Deck 10: Monitoring and Information Systems

ملء الشاشة (f)
exit full mode
سؤال
ETC + AC = __________.

A)BAC
B)EAC
C)SPI
D)CPI
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The most common mistake made when monitoring data is to gather information that is clearly related to project performance but __________.

A)is so volatile that trends cannot be detected
B)has little or no probability of changing significantly between collection periods
C)is too unusual to use
D)cannot be captured in the mechanized PMIS
سؤال
According to the authors, the project manager can tolerate almost any kind of behavior, EXCEPT __________.

A)tardiness
B)negative attitude
C)unpunctuality
D)dishonesty
سؤال
According to the authors, the key items to be planned, monitored, and controlled are __________.

A)time, cost, and financial stability
B)time, quality, performance, and customer satisfaction
C)schedule, budget, and feasibility
D)time, cost, and performance
سؤال
In earned value analysis, if the cost variance is (-$10,000), __________.

A)the cost variance is favorable
B)the cost variance is unfavorable
C)the scheduled variance is favorable
D)the scheduled cost avoidance is unfavorable
سؤال
The first step in setting up a monitoring system is to __________.

A)collect existing data to see what data is relevant and available
B)collect every available piece of information so it can be analyzed
C)use whatever information is available
D)identify the key factors to be controlled
سؤال
Microsoft's PMIS product is referred to as Microsoft __________.

A)Project
B)Excel
C)Office Tools
D)Access
سؤال
In earned value analysis, the 0 - 100 percent rule allows __________.

A)100 percent credit before starting work and 0 percent credit after the completion
B)0 percent credit when work begins and 100 percent credit when the project is complete
C)0 percent credit when work begins and 100 percent credit at completion of the activity
D)0 percent credit at completion of the activity and 100 percent credit at formal acceptance during scope verification
سؤال
According to the authors, in the planning - monitoring - controlling cycle, the directions of the flows indicate that __________.

A)information flows from the top to bottom and authority flows from the bottom to the top
B)information flows from the bottom to the top and authority flows from the top to the bottom
C)authority flows from the bottom to the top
D)information flows from the top to the bottom
سؤال
__________ is when individuals are overwhelmed with too many reports, too much detail, and too much data.

A)Information overload
B)PMIS verification
C)Project isolation
D)Computer paralysis
سؤال
One of the most common errors when collecting data is __________.

A)collecting rapidly changing data frequently
B)collecting data infrequently because data collection is so time consuming
C)collecting data that rarely changes
D)reporting to management after collecting data.
سؤال
If CPI = 1.05, then __________ is favorable.

A)time variance
B)schedule variance
C)cost variance
D)performance variance
سؤال
In earned value analysis, the 50-50 rule assumes that __________.

A)50 percent is earned when the task is half done and 50 percent is earned at completion
B)50 percent is earned when the task begins and 50 percent is earned at completion
C)50 percent is earned when the task begins and 50 percent is earned at the halfway stage
D)50 percent is earned when the project is planned and 50 percent is earned when the project is over
سؤال
__________ may not be constant over the project's life because they can be changed by the parent organization, the client, or the community.

A)Performance criteria
B)Data collection procedures
C)Standards
D)Project goals
سؤال
Monitoring, as an activity, should be kept distinct from __________, which is the process of making judgments about the quality and effectiveness of project performance.

A)collecting
B)reporting
C)evaluation
D)recording
سؤال
Monitoring, as an activity, should be kept distinct from __________, which uses data supplied by monitoring to bring actual performance into approximate congruence with planned performance.

A)recording
B)controlling
C)collecting
D)reporting
سؤال
For each factor to be measured during monitoring; performance criteria, standards, and __________ must be established.

A)Data collection procedures
B)Mechanized systems
C)Automated systems
D)Audit checks
سؤال
Secondary uses for monitoring include __________.

A)auditing, learning from mistakes, and reporting progress and status
B)exercising effective control over the project
C)evaluating current status of the project
D)fixing the blame when things go wrong
سؤال
Which of the following is NOT a common difficulty in the design of project reports?

A)Providing too much detail
B)Having too many interface modules
C)Poor correspondence to the parent firm's reporting system
D)Poor correspondence between the planning and monitoring systems
سؤال
A large proportion of all data collected takes one of the following forms EXCEPT __________.

A)indicators
B)verbal measures
C)raw numbers
D)individual perceptions
سؤال
In general data are biased by __________ advertently or inadvertently.
سؤال
Reports for __________ have a need for detailed information about individual tasks and the factors affecting such tasks.

A)top executives
B)lower-level personnel
C)all the stakeholders
D)project managers
سؤال
Ordinal rankings of performance are examples of a __________ type of measure.
سؤال
The project control process should be viewed as a __________, with revised plans and schedules (if warranted)following corrective actions. The project control process should run continuously until the project is completed.
سؤال
__________ are used when some aspect of system performance cannot be measured directly.
سؤال
The best sources of items to be monitored are the project risk management plan, change of scope orders, and __________.
سؤال
__________ is collecting, recording, and reporting information concerning any and all aspects of project performance that the project manager or others in the organization wish to know.
سؤال
Measuring characteristics such as "quality of team member cooperation" and "morale of team members" generally takes the form of __________characterizations.

A)verbal
B)raw number
C)indicative
D)oral
سؤال
__________ can often give the project manager early warning signals of potential problems in a project and help understand the relationships of individual tasks to one another and to the overall project.
سؤال
In earned value analysis, the __________ is computed as the earned value minus the actual cost of work performed.
سؤال
A(n)__________ is a simple tally of the occurrence of an event. This type of measure is easy to collect and is often reported as events per unit of time or reported as events as a percent of a standard number.
سؤال
The project __________ describes what is being done, when and the planned level of resource usage for each task, work-package or element in the project.
سؤال
In earned value analysis, EAC refers to the __________.
سؤال
The earned value rule that divides the actual task time-to-date by the scheduled time for the task to calculate percent complete is called the __________ rule.
 
سؤال
EV - PV = __________.
سؤال
In earned value analysis, BAC refers to the __________.
سؤال
When collecting raw project data, it is important to make sure that all data are collected from sources that operate on the same __________ and with the same rules for data collection.
سؤال
A(n)__________ can be used to deal with issues of honesty related to the monitoring system.
سؤال
Which of the following conventions has the characteristic of the project always seeming to be running late, until the very end when it seems to suddenly catch up?

A)The 50-50 rule
B)The 0-100 percent rule
C)Critical input use rule
D)The proportionality rule
سؤال
Management by exception has the disadvantage of being __________.

A)too expensive
B)too difficult to implement
C)a quantitative approach
D)an "after the fact" type of approach
سؤال
Identify the main complaints associated with meetings.
سؤال
(BAC + EV)/ CPI = __________.
سؤال
Identify some of the benefits when timely reports are delivered to the proper people by the project management information system.
سؤال
Excessive computer involvement with computer activity replacing project management; loss of touch with the project and its realities, is referred to as __________.
سؤال
Suggest some practical measures that can be used to improve the perception about the benefits of meetings.
سؤال
Conceptually, EAC represents the amount spent to date plus __________.
سؤال
Describe the three common difficulties in designing project reports.
سؤال
When using earned value analysis, identify the three conditions that can exist with respect to the completion of activity in a project.
سؤال
If EV = $500, AC = $475, PV = $450; SV = $________.
سؤال
If EV = $500, AC = $450, PV = $475; CPI = __________.
سؤال
List the four conventions used to aid in estimating percent completion.
سؤال
In earned value analysis, (CPI)(SPI)= __________.
سؤال
If CSI is less than 1, it is indicative of a(n) __________.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/53
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Monitoring and Information Systems
1
ETC + AC = __________.

A)BAC
B)EAC
C)SPI
D)CPI
B
2
The most common mistake made when monitoring data is to gather information that is clearly related to project performance but __________.

A)is so volatile that trends cannot be detected
B)has little or no probability of changing significantly between collection periods
C)is too unusual to use
D)cannot be captured in the mechanized PMIS
B
3
According to the authors, the project manager can tolerate almost any kind of behavior, EXCEPT __________.

A)tardiness
B)negative attitude
C)unpunctuality
D)dishonesty
D
4
According to the authors, the key items to be planned, monitored, and controlled are __________.

A)time, cost, and financial stability
B)time, quality, performance, and customer satisfaction
C)schedule, budget, and feasibility
D)time, cost, and performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
5
In earned value analysis, if the cost variance is (-$10,000), __________.

A)the cost variance is favorable
B)the cost variance is unfavorable
C)the scheduled variance is favorable
D)the scheduled cost avoidance is unfavorable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
6
The first step in setting up a monitoring system is to __________.

A)collect existing data to see what data is relevant and available
B)collect every available piece of information so it can be analyzed
C)use whatever information is available
D)identify the key factors to be controlled
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
7
Microsoft's PMIS product is referred to as Microsoft __________.

A)Project
B)Excel
C)Office Tools
D)Access
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
8
In earned value analysis, the 0 - 100 percent rule allows __________.

A)100 percent credit before starting work and 0 percent credit after the completion
B)0 percent credit when work begins and 100 percent credit when the project is complete
C)0 percent credit when work begins and 100 percent credit at completion of the activity
D)0 percent credit at completion of the activity and 100 percent credit at formal acceptance during scope verification
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
9
According to the authors, in the planning - monitoring - controlling cycle, the directions of the flows indicate that __________.

A)information flows from the top to bottom and authority flows from the bottom to the top
B)information flows from the bottom to the top and authority flows from the top to the bottom
C)authority flows from the bottom to the top
D)information flows from the top to the bottom
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
10
__________ is when individuals are overwhelmed with too many reports, too much detail, and too much data.

A)Information overload
B)PMIS verification
C)Project isolation
D)Computer paralysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
11
One of the most common errors when collecting data is __________.

A)collecting rapidly changing data frequently
B)collecting data infrequently because data collection is so time consuming
C)collecting data that rarely changes
D)reporting to management after collecting data.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
12
If CPI = 1.05, then __________ is favorable.

A)time variance
B)schedule variance
C)cost variance
D)performance variance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
13
In earned value analysis, the 50-50 rule assumes that __________.

A)50 percent is earned when the task is half done and 50 percent is earned at completion
B)50 percent is earned when the task begins and 50 percent is earned at completion
C)50 percent is earned when the task begins and 50 percent is earned at the halfway stage
D)50 percent is earned when the project is planned and 50 percent is earned when the project is over
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
14
__________ may not be constant over the project's life because they can be changed by the parent organization, the client, or the community.

A)Performance criteria
B)Data collection procedures
C)Standards
D)Project goals
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
15
Monitoring, as an activity, should be kept distinct from __________, which is the process of making judgments about the quality and effectiveness of project performance.

A)collecting
B)reporting
C)evaluation
D)recording
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
16
Monitoring, as an activity, should be kept distinct from __________, which uses data supplied by monitoring to bring actual performance into approximate congruence with planned performance.

A)recording
B)controlling
C)collecting
D)reporting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
17
For each factor to be measured during monitoring; performance criteria, standards, and __________ must be established.

A)Data collection procedures
B)Mechanized systems
C)Automated systems
D)Audit checks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
18
Secondary uses for monitoring include __________.

A)auditing, learning from mistakes, and reporting progress and status
B)exercising effective control over the project
C)evaluating current status of the project
D)fixing the blame when things go wrong
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is NOT a common difficulty in the design of project reports?

A)Providing too much detail
B)Having too many interface modules
C)Poor correspondence to the parent firm's reporting system
D)Poor correspondence between the planning and monitoring systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
20
A large proportion of all data collected takes one of the following forms EXCEPT __________.

A)indicators
B)verbal measures
C)raw numbers
D)individual perceptions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
21
In general data are biased by __________ advertently or inadvertently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
22
Reports for __________ have a need for detailed information about individual tasks and the factors affecting such tasks.

A)top executives
B)lower-level personnel
C)all the stakeholders
D)project managers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
23
Ordinal rankings of performance are examples of a __________ type of measure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
24
The project control process should be viewed as a __________, with revised plans and schedules (if warranted)following corrective actions. The project control process should run continuously until the project is completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
25
__________ are used when some aspect of system performance cannot be measured directly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
26
The best sources of items to be monitored are the project risk management plan, change of scope orders, and __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
27
__________ is collecting, recording, and reporting information concerning any and all aspects of project performance that the project manager or others in the organization wish to know.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
28
Measuring characteristics such as "quality of team member cooperation" and "morale of team members" generally takes the form of __________characterizations.

A)verbal
B)raw number
C)indicative
D)oral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
29
__________ can often give the project manager early warning signals of potential problems in a project and help understand the relationships of individual tasks to one another and to the overall project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
30
In earned value analysis, the __________ is computed as the earned value minus the actual cost of work performed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
31
A(n)__________ is a simple tally of the occurrence of an event. This type of measure is easy to collect and is often reported as events per unit of time or reported as events as a percent of a standard number.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
32
The project __________ describes what is being done, when and the planned level of resource usage for each task, work-package or element in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
33
In earned value analysis, EAC refers to the __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
34
The earned value rule that divides the actual task time-to-date by the scheduled time for the task to calculate percent complete is called the __________ rule.
 
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
35
EV - PV = __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
36
In earned value analysis, BAC refers to the __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
37
When collecting raw project data, it is important to make sure that all data are collected from sources that operate on the same __________ and with the same rules for data collection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
38
A(n)__________ can be used to deal with issues of honesty related to the monitoring system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following conventions has the characteristic of the project always seeming to be running late, until the very end when it seems to suddenly catch up?

A)The 50-50 rule
B)The 0-100 percent rule
C)Critical input use rule
D)The proportionality rule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
40
Management by exception has the disadvantage of being __________.

A)too expensive
B)too difficult to implement
C)a quantitative approach
D)an "after the fact" type of approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
41
Identify the main complaints associated with meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
42
(BAC + EV)/ CPI = __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
43
Identify some of the benefits when timely reports are delivered to the proper people by the project management information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
44
Excessive computer involvement with computer activity replacing project management; loss of touch with the project and its realities, is referred to as __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
45
Suggest some practical measures that can be used to improve the perception about the benefits of meetings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
46
Conceptually, EAC represents the amount spent to date plus __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
47
Describe the three common difficulties in designing project reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
48
When using earned value analysis, identify the three conditions that can exist with respect to the completion of activity in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
49
If EV = $500, AC = $475, PV = $450; SV = $________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
50
If EV = $500, AC = $450, PV = $475; CPI = __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
51
List the four conventions used to aid in estimating percent completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
52
In earned value analysis, (CPI)(SPI)= __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
53
If CSI is less than 1, it is indicative of a(n) __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.