سؤال
Quality function deployment can be used to show linkages between customer requirements and product characteristics.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
CAD systems allow engineers to develop,modify,share,and test designs in a virtual world.
سؤال
The ease with which parts can be replaced,checked or evaluated is testability.
سؤال
Product design refers to the development of physical products and intangible services.
سؤال
Target costing is the act of designing a process to meet a specific cost objective.
سؤال
An example of black box design would be a producer of automotive brakes working at the design table with an automobile manufacturer through all phases of product development.
سؤال
The concept development phase addresses the feasibility of a product or service.
سؤال
Presourcing is the process of preapproving suppliers for specific commodities or parts.
سؤال
The roof of the house of quality displays conflicts between the voice of the customer and product characteristics and permits designers to rapidly identify trade-offs.
سؤال
Robust design is the design of products to be less sensitive to manufacturing variation and misuse.
سؤال
Products developed using a concurrent engineering process can be developed more quickly than those using a sequential development process.
سؤال
Companies can reduce the time and cost of developing new products and reduce the cost of final products by using parts standardization.
سؤال
The output from the first QFD matrix that feeds into the second QFD matrix is the product characteristics information.
سؤال
In the planning phase,the operations and supply chain function develops initial cost estimates and identifies key supply chain partners.
سؤال
The development funnel demonstrates that while initial conceptual development takes a long time,product design can progress quickly through the final phases of development.
سؤال
The oil could be changed at the push of a button without dirtying your hands or peering underneath the new Chrysler Crepitus,an important achievement in their Design for Six Sigma program.
سؤال
In the launch phase of product development it is typically the marketing department's responsibility to fill the downstream supply chain.
سؤال
If a company is capable of delivering the service time and again at a consistent level of quality it is said to have a high level of scalability.
سؤال
An airline specifies a wider monitor for installation on their overseas flights.The airframe manufacturer will accommodate this order by issuing an engineering change.
سؤال
All product development efforts directly benefit the consumer.
سؤال
The feasibility of a product or service is evaluated during the:

A)planning phase.
B)evaluation phase.
C)launch phase.
D)concept development phase.
سؤال
A revision to a drawing or design released by designers to correct a part is called a(n):

A)engineering change.
B)part mod.
C)tweak.
D)lock-in.
سؤال
Parts standardization typically does NOT:

A)reduce the time to develop a new product.
B)reduce the cost of final products.
C)reduce the profit of a new product.
D)reduce the cost of developing new products.
سؤال
Customers are often brought in to lend their thoughts during the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
سؤال
The development of specifications for the manufacturing equipment needed to make the product is the responsibility of:

A)engineering.
B)marketing.
C)accounting.
D)purchasing.
سؤال
A modular architecture probably improves:

A)design for Six Sigma and design for the environment.
B)design for manufacturability and design for maintainability.
C)design for maintainability and design for the environment.
D)design for Six Sigma and design for manufacturability.
سؤال
In high tech firms,the group most likely to be responsible for the success of a product development process is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting/finance.
سؤال
The operations and supply chain functions develop detailed process maps of the operations and supply chain flows and test new processes in the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
سؤال
Which of these matrix combinations is a correct pairing for quality function deployment?

A)customer requirements and process specifications
B)product characteristics and process characteristics
C)product specifications and process characteristics
D)process specifications and product specifications
سؤال
A box of cake mix can be the basis for a tasty cake even if the novice baker adds olive oil instead of vegetable oil and forgets to set a timer.The cake recipe has probably been developed using:

A)value analysis.
B)the development funnel.
C)robust design.
D)DFE.
سؤال
Which of the following occurs during a sequential development process?

A)Activities in different development stages overlap with one another.
B)Constant communication is required between participants at various stages in the development effort.
C)Prototypes can begin before product characteristics are finalized.
D)The development funnel process takes place.
سؤال
Value may be increased by simultaneously increasing cost and decreasing functionality.
سؤال
The ease with which parts can be replaced or evaluated is:

A)repeatability.
B)serviceability.
C)testability.
D)functionality.
سؤال
Your supplier works closely with you to jointly design a product in:

A)gray box design.
B)black box design.
C)white box design.
D)red box design.
سؤال
________ refers to the ease with which critical components or functions can be tested during production.
سؤال
A consideration to create products and services that are easy to make is:

A)DFE.
B)CAM.
C)QFD.
D)DFM.
سؤال
A process that involves examining all elements of a component,assembly,end product,or service to make sure it fulfills its intended function at the lowest total cost is:

A)target costing.
B)design to cost.
C)value analysis.
D)examination costing.
سؤال
Which of the following functions is NOT typically involved in a cross-functional product development effort?

A)marketing
B)operations
C)finance
D)All of these functions are involved.
سؤال
The left side of the quality function deployment house of quality contains:

A)product characteristics.
B)relationships between product characteristics.
C)customer requirements.
D)product specifications.
سؤال
The process of preapproving suppliers for specific commodities or parts is known as:

A)screening.
B)presourcing.
C)presaging.
D)certifying.
سؤال
The company begins to address the feasibility of a product or service in the ________ phase of the development process.
سؤال
How does quality function deployment work and what advantages are accrued when it is used?
سؤال
The unexpected expenses associated with overhead and engineering change notices are ________.
سؤال
The initial generation of DeLorean boasted of its stainless steel skin,gull-wing doors,and 273 sizes of fasteners.The engineers lowered the product's overall inventory level and product complexity by settling on only 12 different sizes of fasteners thanks to their ________ program.
سؤال
What is the operations and supply chain function responsible for in each of the product development phases?
سؤال
The ________ is the process whereby many ideas are considered at the concept development phase but few ideas make it to the commercial development and launch phases.
سؤال
In ________,the supplier works with the customer to jointly design the product.
سؤال
What is the Six Sigma approach to new product and process development? What takes place in each step?
سؤال
What are the phases of the product development process and what takes place in each?
سؤال
ABC Corporation knew that XYZ Industries could provide the casings needed for their new line of typewriters as they had for the previous generations of typewriters.Therefore,they designated XYZ as the supplier for that key element,a practice known as ________.
سؤال
________ allows activities in different development stages to overlap with one another.
سؤال
The relationship between product functionality and product cost is quantified as ________.
سؤال
What are the four reasons that a company might develop new products and services?
سؤال
What is value analysis and how is it typically conducted?
سؤال
What are robust design,testability,and serviceability and how are they related?
سؤال
Safety and health issues over the product's projected life cycle are addressed by ________.
سؤال
No poultry farmer in his right mind was going to pay more than $1 for a rooster helmet,so the ________ program for RoosterBoosters set that as the goal for their new product.
سؤال
The roof of the quality function deployment house of quality displays synergies among the ________.
سؤال
________ is a product design in which each functional element maps into its own physical chunk.
سؤال
What are the advantages for a manufacturer of parts standardization and modular architecture and how are they related?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/60
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 17: Developing Products and Services
1
Quality function deployment can be used to show linkages between customer requirements and product characteristics.
True
2
CAD systems allow engineers to develop,modify,share,and test designs in a virtual world.
True
3
The ease with which parts can be replaced,checked or evaluated is testability.
False
4
Product design refers to the development of physical products and intangible services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
5
Target costing is the act of designing a process to meet a specific cost objective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
6
An example of black box design would be a producer of automotive brakes working at the design table with an automobile manufacturer through all phases of product development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
7
The concept development phase addresses the feasibility of a product or service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
8
Presourcing is the process of preapproving suppliers for specific commodities or parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
9
The roof of the house of quality displays conflicts between the voice of the customer and product characteristics and permits designers to rapidly identify trade-offs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
10
Robust design is the design of products to be less sensitive to manufacturing variation and misuse.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
11
Products developed using a concurrent engineering process can be developed more quickly than those using a sequential development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
12
Companies can reduce the time and cost of developing new products and reduce the cost of final products by using parts standardization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
13
The output from the first QFD matrix that feeds into the second QFD matrix is the product characteristics information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
14
In the planning phase,the operations and supply chain function develops initial cost estimates and identifies key supply chain partners.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
15
The development funnel demonstrates that while initial conceptual development takes a long time,product design can progress quickly through the final phases of development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
16
The oil could be changed at the push of a button without dirtying your hands or peering underneath the new Chrysler Crepitus,an important achievement in their Design for Six Sigma program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
17
In the launch phase of product development it is typically the marketing department's responsibility to fill the downstream supply chain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
18
If a company is capable of delivering the service time and again at a consistent level of quality it is said to have a high level of scalability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
19
An airline specifies a wider monitor for installation on their overseas flights.The airframe manufacturer will accommodate this order by issuing an engineering change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
20
All product development efforts directly benefit the consumer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
21
The feasibility of a product or service is evaluated during the:

A)planning phase.
B)evaluation phase.
C)launch phase.
D)concept development phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
22
A revision to a drawing or design released by designers to correct a part is called a(n):

A)engineering change.
B)part mod.
C)tweak.
D)lock-in.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
23
Parts standardization typically does NOT:

A)reduce the time to develop a new product.
B)reduce the cost of final products.
C)reduce the profit of a new product.
D)reduce the cost of developing new products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
24
Customers are often brought in to lend their thoughts during the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
25
The development of specifications for the manufacturing equipment needed to make the product is the responsibility of:

A)engineering.
B)marketing.
C)accounting.
D)purchasing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
26
A modular architecture probably improves:

A)design for Six Sigma and design for the environment.
B)design for manufacturability and design for maintainability.
C)design for maintainability and design for the environment.
D)design for Six Sigma and design for manufacturability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
27
In high tech firms,the group most likely to be responsible for the success of a product development process is:

A)scientists and engineers.
B)marketing.
C)consumers.
D)accounting/finance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
28
The operations and supply chain functions develop detailed process maps of the operations and supply chain flows and test new processes in the:

A)concept development phase.
B)planning phase.
C)design and development phase.
D)commercial preparation phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of these matrix combinations is a correct pairing for quality function deployment?

A)customer requirements and process specifications
B)product characteristics and process characteristics
C)product specifications and process characteristics
D)process specifications and product specifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
30
A box of cake mix can be the basis for a tasty cake even if the novice baker adds olive oil instead of vegetable oil and forgets to set a timer.The cake recipe has probably been developed using:

A)value analysis.
B)the development funnel.
C)robust design.
D)DFE.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following occurs during a sequential development process?

A)Activities in different development stages overlap with one another.
B)Constant communication is required between participants at various stages in the development effort.
C)Prototypes can begin before product characteristics are finalized.
D)The development funnel process takes place.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
32
Value may be increased by simultaneously increasing cost and decreasing functionality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
33
The ease with which parts can be replaced or evaluated is:

A)repeatability.
B)serviceability.
C)testability.
D)functionality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
34
Your supplier works closely with you to jointly design a product in:

A)gray box design.
B)black box design.
C)white box design.
D)red box design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
35
________ refers to the ease with which critical components or functions can be tested during production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
36
A consideration to create products and services that are easy to make is:

A)DFE.
B)CAM.
C)QFD.
D)DFM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
37
A process that involves examining all elements of a component,assembly,end product,or service to make sure it fulfills its intended function at the lowest total cost is:

A)target costing.
B)design to cost.
C)value analysis.
D)examination costing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following functions is NOT typically involved in a cross-functional product development effort?

A)marketing
B)operations
C)finance
D)All of these functions are involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
39
The left side of the quality function deployment house of quality contains:

A)product characteristics.
B)relationships between product characteristics.
C)customer requirements.
D)product specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
40
The process of preapproving suppliers for specific commodities or parts is known as:

A)screening.
B)presourcing.
C)presaging.
D)certifying.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
41
The company begins to address the feasibility of a product or service in the ________ phase of the development process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
42
How does quality function deployment work and what advantages are accrued when it is used?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
43
The unexpected expenses associated with overhead and engineering change notices are ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
44
The initial generation of DeLorean boasted of its stainless steel skin,gull-wing doors,and 273 sizes of fasteners.The engineers lowered the product's overall inventory level and product complexity by settling on only 12 different sizes of fasteners thanks to their ________ program.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
45
What is the operations and supply chain function responsible for in each of the product development phases?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
46
The ________ is the process whereby many ideas are considered at the concept development phase but few ideas make it to the commercial development and launch phases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
47
In ________,the supplier works with the customer to jointly design the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
48
What is the Six Sigma approach to new product and process development? What takes place in each step?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
49
What are the phases of the product development process and what takes place in each?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
50
ABC Corporation knew that XYZ Industries could provide the casings needed for their new line of typewriters as they had for the previous generations of typewriters.Therefore,they designated XYZ as the supplier for that key element,a practice known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
51
________ allows activities in different development stages to overlap with one another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
52
The relationship between product functionality and product cost is quantified as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
53
What are the four reasons that a company might develop new products and services?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
54
What is value analysis and how is it typically conducted?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
55
What are robust design,testability,and serviceability and how are they related?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
56
Safety and health issues over the product's projected life cycle are addressed by ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
57
No poultry farmer in his right mind was going to pay more than $1 for a rooster helmet,so the ________ program for RoosterBoosters set that as the goal for their new product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
58
The roof of the quality function deployment house of quality displays synergies among the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
59
________ is a product design in which each functional element maps into its own physical chunk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
60
What are the advantages for a manufacturer of parts standardization and modular architecture and how are they related?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.