Deck 6: Allocating Resources to the Project

ملء الشاشة (f)
exit full mode
سؤال
Often it is beneficial to crash activities NOT on the critical path.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
When crashing a task,the usual assumption is that a task is crashed the full amount or none at all.
سؤال
For resources that are consumed when used,the problem is which project gets to use the resource first and which must wait.
سؤال
Trade-offs must be made in order to optimize the use of limited resources.
سؤال
Good PM are able to estimate project task times with absolute certainty
سؤال
If resources were not scarce,the resource allocation problem would be concerned solely with cost minimization.
سؤال
The time to complete a task with normal or standard-practice resource usage is referred to as the crash duration.
سؤال
If resources were not scarce,the resource allocation problem would be concerned solely with profit maximization.
سؤال
The amount of resources a project can use depends in part on the timing of the allocation.
سؤال
It is considered good management to crash the least costly activities before the more costly ones.
سؤال
The variance of the normal time can be quite different from the variance of the crash time.
سؤال
Fast-tracking a project is used primarily in the pharmaceutical industry.
سؤال
When the work is routine,fast-tracking rarely causes serious problems.
سؤال
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
سؤال
All projects are carried out under conditions of uncertainty.
سؤال
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
سؤال
All tasks can be crashed to some extent.
سؤال
Projects often compete with each other for the same resources.
سؤال
The CPM method cannot be used when task durations are probabilistic.
سؤال
A project that must be completed by a fixed time is referred to as resource constrained.
سؤال
The primary cause of concern in resource allocation is

A) labor cost
B) resource scarcity
C) lack of solution methodologies
D) parallel activities
E) equipment downtime
سؤال
MSP allows the PM to create an individual availability calendar for each resource on the project
سؤال
A limitation associated with traditional approaches to project management is that the dependency between resources and tasks is often ignored.
سؤال
Allocating specific,limited resources to specific activities is called

A) resource allocation
B) resource leveling
C) resource tracking
D) expediting a project
E) crashing a project
سؤال
A task's duration is a function of both the amount of labor required to complete the task as well as the calendar time required to complete it.
سؤال
Pools of like workers are most useful when labor is subdivided into highly specialized subtasks.
سؤال
Applying "line balancing" techniques to balance the capacity of a project typically yields significant benefits.
سؤال
A resource allocation decision may be intended to avoid a future problem rather than correct a current problem.
سؤال
One limitation of MSP is that all resources must share the same availability calendar.
سؤال
The task duration with standard-practice resource usage is referred to as the

A) expected task duration
B) nominal task duration
C) crash duration
D) normal task duration
E) planned task duration
سؤال
The as late as possible priority rule is considered the standard scheduling rule.
سؤال
Which of the following priority rules makes resources available so that activities start on their LSTs whenever possible without increasing the project's duration?

A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
سؤال
Which of the following rules maximizes the number of tasks that can be completed by a system in a given period of time?

A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
سؤال
Crashing refers to

A) expediting the project so as to minimizing the total cost of completing the project.
B) expediting the project so as to minimizing the number of activities in the project
C) expediting the project so as to completing the project by a specified time.
D) all of the above
E) none of the above.
سؤال
A task has a normal duration of 9 days and a crash duration of 7 days.Its normal cost is $40 and its crash cost is $100.What is the crash cost per day?

A) $140
B) $70
C) $50
D) $40
E) $30
سؤال
A project that must be completed by a specific time is considered

A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
سؤال
Starting the building phase before the design and planning phases is called

A) operations overlapping
B) concurrent engineering
C) fast-tracking
D) concurrent construction
E) construction overlapping
سؤال
Which of the following is NOT considered a resource

A) Money
B) People
C) Equipment
D) Material
E) All of the above
سؤال
Pools of like resources from which labor can be added temporarily to projects tend to increase costs for the firm as a whole.
سؤال
In general,steady state demand for human resources is highly desirable.
سؤال
The safety time added to chains other than the critical chain is called

A) feeding buffer
B) project buffer
C) path buffer
D) critical buffer
E) team buffer
سؤال
The practice of assigning project team members to multiple projects is called

A) concurrent engineering
B) parallel activities
C) fast-tracking
D) project crashing
E) multitasking
سؤال
Which of the following is a measure of the amount by which a project is delayed by application of a leveling rule?

A) schedule inflation
B) schedule progression
C) schedule efficacy
D) schedule efficiency
E) schedule slippage
سؤال
Which of the following is NOT commonly used to help select a priority rule?

A) schedule slippage
B) resource utilization
C) in-process inventory
D) cost overruns
E) all of the above are used
سؤال
A project that must be completed with in the specified performance requirements is considered

A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
سؤال
According to research,the best overall priority rule is

A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/46
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Allocating Resources to the Project
1
Often it is beneficial to crash activities NOT on the critical path.
False
2
When crashing a task,the usual assumption is that a task is crashed the full amount or none at all.
False
3
For resources that are consumed when used,the problem is which project gets to use the resource first and which must wait.
False
4
Trade-offs must be made in order to optimize the use of limited resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
5
Good PM are able to estimate project task times with absolute certainty
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
6
If resources were not scarce,the resource allocation problem would be concerned solely with cost minimization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
7
The time to complete a task with normal or standard-practice resource usage is referred to as the crash duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
8
If resources were not scarce,the resource allocation problem would be concerned solely with profit maximization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
9
The amount of resources a project can use depends in part on the timing of the allocation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
10
It is considered good management to crash the least costly activities before the more costly ones.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
11
The variance of the normal time can be quite different from the variance of the crash time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
12
Fast-tracking a project is used primarily in the pharmaceutical industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
13
When the work is routine,fast-tracking rarely causes serious problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
14
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
15
All projects are carried out under conditions of uncertainty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
16
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
17
All tasks can be crashed to some extent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
18
Projects often compete with each other for the same resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
19
The CPM method cannot be used when task durations are probabilistic.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
20
A project that must be completed by a fixed time is referred to as resource constrained.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
21
The primary cause of concern in resource allocation is

A) labor cost
B) resource scarcity
C) lack of solution methodologies
D) parallel activities
E) equipment downtime
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
22
MSP allows the PM to create an individual availability calendar for each resource on the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
23
A limitation associated with traditional approaches to project management is that the dependency between resources and tasks is often ignored.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
24
Allocating specific,limited resources to specific activities is called

A) resource allocation
B) resource leveling
C) resource tracking
D) expediting a project
E) crashing a project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
25
A task's duration is a function of both the amount of labor required to complete the task as well as the calendar time required to complete it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
26
Pools of like workers are most useful when labor is subdivided into highly specialized subtasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
27
Applying "line balancing" techniques to balance the capacity of a project typically yields significant benefits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
28
A resource allocation decision may be intended to avoid a future problem rather than correct a current problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
29
One limitation of MSP is that all resources must share the same availability calendar.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
30
The task duration with standard-practice resource usage is referred to as the

A) expected task duration
B) nominal task duration
C) crash duration
D) normal task duration
E) planned task duration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
31
The as late as possible priority rule is considered the standard scheduling rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following priority rules makes resources available so that activities start on their LSTs whenever possible without increasing the project's duration?

A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following rules maximizes the number of tasks that can be completed by a system in a given period of time?

A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
34
Crashing refers to

A) expediting the project so as to minimizing the total cost of completing the project.
B) expediting the project so as to minimizing the number of activities in the project
C) expediting the project so as to completing the project by a specified time.
D) all of the above
E) none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
35
A task has a normal duration of 9 days and a crash duration of 7 days.Its normal cost is $40 and its crash cost is $100.What is the crash cost per day?

A) $140
B) $70
C) $50
D) $40
E) $30
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
36
A project that must be completed by a specific time is considered

A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
37
Starting the building phase before the design and planning phases is called

A) operations overlapping
B) concurrent engineering
C) fast-tracking
D) concurrent construction
E) construction overlapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is NOT considered a resource

A) Money
B) People
C) Equipment
D) Material
E) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
39
Pools of like resources from which labor can be added temporarily to projects tend to increase costs for the firm as a whole.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
40
In general,steady state demand for human resources is highly desirable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
41
The safety time added to chains other than the critical chain is called

A) feeding buffer
B) project buffer
C) path buffer
D) critical buffer
E) team buffer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
42
The practice of assigning project team members to multiple projects is called

A) concurrent engineering
B) parallel activities
C) fast-tracking
D) project crashing
E) multitasking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is a measure of the amount by which a project is delayed by application of a leveling rule?

A) schedule inflation
B) schedule progression
C) schedule efficacy
D) schedule efficiency
E) schedule slippage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following is NOT commonly used to help select a priority rule?

A) schedule slippage
B) resource utilization
C) in-process inventory
D) cost overruns
E) all of the above are used
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
45
A project that must be completed with in the specified performance requirements is considered

A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
46
According to research,the best overall priority rule is

A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 46 في هذه المجموعة.