Deck 12: Systems Development: Investigation and Analysis

ملء الشاشة (f)
exit full mode
سؤال
What system development approach requires cooperation and frequent face-to-face meetings with all project participants to modify, refine, and test how the system meets users' needs and what its capabilities are?

A)prototyping
B)agile development
C)extreme programming
D)traditional development
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
What type of information technology professional specializes in analyzing and designing products and services for business?

A)a programmer
B)a stakeholder
C)an end user
D)a systems analyst
سؤال
After several meetings with users, Leslie has identified strengths, weaknesses, and opportunities in her company's work processes and made a recommendation for improvement, which the business accepted.Which phase of the systems development life cycle can she now move to?

A)systems analysis
B)systems design
C)systems implementation
D)systems testing
سؤال
Ragu provided users with details on the hardware, software, personnel, and procedure components, and showed them how these components are related.Which stage of the systems development life cycle did Ragu just complete?

A)systems analysis
B)systems design
C)systems implementation
D)systems testing
سؤال
How can an organization effectively reduce risk and protect its critical data resources?

A)limit access to any off-site IS facilities
B)control access to critical data
C)lock its data and files
D)use third-party antivirus software
سؤال
During what phase of the system development process are potential problems and opportunities identified and considered in light of the goals of the business?

A)the systems design phase
B)the systems analysis phase
C)the systems investigation phase
D)the systems development phase
سؤال
Sheik is having a kick-off meeting for a major project and has invited his managers and the members of his team.Which two groups of people did Sheik forget to invite?

A)the users and administrative staff
B)the stakeholders and finance staff
C)the users and stakeholders
D)the administrative and finance staff
سؤال
Which of the following is the result of an installed and operational functioning system required by business?

A)a systems implementation
B)a systems production
C)a systems development
D)a systems maintenance and review
سؤال
Larkin has been assigned to the Skating Project.She needs to have a panoramic view of the project and will work closely with different groups.What is her role?

A)finance analyst
B)analyst programmer
C)system analyst
D)operator/programmer
سؤال
Sales are down for Air Toronto Enterprise and the CEO is reflecting on times when her company was profitable and had a sustainable competitive advantage.What aspects is the CEO looking at to help her move the company back to being profitable?

A)mission critical systems
B)critical success factors
C)performance objectives
D)financial reports
سؤال
During what phase of a systems development project is training end users an important task?

A)the initial phase
B)the phase between analysis and design
C)the systems implementation phase
D)the post-implementation phase
سؤال
What is the term used to refer to the running of applications such as word-processing and spreadsheet analysis over the Internet rather than on local machines?

A)rapid application development
B)end-user systems development
C)cloud computing
D)outsourcing
سؤال
What activity takes an iterative approach to the systems development process?

A)rapid application development
B)prototyping
C)traditional systems development
D)progressive systems development
سؤال
The system users are unhappy and have identified several flaws.During which phase would these flaws be addressed to ensure that the system operates smoothly and continues to meet changing business needs?

A)systems investigation
B)systems design
C)systems implementation
D)systems maintenance and review
سؤال
Company AVX has not been doing as well as its competitors that have been investing in enabling technologies.Meera has been asked to look into the situation and propose an action plan so Company AVX can develop competitive advantage.What could Meera do?

A)creative analysis
B)system development
C)strategic planning
D)requirements elicitation
سؤال
Which type of analysis requires unbiased and careful questioning of whether system elements are related in the most effective ways?

A)critical analysis
B)creative analysis
C)causal analysis
D)data-flow analysis
سؤال
What phase of the traditional systems development life cycle identifies strengths, weaknesses, and opportunities for improvement in the current system?

A)the systems investigation phase
B)the systems analysis phase
C)the systems coding phase
D)the systems development phase
سؤال
During what phase of the systems development life cycle do people attempt to answer the question, "What must the information system do to solve the problem?"?

A)the systems investigation phase
B)the systems question phase
C)the systems design phase
D)the systems analysis phase
سؤال
Which of the following situation would typically result in initiating systems development?

A)The current system needs to be relocated to another building.
B)The current system experienced a virus attack.
C)The current system is no longer being used by one entire department.
D)The current system crashed frequently.
سؤال
What ensures that the system operates as intended and modifies the system so that it continues to meet changing business needs?

A)systems implementation
B)systems maintenance and review
C)systems analysis
D)systems design
سؤال
Pam is a project manager and reminds Randy of the importance of completing his tasks on time so that the whole project will not be delayed.What is Pam trying to say?

A)Randy is not following the Gantt Chart.
B)Randy has missed a key milestone.
C)Randy is on the critical path.
D)Randy is behind schedule.
سؤال
The systems development team accepts a given set of information system objectives and delivers a system that meets those objectives.
سؤال
Managers and employees in all functional work areas are helping with systems development and, in many cases, leading the way.
سؤال
What type of assessment determines whether the hardware, software, and other system components can be acquired or developed to address the needs of the organization?

A)a systems investigation
B)a feasibility analysis
C)a technical feasibility
D)a project assessment
سؤال
Why are more organizations outsourcing system development?

A)to reduce the cost of training
B)to share the state-of-the-art technology
C)to increase technological flexibility
D)to seek new partnerships abroad
سؤال
What does a formal system analysis report include?

A)the cost and benefit analysis of the existing system
B)the functional requirements for the new system
C)the features available for the new system
D)a description of the users of the existing system
سؤال
In a data-flow diagram, what symbol reveals a function that is being performed?

A)the data-flow symbol
B)the process symbol
C)the entity symbol
D)the data store symbol
سؤال
Which of the following statements is applicable to the systems steering committee?

A)It consists of mid-level managers from the IS department.
B)It never includes end users.
C)It might suggest a change in project focus.
D)It is a non-advisory group.
سؤال
What task are entity-relationship diagrams used to perform?

A)data modelling
B)process modelling
C)problem analysis
D)activity analysis
سؤال
Apple's application store is called App World, while Blackberry's store is called App Store.
سؤال
Which of the following is a characteristic of data-flow diagrams?

A)They are used to model data entities and their relationships.
B)They are quite complicated and seldom used or understood by nontechnical people.
C)They describe the activities that accomplish a business task.
D)They describe the relationship between the different data entities.
سؤال
An individual systems developer is a person that performs all of the system development roles, including systems analyst, programmer, and technical specialist.
سؤال
Smartco is a medium-sized business interested in creating an online accounting system.The company does not have enough money to buy the entire required infrastructure.Which route could it take?

A)outsourcing
B)on-demand computing
C)partnership
D)merger acquisition
سؤال
How much slack time do activities on the critical path of a project have?

A)infinite slack time
B)maximum slack time
C)minimum slack time
D)zero slack time
سؤال
System users and system stakeholders are essentially the same set of people.
سؤال
On what basis do managers make decisions regarding the initiation of each system investigation for potential IS projects?

A)the overall financial plan
B)the organization's financial needs
C)the estimated value and priority
D)the availability of the resources
سؤال
What is the second level in the capability maturity model?

A)repeatable
B)optimized
C)defined
D)managed
سؤال
What is likely to affect the quality of the systems development effort?

A)the degree of change associated with the project
B)whether the project is a request by the CIO or the stakeholders
C)the ability to manage the environmental factors associated with the project
D)the stability of the resources assigned to the project, including the project manager
سؤال
What type of feasibility determines whether the project can be completed in a reasonable amount of time?

A)economic feasibility
B)legal feasibility
C)operational feasibility
D)schedule feasibility
سؤال
What is the primary outcome of the systems analysis phase?

A)a prioritized list of system requirements
B)the data models needed to build the new system
C)the case diagrams to be used in system design
D)identified sources of data for the new system
سؤال
In general, continuous improvement projects have a higher degree of success than reengineering projects.
سؤال
Getting users and stakeholders involved in systems development is not critical to the success of a systems development effort.
سؤال
The sooner an error is detected in the systems development life cycle, the more expensive it is to correct.
سؤال
Developing information systems that meet both end-user and organizational needs and delivering them on time and within budget are a relatively easy and straightforward process.
سؤال
It is becoming more common for organizations to open IS departments with a team of systems analysts and other IS personnel in foreign countries.
سؤال
Each generation of a prototype is a refined version of the previous generation based on user feedback.
سؤال
A problem with the traditional systems development life cycle is that formal end-of-phase reviews do not occur; thus, it is very difficult to contain the scope of the project, and the project never seems to end.
سؤال
The Capability Maturity Model is a measure of the maturity of the software development process in an organization.
سؤال
The prototype systems development life cycle allows for a large degree of management control; however, users do not get to use the solution until the system is nearly complete.
سؤال
Continuous improvement projects do not require a lot of changes or retraining of people; thus, they have a higher degree of success than reengineering projects.
سؤال
Because information systems support other business activities, IS staff and people in other departments need to understand each other's responsibilities and tasks.
سؤال
Small- and medium-sized firms are expected to decrease their use of outsourcing by 15% annually through 2012 and beyond.
سؤال
Technical feasibility is an assessment of the technical, economic, legal, operational, and schedule feasibility of a project.
سؤال
Most organizations avoid using outside resources to perform systems development.
سؤال
Information systems planning transforms organizational goals outlined in the strategic plan into specific system development activities.
سؤال
Proper planning can guarantee that projects will not fall behind schedule, go over budget, or fail to meet expectations.
سؤال
The systems maintenance form is a document that is filled out by someone who wants the IS department to initiate systems investigation.
سؤال
The Sarbanes-Oxley Act has failed to stimulate information system changes to conform to new corporate financial reporting rules.
سؤال
Computer-aided software engineering (CASE) tools are used to plan and schedule software projects.
سؤال
In general, smaller projects have a higher probability of success than larger projects.
سؤال
____________________ analysis involves investigating new approaches to existing problems.
سؤال
Experienced systems developers prefer a systems development approach that will catch errors ____________________ in the project life cycle.
سؤال
The extent to which a system performs as desired can be measured through its ____________________ objectives.
سؤال
____________________ uses pairs of programmers who work together to design, test, and code parts of the systems they develop.
سؤال
During each ____________________ of the prototyping approach, requirements and alternative solutions to the problem are identified and analyzed, new solutions are designed, and a portion of the system is implemented.
سؤال
The IS plan translates strategic and organizational goals into specific information system requirements.
سؤال
Once the new system development process has begun, management cannot call a stop to the effort.
سؤال
The highest level of the capability maturity level is ____________________.
سؤال
____________________ is a key metric for technology initiatives, and the business case needs to include both initial development costs and subsequent maintenance costs.
سؤال
____________________ allows an information system to handle business growth and increased business volume.
سؤال
Like a contractor constructing a new building or renovating an existing one, the ___________________ takes the plans developed by others and builds or modifies the necessary software.
سؤال
____________________ uses pairs of programmers who work together to design, test, and code parts of the system they develop.
سؤال
The ____________________ is the date the entire project is to be complete and operational.
سؤال
The primary outcome of systems investigation is a systems investigation report, which is also called a feasibility report.
سؤال
The overall purpose of requirements analysis is to determine user, stakeholder, and organizational needs.
سؤال
Data about the problems or needs for the new system can come from both sources internal and external to the organization.
سؤال
Like an architect developing blueprints for a new building, a(n) ____________________ develops detailed plans for the new or modified system.
سؤال
The term ____________________ development describes any systems development project in which business managers and users assume the primary effort.
سؤال
The translation of strategic and organizational goals into system development initiatives is called ____________________.
سؤال
A(n) ____________________ is a detailed description of what needs to be done in a software project.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/95
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Systems Development: Investigation and Analysis
1
What system development approach requires cooperation and frequent face-to-face meetings with all project participants to modify, refine, and test how the system meets users' needs and what its capabilities are?

A)prototyping
B)agile development
C)extreme programming
D)traditional development
B
2
What type of information technology professional specializes in analyzing and designing products and services for business?

A)a programmer
B)a stakeholder
C)an end user
D)a systems analyst
D
3
After several meetings with users, Leslie has identified strengths, weaknesses, and opportunities in her company's work processes and made a recommendation for improvement, which the business accepted.Which phase of the systems development life cycle can she now move to?

A)systems analysis
B)systems design
C)systems implementation
D)systems testing
B
4
Ragu provided users with details on the hardware, software, personnel, and procedure components, and showed them how these components are related.Which stage of the systems development life cycle did Ragu just complete?

A)systems analysis
B)systems design
C)systems implementation
D)systems testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
5
How can an organization effectively reduce risk and protect its critical data resources?

A)limit access to any off-site IS facilities
B)control access to critical data
C)lock its data and files
D)use third-party antivirus software
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
6
During what phase of the system development process are potential problems and opportunities identified and considered in light of the goals of the business?

A)the systems design phase
B)the systems analysis phase
C)the systems investigation phase
D)the systems development phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
7
Sheik is having a kick-off meeting for a major project and has invited his managers and the members of his team.Which two groups of people did Sheik forget to invite?

A)the users and administrative staff
B)the stakeholders and finance staff
C)the users and stakeholders
D)the administrative and finance staff
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is the result of an installed and operational functioning system required by business?

A)a systems implementation
B)a systems production
C)a systems development
D)a systems maintenance and review
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
9
Larkin has been assigned to the Skating Project.She needs to have a panoramic view of the project and will work closely with different groups.What is her role?

A)finance analyst
B)analyst programmer
C)system analyst
D)operator/programmer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
10
Sales are down for Air Toronto Enterprise and the CEO is reflecting on times when her company was profitable and had a sustainable competitive advantage.What aspects is the CEO looking at to help her move the company back to being profitable?

A)mission critical systems
B)critical success factors
C)performance objectives
D)financial reports
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
11
During what phase of a systems development project is training end users an important task?

A)the initial phase
B)the phase between analysis and design
C)the systems implementation phase
D)the post-implementation phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
12
What is the term used to refer to the running of applications such as word-processing and spreadsheet analysis over the Internet rather than on local machines?

A)rapid application development
B)end-user systems development
C)cloud computing
D)outsourcing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
13
What activity takes an iterative approach to the systems development process?

A)rapid application development
B)prototyping
C)traditional systems development
D)progressive systems development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
14
The system users are unhappy and have identified several flaws.During which phase would these flaws be addressed to ensure that the system operates smoothly and continues to meet changing business needs?

A)systems investigation
B)systems design
C)systems implementation
D)systems maintenance and review
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
15
Company AVX has not been doing as well as its competitors that have been investing in enabling technologies.Meera has been asked to look into the situation and propose an action plan so Company AVX can develop competitive advantage.What could Meera do?

A)creative analysis
B)system development
C)strategic planning
D)requirements elicitation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which type of analysis requires unbiased and careful questioning of whether system elements are related in the most effective ways?

A)critical analysis
B)creative analysis
C)causal analysis
D)data-flow analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
17
What phase of the traditional systems development life cycle identifies strengths, weaknesses, and opportunities for improvement in the current system?

A)the systems investigation phase
B)the systems analysis phase
C)the systems coding phase
D)the systems development phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
18
During what phase of the systems development life cycle do people attempt to answer the question, "What must the information system do to solve the problem?"?

A)the systems investigation phase
B)the systems question phase
C)the systems design phase
D)the systems analysis phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following situation would typically result in initiating systems development?

A)The current system needs to be relocated to another building.
B)The current system experienced a virus attack.
C)The current system is no longer being used by one entire department.
D)The current system crashed frequently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
20
What ensures that the system operates as intended and modifies the system so that it continues to meet changing business needs?

A)systems implementation
B)systems maintenance and review
C)systems analysis
D)systems design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
21
Pam is a project manager and reminds Randy of the importance of completing his tasks on time so that the whole project will not be delayed.What is Pam trying to say?

A)Randy is not following the Gantt Chart.
B)Randy has missed a key milestone.
C)Randy is on the critical path.
D)Randy is behind schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
22
The systems development team accepts a given set of information system objectives and delivers a system that meets those objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
23
Managers and employees in all functional work areas are helping with systems development and, in many cases, leading the way.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
24
What type of assessment determines whether the hardware, software, and other system components can be acquired or developed to address the needs of the organization?

A)a systems investigation
B)a feasibility analysis
C)a technical feasibility
D)a project assessment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
25
Why are more organizations outsourcing system development?

A)to reduce the cost of training
B)to share the state-of-the-art technology
C)to increase technological flexibility
D)to seek new partnerships abroad
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
26
What does a formal system analysis report include?

A)the cost and benefit analysis of the existing system
B)the functional requirements for the new system
C)the features available for the new system
D)a description of the users of the existing system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
27
In a data-flow diagram, what symbol reveals a function that is being performed?

A)the data-flow symbol
B)the process symbol
C)the entity symbol
D)the data store symbol
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following statements is applicable to the systems steering committee?

A)It consists of mid-level managers from the IS department.
B)It never includes end users.
C)It might suggest a change in project focus.
D)It is a non-advisory group.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
29
What task are entity-relationship diagrams used to perform?

A)data modelling
B)process modelling
C)problem analysis
D)activity analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
30
Apple's application store is called App World, while Blackberry's store is called App Store.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is a characteristic of data-flow diagrams?

A)They are used to model data entities and their relationships.
B)They are quite complicated and seldom used or understood by nontechnical people.
C)They describe the activities that accomplish a business task.
D)They describe the relationship between the different data entities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
32
An individual systems developer is a person that performs all of the system development roles, including systems analyst, programmer, and technical specialist.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
33
Smartco is a medium-sized business interested in creating an online accounting system.The company does not have enough money to buy the entire required infrastructure.Which route could it take?

A)outsourcing
B)on-demand computing
C)partnership
D)merger acquisition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
34
How much slack time do activities on the critical path of a project have?

A)infinite slack time
B)maximum slack time
C)minimum slack time
D)zero slack time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
35
System users and system stakeholders are essentially the same set of people.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
36
On what basis do managers make decisions regarding the initiation of each system investigation for potential IS projects?

A)the overall financial plan
B)the organization's financial needs
C)the estimated value and priority
D)the availability of the resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
37
What is the second level in the capability maturity model?

A)repeatable
B)optimized
C)defined
D)managed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
38
What is likely to affect the quality of the systems development effort?

A)the degree of change associated with the project
B)whether the project is a request by the CIO or the stakeholders
C)the ability to manage the environmental factors associated with the project
D)the stability of the resources assigned to the project, including the project manager
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
39
What type of feasibility determines whether the project can be completed in a reasonable amount of time?

A)economic feasibility
B)legal feasibility
C)operational feasibility
D)schedule feasibility
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
40
What is the primary outcome of the systems analysis phase?

A)a prioritized list of system requirements
B)the data models needed to build the new system
C)the case diagrams to be used in system design
D)identified sources of data for the new system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
41
In general, continuous improvement projects have a higher degree of success than reengineering projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
42
Getting users and stakeholders involved in systems development is not critical to the success of a systems development effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
43
The sooner an error is detected in the systems development life cycle, the more expensive it is to correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
44
Developing information systems that meet both end-user and organizational needs and delivering them on time and within budget are a relatively easy and straightforward process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
45
It is becoming more common for organizations to open IS departments with a team of systems analysts and other IS personnel in foreign countries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
46
Each generation of a prototype is a refined version of the previous generation based on user feedback.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
47
A problem with the traditional systems development life cycle is that formal end-of-phase reviews do not occur; thus, it is very difficult to contain the scope of the project, and the project never seems to end.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
48
The Capability Maturity Model is a measure of the maturity of the software development process in an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
49
The prototype systems development life cycle allows for a large degree of management control; however, users do not get to use the solution until the system is nearly complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
50
Continuous improvement projects do not require a lot of changes or retraining of people; thus, they have a higher degree of success than reengineering projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
51
Because information systems support other business activities, IS staff and people in other departments need to understand each other's responsibilities and tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
52
Small- and medium-sized firms are expected to decrease their use of outsourcing by 15% annually through 2012 and beyond.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
53
Technical feasibility is an assessment of the technical, economic, legal, operational, and schedule feasibility of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
54
Most organizations avoid using outside resources to perform systems development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
55
Information systems planning transforms organizational goals outlined in the strategic plan into specific system development activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
56
Proper planning can guarantee that projects will not fall behind schedule, go over budget, or fail to meet expectations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
57
The systems maintenance form is a document that is filled out by someone who wants the IS department to initiate systems investigation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
58
The Sarbanes-Oxley Act has failed to stimulate information system changes to conform to new corporate financial reporting rules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
59
Computer-aided software engineering (CASE) tools are used to plan and schedule software projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
60
In general, smaller projects have a higher probability of success than larger projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
61
____________________ analysis involves investigating new approaches to existing problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
62
Experienced systems developers prefer a systems development approach that will catch errors ____________________ in the project life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
63
The extent to which a system performs as desired can be measured through its ____________________ objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
64
____________________ uses pairs of programmers who work together to design, test, and code parts of the systems they develop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
65
During each ____________________ of the prototyping approach, requirements and alternative solutions to the problem are identified and analyzed, new solutions are designed, and a portion of the system is implemented.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
66
The IS plan translates strategic and organizational goals into specific information system requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
67
Once the new system development process has begun, management cannot call a stop to the effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
68
The highest level of the capability maturity level is ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
69
____________________ is a key metric for technology initiatives, and the business case needs to include both initial development costs and subsequent maintenance costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
70
____________________ allows an information system to handle business growth and increased business volume.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
71
Like a contractor constructing a new building or renovating an existing one, the ___________________ takes the plans developed by others and builds or modifies the necessary software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
72
____________________ uses pairs of programmers who work together to design, test, and code parts of the system they develop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
73
The ____________________ is the date the entire project is to be complete and operational.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
74
The primary outcome of systems investigation is a systems investigation report, which is also called a feasibility report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
75
The overall purpose of requirements analysis is to determine user, stakeholder, and organizational needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
76
Data about the problems or needs for the new system can come from both sources internal and external to the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
77
Like an architect developing blueprints for a new building, a(n) ____________________ develops detailed plans for the new or modified system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
78
The term ____________________ development describes any systems development project in which business managers and users assume the primary effort.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
79
The translation of strategic and organizational goals into system development initiatives is called ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
80
A(n) ____________________ is a detailed description of what needs to be done in a software project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 95 في هذه المجموعة.