Deck 9: Database Design

ملء الشاشة (f)
exit full mode
سؤال
During the implementation phase of the Systems Development Life Cycle (SDLC), the hardware, database management system (DBMS) software, and application programs are installed, and the database design is implemented.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The implementation phase of database design includes creating the database storage structure and loading the database, but does not provide for data management.
سؤال
Training principles and methodologies are planned during the implementation phase of the Systems Development Life Cycle (SDLC).
سؤال
A system is always at some stage of SDLC because every request for structural changes requires retracing the steps of the Systems Development Life Cycle (SDLC).
سؤال
Systems analysis establishes the need for an information system and its extent.
سؤال
The term "database development" is used to describe the process of database design and implementation.
سؤال
The result of analysis phase of the Systems Development Life Cycle (SDLC) should be a better understanding of the system's functional areas, actual and potential problems, and opportunities.
سؤال
The Systems Development Life Cycle (SDLC) provides the big picture within which the database design and application development can be mapped out and evaluated.
سؤال
In the Systems Development Life Cycle (SDLC), after testing is concluded, end-user training is not necessary.
سؤال
The Systems Development Life Cycle (SDLC) traces the history of an information system.
سؤال
A system maintenance activity generated in response to changes in the business environment is referred to as corrective maintenance.
سؤال
In the Systems Development Life Cycle (SDLC), problems defined during the planning phase are examined in greater detail during the analysis phase.
سؤال
The Systems Development Life Cycle's (SDLC's) planning phase yields a general overview of the company and its objectives.
سؤال
In the Systems Development Life Cycle(SDLC), the design of the system's processes begins in the detailed systems design phase.
سؤال
The system is subjected to exhaustive testing during the testing phase of the Systems Development Life Cycle (SDLC).
سؤال
The primary objective in database design is to create complete, normalized, nonredundant, and fully integrated conceptual, logical, and physical database models.
سؤال
The database contents might be loaded interactively or in batch mode using a variety of methods and devices including customized user programs.
سؤال
The analysis phase of the Systems Development Life Cycle (SDLC) involves a cycle of coding, testing, and debugging.
سؤال
In the detailed systems design phase of the Systems Development Life Cycle (SDLC), steps are laid out for the conversion of a database from an old system to a new system.
سؤال
The detailed systems design phase of the Systems Development Life Cycle (SDLC) includes all the necessary technical specifications for the screens, menus, reports, and other devices used to make the system more efficient.
سؤال
Database performance is one of the least important factors in all database implementations.
سؤال
Coding, testing, and debugging are part of the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
سؤال
The assignment of access rights may restrict operations on predetermined objects such as databases, tables, views, queries, and reports.
سؤال
Data integrity is enforced by the database management system (DBMS) through the proper use of primary and foreign key rules.
سؤال
Physical design becomes simpler when data is distributed at different locations.
سؤال
Decentralized design is typical of relatively simple, small databases and can be successfully done by a single person.
سؤال
The traditional Systems Development Life Cycle (SDLC) is divided into phases.

A) two
B) three
C) four
D) five
سؤال
Discovery of user requirements, existing system evaluation, and logical system design are part of the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
سؤال
The overall purpose of the database initial study is to create the conceptual design.
سؤال
The testing and evaluation phase of the Database Life Cycle (DBLC) occurs after applications programming.
سؤال
In most modern relational DBMSs, a new database implementation requires the creation of special storage-related constructs to house the end-user tables.
سؤال
The main purpose of a backup is to guarantee database restoration following a hardware or software failure.
سؤال
The process of creating an information system is known as .

A) systems development
B) database development
C) network development
D) enterprise development
سؤال
The initial assessment and the feasibility study are part of the Systems Development Life Cycle's (SDLC's) ? phase.

A) planning
B) analysis
C) detailed systems design
D) implementation
سؤال
After the initial declarations in Database Life Cycle (DBLC), the database designer must carefully probe in order to generate additional information that will help define the problem within the larger framework of company operations.
سؤال
Evaluation of database performance is rendered easier by the fact there are no standards to measure it.
سؤال
The Systems Development Life Cycle (SDLC) is a sequential process rather than an iterative process.
سؤال
The database administrator must be prepared to perform routine maintenance activities within the database.
سؤال
To analyze the company situation, the database designer must discover what the company's operational components are, how they function, and how they interact.
سؤال
Installation and fine tuning are part of the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
سؤال
Producing the required information flow is part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) operation
D) testing and evaluation
سؤال
The database contents are loaded during the phase of the Systems Development Life Cycle (SDLC).

A) analysis
B) detailed systems design
C) implementation
D) maintenance
سؤال
The logical systems design is created during the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) implementation
D) maintenance
سؤال
can render data useless to unauthorized users who might have violated some of the database security layers.

A) Data encryption
B) Access rights
C) Physical security
D) Password security
سؤال
The implementation of applications tends to prolong the operational life of systems by making them easier to update and maintain.

A) database-produced
B) network-produced
C) CASE-produced
D) design-produced
سؤال
In the context of the database design process, the conceptual design step that determines end-user views, outputs, and transaction-processing requirements is .

A) data analysis and requirements
B) entity relationship modeling and normalization
C) data model verification
D) distributed database design
سؤال
In DBLC, the phase after the database initial study is .

A) operation
B) database design
C) database initial study
D) implementation and loading
سؤال
"Should the existing system be replaced?" is a question that is asked during the stage of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) implementation
D) maintenance
سؤال
The feasibility study during the planning phase of the Systems Development Life Cycle (SDLC) must address the:

A) requirements of the current system's end users.
B) problems and constraints related to the company situation.
C) questions about modification and replacement of existing system.
D) technical aspects of hardware and software requirements.
سؤال
The database initial study phase of the Database Life Cycle (DBLC) involves .

A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
سؤال
There are stages in the Database Life Cycle (DBLC).

A) four
B) five
C) six
D) seven
سؤال
Selecting database management system (DBMS) software is part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) implementation and loading
D) testing and evaluation
سؤال
Analyzing the company situation is part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) testing, and evaluation
D) operation
سؤال
Installing the DBMS, creating the database, and loading or converting the data are part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) implementation and loading
D) testing and evaluation
سؤال
The design of the system's processes is completed during the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
سؤال
"What are the requirements of the current system's end users?" is a question asked during the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) implementation
D) maintenance
سؤال
The implementation and loading phase of the Database Life Cycle (DBLC) involves .

A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
سؤال
is a technique that creates logical representations of computing resources that are independent of the underlying physical computing resources.

A) Normalization
B) Virtualization
C) Specialization
D) Generalization
سؤال
In the context of the database design process, the conceptual design step that identifies ER modules and validates insert, update, and delete rules is .

A) database analysis and requirements
B) ER modeling and normalization
C) data model verification
D) distributed database design
سؤال
The last step in the Database Life Cycle (DBLC) is .

A) maintenance and evolution
B) operation
C) testing and evaluation
D) implementation and loading
سؤال
The first step in the ER model verification process is to .

A) identify each module and its components
B) identify the ER model's central entity
C) verify all processes against the ER model
D) identify each module's internal transaction requirements
سؤال
The system's defines the extent of the design according to operational requirements.
سؤال
The first step in developing the conceptual model using ER diagrams is to .

A) normalize the entities
B) complete the initial ER diagram
C) identify, analyze, and refine the business rules
D) define the attributes, primary keys, and foreign keys for each of the entities
سؤال
Which of the following is a hardware-induced database failure?

A) Memory chip errors
B) Viruses
C) Malware
D) Abortion due to deadlock
سؤال
After testing is concluded, the final is reviewed and printed and end users are trained.
سؤال
are usually provided by the database management system (DBMS) to check for access violations.
سؤال
Once the data has been loaded into the database, the tests and fine-tunes the database for performance, integrity, concurrent access, and security constraints.

A) programmer
B) manager
C) database administrator
D) systems administrator
سؤال
The traditional Systems Development Life Cycle (SDLC) phases are , analysis, detailed systems design, implementation, and maintenance.
سؤال
During decentralized design, after the has been completed, all modules are integrated into one conceptual model.

A) declaration process
B) verification process
C) conceptual process
D) logical process
سؤال
The describes the general conditions in which a company operates, its organizational structure, and its mission.
سؤال
In a(n) , only the objects that have been updated or modified since the last full backup are backed up.

A) transaction log backup
B) conservative backup
C) differential backup
D) adaptive backup
سؤال
The proposed system is subject to limits known as , which are external to the system.
سؤال
A(n) is a carefully designed and constructed repository of facts that is a part of a larger whole known as an information system.
سؤال
In the context of the database design process, the conceptual design step that defines the fragmentation and allocation strategy is .

A) database analysis and requirements
B) ER modeling and normalization
C) data model verification
D) distributed database design
سؤال
is the process of determining the data storage organization and data access characteristics of the database to ensure its integrity, security, and performance.

A) Conceptual design
B) Network design
C) Logical design
D) Physical design
سؤال
An initial assessment of the information flow-and-extent requirements must be made during the portion of the Systems Development Life Cycle (SDLC).
سؤال
The maintenance and evolution phase of the Database Life Cycle (DBLC) involves .

A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
سؤال
is the process that establishes the need for, and the extent of, an information system.
سؤال
The advent of very sophisticated application generators and has substantially decreased coding and testing time.
سؤال
The system and operational costs are addressed by the during the planning phase of the Systems Development Life Cycle (SDLC).
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/103
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Database Design
1
During the implementation phase of the Systems Development Life Cycle (SDLC), the hardware, database management system (DBMS) software, and application programs are installed, and the database design is implemented.
True
2
The implementation phase of database design includes creating the database storage structure and loading the database, but does not provide for data management.
False
3
Training principles and methodologies are planned during the implementation phase of the Systems Development Life Cycle (SDLC).
False
4
A system is always at some stage of SDLC because every request for structural changes requires retracing the steps of the Systems Development Life Cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
5
Systems analysis establishes the need for an information system and its extent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
6
The term "database development" is used to describe the process of database design and implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
7
The result of analysis phase of the Systems Development Life Cycle (SDLC) should be a better understanding of the system's functional areas, actual and potential problems, and opportunities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
8
The Systems Development Life Cycle (SDLC) provides the big picture within which the database design and application development can be mapped out and evaluated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
9
In the Systems Development Life Cycle (SDLC), after testing is concluded, end-user training is not necessary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
10
The Systems Development Life Cycle (SDLC) traces the history of an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
11
A system maintenance activity generated in response to changes in the business environment is referred to as corrective maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the Systems Development Life Cycle (SDLC), problems defined during the planning phase are examined in greater detail during the analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
13
The Systems Development Life Cycle's (SDLC's) planning phase yields a general overview of the company and its objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
14
In the Systems Development Life Cycle(SDLC), the design of the system's processes begins in the detailed systems design phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
15
The system is subjected to exhaustive testing during the testing phase of the Systems Development Life Cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
16
The primary objective in database design is to create complete, normalized, nonredundant, and fully integrated conceptual, logical, and physical database models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
17
The database contents might be loaded interactively or in batch mode using a variety of methods and devices including customized user programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
18
The analysis phase of the Systems Development Life Cycle (SDLC) involves a cycle of coding, testing, and debugging.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
19
In the detailed systems design phase of the Systems Development Life Cycle (SDLC), steps are laid out for the conversion of a database from an old system to a new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
20
The detailed systems design phase of the Systems Development Life Cycle (SDLC) includes all the necessary technical specifications for the screens, menus, reports, and other devices used to make the system more efficient.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
21
Database performance is one of the least important factors in all database implementations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
22
Coding, testing, and debugging are part of the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
23
The assignment of access rights may restrict operations on predetermined objects such as databases, tables, views, queries, and reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
24
Data integrity is enforced by the database management system (DBMS) through the proper use of primary and foreign key rules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
25
Physical design becomes simpler when data is distributed at different locations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
26
Decentralized design is typical of relatively simple, small databases and can be successfully done by a single person.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
27
The traditional Systems Development Life Cycle (SDLC) is divided into phases.

A) two
B) three
C) four
D) five
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
28
Discovery of user requirements, existing system evaluation, and logical system design are part of the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
29
The overall purpose of the database initial study is to create the conceptual design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
30
The testing and evaluation phase of the Database Life Cycle (DBLC) occurs after applications programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
31
In most modern relational DBMSs, a new database implementation requires the creation of special storage-related constructs to house the end-user tables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
32
The main purpose of a backup is to guarantee database restoration following a hardware or software failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
33
The process of creating an information system is known as .

A) systems development
B) database development
C) network development
D) enterprise development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
34
The initial assessment and the feasibility study are part of the Systems Development Life Cycle's (SDLC's) ? phase.

A) planning
B) analysis
C) detailed systems design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
35
After the initial declarations in Database Life Cycle (DBLC), the database designer must carefully probe in order to generate additional information that will help define the problem within the larger framework of company operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
36
Evaluation of database performance is rendered easier by the fact there are no standards to measure it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
37
The Systems Development Life Cycle (SDLC) is a sequential process rather than an iterative process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
38
The database administrator must be prepared to perform routine maintenance activities within the database.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
39
To analyze the company situation, the database designer must discover what the company's operational components are, how they function, and how they interact.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
40
Installation and fine tuning are part of the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
41
Producing the required information flow is part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) operation
D) testing and evaluation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
42
The database contents are loaded during the phase of the Systems Development Life Cycle (SDLC).

A) analysis
B) detailed systems design
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
43
The logical systems design is created during the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
44
can render data useless to unauthorized users who might have violated some of the database security layers.

A) Data encryption
B) Access rights
C) Physical security
D) Password security
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
45
The implementation of applications tends to prolong the operational life of systems by making them easier to update and maintain.

A) database-produced
B) network-produced
C) CASE-produced
D) design-produced
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
46
In the context of the database design process, the conceptual design step that determines end-user views, outputs, and transaction-processing requirements is .

A) data analysis and requirements
B) entity relationship modeling and normalization
C) data model verification
D) distributed database design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
47
In DBLC, the phase after the database initial study is .

A) operation
B) database design
C) database initial study
D) implementation and loading
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
48
"Should the existing system be replaced?" is a question that is asked during the stage of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
49
The feasibility study during the planning phase of the Systems Development Life Cycle (SDLC) must address the:

A) requirements of the current system's end users.
B) problems and constraints related to the company situation.
C) questions about modification and replacement of existing system.
D) technical aspects of hardware and software requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
50
The database initial study phase of the Database Life Cycle (DBLC) involves .

A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
51
There are stages in the Database Life Cycle (DBLC).

A) four
B) five
C) six
D) seven
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
52
Selecting database management system (DBMS) software is part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) implementation and loading
D) testing and evaluation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
53
Analyzing the company situation is part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) testing, and evaluation
D) operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
54
Installing the DBMS, creating the database, and loading or converting the data are part of the phase of the Database Life Cycle (DBLC).

A) database initial study
B) database design
C) implementation and loading
D) testing and evaluation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
55
The design of the system's processes is completed during the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) detailed systems design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
56
"What are the requirements of the current system's end users?" is a question asked during the phase of the Systems Development Life Cycle (SDLC).

A) planning
B) analysis
C) implementation
D) maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
57
The implementation and loading phase of the Database Life Cycle (DBLC) involves .

A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
58
is a technique that creates logical representations of computing resources that are independent of the underlying physical computing resources.

A) Normalization
B) Virtualization
C) Specialization
D) Generalization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
59
In the context of the database design process, the conceptual design step that identifies ER modules and validates insert, update, and delete rules is .

A) database analysis and requirements
B) ER modeling and normalization
C) data model verification
D) distributed database design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
60
The last step in the Database Life Cycle (DBLC) is .

A) maintenance and evolution
B) operation
C) testing and evaluation
D) implementation and loading
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
61
The first step in the ER model verification process is to .

A) identify each module and its components
B) identify the ER model's central entity
C) verify all processes against the ER model
D) identify each module's internal transaction requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
62
The system's defines the extent of the design according to operational requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
63
The first step in developing the conceptual model using ER diagrams is to .

A) normalize the entities
B) complete the initial ER diagram
C) identify, analyze, and refine the business rules
D) define the attributes, primary keys, and foreign keys for each of the entities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is a hardware-induced database failure?

A) Memory chip errors
B) Viruses
C) Malware
D) Abortion due to deadlock
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
65
After testing is concluded, the final is reviewed and printed and end users are trained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
66
are usually provided by the database management system (DBMS) to check for access violations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
67
Once the data has been loaded into the database, the tests and fine-tunes the database for performance, integrity, concurrent access, and security constraints.

A) programmer
B) manager
C) database administrator
D) systems administrator
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
68
The traditional Systems Development Life Cycle (SDLC) phases are , analysis, detailed systems design, implementation, and maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
69
During decentralized design, after the has been completed, all modules are integrated into one conceptual model.

A) declaration process
B) verification process
C) conceptual process
D) logical process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
70
The describes the general conditions in which a company operates, its organizational structure, and its mission.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
71
In a(n) , only the objects that have been updated or modified since the last full backup are backed up.

A) transaction log backup
B) conservative backup
C) differential backup
D) adaptive backup
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
72
The proposed system is subject to limits known as , which are external to the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
73
A(n) is a carefully designed and constructed repository of facts that is a part of a larger whole known as an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
74
In the context of the database design process, the conceptual design step that defines the fragmentation and allocation strategy is .

A) database analysis and requirements
B) ER modeling and normalization
C) data model verification
D) distributed database design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
75
is the process of determining the data storage organization and data access characteristics of the database to ensure its integrity, security, and performance.

A) Conceptual design
B) Network design
C) Logical design
D) Physical design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
76
An initial assessment of the information flow-and-extent requirements must be made during the portion of the Systems Development Life Cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
77
The maintenance and evolution phase of the Database Life Cycle (DBLC) involves .

A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
78
is the process that establishes the need for, and the extent of, an information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
79
The advent of very sophisticated application generators and has substantially decreased coding and testing time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
80
The system and operational costs are addressed by the during the planning phase of the Systems Development Life Cycle (SDLC).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.