Deck 6: Process Analysis and Redesign

ملء الشاشة (f)
exit full mode
سؤال
Input is often raised by productivity improvement programs (PIPS) without lowering quality,and sometimes raising it.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
CAPP and factory floor simulations allow alternatives to be tested in pursuit of continual improvement,an unceasing goal of process planning.
سؤال
The seven points to consider for process flow design include considering that product quality is not a direct function of process flow design.
سؤال
Good process innovations can occur because of external forces that impose safety restrictions,pollution regulations,and other governmental controls for the first time.
سؤال
Continuous improvement of processes is an excellent goal for P/OM managers.It is a function of P/OM that is valued by all other functions of the organization.
سؤال
An organization chart can be used to compare the present method for a quantity check with a revised method of inspection.
سؤال
There are competitive advantages,including enhanced profitability,for those in P/OM who consistently avoid waste and disruption by improving process flows.
سؤال
Learning curves for new products include start-up problems with fixtures,jigs,software,and other tools that are used for the first time.
سؤال
Changes in materials can significantly alter processes.
سؤال
Achieving the best in class value includes satisfactory delivery dates and reasonable service levels,which are components of quality worthiness.
سؤال
Value analysis (VA) studies the use of alternative materials that could provide equal or better properties at equal or lower costs.
سؤال
Process managers are responsible for the production line.Filling orders is their prime job.
سؤال
When creating a process flow chart,one should not state the exact materials to be used and the precise amounts that will be consumed.
سؤال
VA is readily identified by the persistent use of a set of questions but does not include addressing which alternative materials might be used.
سؤال
Benchmarked companies must always be in the same industry.
سؤال
The method of finding the best,called benchmarking,is based on comparative measures that identify leaders in specific kinds of processes.
سؤال
Starting from scratch (reengineering a process) generally does not delay new order processing.
سؤال
Symbols for process charts are now regulated because of the growth in types of processes,the need to encourage flexibility,and the impact of computerization of process analysis and redesign.
سؤال
Less dramatic,but of great importance to individual firms,are discoveries that lead to the conversion of a batch-type process into an intermittent flow shop.
سؤال
Operations can be decomposed into detailed elements such as searching for a part,reaching for it,grasping,and turning it.
سؤال
Charting operations for process analysis and redesign should include all of the process transformations that affect customer satisfaction.
سؤال
It is generally less expensive to use corrective maintenance than preventive maintenance.
سؤال
Bar codes and RFID are popular ways of identifying the location of materials.
سؤال
The lead time is the interval that elapses between seeing the need for placing an order and receiving the goods or services.
سؤال
There is an information flow that parallels and mimics the materials that are moving through the input-transformation-output process.
سؤال
It is possible to find equipment that can run one job while workers are changing the setup to run a different job in the SMED approach.
سؤال
The cost of failure and the probability of it occurring lead to an expected cost of failure.
سؤال
PDM programs are most valuable when failure is very costly and/or process stoppage is life threatening.
سؤال
There are several questions that can help determine how large an expenditure for TPM is reasonable.One is: "How vulnerable is the specific process to a breakdown that will slow or stop production output?"
سؤال
Robots are a type of programmable setup system but are not gaining use globally.
سؤال
TPM addresses only the worst kind of failure,which is a failure that stops the process.
سؤال
SMED concepts are limited to manufacturing.Just in case the meaning of the acronym was missed,SMED = single-minute exchange of dies.It sure sounds like manufacturing.
سؤال
The old engineering truism that changeover times and costs must increase with the use of higher volume-efficient equipment is disappearing.
سؤال
Marketing power is decreased when production flexibility is enhanced by a one-time fixed cost increase in facility expenses.
سؤال
Strategic thinking for P/OM is related to altering the competitive situation by means of operating plans and decisions.
سؤال
The systems approach is being used when process analysis for the job shop is focused on the total set of flows for all items that are produced in that job shop.
سؤال
The use of back-up equipment and employing other redundant systems are methods that do not constitute preventive maintenance.
سؤال
The severe costs of flow shop stoppages generally guide the choice of an effective,complete program of preventive maintenance.
سؤال
For the job shop process,the worst-case scenario is when a breakdown stops the line.
سؤال
Remedial maintenance is a complete and total plan to prevent failures of various kinds.
سؤال
_____ is a systematic approach to investigating the functions served by purchased parts,their value to the final product,and whether they are being sourced at the best possible price and quality.

A)Reengineering
B)Value analysis
C)Single-minute exchange of dies
D)Changeover analysis
سؤال
The length of time required for each unit of the order to go from the start of the process to its finish would be calculated and shown as _____ time.

A)process
B)cycle
C)startup
D)end
سؤال
_____ is defined as the application of computer software to evaluate the performance of a process.

A)CI
B)CAPP
C)REE
D)TMP
سؤال
_____ charts can be used to achieve an optimal layout for the factory floor,warehouse,or office.

A)Control
B)Flow
C)Process
D)Purpose
سؤال
In a good job shop,there is concentrated effort on minimizing waste and disruption from

A)machine breakdowns.
B)worker errors.
C)bad materials.
D)all of the above
سؤال
Although they are two different methods,_____ versus starting from scratch,both of them,when properly done,can result in a new and better process flowchart.

A)reengineering
B)continual improvement
C)process improvement
D)redesign
سؤال
_____ focuses on continuous reduction of delivery times.

A)Process analysis
B)Setup management
C)Time-based management
D)Space-based management
سؤال
_____ charts are maps of the specific operations,transports,quality checks,storage,and delays that are used by either the present or the proposed system.

A)Process
B)Control
C)Design
D)Function
سؤال
Process charts bring up the possibility of replacing older,larger,and slower machines with newer,smaller ones having faster processing rates.If the proper machines are chosen to be replaced,this could decrease the size of the waiting lines,also called

A)WIP.
B)SIP.
C)CEO.
D)TMP.
سؤال
The seven points to consider for process flow design include:

A)product quality is a direct function of process flow design.
B)product cost and productivity are direct functions of the process flow design.
C)scheduling decisions interact with the designs for process flows that have been developed.
D)all of the above
سؤال
_____,founder of Japanese manufacturing methods,stated,"The prosperity of a resource-poor country like Japan rests solely on the high quality of its labor."

A)Deming
B)Ford
C)Shingo
D)Smith
سؤال
Process charts should explicitly reflect everything that the process contributes to

A)cost of goods sold.
B)cash flow.
C)profit margins and productivity.
D)all of the above
سؤال
In process redesign the method of continuous incremental improvements,which the Japanese call _____,is applied to quality enhancement.

A)kai-reengi
B)continual improvement
C)kaizen
D)kaison
سؤال
Among the reasons for detailing spatial dimensions is

A)calculating the distances that parts will be transported.
B)choosing the best means for transporting parts.
C)being certain that there is clearance for large parts.
D)all of the above
سؤال
_____ is the start of the changeover cycle.

A)Time-based management
B)Setup
C)Process charting
D)Process analysis
سؤال
_____ the detailed study of activities required to make the product or deliver the service.

A)Setup charting
B)Process analysis
C)Time based management
D)Process conversion
سؤال
People who provide services to other people are called _____.

A)employees
B)managers
C)operators
D)none of the above
سؤال
_____ is a top choice for an excellent benchmarking standard.

A)Best in class
B)Best in industry
C)Best in world
D)Best in business
سؤال
_____ is the stream of revenue spent by each loyal customer over the lifetime of his/her relationship with the store (or brand).

A)Valued-customer purchasing
B)Life-time value of customers
C)Time-based management of buyers
D)Customer last-time purchasing
سؤال
The process can be viewed as a total flow system.The activities that make up the flow are called the

A)operators.
B)process layout steps.
C)operations.
D)value analysis stages.
سؤال
_____ charts allow for the use of management by exception methods.This can be applied to important quality variables that could readily include maintenance dimensions.

A)Control
B)Process
C)Flow
D)Shop
سؤال
A policy of _____ specifies that everything possible will be done to eliminate malfunctions and failures.

A)total production maintenance
B)zero breakdowns
C)optimal breakdowns
D)zero tolerance
سؤال
The _____ chart provides both visual and quantitative data that summarizes the pros and cons of making changes.

A)flow
B)process
C)control
D)operations
سؤال
Value analysis comparisons between present and proposed materials are facilitated by using _____ chart analysis.

A)hybrid control
B)production operations
C)flow process
D)added value
سؤال
The _____ system for cutting changeover items is based on the recognition that there are setup steps that can be done without shutting the machine down.

A)RM
B)TPM
C)SMED
D)PDM
سؤال
_____ is based on knowledge of signs and symptoms that something is likely to go awry in the future.

A)TPM
B)RM
C)PM
D)PDM
سؤال
_____ is required to repair equipment when failure occurs.

A)PM
B)RM
C)TPM
D)LT
سؤال
_____ provides a means for visualizing the effectiveness with which workers operate their machines over time.

A)TMP
B)SMED
C)MOC
D)RM
سؤال
The _____ permits intelligent assignment of operators to machines and allows for synchronization of operations because time-matching is inherent in the charting.

A)TMP
B)MOC
C)RM
D)PM
سؤال
_____ is defined as steps that need to be taken after a process has been completed in order to revise its output.This includes preparing equipment and assisting people with a new job.

A)Change-ups
B)Single-minute exchange of dies
C)Changeover
D)none of the above
سؤال
_____ can set down goals for achieving zero machine stoppages,no equipment failures,and avoidance of total systems breakdowns.

A)SMED
B)PM
C)RM
D)TPM
سؤال
_____ is repair and replacement at regular,scheduled intervals.

A)RM
B)TPM
C)PM
D)PDM
سؤال
_____ is defined as a rational blend of maintenance alternatives.

A)TPM
B)RM
C)PM
D)SMED
سؤال
TPM for the flow shop has many costs associated with it.These include:

A)cost of repairing the equipment at the station.
B)cost of lost production.
C)cost of line start-up.
D)all of the above
سؤال
_____ is defined as setups that take less than a minute.

A)SMED
B)TMP
C)LT
D)RM
سؤال
The _____ is defined as the end step before the next setup,make-ready cycle.

A)setup
B)put-away
C)final operation
D)single-minute exchange of dies
سؤال
If the light bulbs in a workplace were replaced as they burned out,this would be considered

A)preventive maintenance.
B)remedial maintenance.
C)total productive maintenance.
D)none of the above
سؤال
_____ is a Japanese method aimed at preventing production line failures.

A)Total production management
B)Poka-yoke
C)Lead time kaizen
D)Remedial maintenance
سؤال
The application of _____ concepts reduces the downtime of high-volume equipment by doing much of the setup while the machine is working on another order,or the new order.

A)SMED
B)TMP
C)RM
D)PM
سؤال
_____ maintenance is a program that addresses all factors that slow down or stop a productive process.

A)Total productive
B)Lead time
C)Remedial
D)Preventive
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/115
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Process Analysis and Redesign
1
Input is often raised by productivity improvement programs (PIPS) without lowering quality,and sometimes raising it.
False
2
CAPP and factory floor simulations allow alternatives to be tested in pursuit of continual improvement,an unceasing goal of process planning.
True
3
The seven points to consider for process flow design include considering that product quality is not a direct function of process flow design.
False
4
Good process innovations can occur because of external forces that impose safety restrictions,pollution regulations,and other governmental controls for the first time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
5
Continuous improvement of processes is an excellent goal for P/OM managers.It is a function of P/OM that is valued by all other functions of the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
6
An organization chart can be used to compare the present method for a quantity check with a revised method of inspection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
7
There are competitive advantages,including enhanced profitability,for those in P/OM who consistently avoid waste and disruption by improving process flows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
8
Learning curves for new products include start-up problems with fixtures,jigs,software,and other tools that are used for the first time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
9
Changes in materials can significantly alter processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
10
Achieving the best in class value includes satisfactory delivery dates and reasonable service levels,which are components of quality worthiness.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
11
Value analysis (VA) studies the use of alternative materials that could provide equal or better properties at equal or lower costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
12
Process managers are responsible for the production line.Filling orders is their prime job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
13
When creating a process flow chart,one should not state the exact materials to be used and the precise amounts that will be consumed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
14
VA is readily identified by the persistent use of a set of questions but does not include addressing which alternative materials might be used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
15
Benchmarked companies must always be in the same industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
16
The method of finding the best,called benchmarking,is based on comparative measures that identify leaders in specific kinds of processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
17
Starting from scratch (reengineering a process) generally does not delay new order processing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
18
Symbols for process charts are now regulated because of the growth in types of processes,the need to encourage flexibility,and the impact of computerization of process analysis and redesign.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
19
Less dramatic,but of great importance to individual firms,are discoveries that lead to the conversion of a batch-type process into an intermittent flow shop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
20
Operations can be decomposed into detailed elements such as searching for a part,reaching for it,grasping,and turning it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
21
Charting operations for process analysis and redesign should include all of the process transformations that affect customer satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
22
It is generally less expensive to use corrective maintenance than preventive maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
23
Bar codes and RFID are popular ways of identifying the location of materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
24
The lead time is the interval that elapses between seeing the need for placing an order and receiving the goods or services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
25
There is an information flow that parallels and mimics the materials that are moving through the input-transformation-output process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
26
It is possible to find equipment that can run one job while workers are changing the setup to run a different job in the SMED approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
27
The cost of failure and the probability of it occurring lead to an expected cost of failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
28
PDM programs are most valuable when failure is very costly and/or process stoppage is life threatening.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
29
There are several questions that can help determine how large an expenditure for TPM is reasonable.One is: "How vulnerable is the specific process to a breakdown that will slow or stop production output?"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
30
Robots are a type of programmable setup system but are not gaining use globally.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
31
TPM addresses only the worst kind of failure,which is a failure that stops the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
32
SMED concepts are limited to manufacturing.Just in case the meaning of the acronym was missed,SMED = single-minute exchange of dies.It sure sounds like manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
33
The old engineering truism that changeover times and costs must increase with the use of higher volume-efficient equipment is disappearing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
34
Marketing power is decreased when production flexibility is enhanced by a one-time fixed cost increase in facility expenses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
35
Strategic thinking for P/OM is related to altering the competitive situation by means of operating plans and decisions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
36
The systems approach is being used when process analysis for the job shop is focused on the total set of flows for all items that are produced in that job shop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
37
The use of back-up equipment and employing other redundant systems are methods that do not constitute preventive maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
38
The severe costs of flow shop stoppages generally guide the choice of an effective,complete program of preventive maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
39
For the job shop process,the worst-case scenario is when a breakdown stops the line.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
40
Remedial maintenance is a complete and total plan to prevent failures of various kinds.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
41
_____ is a systematic approach to investigating the functions served by purchased parts,their value to the final product,and whether they are being sourced at the best possible price and quality.

A)Reengineering
B)Value analysis
C)Single-minute exchange of dies
D)Changeover analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
42
The length of time required for each unit of the order to go from the start of the process to its finish would be calculated and shown as _____ time.

A)process
B)cycle
C)startup
D)end
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
43
_____ is defined as the application of computer software to evaluate the performance of a process.

A)CI
B)CAPP
C)REE
D)TMP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
44
_____ charts can be used to achieve an optimal layout for the factory floor,warehouse,or office.

A)Control
B)Flow
C)Process
D)Purpose
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
45
In a good job shop,there is concentrated effort on minimizing waste and disruption from

A)machine breakdowns.
B)worker errors.
C)bad materials.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
46
Although they are two different methods,_____ versus starting from scratch,both of them,when properly done,can result in a new and better process flowchart.

A)reengineering
B)continual improvement
C)process improvement
D)redesign
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
47
_____ focuses on continuous reduction of delivery times.

A)Process analysis
B)Setup management
C)Time-based management
D)Space-based management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
48
_____ charts are maps of the specific operations,transports,quality checks,storage,and delays that are used by either the present or the proposed system.

A)Process
B)Control
C)Design
D)Function
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
49
Process charts bring up the possibility of replacing older,larger,and slower machines with newer,smaller ones having faster processing rates.If the proper machines are chosen to be replaced,this could decrease the size of the waiting lines,also called

A)WIP.
B)SIP.
C)CEO.
D)TMP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
50
The seven points to consider for process flow design include:

A)product quality is a direct function of process flow design.
B)product cost and productivity are direct functions of the process flow design.
C)scheduling decisions interact with the designs for process flows that have been developed.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
51
_____,founder of Japanese manufacturing methods,stated,"The prosperity of a resource-poor country like Japan rests solely on the high quality of its labor."

A)Deming
B)Ford
C)Shingo
D)Smith
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
52
Process charts should explicitly reflect everything that the process contributes to

A)cost of goods sold.
B)cash flow.
C)profit margins and productivity.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
53
In process redesign the method of continuous incremental improvements,which the Japanese call _____,is applied to quality enhancement.

A)kai-reengi
B)continual improvement
C)kaizen
D)kaison
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
54
Among the reasons for detailing spatial dimensions is

A)calculating the distances that parts will be transported.
B)choosing the best means for transporting parts.
C)being certain that there is clearance for large parts.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
55
_____ is the start of the changeover cycle.

A)Time-based management
B)Setup
C)Process charting
D)Process analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
56
_____ the detailed study of activities required to make the product or deliver the service.

A)Setup charting
B)Process analysis
C)Time based management
D)Process conversion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
57
People who provide services to other people are called _____.

A)employees
B)managers
C)operators
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
58
_____ is a top choice for an excellent benchmarking standard.

A)Best in class
B)Best in industry
C)Best in world
D)Best in business
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
59
_____ is the stream of revenue spent by each loyal customer over the lifetime of his/her relationship with the store (or brand).

A)Valued-customer purchasing
B)Life-time value of customers
C)Time-based management of buyers
D)Customer last-time purchasing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
60
The process can be viewed as a total flow system.The activities that make up the flow are called the

A)operators.
B)process layout steps.
C)operations.
D)value analysis stages.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
61
_____ charts allow for the use of management by exception methods.This can be applied to important quality variables that could readily include maintenance dimensions.

A)Control
B)Process
C)Flow
D)Shop
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
62
A policy of _____ specifies that everything possible will be done to eliminate malfunctions and failures.

A)total production maintenance
B)zero breakdowns
C)optimal breakdowns
D)zero tolerance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
63
The _____ chart provides both visual and quantitative data that summarizes the pros and cons of making changes.

A)flow
B)process
C)control
D)operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
64
Value analysis comparisons between present and proposed materials are facilitated by using _____ chart analysis.

A)hybrid control
B)production operations
C)flow process
D)added value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
65
The _____ system for cutting changeover items is based on the recognition that there are setup steps that can be done without shutting the machine down.

A)RM
B)TPM
C)SMED
D)PDM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
66
_____ is based on knowledge of signs and symptoms that something is likely to go awry in the future.

A)TPM
B)RM
C)PM
D)PDM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
67
_____ is required to repair equipment when failure occurs.

A)PM
B)RM
C)TPM
D)LT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
68
_____ provides a means for visualizing the effectiveness with which workers operate their machines over time.

A)TMP
B)SMED
C)MOC
D)RM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
69
The _____ permits intelligent assignment of operators to machines and allows for synchronization of operations because time-matching is inherent in the charting.

A)TMP
B)MOC
C)RM
D)PM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
70
_____ is defined as steps that need to be taken after a process has been completed in order to revise its output.This includes preparing equipment and assisting people with a new job.

A)Change-ups
B)Single-minute exchange of dies
C)Changeover
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
71
_____ can set down goals for achieving zero machine stoppages,no equipment failures,and avoidance of total systems breakdowns.

A)SMED
B)PM
C)RM
D)TPM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
72
_____ is repair and replacement at regular,scheduled intervals.

A)RM
B)TPM
C)PM
D)PDM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
73
_____ is defined as a rational blend of maintenance alternatives.

A)TPM
B)RM
C)PM
D)SMED
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
74
TPM for the flow shop has many costs associated with it.These include:

A)cost of repairing the equipment at the station.
B)cost of lost production.
C)cost of line start-up.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
75
_____ is defined as setups that take less than a minute.

A)SMED
B)TMP
C)LT
D)RM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
76
The _____ is defined as the end step before the next setup,make-ready cycle.

A)setup
B)put-away
C)final operation
D)single-minute exchange of dies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
77
If the light bulbs in a workplace were replaced as they burned out,this would be considered

A)preventive maintenance.
B)remedial maintenance.
C)total productive maintenance.
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
78
_____ is a Japanese method aimed at preventing production line failures.

A)Total production management
B)Poka-yoke
C)Lead time kaizen
D)Remedial maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
79
The application of _____ concepts reduces the downtime of high-volume equipment by doing much of the setup while the machine is working on another order,or the new order.

A)SMED
B)TMP
C)RM
D)PM
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
80
_____ maintenance is a program that addresses all factors that slow down or stop a productive process.

A)Total productive
B)Lead time
C)Remedial
D)Preventive
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 115 في هذه المجموعة.