة (f)
exit full mode
سؤال
What does EWMA stand for?

A) Equally weighted moving average
B) Equally weighted median approximation
C) Exponentially weighted moving average
D) Exponentially weighted median average
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is true of the historical simulation method for calculating VaR?

A) It fits historical data on the behavior of variables to a normal distribution
B) It fits historical data on the behavior of variables to a lognormal distribution
C) It assumes that what will happen in the future is a random sample from what has happened in the past
D) It uses Monte Carlo simulation to create random future scenarios
سؤال
At the end of Thursday, the estimated covariance between assets A and B is 0.0001. During Friday asset A produces a return of 3% and asset B produces a return of zero. An EWMA model with lambda equal to 0.9 is used. What is an estimate of the covariance at the end of Friday?

A) 0.000090
B) 0.000081
C) 0.000100
D) 0.000095
سؤال
The 10-day VaR is often assumed to be which of the following

A) The 1-day VaR multiplied by 10
B) The 1-day VaR multiplied by the square root of10
C) The 1-day VaR divided by 10
D) The 1-day VaR divided by the square root of 10
سؤال
14. An investor has $2,000 invested in stock A and $5,000 in stock B. The daily volatilities of A and B are 1.5% and 1% respectively and the coefficient of correlation is 0.8. What is the one day 99% VaR? (Note that N(-2.33)=0.01)

A) $177
B) $135
C) $215
D) $331
سؤال
At the end of Thursday, the estimated volatility of asset A is 2% per day. During Friday asset A produces a return of 3%. An EWMA model with lambda equal to 0.9 is used. What is an estimate of the volatility of asset A at the end of Friday?

A) 2.08%
B) 2.10%
C) 2.12%
D) 2.14%
سؤال
At the end of Thursday, the estimated volatility of asset B is 1% per day. During Friday asset B produces a return of zero. An EWMA model with lambda equal to 0.9 is used. What is an estimate of the volatility of asset A at the end of Friday?

A) 0.98%
B) 0.95%
C) 0.92%
D) 0.90%
سؤال
Which of the following is true of a covariance matrix?

A) The numbers on the diagonal are variances
B) The numbers on the diagonal are standard deviations
C) The numbers on the diagonal are all one
D) The numbers on the diagonal are all zero
سؤال
Which of the following is true when lambda equals 0.95?

A) The weight given to the most recent observation is 0.95
B) The weight given to the observation one day ago is 95% of the weight given to the observation two days ago
C) The weights given to observations add up to 0.95
D) The weights given to the observation two days ago is 95% of the weight given to the observation one day ago
سؤال
If the volatility for a portfolio is 20% per year, what is the volatility per quarter?

A) 20%
B) 10%
C) 5%
D) 2%
سؤال
What is the method of testing how often a VaR with a certain confidence level was exceeded in the past called?

A) Stress testing
B) Backtesting
C) EWMA
D) The model-building approach
سؤال
Which of the following is a definition of the covariance between X and Y?

A) Correlation between X and Y times variance of X times variance of Y
B) Variance of X times the variance of Y
C) Correlation between X and Y divided by the product of the standard deviation of X and the standard deviation of Y
D) Correlation between X and Y times standard deviation of X times standard deviation of Y
سؤال
Which of the following is true?

A) The quadratic model approximates daily changes in using delta and gamma
B) The quadratic model approximates daily changes using delta, but not gamma
C) The quadratic model approximates daily changes using gamma, but not delta
D) None of the above
سؤال
Which of the following is true of the 99.9% value at risk?

A) There is 1 chance in 10 that the loss will be greater than the value of risk
B) There is 1 chance in 100 that the loss will be greater than the value of risk
C) There is 1 chance in 1000 that the loss will be greater than the value of risk
D) None of the above
سؤال
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million. What is the 99% expected shortfall?

A) $0.145 million
B) $0.14 million
C) $0.13 million
D) $0.10 million
سؤال
Which of the following describes stressed VaR?

A) It is based on movements in market variables in stressed market conditions
B) It is VaR with a very high confidence level
C) It is VaR multiplied by a factor of 3
D) None of the above
سؤال
Which of the following is true?

A) Cash flow mapping is a way of calculating the present value of cash flows
B) Cash flow mapping is used to handle interest rate exposures in the model building approach
C) Cash flow mapping is used to handle interest rate exposures in the historical simulation approach
D) None of the above
سؤال
Which was the minimum capital requirement for market risk in the 1996 BIS Amendment?

A) At least 3 times the 10-day VaR with a 99% confidence level
B) At least 3 times 7-day VaR with a 97% confidence level
C) At least 2 times 5-day VaR with a 95% confidence level
D) 1-day VaR with a 99% confidence level
سؤال
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million. What is the 99% value at risk?

A) $0.145 million
B) $0.14 million
C) $0.13 million
D) $0.10 million
سؤال
Which of the following is true when delta, but not gamma, is used in calculating VaR for option positions?

A) VaR for a long call is too low and VaR for a long put is too low
B) VaR for a long call is too low and VaR for a long put is too high
C) VaR for a long call is too high and VaR for a long put is too low
D) VaR for a long call is too high and VaR for a long put is too high
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 20: Value at Risk and Expected Shortfall
1
What does EWMA stand for?

A) Equally weighted moving average
B) Equally weighted median approximation
C) Exponentially weighted moving average
D) Exponentially weighted median average
C
2
Which of the following is true of the historical simulation method for calculating VaR?

A) It fits historical data on the behavior of variables to a normal distribution
B) It fits historical data on the behavior of variables to a lognormal distribution
C) It assumes that what will happen in the future is a random sample from what has happened in the past
D) It uses Monte Carlo simulation to create random future scenarios
C
3
At the end of Thursday, the estimated covariance between assets A and B is 0.0001. During Friday asset A produces a return of 3% and asset B produces a return of zero. An EWMA model with lambda equal to 0.9 is used. What is an estimate of the covariance at the end of Friday?

A) 0.000090
B) 0.000081
C) 0.000100
D) 0.000095
A
4
The 10-day VaR is often assumed to be which of the following

A) The 1-day VaR multiplied by 10
B) The 1-day VaR multiplied by the square root of10
C) The 1-day VaR divided by 10
D) The 1-day VaR divided by the square root of 10
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
14. An investor has $2,000 invested in stock A and $5,000 in stock B. The daily volatilities of A and B are 1.5% and 1% respectively and the coefficient of correlation is 0.8. What is the one day 99% VaR? (Note that N(-2.33)=0.01)

A) $177
B) $135
C) $215
D) $331
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
At the end of Thursday, the estimated volatility of asset A is 2% per day. During Friday asset A produces a return of 3%. An EWMA model with lambda equal to 0.9 is used. What is an estimate of the volatility of asset A at the end of Friday?

A) 2.08%
B) 2.10%
C) 2.12%
D) 2.14%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
At the end of Thursday, the estimated volatility of asset B is 1% per day. During Friday asset B produces a return of zero. An EWMA model with lambda equal to 0.9 is used. What is an estimate of the volatility of asset A at the end of Friday?

A) 0.98%
B) 0.95%
C) 0.92%
D) 0.90%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is true of a covariance matrix?

A) The numbers on the diagonal are variances
B) The numbers on the diagonal are standard deviations
C) The numbers on the diagonal are all one
D) The numbers on the diagonal are all zero
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is true when lambda equals 0.95?

A) The weight given to the most recent observation is 0.95
B) The weight given to the observation one day ago is 95% of the weight given to the observation two days ago
C) The weights given to observations add up to 0.95
D) The weights given to the observation two days ago is 95% of the weight given to the observation one day ago
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
If the volatility for a portfolio is 20% per year, what is the volatility per quarter?

A) 20%
B) 10%
C) 5%
D) 2%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
What is the method of testing how often a VaR with a certain confidence level was exceeded in the past called?

A) Stress testing
B) Backtesting
C) EWMA
D) The model-building approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following is a definition of the covariance between X and Y?

A) Correlation between X and Y times variance of X times variance of Y
B) Variance of X times the variance of Y
C) Correlation between X and Y divided by the product of the standard deviation of X and the standard deviation of Y
D) Correlation between X and Y times standard deviation of X times standard deviation of Y
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following is true?

A) The quadratic model approximates daily changes in using delta and gamma
B) The quadratic model approximates daily changes using delta, but not gamma
C) The quadratic model approximates daily changes using gamma, but not delta
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is true of the 99.9% value at risk?

A) There is 1 chance in 10 that the loss will be greater than the value of risk
B) There is 1 chance in 100 that the loss will be greater than the value of risk
C) There is 1 chance in 1000 that the loss will be greater than the value of risk
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million. What is the 99% expected shortfall?

A) $0.145 million
B) $0.14 million
C) $0.13 million
D) $0.10 million
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following describes stressed VaR?

A) It is based on movements in market variables in stressed market conditions
B) It is VaR with a very high confidence level
C) It is VaR multiplied by a factor of 3
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following is true?

A) Cash flow mapping is a way of calculating the present value of cash flows
B) Cash flow mapping is used to handle interest rate exposures in the model building approach
C) Cash flow mapping is used to handle interest rate exposures in the historical simulation approach
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which was the minimum capital requirement for market risk in the 1996 BIS Amendment?

A) At least 3 times the 10-day VaR with a 99% confidence level
B) At least 3 times 7-day VaR with a 97% confidence level
C) At least 2 times 5-day VaR with a 95% confidence level
D) 1-day VaR with a 99% confidence level
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
The gain from a project is equally likely to have any value between -$0.15 million and +$0.85 million. What is the 99% value at risk?

A) $0.145 million
B) $0.14 million
C) $0.13 million
D) $0.10 million
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following is true when delta, but not gamma, is used in calculating VaR for option positions?

A) VaR for a long call is too low and VaR for a long put is too low
B) VaR for a long call is too low and VaR for a long put is too high
C) VaR for a long call is too high and VaR for a long put is too low
D) VaR for a long call is too high and VaR for a long put is too high