Deck 13: Building Information Systems

ملء الشاشة (f)
exit full mode
سؤال
In some forms of outsourcing, a company hires an external vendor to create the software for its system, but operates the software on its own computers.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A data flow diagram offers a logical and graphical model of information flow, partitioning a system into modules that show manageable levels of detail.
سؤال
Objects are grouped into hierarchies, and hierarchies into classes.
سؤال
Rationalization of procedures describes a radical rethinking of the business models.
سؤال
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
سؤال
A structure chart is a bottom-up chart, showing each level of design, its relationship to other levels, and its place in the overall design structure.
سؤال
The oldest method for building information systems is prototyping.
سؤال
The system is not in production until conversion is complete.
سؤال
End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle.
سؤال
One advantage of fourth-generation tools is that they can easily handle processing large numbers of transactions or applications with extensive procedural logic and updating requirements.
سؤال
Systems development activities always take place in sequential order.
سؤال
Thorough testing is not required if, during the programming stage, the design documents are sufficiently detailed.
سؤال
A primary benefit of offshore outsourcing is that this can substantially reduce hidden costs.
سؤال
Prototyping is more iterative than the conventional lifecycle.
سؤال
A problem with prototyping is that the systems constructed using this method may not be able to handle large quantities of data in a production environment.
سؤال
Object-oriented development is more incremental than traditional structured development.
سؤال
Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise good system.
سؤال
The most common form of IT-enabled organizational change is automation.
سؤال
TQM describes the measurement of quality as 3.4 defects per million.
سؤال
Documentation reveals how well the system has met its original objectives.
سؤال
In automation

A) business processes are simplified.
B) business processes are reorganized to cut waste and eliminate repetitive, paper-intensive tasks.
C) standard operating procedures are streamlined to remove bottlenecks.
D) employees are enabled to perform their tasks more efficiently.
سؤال
Which process develops a detailed description of the functions that a new information system must perform?

A) feasibility study
B) requirements analysis
C) systems design
D) test plan development
سؤال
System testing

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
سؤال
Enabling organizations to make continual improvements to many business processes and to use processes as the fundamental building blocks of corporate information systems is the goal of

A) business process management.
B) business process redesign.
C) workflow engineering.
D) workflow management.
سؤال
System design specifications that address the category of database design issues will include specifications for

A) transaction volume and speed requirements.
B) data entry.
C) job design.
D) program logic and computations.
سؤال
What is the primary driving factor in firms to select domestic outsourcing firms to build system solutions?

A) to take advantage of technical skills the firm does not have
B) to save labor costs
C) to avoid change management issues
D) all of the above
سؤال
Unit testing

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
سؤال
In order, what are the first three steps in BPM?

A) (1) identifying processes for change, (2) analyzing existing processes, (3) designing the new process
B) (1) analyzing existing processes, (2) identifying processes for change, (3) designing the new process
C) (1) identifying processes for change, (2) designing the new process, (3) implementing the new process
D) (1) analyzing processes to change (2) designing the new process, (3) measuring the optimized process
سؤال
Determining methods for feedback and error handling would be defined by which category of system design specifications?

A) training and documentation
B) user interface
C) manual procedures
D) security and controls
سؤال
Acceptance testing

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
سؤال
A bank has reworked its mortgage application process so that several steps are handled by computer software, and some steps are combined to reduce bottlenecks in processing. The goal is to gradually improve its efficiency over time. This is an example of

A) automation.
B) rationalization of procedures.
C) paradigm shift.
D) business process redesign.
سؤال
The idea that the achievement of quality control is an end in itself describes a main concept of

A) BPM.
B) BPR.
C) six sigma.
D) TQM.
سؤال
Systems design

A) describes what a system should do to meet information requirements.
B) shows how the new system will fulfill the information requirements.
C) identifies which users need what information, where, when and how.
D) is concerned with the logical view of the system solution.
سؤال
The entire system-building effort is driven by

A) organizational change.
B) feasibility studies.
C) the information value chain.
D) user information requirements.
سؤال
In a parallel conversion strategy, the new system

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
سؤال
Business processes are analyzed, simplified, and redesigned in

A) business process redesign.
B) rationalization of procedures.
C) automation.
D) paradigm shifts.
سؤال
The four kinds of structural organizational change enabled by IT, in order from least to most risky, are

A) rationalization, automation, reengineering, and redesigning.
B) rationalization, automation, reengineering, and paradigm shift.
C) automation, rationalization, reengineering, and paradigm shift.
D) automation, redesigning, restructuring, and paradigm shift.
سؤال
Transferring data from a legacy system to the new system would be defined by which category of system design specifications?

A) input
B) database
C) manual procedures
D) conversion
سؤال
________ provide(s) a methodology and tools for dealing with the organization's ongoing need to revise and optimize its numerous business processes.

A) Business process redesign
B) Business process management
C) CASE tools
D) TQM
سؤال
An upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example of

A) automation.
B) rationalization of procedures.
C) paradigm shift.
D) business process redesign.
سؤال
Object-oriented development could potentially reduce the time and cost of writing software because

A) object-oriented programming requires less training.
B) iterative prototyping is not required.
C) objects are reusable.
D) a single user interface object can be used for the entire application.
سؤال
Which type of fourth-generation language tool contains preprogrammed modules that can be used to create entire applications?

A) PC software tools
B) report generators
C) application generators
D) application software packages
سؤال
To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use

A) structure charts.
B) Gantt and PERT charts.
C) process specifications.
D) data flow diagrams.
سؤال
When systems are created rapidly, without a formal development methodology

A) end users can take over the work of IT specialists.
B) the organization quickly outgrows the new system.
C) hardware, software, and quality standards are less important.
D) testing and documentation may be inadequate.
سؤال
In the traditional systems development lifecycle, end users

A) are important and ongoing members of the team from the original analysis phase through maintenance.
B) are important only in the testing phases.
C) have no input.
D) are limited to providing information requirements and reviewing the technical staff's work.
سؤال
An entire information system is broken down into its subsystems by using

A) high-level data flow diagrams.
B) low-level data flow diagrams.
C) process specifications.
D) structured diagrams.
سؤال
Which type of fourth-generation language tools are end-users most likely to work with?

A) report generators and query languages
B) report generators and application generators
C) PC software tools and query languages
D) PC software tools and report generators
سؤال
In object-oriented development

A) the class is used as the basic unit of systems analysis and design.
B) an object is a collection of data that is acted on by external processes.
C) processing logic resides within objects.
D) a strict, step-by-step development process is essential.
سؤال
In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related?

A) Degree would be a sister class to Mathematics and Physics.
B) Degree is a superclass to Mathematics and Physics.
C) Mathematics and Physics would be ancestors to Degree.
D) Degree would be a subclass to Mathematics and Physics.
سؤال
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed

A) compliance.
B) production.
C) maintenance.
D) acceptance.
سؤال
In the direct cutover conversion strategy, the new system

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
سؤال
As a technical project manager you have decided to propose implementing a prototyping methodology for a small Web-based design project. What is the order of steps you will follow in this project?

A) Develop the prototype; use the prototype; revise and enhance the prototype.
B) Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype.
C) Define the requirements, develop solutions, select the best prototype, and implement the prototype.
D) Define the requirements, develop the prototype, revise and enhance the prototype.
سؤال
The primary tool for representing a system's component processes and the flow of data between them is the

A) data dictionary.
B) process specifications diagram.
C) user documentation.
D) data flow diagram.
سؤال
A systems building approach in which the system is developed as successive versions, each version reflecting requirements more accurately, is described to be

A) end-user oriented.
B) iterative.
C) object-oriented.
D) agile.
سؤال
In which type of systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage begun?

A) traditional
B) prototyping
C) RAD
D) all of the above
سؤال
Object-oriented modeling is based on the concepts of

A) objects and relationships.
B) classes and objects.
C) class and inheritance.
D) objects and inheritance.
سؤال
CASE tools automate

A) documentation.
B) code generation.
C) creating data dictionaries.
D) all of the above.
سؤال
In what stage of systems development are design specifications created?

A) systems analysis
B) systems design
C) testing
D) conversion
سؤال
The oldest method for building information systems is

A) component-based development.
B) prototyping.
C) object-oriented development.
D) the systems development lifecycle.
سؤال
To understand and define the contents of data flows and data store, system builders use

A) a data dictionary.
B) process specifications diagrams.
C) user documentation.
D) data flow diagrams.
سؤال
________ is the process of changing from the old system to the new system.
سؤال
________ design is a process used to accelerate the generation of information requirements by having end-users and information system specialists work together in intensive interactive design sessions.
سؤال
Fourth-generation tools cannot replace conventional development tools because they

A) cannot handle large numbers of transactions or extensive procedural logic.
B) are not designed to integrate with legacy systems.
C) do not incorporate methods for documentation.
D) do not incorporate methods for testing.
سؤال
During the ________ stage of system development, system specifications that were prepared during the design stage are translated into software code.
سؤال
You are an IT project manager for an advertising firm. The firm wishes to create an online tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project?

A) RAD
B) JAD
C) end-user development
D) prototyping
سؤال
________ describe the transformation occurring within the lowest level of the data flow diagrams.
سؤال
A software package evaluation process is often based on a series of questions sent to vendors, called a(n) ________.
سؤال
Management should control the development of end-user applications by

A) developing a formal development methodology.
B) requiring cost justification for end-user IS projects.
C) establishing standards for user-developed applications.
D) both B and C
E) both A and B
سؤال
Compared to the use of proprietary components, Web services promise to be less expensive and less difficult to implement because of

A) their ability to integrate seamlessly with legacy systems.
B) the use of universal standards.
C) the ubiquity of the Internet.
D) the ability to reuse Web services components.
سؤال
________ are software tools that enable end users to create reports or develop software applications with minimal or no technical assistance.
سؤال
Categories of tools for BPM include all of the following except

A) tools to integrate existing systems to support business processes improvements.
B) tools to automate business processes.
C) tools to identify and document business processes.
D) tools to test the security of business processes.
سؤال
A(n) ________ is an organizational change that involves rethinking the nature of the business and the nature of the organization itself.
سؤال
________ development focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback.

A) Agile
B) Rapid application
C) Joint application
D) Object-oriented
سؤال
A systems analysis includes a(n) ________ that is used to determine whether the solution is achievable from a financial, technical, and organizational standpoint.
سؤال
A(n) ________ is the model or blueprint for an information system solution and consists of all the specifications that will deliver the functions identified during systems analysis.
سؤال
What is the greatest barrier to successful business process change?

A) ineffective project management
B) usability of implemented solution
C) selecting the correct process to change
D) organizational change
سؤال
Which type of systems development is characterized by significantly speeding up the design phase and the generation of information requirements and involving users at an intense level?

A) RAD
B) JAD
C) prototyping
D) end-user development
سؤال
Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development?

A) object-oriented development
B) component-based development
C) structured methodologies
D) RAD
سؤال
________ contain a detailed statement of the information needs that a new system must satisfy; identifies who needs what information, and when, where, and how the information is needed.
سؤال
The process of creating workable information systems in a very short period of time is called

A) RAD.
B) JAD.
C) prototyping.
D) B and C.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/90
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Building Information Systems
1
In some forms of outsourcing, a company hires an external vendor to create the software for its system, but operates the software on its own computers.
True
2
A data flow diagram offers a logical and graphical model of information flow, partitioning a system into modules that show manageable levels of detail.
True
3
Objects are grouped into hierarchies, and hierarchies into classes.
False
4
Rationalization of procedures describes a radical rethinking of the business models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
5
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
6
A structure chart is a bottom-up chart, showing each level of design, its relationship to other levels, and its place in the overall design structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
7
The oldest method for building information systems is prototyping.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
8
The system is not in production until conversion is complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
9
End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
10
One advantage of fourth-generation tools is that they can easily handle processing large numbers of transactions or applications with extensive procedural logic and updating requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
11
Systems development activities always take place in sequential order.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
12
Thorough testing is not required if, during the programming stage, the design documents are sufficiently detailed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
13
A primary benefit of offshore outsourcing is that this can substantially reduce hidden costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
14
Prototyping is more iterative than the conventional lifecycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
15
A problem with prototyping is that the systems constructed using this method may not be able to handle large quantities of data in a production environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
16
Object-oriented development is more incremental than traditional structured development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
17
Failure to address properly the organizational changes surrounding the introduction of a new system can cause the demise of an otherwise good system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
18
The most common form of IT-enabled organizational change is automation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
19
TQM describes the measurement of quality as 3.4 defects per million.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
20
Documentation reveals how well the system has met its original objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
21
In automation

A) business processes are simplified.
B) business processes are reorganized to cut waste and eliminate repetitive, paper-intensive tasks.
C) standard operating procedures are streamlined to remove bottlenecks.
D) employees are enabled to perform their tasks more efficiently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which process develops a detailed description of the functions that a new information system must perform?

A) feasibility study
B) requirements analysis
C) systems design
D) test plan development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
23
System testing

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
24
Enabling organizations to make continual improvements to many business processes and to use processes as the fundamental building blocks of corporate information systems is the goal of

A) business process management.
B) business process redesign.
C) workflow engineering.
D) workflow management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
25
System design specifications that address the category of database design issues will include specifications for

A) transaction volume and speed requirements.
B) data entry.
C) job design.
D) program logic and computations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
26
What is the primary driving factor in firms to select domestic outsourcing firms to build system solutions?

A) to take advantage of technical skills the firm does not have
B) to save labor costs
C) to avoid change management issues
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
27
Unit testing

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
28
In order, what are the first three steps in BPM?

A) (1) identifying processes for change, (2) analyzing existing processes, (3) designing the new process
B) (1) analyzing existing processes, (2) identifying processes for change, (3) designing the new process
C) (1) identifying processes for change, (2) designing the new process, (3) implementing the new process
D) (1) analyzing processes to change (2) designing the new process, (3) measuring the optimized process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
29
Determining methods for feedback and error handling would be defined by which category of system design specifications?

A) training and documentation
B) user interface
C) manual procedures
D) security and controls
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
30
Acceptance testing

A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
31
A bank has reworked its mortgage application process so that several steps are handled by computer software, and some steps are combined to reduce bottlenecks in processing. The goal is to gradually improve its efficiency over time. This is an example of

A) automation.
B) rationalization of procedures.
C) paradigm shift.
D) business process redesign.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
32
The idea that the achievement of quality control is an end in itself describes a main concept of

A) BPM.
B) BPR.
C) six sigma.
D) TQM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
33
Systems design

A) describes what a system should do to meet information requirements.
B) shows how the new system will fulfill the information requirements.
C) identifies which users need what information, where, when and how.
D) is concerned with the logical view of the system solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
34
The entire system-building effort is driven by

A) organizational change.
B) feasibility studies.
C) the information value chain.
D) user information requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
35
In a parallel conversion strategy, the new system

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
36
Business processes are analyzed, simplified, and redesigned in

A) business process redesign.
B) rationalization of procedures.
C) automation.
D) paradigm shifts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
37
The four kinds of structural organizational change enabled by IT, in order from least to most risky, are

A) rationalization, automation, reengineering, and redesigning.
B) rationalization, automation, reengineering, and paradigm shift.
C) automation, rationalization, reengineering, and paradigm shift.
D) automation, redesigning, restructuring, and paradigm shift.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
38
Transferring data from a legacy system to the new system would be defined by which category of system design specifications?

A) input
B) database
C) manual procedures
D) conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
39
________ provide(s) a methodology and tools for dealing with the organization's ongoing need to revise and optimize its numerous business processes.

A) Business process redesign
B) Business process management
C) CASE tools
D) TQM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
40
An upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example of

A) automation.
B) rationalization of procedures.
C) paradigm shift.
D) business process redesign.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
41
Object-oriented development could potentially reduce the time and cost of writing software because

A) object-oriented programming requires less training.
B) iterative prototyping is not required.
C) objects are reusable.
D) a single user interface object can be used for the entire application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which type of fourth-generation language tool contains preprogrammed modules that can be used to create entire applications?

A) PC software tools
B) report generators
C) application generators
D) application software packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
43
To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use

A) structure charts.
B) Gantt and PERT charts.
C) process specifications.
D) data flow diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
44
When systems are created rapidly, without a formal development methodology

A) end users can take over the work of IT specialists.
B) the organization quickly outgrows the new system.
C) hardware, software, and quality standards are less important.
D) testing and documentation may be inadequate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
45
In the traditional systems development lifecycle, end users

A) are important and ongoing members of the team from the original analysis phase through maintenance.
B) are important only in the testing phases.
C) have no input.
D) are limited to providing information requirements and reviewing the technical staff's work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
46
An entire information system is broken down into its subsystems by using

A) high-level data flow diagrams.
B) low-level data flow diagrams.
C) process specifications.
D) structured diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which type of fourth-generation language tools are end-users most likely to work with?

A) report generators and query languages
B) report generators and application generators
C) PC software tools and query languages
D) PC software tools and report generators
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
48
In object-oriented development

A) the class is used as the basic unit of systems analysis and design.
B) an object is a collection of data that is acted on by external processes.
C) processing logic resides within objects.
D) a strict, step-by-step development process is essential.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
49
In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related?

A) Degree would be a sister class to Mathematics and Physics.
B) Degree is a superclass to Mathematics and Physics.
C) Mathematics and Physics would be ancestors to Degree.
D) Degree would be a subclass to Mathematics and Physics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
50
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed

A) compliance.
B) production.
C) maintenance.
D) acceptance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
51
In the direct cutover conversion strategy, the new system

A) is tested by an outsourced company.
B) replaces the old one at an appointed time.
C) and the old are run together.
D) is introduced in stages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
52
As a technical project manager you have decided to propose implementing a prototyping methodology for a small Web-based design project. What is the order of steps you will follow in this project?

A) Develop the prototype; use the prototype; revise and enhance the prototype.
B) Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype.
C) Define the requirements, develop solutions, select the best prototype, and implement the prototype.
D) Define the requirements, develop the prototype, revise and enhance the prototype.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
53
The primary tool for representing a system's component processes and the flow of data between them is the

A) data dictionary.
B) process specifications diagram.
C) user documentation.
D) data flow diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
54
A systems building approach in which the system is developed as successive versions, each version reflecting requirements more accurately, is described to be

A) end-user oriented.
B) iterative.
C) object-oriented.
D) agile.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
55
In which type of systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage begun?

A) traditional
B) prototyping
C) RAD
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
56
Object-oriented modeling is based on the concepts of

A) objects and relationships.
B) classes and objects.
C) class and inheritance.
D) objects and inheritance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
57
CASE tools automate

A) documentation.
B) code generation.
C) creating data dictionaries.
D) all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
58
In what stage of systems development are design specifications created?

A) systems analysis
B) systems design
C) testing
D) conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
59
The oldest method for building information systems is

A) component-based development.
B) prototyping.
C) object-oriented development.
D) the systems development lifecycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
60
To understand and define the contents of data flows and data store, system builders use

A) a data dictionary.
B) process specifications diagrams.
C) user documentation.
D) data flow diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
61
________ is the process of changing from the old system to the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
62
________ design is a process used to accelerate the generation of information requirements by having end-users and information system specialists work together in intensive interactive design sessions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
63
Fourth-generation tools cannot replace conventional development tools because they

A) cannot handle large numbers of transactions or extensive procedural logic.
B) are not designed to integrate with legacy systems.
C) do not incorporate methods for documentation.
D) do not incorporate methods for testing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
64
During the ________ stage of system development, system specifications that were prepared during the design stage are translated into software code.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
65
You are an IT project manager for an advertising firm. The firm wishes to create an online tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project?

A) RAD
B) JAD
C) end-user development
D) prototyping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
66
________ describe the transformation occurring within the lowest level of the data flow diagrams.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
67
A software package evaluation process is often based on a series of questions sent to vendors, called a(n) ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
68
Management should control the development of end-user applications by

A) developing a formal development methodology.
B) requiring cost justification for end-user IS projects.
C) establishing standards for user-developed applications.
D) both B and C
E) both A and B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
69
Compared to the use of proprietary components, Web services promise to be less expensive and less difficult to implement because of

A) their ability to integrate seamlessly with legacy systems.
B) the use of universal standards.
C) the ubiquity of the Internet.
D) the ability to reuse Web services components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
70
________ are software tools that enable end users to create reports or develop software applications with minimal or no technical assistance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
71
Categories of tools for BPM include all of the following except

A) tools to integrate existing systems to support business processes improvements.
B) tools to automate business processes.
C) tools to identify and document business processes.
D) tools to test the security of business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
72
A(n) ________ is an organizational change that involves rethinking the nature of the business and the nature of the organization itself.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
73
________ development focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback.

A) Agile
B) Rapid application
C) Joint application
D) Object-oriented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
74
A systems analysis includes a(n) ________ that is used to determine whether the solution is achievable from a financial, technical, and organizational standpoint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
75
A(n) ________ is the model or blueprint for an information system solution and consists of all the specifications that will deliver the functions identified during systems analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
76
What is the greatest barrier to successful business process change?

A) ineffective project management
B) usability of implemented solution
C) selecting the correct process to change
D) organizational change
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which type of systems development is characterized by significantly speeding up the design phase and the generation of information requirements and involving users at an intense level?

A) RAD
B) JAD
C) prototyping
D) end-user development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
78
Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development?

A) object-oriented development
B) component-based development
C) structured methodologies
D) RAD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
79
________ contain a detailed statement of the information needs that a new system must satisfy; identifies who needs what information, and when, where, and how the information is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
80
The process of creating workable information systems in a very short period of time is called

A) RAD.
B) JAD.
C) prototyping.
D) B and C.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.