Deck 10: Process Improvement: Lean

ملء الشاشة (f)
exit full mode
سؤال
Which of the following is/are (a)primary tenet(s)in the Japanese work systems?

A)Waste is minimized
B)Continually improving process and systems
C)Six sigma implementation
D)Both A and B
E)None of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The goal of single minute exchange of die is to reduce setup times to less than 10 minutes.
سؤال
Which of the following is not one of the seven categories of waste or muda?

A)Waiting
B)Inventory
C)Underproduction
D)Defects
سؤال
In traditional approaches to production,preventive maintenance is also common.
سؤال
Which of the following is not a direct benefit of lean?

A)Cost savings
B)Uncovering problems
C)Improved financial investments
D)Revenue increases
سؤال
A patient diagnosis is an example of what type of activity?

A)Value-added
B)Non-value-added but necessary
C)Non-value-added and not necessary
D)Necessary and value-neutral
سؤال
Mixed-model assembly requires optimized production technology (OPT)for sequencing.
سؤال
The following are characteristics of Lean when contrasted with traditional systems,except:

A)Priorities are a limited market and few options
B)Capacity is flexible and moderately utilized
C)Suppliers are many,competitive,deliver to central receiving area and have independent forecasts
D)Quality is at the source,continuous and with statistical process controls
سؤال
Japanese production approaches such as JIT could not be applied in the United States because companies do not show much respect and loyalty to their employees.
سؤال
The step in the 5S approach in which standardized procedures for maintaining an orderly work environment are developed and implemented is:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
سؤال
The step in the 5s approach in which the other four steps are made a habit is:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
سؤال
A diagram where the physical flows of the parts are mapped onto the shop floor is referred to as muda.
سؤال
The step in the 5S approach in which unnecessary steps are eliminated is called:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
سؤال
The __________ offers a systematic way to view and analyze process flows.

A)Optimized production technology (OPT)
B)Pull system
C)Theory of constraints
D)Progression theory
سؤال
Which of the following is false about Optimized Production Technology (OPT)?

A)Bottleneck workstations in the shop must be identified
B)Bottleneck workstations must be scheduled for full utilization
C)Capacities are to be balanced throughout the shop
D)Non-bottleneck workstations must be scheduled to keep bottlenecks busy so they never wait for work
سؤال
A value stream map:

A)Can only be used in manufacturing facilities
B)May also be used for service providers
C)Shows the flow of materials and information with suppliers shown on the left of the diagram and customers on the right
D)Both B and C
سؤال
Takt time is calculated as

A)Demand volume divided by customer required volume
B)Customer required volume divided by available work time
C)Available work time divided by customer required volume
D)Available work time divided by demand volume
E)Any of the above can be used
سؤال
Pursuing perfection in lean organizations involves which of the following tools?

A)5S,the visual factory and kaizen
B)Six Sigma,Project management and continuous improvement
C)Poka yoke and total productive maintenance
D)Both A and C
سؤال
The following are characteristics of continuous flow manufacturing (CFM),except:

A)Work should flow through the process without interruption
B)Work is organized based on the similarity of the work performed (a functional organization)
C)Work flows one unit at a time,based on the customer's demand rate
D)The phrase "don't let the parts touch the floor" exemplify CFM
سؤال
The goal of this approach is to mistake-proof work activities in a way that prevents errors from being committed in the first place:

A)Kaizen blitz
B)Poka Yoke
C)5S
D)Six sigma
E)OPT
سؤال
If your processing plant were put under a tight deadline,using the Theory of Constraints,would it be more efficient to use a transfer batch smaller or larger than the current process batch in order to reduce batch flow times? Explain your answer.
سؤال
The idea behind the Kanban system is to authorize materials for production only if there is a need for them.
سؤال
The Japanese work systems tend to be based on three primary tenants.What are they?
سؤال
Saving time at non-bottleneck workstations increases total output by an average of five minutes per part per operation.
سؤال
Describe the Japanese culture that lead to the development of lean.
سؤال
Waste can be defined as those activities that consume resources but from the customer's perspective create no value.From this perspective,waste is often classified into seven categories.Briefly describe these.
سؤال
The goal of Kaizen blitz is to mistake-proof work activities in a way that prevents errors from being committed in the first place.
سؤال
Key aspects of the theory of constraints include identifying the bottlenecks in the process and balancing the work flows in the system.
سؤال
A measure of overall ________ ________ is calculated as the product of equipment availability,equipment efficiency,and the rate of quality output.
سؤال
How are suppliers viewed under lean?
سؤال
Describe the lean layout.
سؤال
In general,there are five primary types of benefits of lean.What are they?
سؤال
Briefly describe the ten guidelines of the theory of constraints.
سؤال
Provide an example of how a bottleneck in a manufacturing plant can affect the output of the entire system.
سؤال
The idea of authorizing materials for production only if there is a need for them originated the materials management system known as ________.
سؤال
It is often clear the advantages of a JIT (just in time)system for the manufacturing industry.On the other hand,what are some of the advantages of JIT for the service industry?
سؤال
Lean enterprises rely on the push system,whereby company supply drives the production process.
سؤال
What is the Japanese view of inventories?
سؤال
What is the goal of poka yoke?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/39
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Process Improvement: Lean
1
Which of the following is/are (a)primary tenet(s)in the Japanese work systems?

A)Waste is minimized
B)Continually improving process and systems
C)Six sigma implementation
D)Both A and B
E)None of the above
Both A and B
2
The goal of single minute exchange of die is to reduce setup times to less than 10 minutes.
True
3
Which of the following is not one of the seven categories of waste or muda?

A)Waiting
B)Inventory
C)Underproduction
D)Defects
Underproduction
4
In traditional approaches to production,preventive maintenance is also common.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is not a direct benefit of lean?

A)Cost savings
B)Uncovering problems
C)Improved financial investments
D)Revenue increases
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
6
A patient diagnosis is an example of what type of activity?

A)Value-added
B)Non-value-added but necessary
C)Non-value-added and not necessary
D)Necessary and value-neutral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
7
Mixed-model assembly requires optimized production technology (OPT)for sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
8
The following are characteristics of Lean when contrasted with traditional systems,except:

A)Priorities are a limited market and few options
B)Capacity is flexible and moderately utilized
C)Suppliers are many,competitive,deliver to central receiving area and have independent forecasts
D)Quality is at the source,continuous and with statistical process controls
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
9
Japanese production approaches such as JIT could not be applied in the United States because companies do not show much respect and loyalty to their employees.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
10
The step in the 5S approach in which standardized procedures for maintaining an orderly work environment are developed and implemented is:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
11
The step in the 5s approach in which the other four steps are made a habit is:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
12
A diagram where the physical flows of the parts are mapped onto the shop floor is referred to as muda.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
13
The step in the 5S approach in which unnecessary steps are eliminated is called:

A)Sort
B)Straighten (Set in order)
C)Scrub (Shine)
D)Systemize
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
14
The __________ offers a systematic way to view and analyze process flows.

A)Optimized production technology (OPT)
B)Pull system
C)Theory of constraints
D)Progression theory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following is false about Optimized Production Technology (OPT)?

A)Bottleneck workstations in the shop must be identified
B)Bottleneck workstations must be scheduled for full utilization
C)Capacities are to be balanced throughout the shop
D)Non-bottleneck workstations must be scheduled to keep bottlenecks busy so they never wait for work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
16
A value stream map:

A)Can only be used in manufacturing facilities
B)May also be used for service providers
C)Shows the flow of materials and information with suppliers shown on the left of the diagram and customers on the right
D)Both B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
17
Takt time is calculated as

A)Demand volume divided by customer required volume
B)Customer required volume divided by available work time
C)Available work time divided by customer required volume
D)Available work time divided by demand volume
E)Any of the above can be used
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
18
Pursuing perfection in lean organizations involves which of the following tools?

A)5S,the visual factory and kaizen
B)Six Sigma,Project management and continuous improvement
C)Poka yoke and total productive maintenance
D)Both A and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
19
The following are characteristics of continuous flow manufacturing (CFM),except:

A)Work should flow through the process without interruption
B)Work is organized based on the similarity of the work performed (a functional organization)
C)Work flows one unit at a time,based on the customer's demand rate
D)The phrase "don't let the parts touch the floor" exemplify CFM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
20
The goal of this approach is to mistake-proof work activities in a way that prevents errors from being committed in the first place:

A)Kaizen blitz
B)Poka Yoke
C)5S
D)Six sigma
E)OPT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
21
If your processing plant were put under a tight deadline,using the Theory of Constraints,would it be more efficient to use a transfer batch smaller or larger than the current process batch in order to reduce batch flow times? Explain your answer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
22
The idea behind the Kanban system is to authorize materials for production only if there is a need for them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
23
The Japanese work systems tend to be based on three primary tenants.What are they?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
24
Saving time at non-bottleneck workstations increases total output by an average of five minutes per part per operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
25
Describe the Japanese culture that lead to the development of lean.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
26
Waste can be defined as those activities that consume resources but from the customer's perspective create no value.From this perspective,waste is often classified into seven categories.Briefly describe these.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
27
The goal of Kaizen blitz is to mistake-proof work activities in a way that prevents errors from being committed in the first place.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
28
Key aspects of the theory of constraints include identifying the bottlenecks in the process and balancing the work flows in the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
29
A measure of overall ________ ________ is calculated as the product of equipment availability,equipment efficiency,and the rate of quality output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
30
How are suppliers viewed under lean?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
31
Describe the lean layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
32
In general,there are five primary types of benefits of lean.What are they?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
33
Briefly describe the ten guidelines of the theory of constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
34
Provide an example of how a bottleneck in a manufacturing plant can affect the output of the entire system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
35
The idea of authorizing materials for production only if there is a need for them originated the materials management system known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
36
It is often clear the advantages of a JIT (just in time)system for the manufacturing industry.On the other hand,what are some of the advantages of JIT for the service industry?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
37
Lean enterprises rely on the push system,whereby company supply drives the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
38
What is the Japanese view of inventories?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
39
What is the goal of poka yoke?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 39 في هذه المجموعة.