Deck 8: Capacity, Scheduling, and Location Planning

ملء الشاشة (f)
exit full mode
سؤال
Yield or revenue management would NOT be so appropriate if which of the following circumstances is present?

A)Uncertain demand
B)Perishable capacity
C)The market is homogeneous
D)Capacity is sold in advance
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The four major considerations in selecting a national or overseas region for the facility are:

A)Labor supply,availability of inputs,foreign management,and environment
B)Proximity,labor supply,availability of inputs,and environment
C)Proximity,environment,facility size,and foreign management styles
D)Proximity,environment,facility size,and labor supply
سؤال
__________ means deciding which jobs to assign to which work centers.

A)Loading
B)Sequencing
C)MRP
D)Facility planning
سؤال
Which of the following is/are (a)technique(s)used for increasing short-run capacity

A)Increase resources
B)Improve resource use
C)Modify the demand
D)All of the above
سؤال
When a resource is scheduled as if it had unlimited capacity to handle any and all jobs,its schedule is called

A)Bottleneck
B)Infinite loading
C)Finite loading
D)Cycle time
سؤال
In order to leverage the location decision to enhance the development of long-term capabilities,the first step is to:

A)Identify the sources of value the company will deliver
B)Assess implications for the location of organizational units
C)Identify the key organizational capabilities
D)Evaluate the key decision makers
سؤال
Yield management,also known as revenue management is the amount of output of acceptable quality emerging from a production system compared with the amount that entered it.
سؤال
It is not unusual for fire departments to use "slack months" for building inspections,conducting prevention programs and giving talks as a way to have anticyclic outputs.
سؤال
Utilization can be defined as:

A)Output divided input
B)Actual output relative to some expected,designed,or normal output
C)Input divided by output
D)Output in proportion to the actual input
سؤال
Learning curve effect is

A)The ability to increase a machine's productive capacity through usage
B)The ability to improve a process capacity through the usage of a machine
C)The human ability to adjust their productive capacity through learning
D)The human ability to increase their productive capacity through learning
سؤال
The first step to enhance the development of long-term capabilities is to identify potential locations.
سؤال
Obtaining lower unit costs through the use of larger facilities is called economies of scope.
سؤال
Assume that Company F produces a variety of smart phones sequentially on three machines.The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes,M3: 2 minutes,M4: 5 minutes.The throughput time for a smart phone is :

A)2 minutes
B)4)5 minutes
C)9 minutes
D)18 minutes
سؤال
The __________ plan is a preliminary,approximate schedule of an organization's overall operations that will satisfy the demand forecast at minimum cost.

A)Production
B)Rough-cut capacity
C)Aggregate
D)Efficiency
سؤال
Which of the following are measures of capacity in terms of outputs and inputs produced for the corresponding production system?

A)Airline - customers checked out per hour - reservation calls handled per day
B)Supermarket - available seat miles per year - cartons unloaded per hour
C)University - graduates per year - students admitted per year
D)Automobile assembly plant - autos assembled per year -packages delivered per day
سؤال
The most important factor(s)effecting the learning curve rate include(s):

A)Complexity of the task
B)Percentage of mechanical input
C)Percentage of human input
D)Only A and C
سؤال
The weighted score model is helpful for site selection decisions at the following stage:

A)Community
B)Site
C)Regional - International
D)None of the above
سؤال
In planning the long-term capacity of an operation,one should take into account:

A)Bottlenecks
B)Economies of scale
C)Economies of scope
D)Only B and C
سؤال
In locating pure services,which of the following measures are recommended in the literature on health clinics and can be used for trial-and-error procedures?

A)Facility utilization
B)Travel distance per citizen
C)Travel distance per doctor
D)Only A and B
سؤال
Revenue or Yield Management may also be thought of as:

A)The process of trying to manage the entire production based on the expected revenue
B)The attempt to allocate the fixed capacity of the service to match the highest revenue demand in the marketplace
C)The notion that revenue can be generated though managing only a certain set of operations
D)Trying to get a fixed source of revenue for the organization
سؤال
In addition to showing time schedules,Gantt charts can also be used for capacities of facilities,workers,jobs,activities,and so forth.
سؤال
In the allocation of capacity,overbooking is an attempt to reduce costs through better schedule management.
سؤال
Organizations such as makers of greeting cards,of summer or winter products and of fireworks face a cyclic difficulty referred to as _________.
سؤال
The physical release of a work order from the production planning and control department to operations is called ___________.
سؤال
The more __________ the service,the longer it is worth waiting for.
سؤال
The cycle time of the process is the reciprocal of the output rate.
سؤال
Rough-cut capacity planning projects job orders and demands for materials into requirements for equipment,work force,and facility to find total capacity of each over the planning horizon.
سؤال
The learning curve is the ability programmed in robots to increase their productive capacity through learning.
سؤال
Efficiency is defined as input divided by output.
سؤال
Uncertain waiting is longer than known,finite waiting.
سؤال
Bottlenecks are places in the production process where production slows down because of a slow or insufficient number of resources.
سؤال
After a region of a new facility has been selected,candidate communities within the region are identified for further analysis.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/32
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Capacity, Scheduling, and Location Planning
1
Yield or revenue management would NOT be so appropriate if which of the following circumstances is present?

A)Uncertain demand
B)Perishable capacity
C)The market is homogeneous
D)Capacity is sold in advance
C
2
The four major considerations in selecting a national or overseas region for the facility are:

A)Labor supply,availability of inputs,foreign management,and environment
B)Proximity,labor supply,availability of inputs,and environment
C)Proximity,environment,facility size,and foreign management styles
D)Proximity,environment,facility size,and labor supply
B
3
__________ means deciding which jobs to assign to which work centers.

A)Loading
B)Sequencing
C)MRP
D)Facility planning
A
4
Which of the following is/are (a)technique(s)used for increasing short-run capacity

A)Increase resources
B)Improve resource use
C)Modify the demand
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
5
When a resource is scheduled as if it had unlimited capacity to handle any and all jobs,its schedule is called

A)Bottleneck
B)Infinite loading
C)Finite loading
D)Cycle time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
6
In order to leverage the location decision to enhance the development of long-term capabilities,the first step is to:

A)Identify the sources of value the company will deliver
B)Assess implications for the location of organizational units
C)Identify the key organizational capabilities
D)Evaluate the key decision makers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
7
Yield management,also known as revenue management is the amount of output of acceptable quality emerging from a production system compared with the amount that entered it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
8
It is not unusual for fire departments to use "slack months" for building inspections,conducting prevention programs and giving talks as a way to have anticyclic outputs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
9
Utilization can be defined as:

A)Output divided input
B)Actual output relative to some expected,designed,or normal output
C)Input divided by output
D)Output in proportion to the actual input
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
10
Learning curve effect is

A)The ability to increase a machine's productive capacity through usage
B)The ability to improve a process capacity through the usage of a machine
C)The human ability to adjust their productive capacity through learning
D)The human ability to increase their productive capacity through learning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
11
The first step to enhance the development of long-term capabilities is to identify potential locations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
12
Obtaining lower unit costs through the use of larger facilities is called economies of scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
13
Assume that Company F produces a variety of smart phones sequentially on three machines.The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes,M3: 2 minutes,M4: 5 minutes.The throughput time for a smart phone is :

A)2 minutes
B)4)5 minutes
C)9 minutes
D)18 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
14
The __________ plan is a preliminary,approximate schedule of an organization's overall operations that will satisfy the demand forecast at minimum cost.

A)Production
B)Rough-cut capacity
C)Aggregate
D)Efficiency
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following are measures of capacity in terms of outputs and inputs produced for the corresponding production system?

A)Airline - customers checked out per hour - reservation calls handled per day
B)Supermarket - available seat miles per year - cartons unloaded per hour
C)University - graduates per year - students admitted per year
D)Automobile assembly plant - autos assembled per year -packages delivered per day
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
16
The most important factor(s)effecting the learning curve rate include(s):

A)Complexity of the task
B)Percentage of mechanical input
C)Percentage of human input
D)Only A and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
17
The weighted score model is helpful for site selection decisions at the following stage:

A)Community
B)Site
C)Regional - International
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
18
In planning the long-term capacity of an operation,one should take into account:

A)Bottlenecks
B)Economies of scale
C)Economies of scope
D)Only B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
19
In locating pure services,which of the following measures are recommended in the literature on health clinics and can be used for trial-and-error procedures?

A)Facility utilization
B)Travel distance per citizen
C)Travel distance per doctor
D)Only A and B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
20
Revenue or Yield Management may also be thought of as:

A)The process of trying to manage the entire production based on the expected revenue
B)The attempt to allocate the fixed capacity of the service to match the highest revenue demand in the marketplace
C)The notion that revenue can be generated though managing only a certain set of operations
D)Trying to get a fixed source of revenue for the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
21
In addition to showing time schedules,Gantt charts can also be used for capacities of facilities,workers,jobs,activities,and so forth.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
22
In the allocation of capacity,overbooking is an attempt to reduce costs through better schedule management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
23
Organizations such as makers of greeting cards,of summer or winter products and of fireworks face a cyclic difficulty referred to as _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
24
The physical release of a work order from the production planning and control department to operations is called ___________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
25
The more __________ the service,the longer it is worth waiting for.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
26
The cycle time of the process is the reciprocal of the output rate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
27
Rough-cut capacity planning projects job orders and demands for materials into requirements for equipment,work force,and facility to find total capacity of each over the planning horizon.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
28
The learning curve is the ability programmed in robots to increase their productive capacity through learning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
29
Efficiency is defined as input divided by output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
30
Uncertain waiting is longer than known,finite waiting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
31
Bottlenecks are places in the production process where production slows down because of a slow or insufficient number of resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
32
After a region of a new facility has been selected,candidate communities within the region are identified for further analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.