Deck 13: Systems Development: Design, Implementation, Maintenance, and Review

ملء الشاشة (f)
exit full mode
سؤال
Upbeat Enterprise is responsible for the payroll processing of many large organizations.What can Upbeat do to ensure zero downtime in its processing?

A)Implement a hot site.
B)Implement a warm site.
C)Implement a cold site.
D)Implement a backup site
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following should be included in a good contract for new computer equipment?

A)a dispute resolution process to negotiate maintenance costs
B)ownership and property rights of the new or modified system
C)contingency provisions in case the vendor goes bankrupt
D)a set of proper documentation for the maintenance of the system
سؤال
Nick has a clear idea of how he intends to design the solution.He has identified the inputs and outputs including the computer components that are required.He is now looking at what the system will do and how it will do it.What are the two dimensions of design he is looking for?

A)conceptual and logical design
B)logical and physical design
C)physical and security design
D)security and conceptual design
سؤال
What evaluation approach compares systems operating under the same conditions?

A)cost/benefit analysis
B)benchmark testing
C)a point evaluation system
D)group consensus
سؤال
Which of the following is an advantage of buying off-the-shelf software?

A)The organization can use the software to gain a lasting competitive advantage.
B)The software will match the organization's needs exactly with no need for customization.
C)The lead time to implement the software is greatly shortened.
D)The vendor is committed to support the product for an indefinite amount of time.
سؤال
As part of the design phase, Nick is looking at the step-by-step set of activities to understand how an actor interacts with the system.What diagram is Nick looking at?

A)logical
B)physical
C)sequence
D)interface
سؤال
What can companies expect when purchasing computer-related equipment via Internet auction?

A)to get refurbished and discontinued products
B)to purchase equipment at 20 to 30 cents on the dollar
C)to obtain product warranties and support for their purchases
D)to have a broad range of equipment selection
سؤال
Imaging Enterprises installed backup software that was configured to take a complete copy of the entire graphic files in the working directory every Monday.On Tuesday and subsequent weekdays, the system scans changes made to existing files and copies them.No backup is done on Saturdays and Sundays since the company is closed.What type of backup has been implemented?

A)full
B)partial
C)incremental
D)hybrid
سؤال
Which of the following is an advantage of software developed in-house as compared with off-the shelf packages?

A)It meets better user and organizational requirements without customization.
B)It has a greater potential for providing competitive advantage.
C)It is cheaper in the long run.
D)It takes much less time to develop than off-the-shelf packages.
سؤال
Which of the following is a disadvantage of purchasing computer hardware?

A)There is a risk of equipment obsolescence.
B)The equipment can depreciate.
C)It is less expensive than renting.
D)There is no long-term financial investment.
سؤال
What does on-demand computing mean?

A)It means an organization pays the service provider periodically as requested by the provider.
B)It means an organization pays only for the computer power it uses.
C)It means an organization making pre-payments to the service provider for services well in advance of needing them.
D)It means an organization requests flexible payment options.
سؤال
Which of the following is characteristic of virtualization?

A)It introduces consideration for security and backup procedures.
B)It leads to a dramatic increase in power consumption.
C)It increases hardware space requirements.
D)It contributes to lowering programming productivity.
سؤال
What is the first systems implementation task?

A)user acceptance
B)site preparation
C)testing
D)hardware acquisition
سؤال
What process involves physically placing the computer equipment on the site and making it operational?

A)site preparation
B)user acceptance
C)installation
D)start-up
سؤال
What question does systems design aim to answer?

A)How will the information system solve the problem?
B)What must the information system do to solve the problem?
C)When can the new system be operational?
D)Why must the system be changed?
سؤال
Prudent Enterprise has opened a plant in an area with a high risk of earthquakes so the CEO requests a plan to mitigate such risk.What is the name given to such a plan?

A)business continuity
B)backup
C)disaster recovery
D)hot site
سؤال
What examination compares batch payroll processing under a WINDOWS system and under a UNIX system?

A)a point evaluation test
B)a live test
C)a physical test
D)a benchmark test
سؤال
Which of the following is a goal of systems development efforts within the context of environmental design?

A)to monitor the power consumption of the new system
B)to create space for users of the system that is aesthetically pleasing
C)to properly dispose of systems in an environmentally friendly manner
D)to ensure that the people working on the team follow good environmental practices
سؤال
Which of the following is a possible benefit of a new system?

A)lower fixed costs of the computer equipment
B)increased efficiency in the operation of electric and other utilities needed to run the hardware
C)lower system development costs
D)increased revenues associated with new customers
سؤال
From the purchaser's perspective, which of the following should be included in a vendor's standard contract for purchase of new computer hardware or software?

A)financial details
B)penalty clauses
C)product's life cycle
D)disposition costs
سؤال
Tessa asks the 10 members of her testing team to each load their 20 testing scripts to ensure that the modified information system is operating as intended.What type of testing is that?

A)unit
B)system
C)volume
D)integration
سؤال
One advantage of using cloud computing is that it is easier management of information systems because everything is in one place on the Internet.
سؤال
What type of testing involves testing an incomplete or early version of the system?

A)beta testing
B)unit testing
C)volume testing
D)alpha testing
سؤال
Which of the following activities is included in site preparation?

A)hiring and training IS personnel
B)readying users for the new system
C)installing special wiring and air conditioning
D)physically placing the computer system on the site and making it operational
سؤال
What approach is a form of system initiation with a specific group of users?

A)the phase-in approach 23.
B)the pilot start-up approach
C)the parallel start-up approach
D)the direct conversion approach
سؤال
What term refers to the activity to enable the new system so it is up and running efficiently with the relevant data from the previous system?

A)data mapping
B)data deployment
C)data testing
D)data conversion
سؤال
Which of the following denotes a software development technique that allows programmers to develop programs that can run on computer systems having different hardware and operating systems?

A)computer-aided software engineering (CASE)
B)a cross-platform development package
C)an integrated development environment
D)an object-oriented approach
سؤال
Security is not an important consideration of logical design, but comes later in the systems development process.
سؤال
Which one of the following terms accurately defines the process to help managers, decision makers, employees, stakeholders, and others to be ready for the new system?

A)start-up
B)user acceptance
C)user preparation
D)training
سؤال
Two advantages of cloud computing are improved security and increased availability of critical applications.
سؤال
The logical design phase refers to how the tasks are accomplished, including how the components work together and what each component does.
سؤال
Which of the following is a characteristic of a slipstream upgrade to a system?

A)It requires notifying end users well in advance.
B)It represents a fairly significant change in how the system operates.
C)It can create entirely new bugs.
D)It is a major upgrade.
سؤال
Many organizations are turning to object-oriented development because of its increased flexibility.
سؤال
Which of the following is a characteristic of a legacy system?

A)It is an old system that may have been patched or modified repeatedly over time.
B)It is usually easy to modify to add new features.
C)It requires minimal cost to maintain.
D)It closely matches the current needs of the organization.
سؤال
During physical design, the characteristics of the hardware, software, database, telecommunications, personnel, and procedures and control specifications must be detailed.
سؤال
The independent testers have just completed their testing of the codes of the individual developers to ensure that there is no impact to the other functional areas that have already been tested.What type of testing is that?

A)unit
B)system
C)volume
D)integration
سؤال
What process requires testing all related systems together?

A)unit testing
B)acceptance testing
C)volume testing
D)integration testing
سؤال
Which of the following is a characteristic of user documentation?

A)It contains details used by computer operators to execute the program.
B)It is used by analysts and programmers to solve problems or modify the program.
C)It explains the purpose of every major piece of code.
D)It shows how the program can and should be used.
سؤال
The developers have just completed their coding of the system and each developer is testing each of the components that he or she has written.What type of testing is that?

A)unit
B)system
C)volume
D)integration
سؤال
Which of the following is a key system design task?

A)hardware acquisition
B)user preparation
C)site preparation
D)development of an RFP
سؤال
Electronic discovery or e-discovery is the process by which electronic documents are required to be produced under law.
سؤال
Vendor proposals are typically evaluated in a two-phase process that includes a preliminary evaluation and a final evaluation.
سؤال
When a database fails, failover automatically switches applications and other programs that use the database to a redundant or replicated database so there is no interruption of service.
سؤال
In executing the request for proposal process to acquire hardware or software, the number of vendors considered is low during the preliminary evaluation and then increases as more is learned during the final evaluation.
سؤال
Data preparation may involve the conversion of old data files into a format that can be used by the new system.
سؤال
Increasingly, organizations are using virtualization to create a cold site that keeps applications and databases available on a virtual computer that can take over if a disaster renders the main information system inoperable.
سؤال
The Windows Server operating system provides virtualization tools that allow multiple operating systems to run on a single server.
سؤال
An advantage of buying off-the-shelf software is that you have an opportunity to assess how well it meets your needs before purchasing it.
سؤال
SaaS allows individuals or organizations to access needed software applications over the Internet.
سؤال
An organization may have to hire and train new IS personnel as part of their effort to implement a new information system.
سؤال
The use of virtual servers can help save energy and space.
سؤال
With in-house developed software, the organization has no opportunity to reuse software they developed for another application.
سؤال
The commercial off-the-shelf development process involves the use of commonly available products from software vendors, combining the software into a finished system.
سؤال
The system specifications, documented in the design report, are the primary result of systems investigation.
سؤال
In some cases, organizations decide not to install the latest software because the amount of time and money to train employees is too much.
سؤال
Developing new systems in an environmentally sensitive way is becoming a less and less important consideration.
سؤال
One of the best approaches to evaluate hardware from different vendors is to rely on each vendor's published benchmark test results.
سؤال
Programming and software acquisition, user preparation, and site and data preparation are all part of the system design process.
سؤال
Unlike purchasing computer hardware, leasing computer hardware involves no initial investment of funds and no risk of equipment obsolescence.
سؤال
Most application software for organizations is developed using internal resources rather than purchased.
سؤال
The _______________ decision is whether to obtain the necessary software from internal or external sources.
سؤال
When users want to know more about a program or feature or what type of response is expected, they can activate the ____________________ of the system.
سؤال
The design of a new system is broken into two phases: ____________________ design and physical design.
سؤال
____________________ are rules and procedures to maintain data security.
سؤال
During unit testing, each program is tested with abnormal data to determine how it will handle problems.
سؤال
A technical description that details system outputs, inputs, and user interfaces as well as all hardware, software, databases, telecommunications, personnel, and procedure components is contained in the ____________________ report.
سؤال
____________________ is an evaluation approach that involves expressing all the costs and benefits of a new system in monetary terms.
سؤال
Unit testing is the testing of the entire system of programs.
سؤال
A(n) ____________________ requiring identification numbers, passwords, and other safeguards is available with most systems to improve security and unauthorized use.
سؤال
Near the end of the design stage, some organizations prohibit further changes in the design of the system in an approach called ____________________ design specifications.
سؤال
During the testing phase, if the system testing is completed successfully, no further testing is needed.
سؤال
When following the object-oriented design approach, you might want to design the sequence of events for performing some process.The event sequence is also called a(n) ____________________.
سؤال
A(n) ____________________ is a company that offers hardware, software, telecommunications systems, databases, IS personnel, or other computer-related resources.
سؤال
The process of anticipating and planning for disasters is called ____________________.
سؤال
A parallel start-up involves running the new system for one group of users while the rest of the users still run the old system.
سؤال
____________________ allows businesses to subscribe to Web-delivered application software by paying a monthly service charge or a per-use fee.
سؤال
The ____________________ is a document used to communicate an organization's needs for hardware, software, or database systems to one or more vendors.
سؤال
A duplicate, operational hardware system that is ready for use is an example of a(n) ____________________.
سؤال
The ____________________ software development technique allows programmers to develop programs that can run on computer systems that have different hardware and operating systems.
سؤال
Whenever an application is run, a(n) ____________________ is created that contains all changes to all files.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/93
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Systems Development: Design, Implementation, Maintenance, and Review
1
Upbeat Enterprise is responsible for the payroll processing of many large organizations.What can Upbeat do to ensure zero downtime in its processing?

A)Implement a hot site.
B)Implement a warm site.
C)Implement a cold site.
D)Implement a backup site
A
2
Which of the following should be included in a good contract for new computer equipment?

A)a dispute resolution process to negotiate maintenance costs
B)ownership and property rights of the new or modified system
C)contingency provisions in case the vendor goes bankrupt
D)a set of proper documentation for the maintenance of the system
B
3
Nick has a clear idea of how he intends to design the solution.He has identified the inputs and outputs including the computer components that are required.He is now looking at what the system will do and how it will do it.What are the two dimensions of design he is looking for?

A)conceptual and logical design
B)logical and physical design
C)physical and security design
D)security and conceptual design
B
4
What evaluation approach compares systems operating under the same conditions?

A)cost/benefit analysis
B)benchmark testing
C)a point evaluation system
D)group consensus
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is an advantage of buying off-the-shelf software?

A)The organization can use the software to gain a lasting competitive advantage.
B)The software will match the organization's needs exactly with no need for customization.
C)The lead time to implement the software is greatly shortened.
D)The vendor is committed to support the product for an indefinite amount of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
6
As part of the design phase, Nick is looking at the step-by-step set of activities to understand how an actor interacts with the system.What diagram is Nick looking at?

A)logical
B)physical
C)sequence
D)interface
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
7
What can companies expect when purchasing computer-related equipment via Internet auction?

A)to get refurbished and discontinued products
B)to purchase equipment at 20 to 30 cents on the dollar
C)to obtain product warranties and support for their purchases
D)to have a broad range of equipment selection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
8
Imaging Enterprises installed backup software that was configured to take a complete copy of the entire graphic files in the working directory every Monday.On Tuesday and subsequent weekdays, the system scans changes made to existing files and copies them.No backup is done on Saturdays and Sundays since the company is closed.What type of backup has been implemented?

A)full
B)partial
C)incremental
D)hybrid
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is an advantage of software developed in-house as compared with off-the shelf packages?

A)It meets better user and organizational requirements without customization.
B)It has a greater potential for providing competitive advantage.
C)It is cheaper in the long run.
D)It takes much less time to develop than off-the-shelf packages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is a disadvantage of purchasing computer hardware?

A)There is a risk of equipment obsolescence.
B)The equipment can depreciate.
C)It is less expensive than renting.
D)There is no long-term financial investment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
11
What does on-demand computing mean?

A)It means an organization pays the service provider periodically as requested by the provider.
B)It means an organization pays only for the computer power it uses.
C)It means an organization making pre-payments to the service provider for services well in advance of needing them.
D)It means an organization requests flexible payment options.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following is characteristic of virtualization?

A)It introduces consideration for security and backup procedures.
B)It leads to a dramatic increase in power consumption.
C)It increases hardware space requirements.
D)It contributes to lowering programming productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
13
What is the first systems implementation task?

A)user acceptance
B)site preparation
C)testing
D)hardware acquisition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
14
What process involves physically placing the computer equipment on the site and making it operational?

A)site preparation
B)user acceptance
C)installation
D)start-up
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
15
What question does systems design aim to answer?

A)How will the information system solve the problem?
B)What must the information system do to solve the problem?
C)When can the new system be operational?
D)Why must the system be changed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
16
Prudent Enterprise has opened a plant in an area with a high risk of earthquakes so the CEO requests a plan to mitigate such risk.What is the name given to such a plan?

A)business continuity
B)backup
C)disaster recovery
D)hot site
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
17
What examination compares batch payroll processing under a WINDOWS system and under a UNIX system?

A)a point evaluation test
B)a live test
C)a physical test
D)a benchmark test
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is a goal of systems development efforts within the context of environmental design?

A)to monitor the power consumption of the new system
B)to create space for users of the system that is aesthetically pleasing
C)to properly dispose of systems in an environmentally friendly manner
D)to ensure that the people working on the team follow good environmental practices
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is a possible benefit of a new system?

A)lower fixed costs of the computer equipment
B)increased efficiency in the operation of electric and other utilities needed to run the hardware
C)lower system development costs
D)increased revenues associated with new customers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
20
From the purchaser's perspective, which of the following should be included in a vendor's standard contract for purchase of new computer hardware or software?

A)financial details
B)penalty clauses
C)product's life cycle
D)disposition costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
21
Tessa asks the 10 members of her testing team to each load their 20 testing scripts to ensure that the modified information system is operating as intended.What type of testing is that?

A)unit
B)system
C)volume
D)integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
22
One advantage of using cloud computing is that it is easier management of information systems because everything is in one place on the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
23
What type of testing involves testing an incomplete or early version of the system?

A)beta testing
B)unit testing
C)volume testing
D)alpha testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following activities is included in site preparation?

A)hiring and training IS personnel
B)readying users for the new system
C)installing special wiring and air conditioning
D)physically placing the computer system on the site and making it operational
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
25
What approach is a form of system initiation with a specific group of users?

A)the phase-in approach 23.
B)the pilot start-up approach
C)the parallel start-up approach
D)the direct conversion approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
26
What term refers to the activity to enable the new system so it is up and running efficiently with the relevant data from the previous system?

A)data mapping
B)data deployment
C)data testing
D)data conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following denotes a software development technique that allows programmers to develop programs that can run on computer systems having different hardware and operating systems?

A)computer-aided software engineering (CASE)
B)a cross-platform development package
C)an integrated development environment
D)an object-oriented approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
28
Security is not an important consideration of logical design, but comes later in the systems development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which one of the following terms accurately defines the process to help managers, decision makers, employees, stakeholders, and others to be ready for the new system?

A)start-up
B)user acceptance
C)user preparation
D)training
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
30
Two advantages of cloud computing are improved security and increased availability of critical applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
31
The logical design phase refers to how the tasks are accomplished, including how the components work together and what each component does.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is a characteristic of a slipstream upgrade to a system?

A)It requires notifying end users well in advance.
B)It represents a fairly significant change in how the system operates.
C)It can create entirely new bugs.
D)It is a major upgrade.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
33
Many organizations are turning to object-oriented development because of its increased flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is a characteristic of a legacy system?

A)It is an old system that may have been patched or modified repeatedly over time.
B)It is usually easy to modify to add new features.
C)It requires minimal cost to maintain.
D)It closely matches the current needs of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
35
During physical design, the characteristics of the hardware, software, database, telecommunications, personnel, and procedures and control specifications must be detailed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
36
The independent testers have just completed their testing of the codes of the individual developers to ensure that there is no impact to the other functional areas that have already been tested.What type of testing is that?

A)unit
B)system
C)volume
D)integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
37
What process requires testing all related systems together?

A)unit testing
B)acceptance testing
C)volume testing
D)integration testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is a characteristic of user documentation?

A)It contains details used by computer operators to execute the program.
B)It is used by analysts and programmers to solve problems or modify the program.
C)It explains the purpose of every major piece of code.
D)It shows how the program can and should be used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
39
The developers have just completed their coding of the system and each developer is testing each of the components that he or she has written.What type of testing is that?

A)unit
B)system
C)volume
D)integration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is a key system design task?

A)hardware acquisition
B)user preparation
C)site preparation
D)development of an RFP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
41
Electronic discovery or e-discovery is the process by which electronic documents are required to be produced under law.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
42
Vendor proposals are typically evaluated in a two-phase process that includes a preliminary evaluation and a final evaluation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
43
When a database fails, failover automatically switches applications and other programs that use the database to a redundant or replicated database so there is no interruption of service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
44
In executing the request for proposal process to acquire hardware or software, the number of vendors considered is low during the preliminary evaluation and then increases as more is learned during the final evaluation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
45
Data preparation may involve the conversion of old data files into a format that can be used by the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
46
Increasingly, organizations are using virtualization to create a cold site that keeps applications and databases available on a virtual computer that can take over if a disaster renders the main information system inoperable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
47
The Windows Server operating system provides virtualization tools that allow multiple operating systems to run on a single server.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
48
An advantage of buying off-the-shelf software is that you have an opportunity to assess how well it meets your needs before purchasing it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
49
SaaS allows individuals or organizations to access needed software applications over the Internet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
50
An organization may have to hire and train new IS personnel as part of their effort to implement a new information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
51
The use of virtual servers can help save energy and space.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
52
With in-house developed software, the organization has no opportunity to reuse software they developed for another application.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
53
The commercial off-the-shelf development process involves the use of commonly available products from software vendors, combining the software into a finished system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
54
The system specifications, documented in the design report, are the primary result of systems investigation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
55
In some cases, organizations decide not to install the latest software because the amount of time and money to train employees is too much.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
56
Developing new systems in an environmentally sensitive way is becoming a less and less important consideration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
57
One of the best approaches to evaluate hardware from different vendors is to rely on each vendor's published benchmark test results.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
58
Programming and software acquisition, user preparation, and site and data preparation are all part of the system design process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
59
Unlike purchasing computer hardware, leasing computer hardware involves no initial investment of funds and no risk of equipment obsolescence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
60
Most application software for organizations is developed using internal resources rather than purchased.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
61
The _______________ decision is whether to obtain the necessary software from internal or external sources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
62
When users want to know more about a program or feature or what type of response is expected, they can activate the ____________________ of the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
63
The design of a new system is broken into two phases: ____________________ design and physical design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
64
____________________ are rules and procedures to maintain data security.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
65
During unit testing, each program is tested with abnormal data to determine how it will handle problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
66
A technical description that details system outputs, inputs, and user interfaces as well as all hardware, software, databases, telecommunications, personnel, and procedure components is contained in the ____________________ report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
67
____________________ is an evaluation approach that involves expressing all the costs and benefits of a new system in monetary terms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
68
Unit testing is the testing of the entire system of programs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
69
A(n) ____________________ requiring identification numbers, passwords, and other safeguards is available with most systems to improve security and unauthorized use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
70
Near the end of the design stage, some organizations prohibit further changes in the design of the system in an approach called ____________________ design specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
71
During the testing phase, if the system testing is completed successfully, no further testing is needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
72
When following the object-oriented design approach, you might want to design the sequence of events for performing some process.The event sequence is also called a(n) ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
73
A(n) ____________________ is a company that offers hardware, software, telecommunications systems, databases, IS personnel, or other computer-related resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
74
The process of anticipating and planning for disasters is called ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
75
A parallel start-up involves running the new system for one group of users while the rest of the users still run the old system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
76
____________________ allows businesses to subscribe to Web-delivered application software by paying a monthly service charge or a per-use fee.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
77
The ____________________ is a document used to communicate an organization's needs for hardware, software, or database systems to one or more vendors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
78
A duplicate, operational hardware system that is ready for use is an example of a(n) ____________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
79
The ____________________ software development technique allows programmers to develop programs that can run on computer systems that have different hardware and operating systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
80
Whenever an application is run, a(n) ____________________ is created that contains all changes to all files.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 93 في هذه المجموعة.