Deck 5: Process Improvement: Reducing Waste Through Lean

ملء الشاشة (f)
exit full mode
سؤال
Japanese production approaches such as JIT could not be applied in the United States because companies do not show much respect and loyalty to their employees.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The step in the 5s approach in which unnecessary steps are eliminated is called:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
سؤال
The step in the 5s approach in which the other four steps are made a habit is:

A)Sort
B)Standardize (Sustain)
C)Scrub (Shine)
D)Systemize
سؤال
The goal of this approach is to mistake-proof work activities in a way that prevents errors from being committed in the first place:

A)Kaizen blitz
B)Poka Yoke
C)5s
D)Six sigma
سؤال
The step in the 5S approach in which standardized procedures for maintaining an orderly work environment are developed and implemented is:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
سؤال
Which of the following is NOT one of the seven categories of waste or muda?

A)Waiting
B)Inventory
C)Underproduction
D)Defects
سؤال
A value stream map:

A)Can only be used in manufacturing facilities
B)May also be used for service providers
C)Shows the flow of materials and information with suppliers shown on the left of the diagram and customers on the right
D)Both B and C
سؤال
In traditional approaches to production,preventive maintenance is also common.
سؤال
The lean tool to reduce setup times is SMED; this acronym stands for

A)Sample minute exchange of dry
B)Single minute exchange of die
C)Simple minute exchange of die
D)Simple minute exchange of dry
سؤال
Which of the following is FALSE about Optimized Production Technology (OPT)?

A)Bottleneck workstations in the shop must be identified
B)Bottleneck workstations must be scheduled for full utilization
C)Capacities are to be balanced throughout the shop
D)Non-bottleneck workstations must be scheduled to keep bottlenecks busy so they never wait for work
سؤال
Takt time is calculated as

A)Demand volume divided by customer required volume
B)Customer required volume divided by available work time
C)Available work time divided by customer required volume
D)Available work time divided by demand volume
سؤال
Pursuing perfection in lean organizations involves which of the following tools?

A)5S,the visual factory and kaizen
B)Six Sigma,Project management and continuous improvement
C)Poka yoke and total productive maintenance
D)Both A and C
سؤال
A diagram where the physical flows of the parts are mapped onto the shop floor is referred to as muda.
سؤال
The following are characteristics of continuous flow manufacturing (CFM),EXCEPT:

A)Work should flow through the process without interruption
B)Work is organized based on the similarity of the work performed (a functional organization)
C)Work flows one unit at a time,based on the customer's demand rate
D)The phrase "don't let the parts touch the floor" exemplify CFM
سؤال
The __________ offers a systematic way to view and analyze process flows.

A)Optimized Production Technology (OPT)
B)Pull system
C)Theory of constraints
D)Progression theory
سؤال
Which of the following is/are (a)primary tenet(s)in the Japanese work systems?

A)Waste is minimized
B)Continually improving process and systems
C)Six sigma implementation
D)Both A and B
سؤال
Which of the following is NOT a direct benefit of lean?

A)Cost savings
B)Uncovering problems
C)Improved financial investments
D)Revenue increases
سؤال
The following are characteristics of Lean when contrasted with traditional systems,EXCEPT:

A)Priorities are a limited market and few options
B)Capacity is flexible and moderately utilized
C)Suppliers are many,competitive,deliver to central receiving area and have independent forecasts
D)Quality is at the source,continuous and with statistical process controls
سؤال
The goal of single minute exchange of die is to reduce setup times to less than 10 minutes.
سؤال
A patient diagnosis is an example of what type of activity?

A)Value-added
B)Non-value-added but necessary
C)Non-value-added and not necessary
D)Necessary and value-neutral
سؤال
The goal of Kaizen blitz is to mistake-proof work activities in a way that prevents errors from being committed in the first place.
سؤال
A measure of overall ________ ________ is calculated as the product of equipment availability,equipment efficiency,and the rate of quality output.
سؤال
The idea of authorizing materials for production only if there is a need for them originated the materials management system known as ________.
سؤال
The idea behind the Kanban system is to authorize materials for production only if there is a need for them.
سؤال
Lean enterprises rely on the push system,whereby company supply drives the production process.
سؤال
Key aspects of the theory of constraints include identifying the bottlenecks in the process and balancing the work flows in the system.
سؤال
Repairing a machine when it breaks down,as opposed to conducting maintenance before it is expected to fail,or at regular intervals is also known as ______ maintenance.
سؤال
Saving time at non-bottleneck workstations increases total output by an average of five minutes per part per operation.
سؤال
Mixed-model assembly requires optimized production technology (OPT)for sequencing.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/29
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Process Improvement: Reducing Waste Through Lean
1
Japanese production approaches such as JIT could not be applied in the United States because companies do not show much respect and loyalty to their employees.
False
2
The step in the 5s approach in which unnecessary steps are eliminated is called:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
A
3
The step in the 5s approach in which the other four steps are made a habit is:

A)Sort
B)Standardize (Sustain)
C)Scrub (Shine)
D)Systemize
B
4
The goal of this approach is to mistake-proof work activities in a way that prevents errors from being committed in the first place:

A)Kaizen blitz
B)Poka Yoke
C)5s
D)Six sigma
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
5
The step in the 5S approach in which standardized procedures for maintaining an orderly work environment are developed and implemented is:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is NOT one of the seven categories of waste or muda?

A)Waiting
B)Inventory
C)Underproduction
D)Defects
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
7
A value stream map:

A)Can only be used in manufacturing facilities
B)May also be used for service providers
C)Shows the flow of materials and information with suppliers shown on the left of the diagram and customers on the right
D)Both B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
8
In traditional approaches to production,preventive maintenance is also common.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
9
The lean tool to reduce setup times is SMED; this acronym stands for

A)Sample minute exchange of dry
B)Single minute exchange of die
C)Simple minute exchange of die
D)Simple minute exchange of dry
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is FALSE about Optimized Production Technology (OPT)?

A)Bottleneck workstations in the shop must be identified
B)Bottleneck workstations must be scheduled for full utilization
C)Capacities are to be balanced throughout the shop
D)Non-bottleneck workstations must be scheduled to keep bottlenecks busy so they never wait for work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
11
Takt time is calculated as

A)Demand volume divided by customer required volume
B)Customer required volume divided by available work time
C)Available work time divided by customer required volume
D)Available work time divided by demand volume
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
12
Pursuing perfection in lean organizations involves which of the following tools?

A)5S,the visual factory and kaizen
B)Six Sigma,Project management and continuous improvement
C)Poka yoke and total productive maintenance
D)Both A and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
13
A diagram where the physical flows of the parts are mapped onto the shop floor is referred to as muda.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
14
The following are characteristics of continuous flow manufacturing (CFM),EXCEPT:

A)Work should flow through the process without interruption
B)Work is organized based on the similarity of the work performed (a functional organization)
C)Work flows one unit at a time,based on the customer's demand rate
D)The phrase "don't let the parts touch the floor" exemplify CFM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
15
The __________ offers a systematic way to view and analyze process flows.

A)Optimized Production Technology (OPT)
B)Pull system
C)Theory of constraints
D)Progression theory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is/are (a)primary tenet(s)in the Japanese work systems?

A)Waste is minimized
B)Continually improving process and systems
C)Six sigma implementation
D)Both A and B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following is NOT a direct benefit of lean?

A)Cost savings
B)Uncovering problems
C)Improved financial investments
D)Revenue increases
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
18
The following are characteristics of Lean when contrasted with traditional systems,EXCEPT:

A)Priorities are a limited market and few options
B)Capacity is flexible and moderately utilized
C)Suppliers are many,competitive,deliver to central receiving area and have independent forecasts
D)Quality is at the source,continuous and with statistical process controls
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
19
The goal of single minute exchange of die is to reduce setup times to less than 10 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
20
A patient diagnosis is an example of what type of activity?

A)Value-added
B)Non-value-added but necessary
C)Non-value-added and not necessary
D)Necessary and value-neutral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
21
The goal of Kaizen blitz is to mistake-proof work activities in a way that prevents errors from being committed in the first place.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
22
A measure of overall ________ ________ is calculated as the product of equipment availability,equipment efficiency,and the rate of quality output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
23
The idea of authorizing materials for production only if there is a need for them originated the materials management system known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
24
The idea behind the Kanban system is to authorize materials for production only if there is a need for them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
25
Lean enterprises rely on the push system,whereby company supply drives the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
26
Key aspects of the theory of constraints include identifying the bottlenecks in the process and balancing the work flows in the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
27
Repairing a machine when it breaks down,as opposed to conducting maintenance before it is expected to fail,or at regular intervals is also known as ______ maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
28
Saving time at non-bottleneck workstations increases total output by an average of five minutes per part per operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
29
Mixed-model assembly requires optimized production technology (OPT)for sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.