Deck 5: Scheduling the Project

ملء الشاشة (f)
exit full mode
سؤال
The shortest time to complete a network is equal to the duration of the longest path through the network.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The difference between the LST and EST is called slack.
سؤال
Critical path tasks always have zero slack.
سؤال
The actual project duration will be known with certainty after the project is completed.
سؤال
Milestones cannot be identified on a Gantt Chart.
سؤال
A disadvantage of Gantt charts is that they are hard to draw.
سؤال
A Gantt chart can not depict a critical path, only a PERT/CPM chart can.
سؤال
To manage a project successfully, the project manager need only pay close attention to tasks on the critical path.
سؤال
The formula for the expected time of an activity in a network assumes that the optimistic, pessimistic, and most likely time estimates have a Beta distribution.
سؤال
Technical dependencies are often harder to see on a Gantt chart than on a PERT/CPM network.
سؤال
AON and AOA networks can both be used to depict any project network.
سؤال
The difference between LST and LFT is called slack.
سؤال
It is easiest to see lead and lag time in a project task on a PERT/CPM networks.
سؤال
When it was originally developed, PERT used certain (deterministic) methods to estimate activity duration.
سؤال
A project schedule is a project action plan converted into a timetable.
سؤال
If task duration estimates are carefully made, the project manager needs to only examine the critical path when conducting a risk analysis.
سؤال
The difference between EST and LFT is called slack.
سؤال
Standard Pert/CPM networks can be use to resolve probabilistic concerns.
سؤال
"Merger" is a term used to describe the situation in which two or more paths in a network join together.
سؤال
A start-to-finish linkage is the most common way of linking to successive task.
سؤال
Events in a project consume no resources or time.
سؤال
A situation where two or more activities have the same starting and finishing nodes or where a single activity connects to two or more nodes is called a dummy task
سؤال
The movement from left to right through the network beginning with the start node that calculates the LS and LF for each activity is known as "FORWARD PASS"
سؤال
Another name for total slack is free slack.
سؤال
Technical dependencies are generally easier to see on a Gantt chart than on PERT/CPM networks.
سؤال
A big advantage of AON networks is that they are easier to draw.
سؤال
The start-to-finish linkage is used in situations where is it desirable for two or more activities to finish at the same time.
سؤال
Float refers to the amount of time a noncritical task can be delayed without causing a delay in the entire project.
سؤال
Networks are usually drawn with a "Start" node to the right and a "Finish" node to the left.
سؤال
A disadvantage of using beta distribution to approximate activity times is that it is generally less flexible than the normal distribution.
سؤال
A diagram of nodes connected by directional arcs that defines the project and illustrates the technical of all activities is referred to as a network.
سؤال
The amount of time an activity can be delayed without affecting the start time of any successor activity is known as free slack.
سؤال
The tasks of project planning, project budgeting, and project scheduling are largely separable from one another.
سؤال
The simulation approach is generally preferred over the statistical method.
سؤال
An event is a series of connected activities.
سؤال
What is project slack?

A) The amount of time a non-critical task can be delayed without making the project late.
B) The amount of time the critical path of a project can be delayed without making the project late.
C) The amount of time an activity on the critical path can be delayed without making the project late.
D) The difference between how long the project would take if all tasks were completed based on their pessimistic versus optimistic time estimates.
E) None of the above.
سؤال
Milestones are not depended upon the predecessor activities in the project plan.
سؤال
For which purpose is simulation NOT used with regard to project scheduling?

A) to overcome the limitations associated with statistical techniques used to develop probability of completion time estimates
B) to investigate the range of project completion times
C) to investigate the distribution of project completion times
D) to verify the accuracy of the optimistic, pessimistic and most likely time estimates
E) all of the above
سؤال
What is it a milestone?

A) a significant event in the project
B) a mark on a chart that depicts project progress
C) an activity on the critical path
D) an activity with an uncertain completion time
E) all of the above
سؤال
The difference between LFT and EFT is called slack.
سؤال
Why should we only draw the Gantt chart after we have draw the network for the project?
سؤال
Define the term Critical Path.
سؤال
What is activity slack?
سؤال
Contrast the traditional statistical approach to calculating the probability of completing a project by a specified time with the simulation approach.
سؤال
PERT was originally used for what type of project?

A) construction
B) R & D
C) military
D) computer software development
E) advertising
سؤال
What is a Gantt chart?
سؤال
Which of the following terms is most closely associated with a task required by the project?

A) activity
B) event
C) milestone
D) network
E) path
سؤال
Which of the following is NOT an element of the Gantt chart?

A) actual progress
B) variance of the critical path
C) the current date
D) scheduled milestones
E) all of the above are elements
سؤال
What assumptions are made about the probabilities of the optimistic and pessimistic times in the standard formula for calculating the variance of a particular activity? Explain how the formula can be modified to accommodate different assumptions.
سؤال
What is the standard deviation of a task with optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively assuming the estimates were made at the 99% plus level?

A) )444
B) )667
C) 1.212
D) 1.469
E) 1.540
سؤال
An identifiable state resulting from the completion of one or more activities is called?

A) an event
B) an activity
C) a milestone
D) a path
E) the critical path
سؤال
What are the four methods of linking steps in a project using precedence diagramming?
سؤال
A Term not used in the discussion of PERT/CPM analysis is

A) Activity
B) Events
C) Critical Path
D) Sensitivity path
E) network s
سؤال
Which of the following is typically used as the best estimate of task duration?

A) expected time
B) pessimistic time
C) optimistic time
D) most likely time
E) none of the above
سؤال
Technical dependencies on a project plan are easiest to see on a:

A) Gantt chart
B) Cost chart
C) PERT/CPM chart
D) Work Breakdown Structure
E) RACI Matrix
سؤال
What is the expected time to complete a task with an optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively?

A) 3
B) 4
C) 4.3
D) 4.7
E) 7
سؤال
The amount of time a noncritical task can be delayed without delaying the project is called?

A) surplus
B) flop
C) slack
D) critical time
E) safety
سؤال
Which of the following linkages is used to start two or more activities at the same time?

A) finish-to-start
B) start-to-start
C) finish-to-finish
D) start-to-finish
E) They can all be used to start two or more activities at the same time.
سؤال
Contrast "total slack" and "free slack"
سؤال
Slack is calculated as?

A) LFT - EST
B) LFT - LST
C) LST - LFT
D) LFT - EFT
E) EFT - EST
سؤال
Explain why the term "critical path" has less meaning in cases where the activity times are not known with certainty.
سؤال
Why is it necessary for the PM to be aware and to manage the slack in the project?
سؤال
What is a merger and what problems do mergers create?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/63
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Scheduling the Project
1
The shortest time to complete a network is equal to the duration of the longest path through the network.
True
2
The difference between the LST and EST is called slack.
True
3
Critical path tasks always have zero slack.
True
4
The actual project duration will be known with certainty after the project is completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
5
Milestones cannot be identified on a Gantt Chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
6
A disadvantage of Gantt charts is that they are hard to draw.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
7
A Gantt chart can not depict a critical path, only a PERT/CPM chart can.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
8
To manage a project successfully, the project manager need only pay close attention to tasks on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
9
The formula for the expected time of an activity in a network assumes that the optimistic, pessimistic, and most likely time estimates have a Beta distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
10
Technical dependencies are often harder to see on a Gantt chart than on a PERT/CPM network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
11
AON and AOA networks can both be used to depict any project network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
12
The difference between LST and LFT is called slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
13
It is easiest to see lead and lag time in a project task on a PERT/CPM networks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
14
When it was originally developed, PERT used certain (deterministic) methods to estimate activity duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
15
A project schedule is a project action plan converted into a timetable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
16
If task duration estimates are carefully made, the project manager needs to only examine the critical path when conducting a risk analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
17
The difference between EST and LFT is called slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
18
Standard Pert/CPM networks can be use to resolve probabilistic concerns.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
19
"Merger" is a term used to describe the situation in which two or more paths in a network join together.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
20
A start-to-finish linkage is the most common way of linking to successive task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
21
Events in a project consume no resources or time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
22
A situation where two or more activities have the same starting and finishing nodes or where a single activity connects to two or more nodes is called a dummy task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
23
The movement from left to right through the network beginning with the start node that calculates the LS and LF for each activity is known as "FORWARD PASS"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
24
Another name for total slack is free slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
25
Technical dependencies are generally easier to see on a Gantt chart than on PERT/CPM networks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
26
A big advantage of AON networks is that they are easier to draw.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
27
The start-to-finish linkage is used in situations where is it desirable for two or more activities to finish at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
28
Float refers to the amount of time a noncritical task can be delayed without causing a delay in the entire project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
29
Networks are usually drawn with a "Start" node to the right and a "Finish" node to the left.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
30
A disadvantage of using beta distribution to approximate activity times is that it is generally less flexible than the normal distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
31
A diagram of nodes connected by directional arcs that defines the project and illustrates the technical of all activities is referred to as a network.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
32
The amount of time an activity can be delayed without affecting the start time of any successor activity is known as free slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
33
The tasks of project planning, project budgeting, and project scheduling are largely separable from one another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
34
The simulation approach is generally preferred over the statistical method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
35
An event is a series of connected activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
36
What is project slack?

A) The amount of time a non-critical task can be delayed without making the project late.
B) The amount of time the critical path of a project can be delayed without making the project late.
C) The amount of time an activity on the critical path can be delayed without making the project late.
D) The difference between how long the project would take if all tasks were completed based on their pessimistic versus optimistic time estimates.
E) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
37
Milestones are not depended upon the predecessor activities in the project plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
38
For which purpose is simulation NOT used with regard to project scheduling?

A) to overcome the limitations associated with statistical techniques used to develop probability of completion time estimates
B) to investigate the range of project completion times
C) to investigate the distribution of project completion times
D) to verify the accuracy of the optimistic, pessimistic and most likely time estimates
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
39
What is it a milestone?

A) a significant event in the project
B) a mark on a chart that depicts project progress
C) an activity on the critical path
D) an activity with an uncertain completion time
E) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
40
The difference between LFT and EFT is called slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
41
Why should we only draw the Gantt chart after we have draw the network for the project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
42
Define the term Critical Path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
43
What is activity slack?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
44
Contrast the traditional statistical approach to calculating the probability of completing a project by a specified time with the simulation approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
45
PERT was originally used for what type of project?

A) construction
B) R & D
C) military
D) computer software development
E) advertising
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
46
What is a Gantt chart?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following terms is most closely associated with a task required by the project?

A) activity
B) event
C) milestone
D) network
E) path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following is NOT an element of the Gantt chart?

A) actual progress
B) variance of the critical path
C) the current date
D) scheduled milestones
E) all of the above are elements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
49
What assumptions are made about the probabilities of the optimistic and pessimistic times in the standard formula for calculating the variance of a particular activity? Explain how the formula can be modified to accommodate different assumptions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
50
What is the standard deviation of a task with optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively assuming the estimates were made at the 99% plus level?

A) )444
B) )667
C) 1.212
D) 1.469
E) 1.540
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
51
An identifiable state resulting from the completion of one or more activities is called?

A) an event
B) an activity
C) a milestone
D) a path
E) the critical path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
52
What are the four methods of linking steps in a project using precedence diagramming?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
53
A Term not used in the discussion of PERT/CPM analysis is

A) Activity
B) Events
C) Critical Path
D) Sensitivity path
E) network s
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is typically used as the best estimate of task duration?

A) expected time
B) pessimistic time
C) optimistic time
D) most likely time
E) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
55
Technical dependencies on a project plan are easiest to see on a:

A) Gantt chart
B) Cost chart
C) PERT/CPM chart
D) Work Breakdown Structure
E) RACI Matrix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
56
What is the expected time to complete a task with an optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively?

A) 3
B) 4
C) 4.3
D) 4.7
E) 7
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
57
The amount of time a noncritical task can be delayed without delaying the project is called?

A) surplus
B) flop
C) slack
D) critical time
E) safety
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following linkages is used to start two or more activities at the same time?

A) finish-to-start
B) start-to-start
C) finish-to-finish
D) start-to-finish
E) They can all be used to start two or more activities at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
59
Contrast "total slack" and "free slack"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
60
Slack is calculated as?

A) LFT - EST
B) LFT - LST
C) LST - LFT
D) LFT - EFT
E) EFT - EST
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
61
Explain why the term "critical path" has less meaning in cases where the activity times are not known with certainty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
62
Why is it necessary for the PM to be aware and to manage the slack in the project?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 63 في هذه المجموعة.
فتح الحزمة
k this deck
63
What is a merger and what problems do mergers create?