Deck 3: Managing Systems Projects

ملء الشاشة (f)
exit full mode
سؤال
<strong>  The accompanying figure shows task ____, which simplify a complex task by combining several activities.</strong> A)groups B)clusters C)aggregates D)links <div style=padding-top: 35px>
The accompanying figure shows task ____, which simplify a complex task by combining several activities.

A)groups
B)clusters
C)aggregates
D)links
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A ____ might involve maximums for one or more resources.

A)successor task
B)task group
C)constraint
D)bottom-up technique
سؤال
For a project manager, monitoring _____.

A)requires guiding, supervising, and coordinating the project team's workload
B)involves controlling capital
C)consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying and arranging project tasks and estimating completion times and costs
سؤال
Effective project reporting requires ____.

A)strong communication skills
B)staffing the project team
C)creating Gantt charts
D)assigning specific tasks to team members
سؤال
Two or more concurrent tasks often depend on a single prior task, which is called a(n) ____ task.

A)predecessor
B)a priori
C)antecedent
D)ancestor
سؤال
Which of the following are metrics of a successful project ____.

A)late completion
B)completion with the same personnel as were on the team at the outset
C)completion over budget
D)delivery of a product that satisfies users
سؤال
When two or more concurrent tasks depend on a single prior task, the concurrent tasks are called ____ tasks.

A)descendent
B)successor
C)children
D)antecedent
سؤال
The first step in creating a WBS is to ____.

A)mark all recognizable events
B)determine time requirements
C)identify all tasks
D)estimate task completion time and cost
سؤال
A event is a recognizable reference point that you can use to ____.

A)monitor progress
B)assign people
C)manage time
D)allocate money
سؤال
Many project managers find ____ charts more helpful for scheduling, monitoring, and controlling projects.

A)Gantt
B)PERT/CPM
C)index
D)task
سؤال
When several tasks can start at the same time, each is called a(n) ____ task.

A)synchronous
B)asynchronous
C)baseline
D)concurrent
سؤال
A project manager's scheduling function _____.

A)involves guiding, supervising, and coordinating the project team's workload
B)includes monitoring the progress of the project, evaluating results, and taking corrective action when necessary to stay on target
C)involves staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying and arranging project tasks and estimating completion times and costs
سؤال
A project manager's planning _____.

A)involves guiding, supervising, and coordinating the project team's workload
B)includes monitoring the progress of the project, evaluating results, and taking corrective action when necessary to stay on target
C)consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying project tasks and estimating completion times and costs
سؤال
In a PERT/CPM chart, each task has which of the following ____.

A)references to successor tasks
B)references to predecessor tasks
C)start day/date
D)resources allocated
سؤال
A ____ path includes all tasks that are vital to the project schedule.

A)vital
B)baseline
C)critical
D)foundational
سؤال
A(n) ____ chart displays complex task patterns and relationships.

A)Gantt
B)index
C)PERT/CPM
D)task
سؤال
In addition to tasks, every project has ____, which are reference points used to monitor progress and manage the project.

A)targets
B)milestones
C)members
D)workloads
سؤال
PERT/CPM is called a(n) ____ technique, because it analyzes a large, complex project as a series of individual tasks.

A)top-down
B)bottom-up
C)indexed
D)cataloging
سؤال
The first step in the creation of a PERT/CPM chart is to ____.

A)determine the logical order of project tasks
B)identify the graphical planning aids to use
C)identify all the project tasks
D)determine the status of all tasks
سؤال
For a project manager, reporting _____.

A)involves controlling capital
B)includes informing management, users, and the project team about the progress of the project
C)consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying and arranging project tasks and estimating completion times and costs
سؤال
Microsoft claims that Microsoft Project has the capability of ____.

A)linking risks with specific vendors
B)assign ownership of risks
C)eliminating risk
D)preventing fraud
سؤال
Problems with timetables and project milestones can indicate ____.

A)recognition of task dependencies
B)continuity of project personnel
C)good control methods
D)personality conflicts among team members
سؤال
Microsoft's risk management model includes ____.

A)category, which specifies the risk type
B)probability, which indicates the degree of adverse effect should the risk occur, on a scale of 1 to 10
C)impact plan, which identifies plans to control or limit the risk
D)contingency, which identifies a condition that would initiate the contingency plan
سؤال
A risk ____ plan is a proactive effort to anticipate a risk and describe an action plan to deal with it.

A)identification
B)management
C)response
D)balancing
سؤال
The Apptivo ____ is free of charge with unlimited duration.

A)Full Plan
B)Enhanced Plan
C)Expanded Plan
D)Standard Plan
سؤال
When maintaining schedules, if enough ____ and frequent checkpoints exist, problems will be detected rapidly.

A)success indices
B)critical paths
C)milestones
D)all of the above
سؤال
When a project manager first recognizes that a project is in trouble, the options available to her include ____.

A)expanding the project requirements
B)delaying the project deadline
C)reducing the project resources
D)eliminating controls and procedures
سؤال
A(n) ____ chart can be used to display the qualitative risk analysis matrix.

A)pie
B)XY
C)bar
D)line
سؤال
GanttProject can open files created with ____.

A)Apptivo
B)HTML
C)Microsoft Word
D)Microsoft Project
سؤال
____ is open-source software that is supported by a community of users and developers.

A)GanttProject
B)Microsoft Project Standard
C)Microsoft Project Professional
D)Both b and c
سؤال
A project triangle shows three legs: _____.

A)project cost, scope, and time
B)project cost, size, and scope
C)project size, scope, and time
D)project size, cost, and time
سؤال
A _____ cannot be started until one or more other tasks are completed.

A)dependent task
B)concurrent task
C)predecessor task
D)all of the above
سؤال
____ is a possible cause of cost overruns related to human resource issues.

A)unrealistic estimates
B)poor monitoring of progress
C)inaccurate TCO forecast
D)turnover
سؤال
A ____ is an event that could affect a project negatively.

A)menace
B)threat
C)doubt
D)risk
سؤال
A risk management plan includes a review of ____.

A)employees
B)project scope
C)program code
D)open source
سؤال
Most risk identifications include a brief description of ____.

A)the team member who might cause a risk to occur
B)who would be responsible for responding to a given risk
C)the project manager most vulnerable to a given risk
D)the team member most vulnerable to a given risk
سؤال
Project managers always must be aware of the ____ path, so they can monitor the vital tasks and keep the project on track.

A)vital
B)baseline
C)foundational
D)critical
سؤال
A continuous risk-tracking process can ____.

A)identify new risks
B)prevent human resource turnover issues
C)increase employee satisfaction
D)encourage team building
سؤال
_____ is a full-featured program that holds the dominant share of the project management software market.

A)Apptivo
B)GanttProject
C)Microsoft Project
D)OpenProject
سؤال
When an information system does not meet business requirements, causes might include ____.

A)identified requirements
B)adequately defined scope
C)imprecise targets
D)sufficient testing
سؤال
Gantt charts often are included in progress reports to show project status graphically. _________________________
سؤال
System developers can initiate a formal project as early as the preliminary investigation stage, or later on, as analysis, design, and implementation activities occur.
سؤال
Structured walk-throughs take place throughout the SDLC and are called ____ reviews, depending on the phase in which they occur.

A)technical
B)code
C)design
D)testing
سؤال
A PERT/CPM chart does not show the project as a network diagram with tasks connected
by arrows.
سؤال
____ is a time estimate the project manager makes for a task.

A)The weight
B)The worst-case estimate
C)The best-case estimate
D)The probable-case estimate
سؤال
Critical time is the amount of time that a task would be late without pushing back the completion date of the entire project. _________________________
سؤال
Using a WBS allows you to manage a project as one large task.
سؤال
In most systems analysis tasks, time and people are interchangeable.
سؤال
A project manager, or project leader, usually is a senior systems analyst or an IT department manager if the project is large.
سؤال
Project managers typically perform the tasks of ____.

A)project planning
B)project reconciliation
C)project scheduling
D)project monitoring
سؤال
Using prior experience to make time and cost estimates works best for large projects.
سؤال
If you do not have previous experience to measure a project in a given environment, you could design a prototype or pilot system to gain technical and cost estimating experience.
سؤال
If it will take one person 20 days to perform a particular task, it is true that two people could complete the same task in 10 days or that 10 people could perform the task in two days.
سؤال
The purpose of quantitative risk analysis is to understand the actual impact in terms of dollars, time, project scope, or quality. _________________________
سؤال
In the end, every successful information system must ____.

A)support business requirements
B)stay within budget
C)be completed on time
D)not have any errors
سؤال
Although a Gantt chart provides more detailed information about a project, a PERT/CPM chart offers a rapid overview that graphically displays the timing, duration, and progress of each task.
سؤال
PERT/CPM and Gantt charts are mutually exclusive techniques.
سؤال
Quantitative risk analysis evaluates each risk by estimating the probability that it will occur and the degree of impact. _________________________
سؤال
Which of the following is an example of an event?

A)the start of user training
B)conversion of system data
C)project creep
D)completion of interviews
سؤال
Gantt charts are an ideal tool for controlling a complex project because they provide plenty of detailed information.
سؤال
  In the project planning process, a(n) ____________________ is any work that has a beginning and an end and requires the use of company resources.<div style=padding-top: 35px>
In the project planning process, a(n) ____________________ is any work that has a beginning and an end and requires the use of company resources.
سؤال
If team members lack experience with certain aspects of the required technology, temporary help might be obtained from IT consultants or part-time staff.
سؤال
Generally, systems analysts review the work of other systems analysts, and programmers review the work of other programmers, as a form of peer review, in structured walk-throughs.
سؤال
Project status meetings give project managers an opportunity to seek input and conduct brainstorming sessions.
سؤال
In any project, large or small, tasks depend on each other and must be performed in a sequence.
سؤال
The ____________________ handles administrative responsibilities for a project development team and negotiates with users who might have conflicting requirements or want changes that would require additional time or expense.
سؤال
If any task along the critical path falls behind schedule, the entire project is delayed.
سؤال
Project management is dynamic and challenging, regardless of which software you use..
سؤال
Often, two or more concurrent tasks depend on a single prior task, which is called a successor task.
سؤال
In a PERT/CPM chart, each rectangular box, called a task box, has five sections that contain important information about a task.
سؤال
In GanttProject, unlike in Microsoft Project, you create tasks and durations, indicate dependencies, and assign resources.
سؤال
  To simplify a Gantt chart for a large project, a project manager can combine related activities into ____________________ that represent several activities.<div style=padding-top: 35px>
To simplify a Gantt chart for a large project, a project manager can combine related activities into ____________________ that represent several activities.
سؤال
When several tasks can take place at the same time, each is called a sequential task.
سؤال
Project management software can highlight the series of tasks that form the critical path.
سؤال
When tasks must be completed one after another, they are called concurrent tasks.
سؤال
  A(n) ____________________ is a recognizable reference point that can be used to monitor progress and manage a project.<div style=padding-top: 35px>
A(n) ____________________ is a recognizable reference point that can be used to monitor progress and manage a project.
سؤال
Tasks that are not on the critical path cannot be ignored.
سؤال
  To schedule a project, a project manager can use a(n) ____________________ like the one in the accompanying figure, which is a horizontal bar chart that represents a series of tasks.<div style=padding-top: 35px>
To schedule a project, a project manager can use a(n) ____________________ like the one in the accompanying figure, which is a horizontal bar chart that represents a series of tasks.
سؤال
When two or more concurrent tasks depend on a single prior task, each of the concurrent tasks is called a predecessor task.
سؤال
Most managers recognize that problems do occur on most projects; it is better to alert management sooner rather than later.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/112
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: Managing Systems Projects
1
<strong>  The accompanying figure shows task ____, which simplify a complex task by combining several activities.</strong> A)groups B)clusters C)aggregates D)links
The accompanying figure shows task ____, which simplify a complex task by combining several activities.

A)groups
B)clusters
C)aggregates
D)links
A
2
A ____ might involve maximums for one or more resources.

A)successor task
B)task group
C)constraint
D)bottom-up technique
C
3
For a project manager, monitoring _____.

A)requires guiding, supervising, and coordinating the project team's workload
B)involves controlling capital
C)consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying and arranging project tasks and estimating completion times and costs
A
4
Effective project reporting requires ____.

A)strong communication skills
B)staffing the project team
C)creating Gantt charts
D)assigning specific tasks to team members
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
5
Two or more concurrent tasks often depend on a single prior task, which is called a(n) ____ task.

A)predecessor
B)a priori
C)antecedent
D)ancestor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following are metrics of a successful project ____.

A)late completion
B)completion with the same personnel as were on the team at the outset
C)completion over budget
D)delivery of a product that satisfies users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
7
When two or more concurrent tasks depend on a single prior task, the concurrent tasks are called ____ tasks.

A)descendent
B)successor
C)children
D)antecedent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
8
The first step in creating a WBS is to ____.

A)mark all recognizable events
B)determine time requirements
C)identify all tasks
D)estimate task completion time and cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
9
A event is a recognizable reference point that you can use to ____.

A)monitor progress
B)assign people
C)manage time
D)allocate money
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
10
Many project managers find ____ charts more helpful for scheduling, monitoring, and controlling projects.

A)Gantt
B)PERT/CPM
C)index
D)task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
11
When several tasks can start at the same time, each is called a(n) ____ task.

A)synchronous
B)asynchronous
C)baseline
D)concurrent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
12
A project manager's scheduling function _____.

A)involves guiding, supervising, and coordinating the project team's workload
B)includes monitoring the progress of the project, evaluating results, and taking corrective action when necessary to stay on target
C)involves staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying and arranging project tasks and estimating completion times and costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
13
A project manager's planning _____.

A)involves guiding, supervising, and coordinating the project team's workload
B)includes monitoring the progress of the project, evaluating results, and taking corrective action when necessary to stay on target
C)consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying project tasks and estimating completion times and costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
14
In a PERT/CPM chart, each task has which of the following ____.

A)references to successor tasks
B)references to predecessor tasks
C)start day/date
D)resources allocated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
15
A ____ path includes all tasks that are vital to the project schedule.

A)vital
B)baseline
C)critical
D)foundational
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
16
A(n) ____ chart displays complex task patterns and relationships.

A)Gantt
B)index
C)PERT/CPM
D)task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
17
In addition to tasks, every project has ____, which are reference points used to monitor progress and manage the project.

A)targets
B)milestones
C)members
D)workloads
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
18
PERT/CPM is called a(n) ____ technique, because it analyzes a large, complex project as a series of individual tasks.

A)top-down
B)bottom-up
C)indexed
D)cataloging
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
19
The first step in the creation of a PERT/CPM chart is to ____.

A)determine the logical order of project tasks
B)identify the graphical planning aids to use
C)identify all the project tasks
D)determine the status of all tasks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
20
For a project manager, reporting _____.

A)involves controlling capital
B)includes informing management, users, and the project team about the progress of the project
C)consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D)includes identifying and arranging project tasks and estimating completion times and costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
21
Microsoft claims that Microsoft Project has the capability of ____.

A)linking risks with specific vendors
B)assign ownership of risks
C)eliminating risk
D)preventing fraud
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
22
Problems with timetables and project milestones can indicate ____.

A)recognition of task dependencies
B)continuity of project personnel
C)good control methods
D)personality conflicts among team members
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
23
Microsoft's risk management model includes ____.

A)category, which specifies the risk type
B)probability, which indicates the degree of adverse effect should the risk occur, on a scale of 1 to 10
C)impact plan, which identifies plans to control or limit the risk
D)contingency, which identifies a condition that would initiate the contingency plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
24
A risk ____ plan is a proactive effort to anticipate a risk and describe an action plan to deal with it.

A)identification
B)management
C)response
D)balancing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
25
The Apptivo ____ is free of charge with unlimited duration.

A)Full Plan
B)Enhanced Plan
C)Expanded Plan
D)Standard Plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
26
When maintaining schedules, if enough ____ and frequent checkpoints exist, problems will be detected rapidly.

A)success indices
B)critical paths
C)milestones
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
27
When a project manager first recognizes that a project is in trouble, the options available to her include ____.

A)expanding the project requirements
B)delaying the project deadline
C)reducing the project resources
D)eliminating controls and procedures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
28
A(n) ____ chart can be used to display the qualitative risk analysis matrix.

A)pie
B)XY
C)bar
D)line
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
29
GanttProject can open files created with ____.

A)Apptivo
B)HTML
C)Microsoft Word
D)Microsoft Project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
30
____ is open-source software that is supported by a community of users and developers.

A)GanttProject
B)Microsoft Project Standard
C)Microsoft Project Professional
D)Both b and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
31
A project triangle shows three legs: _____.

A)project cost, scope, and time
B)project cost, size, and scope
C)project size, scope, and time
D)project size, cost, and time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
32
A _____ cannot be started until one or more other tasks are completed.

A)dependent task
B)concurrent task
C)predecessor task
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
33
____ is a possible cause of cost overruns related to human resource issues.

A)unrealistic estimates
B)poor monitoring of progress
C)inaccurate TCO forecast
D)turnover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
34
A ____ is an event that could affect a project negatively.

A)menace
B)threat
C)doubt
D)risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
35
A risk management plan includes a review of ____.

A)employees
B)project scope
C)program code
D)open source
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
36
Most risk identifications include a brief description of ____.

A)the team member who might cause a risk to occur
B)who would be responsible for responding to a given risk
C)the project manager most vulnerable to a given risk
D)the team member most vulnerable to a given risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
37
Project managers always must be aware of the ____ path, so they can monitor the vital tasks and keep the project on track.

A)vital
B)baseline
C)foundational
D)critical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
38
A continuous risk-tracking process can ____.

A)identify new risks
B)prevent human resource turnover issues
C)increase employee satisfaction
D)encourage team building
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
39
_____ is a full-featured program that holds the dominant share of the project management software market.

A)Apptivo
B)GanttProject
C)Microsoft Project
D)OpenProject
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
40
When an information system does not meet business requirements, causes might include ____.

A)identified requirements
B)adequately defined scope
C)imprecise targets
D)sufficient testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
41
Gantt charts often are included in progress reports to show project status graphically. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
42
System developers can initiate a formal project as early as the preliminary investigation stage, or later on, as analysis, design, and implementation activities occur.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
43
Structured walk-throughs take place throughout the SDLC and are called ____ reviews, depending on the phase in which they occur.

A)technical
B)code
C)design
D)testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
44
A PERT/CPM chart does not show the project as a network diagram with tasks connected
by arrows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
45
____ is a time estimate the project manager makes for a task.

A)The weight
B)The worst-case estimate
C)The best-case estimate
D)The probable-case estimate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
46
Critical time is the amount of time that a task would be late without pushing back the completion date of the entire project. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
47
Using a WBS allows you to manage a project as one large task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
48
In most systems analysis tasks, time and people are interchangeable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
49
A project manager, or project leader, usually is a senior systems analyst or an IT department manager if the project is large.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
50
Project managers typically perform the tasks of ____.

A)project planning
B)project reconciliation
C)project scheduling
D)project monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
51
Using prior experience to make time and cost estimates works best for large projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
52
If you do not have previous experience to measure a project in a given environment, you could design a prototype or pilot system to gain technical and cost estimating experience.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
53
If it will take one person 20 days to perform a particular task, it is true that two people could complete the same task in 10 days or that 10 people could perform the task in two days.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
54
The purpose of quantitative risk analysis is to understand the actual impact in terms of dollars, time, project scope, or quality. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
55
In the end, every successful information system must ____.

A)support business requirements
B)stay within budget
C)be completed on time
D)not have any errors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
56
Although a Gantt chart provides more detailed information about a project, a PERT/CPM chart offers a rapid overview that graphically displays the timing, duration, and progress of each task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
57
PERT/CPM and Gantt charts are mutually exclusive techniques.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
58
Quantitative risk analysis evaluates each risk by estimating the probability that it will occur and the degree of impact. _________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following is an example of an event?

A)the start of user training
B)conversion of system data
C)project creep
D)completion of interviews
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
60
Gantt charts are an ideal tool for controlling a complex project because they provide plenty of detailed information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
61
  In the project planning process, a(n) ____________________ is any work that has a beginning and an end and requires the use of company resources.
In the project planning process, a(n) ____________________ is any work that has a beginning and an end and requires the use of company resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
62
If team members lack experience with certain aspects of the required technology, temporary help might be obtained from IT consultants or part-time staff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
63
Generally, systems analysts review the work of other systems analysts, and programmers review the work of other programmers, as a form of peer review, in structured walk-throughs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
64
Project status meetings give project managers an opportunity to seek input and conduct brainstorming sessions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
65
In any project, large or small, tasks depend on each other and must be performed in a sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
66
The ____________________ handles administrative responsibilities for a project development team and negotiates with users who might have conflicting requirements or want changes that would require additional time or expense.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
67
If any task along the critical path falls behind schedule, the entire project is delayed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
68
Project management is dynamic and challenging, regardless of which software you use..
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
69
Often, two or more concurrent tasks depend on a single prior task, which is called a successor task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
70
In a PERT/CPM chart, each rectangular box, called a task box, has five sections that contain important information about a task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
71
In GanttProject, unlike in Microsoft Project, you create tasks and durations, indicate dependencies, and assign resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
72
  To simplify a Gantt chart for a large project, a project manager can combine related activities into ____________________ that represent several activities.
To simplify a Gantt chart for a large project, a project manager can combine related activities into ____________________ that represent several activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
73
When several tasks can take place at the same time, each is called a sequential task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
74
Project management software can highlight the series of tasks that form the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
75
When tasks must be completed one after another, they are called concurrent tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
76
  A(n) ____________________ is a recognizable reference point that can be used to monitor progress and manage a project.
A(n) ____________________ is a recognizable reference point that can be used to monitor progress and manage a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
77
Tasks that are not on the critical path cannot be ignored.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
78
  To schedule a project, a project manager can use a(n) ____________________ like the one in the accompanying figure, which is a horizontal bar chart that represents a series of tasks.
To schedule a project, a project manager can use a(n) ____________________ like the one in the accompanying figure, which is a horizontal bar chart that represents a series of tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
79
When two or more concurrent tasks depend on a single prior task, each of the concurrent tasks is called a predecessor task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 112 في هذه المجموعة.
فتح الحزمة
k this deck
80
Most managers recognize that problems do occur on most projects; it is better to alert management sooner rather than later.