Deck 12: Materials Management Impacts All Supply Chain Participants

ملء الشاشة (f)
exit full mode
سؤال
Materials management involves organizing and coordinating all management functions that are responsible for every aspect of materials movements and transformations.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Thailand has not become a large source of labor-intensive production for the U.S.A.
سؤال
Order errors include materials that do not meet blueprint (and other) specifications.To correct these problems requires surcharges which result in overpriced materials.
سؤال
Materials management information systems (MMIS) provide online information about stock levels for work-in-process and on-time deliveries.
سؤال
Good turnover brings large rewards and a reputation for purchasing success.
سؤال
DOI (days of inventory) is a measure that is equivalent to dividing total stock on-hand by the average demand per day.
سؤال
Logistics which are the tactics of MM production and distribution should always be in harmony with the company's strategies.
سؤال
The 2002 longshoremen's port strike in Los Angeles epitomized the problem of (port) management not knowing how to convince unions that the use of technology for very labor-intensive work could be in everyone's best interest.
سؤال
The performance of purchasing agents in the supply chain is related to the speed with which goods move out of the warehouse and off the shelves in relation to the amount of inventory that is on hand to be drawn down.
سؤال
Purchasing departments in the twentieth century were best described as information-gathering agencies.
سؤال
Flow shops require continuous supply of specific sets of unchanging materials.
سؤال
One widely-used information planning system is called material requirements planning (MRP).
سؤال
Some years ago,Brazil's annual inflation rate had been officially estimated at 6,000 percent and unofficially at 12,000 percent.This situation has been corrected.The rate was about 11.5 percent in March 2008.
سؤال
The price-tag approach has been thrown out in favor of long-term relationships with special,trusted suppliers.
سؤال
Purchasing agents and their buying organizations,have the traditional role of bringing needed supplies into the organization.
سؤال
Quality standards for components and subassemblies do not have to be clearly set by the materials manager for the producer.
سؤال
Flow shops,like job shops,have a varied and changing set of materials requirements.
سؤال
Companies that can compete globally have been achieved an organizational integration of the information required for materials control on a global basis.
سؤال
Raw materials have value added by the operations.Mining,growing,refining,cleaning,packing and shipping add value.
سؤال
Internal MM systems do not require control of production materials.
سؤال
A possible description of critical parts relates to the probability of total process or product failure when that critical part fails.
سؤال
In bidding,steps must be taken to ensure that quality is not compromised by price considerations.
سؤال
Value analysis has been part of materials management for only five years.
سؤال
Wal-Mart uses cross-docking to transfer goods from incoming trucks at the receiving dock to outgoing trucks at the shipping docks.
سؤال
A variant of the dollar volume ABC classification is based on the criticality of SKUs.The most critical are called A-critical items.
سؤال
Purchasing records provide a history of what has been done in the past.
سؤال
Often,the most important materials used in the product and process are labeled secondary class materials.The least important materials are relegated to a primary class label.
سؤال
Certification of suppliers is not expensive or time-consuming.
سؤال
Bidding is a process by which the seller requests competing companies to specify how much they will charge for their products.
سؤال
ABC classification of materials is most often done in terms of annual dollar volume.This identifies the most important SKUs as A-class.Increasing numbers of organizations try to prepare for shortage situations by overstocking the C-class of items.
سؤال
The purchasing mission includes achieving deliveries are on time,receiving inventories,inspecting all incoming goods,certifying suppliers,and making sure the relationship with trusted suppliers is stable.
سؤال
Value adding occurs when purchased components are further transformed by the company's production process.
سؤال
A trade-off model can be constructed to determine how many extra tires (spares) should be obtained at the time of the initial order for a tractor.Note that rubber deteriorates and that spare tires can be obtained at any time,at about the same price.
سؤال
In the business environment of the United States,personal relationships are not considered to be a reasonable basis for enterprise decisions.They exist nevertheless in less blatant forms than in other cultures.
سؤال
Certification of suppliers is a process for grading suppliers to ensure that suppliers' organizations conform to standards that are essential for meeting the buyer's needs.
سؤال
Strategies can be tweaked or changed significantly if they are not delivering according to plans.
سؤال
A classical inventory problem with some special characteristics,namely,how much to buy when there is only one purchase occasion allowed.This is called a static inventory problem.
سؤال
Value analysis is a systematic examination of all operations in any process in search of a better way of doing things.
سؤال
The strategic component came into play during start-up,when deciding what goods were to be made and what services were to be offered.
سؤال
Dollar volume is the surrogate for potential savings that can be made by improving the inventory management of specific materials.
سؤال
Penalties for mistakes made in ordering materials (generally) do not depend on

A)the kind of product,
B)the life-cycle stage of the product.
C)the process configuration being used.
D)the software order-placing system.
E)g.,freshness dating.
سؤال
It is to be expected that analysis will continue to indicate that materials have the _____ leverage for making cost savings.

A)greatest
B)most variable
C)least
D)more flexible
سؤال
Average daily demand velocity is often called

A)days of inventory.
B)inventory turns.
C)average demand per day.
D)average supply to meet demand per day.
سؤال
The cost of materials is often less crucial than _____

A)on-time delivery.
B)project completion date.
C)carrying costs.
D)TQM.
سؤال
Which function is part of the responsibilities of the materials control department?

A)inspecting incoming materials
B)expediting flows
C)arranging for and regulating shipments
D)international accounts payable department
E)all of the above
سؤال
Our company makes an extensive line of products.Marketing lands a big contract for one particular item that normally sells hundreds per year.The new contract is for thousands per year.What is triggered by these marketplace demands?

A)hoarding of such materials
B)internal MM information system
C)materials management system
D)order to complete old work in process
سؤال
Critical can mean that when a part fails,it causes product or process failure.
سؤال
What purchased materials have greater value-added than raw materials?

A)components and subassemblies
B)finished goods
C)work-in-process
D)office supplies
سؤال
What captures the essence of supply chain objectives regarding throughput and value added?

A)turnover
B)inventory turns
C)number of links in the chain
D)both b and c
E)both a and b
سؤال
It is estimated that _____ percent of the workforce is currently engaged in _____.

A)more than 3;farming
B)more than 5;agricultural trade
C)less than 5;agricultural trade
D)less than 3;farming
سؤال
Management issues such as what items to buy,when to buy them,from whom to buy,how much to buy at one time,and how much to pay,are captured by what systems?

A)expediting systems
B)intelligent information systems
C)linear programming systems
D)purchasing discount systems
سؤال
Failing to achieve high turnover rates can be caused by

A)carrying excessive inventories.
B)overestimating demand.
C)prices being too high for customers.
D)smart competitive moves.
E)all of the above
سؤال
For a manufacturing firm,which class of materials does not have to be purchased from an outside source?

A)raw materials
B)finished goods
C)components
D)subassemblies
سؤال
_____ involve smaller order quantities of far more kinds of materials than _____.

A)Job shops;flow shops
B)Flexible shops;flow shops
C)Flow shops;job shops
D)Job shops;intermittent flow shops
سؤال
Co-produced products have much of their additional value-added supplied by the

A)original producer.
B)original employees.
C)suppliers.
D)game-playing teammates.
سؤال
_____ provide a useful history of _____.

A)Purchasing records;discounts obtained
B)Suppliers records;days of inventory (DOI)
C)Accounting records;inventory turns
D)Quality control records;purchase prices
E)Legal records;ethical issues
سؤال
The materials management system must be synchronized and coordinated to be

A)effective.
B)interlinked.
C)tolerated.
D)computerized.
سؤال
_____ has become a global system.

A)Freshness dating
B)EDI use
C)Out-sourcing
D)Invoicing
سؤال
_____ are needed to evaluate and balance the disadvantages of having large amounts of stock on-hand (SOH) against the benefits of large order quantities placed long in advance of delivery so that substantial quantity discounts can be obtained.

A)Life-cycle models
B)Trade-off models
C)Order size models
D)all of the above
سؤال
Coordinating the goals of materials management with those of process management is one of the greatest responsibilities of the _____

A)CEO.
B)P/OM department.
C)CFO.
D)legal department.
E)marketing department.
سؤال
The Integrator that orchestrates the materials management system is the _____.

A)Information System
B)MRP
C)Management System
D)none of the above
سؤال
To make sure that everyone was reading (even the fine print),in 2006 what was the most popular girl's name in the USA?

A)Jessica
B)Elizabeth
C)Ashley
D)Emily
E)Mary
سؤال
Organizations that are in the business of supplying raw materials at the very start of the upstream acquisition process are themselves dependent on

A)purchasing.
B)forecast.
C)acquisition.
D)both a and c
سؤال
The decision model for ordering spare parts at the time of the initial order is known as the _____ problem.

A)value analysis
B)traveling salesman
C)static inventory
D)dynamic inventory
سؤال
Who developed the ABC concept in the 1940s,and in which country or company?

A)Del Harder from Ford Motor Company
B)General MacArthur of the U.S.A.
C)Dr.Taguchi from Japan
D)Ms.Lockheed of Lockheed-Martin
سؤال
Bidding is most applicable for project procurement policies as well as for start-up purchase arrangements for

A)job shops without costly components.
B)intermittent flow shops without costly components.
C)none of the choices.
D)flow shops.
سؤال
The receiving facility is often called the _____,and another location for shipping is called a _____.

A)shipping dock;receiving dock
B)receiving dock;shipping dock
C)cross-docking block;dock-crossing block
D)receiving distribution center;shipping floor
سؤال
Cross-docking is the transfer of goods from _____

A)incoming trucks at receiving docks to outgoing trucks at shipping docks.
B)incoming trucks at receiving floors to forklift trucks on the shipping floors.
C)incoming trucks at shipping docks to outgoing trucks at receiving docks.
D)outgoing trucks at shipping docks to incoming trucks at receiving docks.
سؤال
MM connects the _____ sourcing of supplies to the _____ scheduling of product to be delivered to the customer.

A)external;internal
B)internal;external
C)efficient;inefficient
D)none of the above
سؤال
Critical parts refers to

A)parts that shut down the line or seriously delay project completion.
B)parts that combine in many critical ways to form modular systems.
C)products that impact the bottom line in such a way as to cause bankruptcy if projections are not achieved.
D)products that require special coordination between marketing and P/OM for their successful introduction.
سؤال
The step-by-step procedure for dealing with criticality relationships is:

A)Systematically rank order parts by their cost;list the most expensive parts-costly spare parts must be shared between depots;inspect spare parts regularly.
B)Make sure to list all critical parts;rank order all critical parts according to their level of criticality;provide spare parts and backup materials for the most critical parts;regularly inspect spare parts.
C)Regularly inspect spare parts;list the most critical parts;rank order parts according to their criticality;provide spare parts and backup materials.
D)Rank order parts according to their criticality;list the most critical parts;provide spare parts and backup materials;regularly inspect spare parts.
سؤال
Bidding models show that as the number of bidders competing _____,the size of the winning bid decreases.

A)decreases
B)changes
C)increases
D)is unknown
سؤال
The ABC classification for materials is best described by the _____.

A)probability of parts failing in rank order from highest to lowest
B)dollar volume of inventory items in rank order from highest to lowest
C)important many and the trivial few
D)trivial many versus the even more trivial few
سؤال
Value analysis and _____ are often seen as close relatives.

A)inventory studies
B)the ABC classification
C)decision modeling
D)failure analysis
E)methods analysis
سؤال
It is neither ethical nor legal for vendors to use bribes to influence purchasing decisions in _____

A)Japan.
B)Argentina.
C)the U.S.A.
D)Egypt.
سؤال
In what way can suppliers be monitored for their compliance with total quality management programs?

A)ISO 9000 standards
B)Baldrige Awards-award criteria
C)Lead time management programs.
D)all of the above
E)none of the above
سؤال
_____ occurs when purchased components are further transformed by the company's production process.

A)Acquisition
B)RM
C)Value Adding
D)Extraction
سؤال
Material shortages hit particularly hard at the _____,because it has the least flexibility in adapting to changes in the use of materials.

A)flow shop
B)job shop
C)custom shop
D)general-purpose equipment shop
سؤال
For complex machines,the probability of i failures is represented as:

A)pi
B)ipi
C)kc
D)k
سؤال
MMS is a system triggered by

A)forecast.
B)demand.
C)MM.
D)both a and b
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/110
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Materials Management Impacts All Supply Chain Participants
1
Materials management involves organizing and coordinating all management functions that are responsible for every aspect of materials movements and transformations.
True
2
Thailand has not become a large source of labor-intensive production for the U.S.A.
False
3
Order errors include materials that do not meet blueprint (and other) specifications.To correct these problems requires surcharges which result in overpriced materials.
False
4
Materials management information systems (MMIS) provide online information about stock levels for work-in-process and on-time deliveries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
5
Good turnover brings large rewards and a reputation for purchasing success.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
6
DOI (days of inventory) is a measure that is equivalent to dividing total stock on-hand by the average demand per day.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
7
Logistics which are the tactics of MM production and distribution should always be in harmony with the company's strategies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
8
The 2002 longshoremen's port strike in Los Angeles epitomized the problem of (port) management not knowing how to convince unions that the use of technology for very labor-intensive work could be in everyone's best interest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
9
The performance of purchasing agents in the supply chain is related to the speed with which goods move out of the warehouse and off the shelves in relation to the amount of inventory that is on hand to be drawn down.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
10
Purchasing departments in the twentieth century were best described as information-gathering agencies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
11
Flow shops require continuous supply of specific sets of unchanging materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
12
One widely-used information planning system is called material requirements planning (MRP).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
13
Some years ago,Brazil's annual inflation rate had been officially estimated at 6,000 percent and unofficially at 12,000 percent.This situation has been corrected.The rate was about 11.5 percent in March 2008.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
14
The price-tag approach has been thrown out in favor of long-term relationships with special,trusted suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
15
Purchasing agents and their buying organizations,have the traditional role of bringing needed supplies into the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
16
Quality standards for components and subassemblies do not have to be clearly set by the materials manager for the producer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
17
Flow shops,like job shops,have a varied and changing set of materials requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
18
Companies that can compete globally have been achieved an organizational integration of the information required for materials control on a global basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
19
Raw materials have value added by the operations.Mining,growing,refining,cleaning,packing and shipping add value.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
20
Internal MM systems do not require control of production materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
21
A possible description of critical parts relates to the probability of total process or product failure when that critical part fails.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
22
In bidding,steps must be taken to ensure that quality is not compromised by price considerations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
23
Value analysis has been part of materials management for only five years.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
24
Wal-Mart uses cross-docking to transfer goods from incoming trucks at the receiving dock to outgoing trucks at the shipping docks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
25
A variant of the dollar volume ABC classification is based on the criticality of SKUs.The most critical are called A-critical items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
26
Purchasing records provide a history of what has been done in the past.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
27
Often,the most important materials used in the product and process are labeled secondary class materials.The least important materials are relegated to a primary class label.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
28
Certification of suppliers is not expensive or time-consuming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
29
Bidding is a process by which the seller requests competing companies to specify how much they will charge for their products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
30
ABC classification of materials is most often done in terms of annual dollar volume.This identifies the most important SKUs as A-class.Increasing numbers of organizations try to prepare for shortage situations by overstocking the C-class of items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
31
The purchasing mission includes achieving deliveries are on time,receiving inventories,inspecting all incoming goods,certifying suppliers,and making sure the relationship with trusted suppliers is stable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
32
Value adding occurs when purchased components are further transformed by the company's production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
33
A trade-off model can be constructed to determine how many extra tires (spares) should be obtained at the time of the initial order for a tractor.Note that rubber deteriorates and that spare tires can be obtained at any time,at about the same price.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
34
In the business environment of the United States,personal relationships are not considered to be a reasonable basis for enterprise decisions.They exist nevertheless in less blatant forms than in other cultures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
35
Certification of suppliers is a process for grading suppliers to ensure that suppliers' organizations conform to standards that are essential for meeting the buyer's needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
36
Strategies can be tweaked or changed significantly if they are not delivering according to plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
37
A classical inventory problem with some special characteristics,namely,how much to buy when there is only one purchase occasion allowed.This is called a static inventory problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
38
Value analysis is a systematic examination of all operations in any process in search of a better way of doing things.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
39
The strategic component came into play during start-up,when deciding what goods were to be made and what services were to be offered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
40
Dollar volume is the surrogate for potential savings that can be made by improving the inventory management of specific materials.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
41
Penalties for mistakes made in ordering materials (generally) do not depend on

A)the kind of product,
B)the life-cycle stage of the product.
C)the process configuration being used.
D)the software order-placing system.
E)g.,freshness dating.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
42
It is to be expected that analysis will continue to indicate that materials have the _____ leverage for making cost savings.

A)greatest
B)most variable
C)least
D)more flexible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
43
Average daily demand velocity is often called

A)days of inventory.
B)inventory turns.
C)average demand per day.
D)average supply to meet demand per day.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
44
The cost of materials is often less crucial than _____

A)on-time delivery.
B)project completion date.
C)carrying costs.
D)TQM.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which function is part of the responsibilities of the materials control department?

A)inspecting incoming materials
B)expediting flows
C)arranging for and regulating shipments
D)international accounts payable department
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
46
Our company makes an extensive line of products.Marketing lands a big contract for one particular item that normally sells hundreds per year.The new contract is for thousands per year.What is triggered by these marketplace demands?

A)hoarding of such materials
B)internal MM information system
C)materials management system
D)order to complete old work in process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
47
Critical can mean that when a part fails,it causes product or process failure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
48
What purchased materials have greater value-added than raw materials?

A)components and subassemblies
B)finished goods
C)work-in-process
D)office supplies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
49
What captures the essence of supply chain objectives regarding throughput and value added?

A)turnover
B)inventory turns
C)number of links in the chain
D)both b and c
E)both a and b
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
50
It is estimated that _____ percent of the workforce is currently engaged in _____.

A)more than 3;farming
B)more than 5;agricultural trade
C)less than 5;agricultural trade
D)less than 3;farming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
51
Management issues such as what items to buy,when to buy them,from whom to buy,how much to buy at one time,and how much to pay,are captured by what systems?

A)expediting systems
B)intelligent information systems
C)linear programming systems
D)purchasing discount systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
52
Failing to achieve high turnover rates can be caused by

A)carrying excessive inventories.
B)overestimating demand.
C)prices being too high for customers.
D)smart competitive moves.
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
53
For a manufacturing firm,which class of materials does not have to be purchased from an outside source?

A)raw materials
B)finished goods
C)components
D)subassemblies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
54
_____ involve smaller order quantities of far more kinds of materials than _____.

A)Job shops;flow shops
B)Flexible shops;flow shops
C)Flow shops;job shops
D)Job shops;intermittent flow shops
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
55
Co-produced products have much of their additional value-added supplied by the

A)original producer.
B)original employees.
C)suppliers.
D)game-playing teammates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
56
_____ provide a useful history of _____.

A)Purchasing records;discounts obtained
B)Suppliers records;days of inventory (DOI)
C)Accounting records;inventory turns
D)Quality control records;purchase prices
E)Legal records;ethical issues
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
57
The materials management system must be synchronized and coordinated to be

A)effective.
B)interlinked.
C)tolerated.
D)computerized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
58
_____ has become a global system.

A)Freshness dating
B)EDI use
C)Out-sourcing
D)Invoicing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
59
_____ are needed to evaluate and balance the disadvantages of having large amounts of stock on-hand (SOH) against the benefits of large order quantities placed long in advance of delivery so that substantial quantity discounts can be obtained.

A)Life-cycle models
B)Trade-off models
C)Order size models
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
60
Coordinating the goals of materials management with those of process management is one of the greatest responsibilities of the _____

A)CEO.
B)P/OM department.
C)CFO.
D)legal department.
E)marketing department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
61
The Integrator that orchestrates the materials management system is the _____.

A)Information System
B)MRP
C)Management System
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
62
To make sure that everyone was reading (even the fine print),in 2006 what was the most popular girl's name in the USA?

A)Jessica
B)Elizabeth
C)Ashley
D)Emily
E)Mary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
63
Organizations that are in the business of supplying raw materials at the very start of the upstream acquisition process are themselves dependent on

A)purchasing.
B)forecast.
C)acquisition.
D)both a and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
64
The decision model for ordering spare parts at the time of the initial order is known as the _____ problem.

A)value analysis
B)traveling salesman
C)static inventory
D)dynamic inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
65
Who developed the ABC concept in the 1940s,and in which country or company?

A)Del Harder from Ford Motor Company
B)General MacArthur of the U.S.A.
C)Dr.Taguchi from Japan
D)Ms.Lockheed of Lockheed-Martin
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
66
Bidding is most applicable for project procurement policies as well as for start-up purchase arrangements for

A)job shops without costly components.
B)intermittent flow shops without costly components.
C)none of the choices.
D)flow shops.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
67
The receiving facility is often called the _____,and another location for shipping is called a _____.

A)shipping dock;receiving dock
B)receiving dock;shipping dock
C)cross-docking block;dock-crossing block
D)receiving distribution center;shipping floor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
68
Cross-docking is the transfer of goods from _____

A)incoming trucks at receiving docks to outgoing trucks at shipping docks.
B)incoming trucks at receiving floors to forklift trucks on the shipping floors.
C)incoming trucks at shipping docks to outgoing trucks at receiving docks.
D)outgoing trucks at shipping docks to incoming trucks at receiving docks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
69
MM connects the _____ sourcing of supplies to the _____ scheduling of product to be delivered to the customer.

A)external;internal
B)internal;external
C)efficient;inefficient
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
70
Critical parts refers to

A)parts that shut down the line or seriously delay project completion.
B)parts that combine in many critical ways to form modular systems.
C)products that impact the bottom line in such a way as to cause bankruptcy if projections are not achieved.
D)products that require special coordination between marketing and P/OM for their successful introduction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
71
The step-by-step procedure for dealing with criticality relationships is:

A)Systematically rank order parts by their cost;list the most expensive parts-costly spare parts must be shared between depots;inspect spare parts regularly.
B)Make sure to list all critical parts;rank order all critical parts according to their level of criticality;provide spare parts and backup materials for the most critical parts;regularly inspect spare parts.
C)Regularly inspect spare parts;list the most critical parts;rank order parts according to their criticality;provide spare parts and backup materials.
D)Rank order parts according to their criticality;list the most critical parts;provide spare parts and backup materials;regularly inspect spare parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
72
Bidding models show that as the number of bidders competing _____,the size of the winning bid decreases.

A)decreases
B)changes
C)increases
D)is unknown
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
73
The ABC classification for materials is best described by the _____.

A)probability of parts failing in rank order from highest to lowest
B)dollar volume of inventory items in rank order from highest to lowest
C)important many and the trivial few
D)trivial many versus the even more trivial few
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
74
Value analysis and _____ are often seen as close relatives.

A)inventory studies
B)the ABC classification
C)decision modeling
D)failure analysis
E)methods analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
75
It is neither ethical nor legal for vendors to use bribes to influence purchasing decisions in _____

A)Japan.
B)Argentina.
C)the U.S.A.
D)Egypt.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
76
In what way can suppliers be monitored for their compliance with total quality management programs?

A)ISO 9000 standards
B)Baldrige Awards-award criteria
C)Lead time management programs.
D)all of the above
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
77
_____ occurs when purchased components are further transformed by the company's production process.

A)Acquisition
B)RM
C)Value Adding
D)Extraction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
78
Material shortages hit particularly hard at the _____,because it has the least flexibility in adapting to changes in the use of materials.

A)flow shop
B)job shop
C)custom shop
D)general-purpose equipment shop
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
79
For complex machines,the probability of i failures is represented as:

A)pi
B)ipi
C)kc
D)k
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
80
MMS is a system triggered by

A)forecast.
B)demand.
C)MM.
D)both a and b
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.