Deck 19: Change Management With Faster Project Completions

ملء الشاشة (f)
exit full mode
سؤال
Long cycle times are chosen to increase throughput rates.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The measure of "inventory turns per year" is increasingly used by retailers in preference to direct measures of profit.
سؤال
Government regulations apply to design for manufacturability and design for assembly.Both are subject to the conditions of design for safe use by competitors.
سؤال
Industries that have used downsizing extensively have done so because they have never observed signs of dissatisfaction on the part of their stakeholders and employees.
سؤال
If (D × V × P) < C,then change is likely,assuming that no other factors negatively impact the change.
سؤال
Benchmarking is useful and effective even when there is no clear correspondence between processes and their purposes.
سؤال
Start-up companies are disadvantaged when compared to established companies because they start with old designs and obsolete equipment
سؤال
Benchmarking can trigger dissatisfaction with the status quo.Conversely,benchmarks have the power to influence behavior in unexpected ways,even counter-productive ways.
سؤال
Companies that would like to benchmark themselves against the competition can only use measures that are available through information in the public domain.
سؤال
Change management decreases the capabilities and competencies of the firm.
سؤال
Inventory turns per year equals net annual sales divided by the total inventory level.
سؤال
Two major approaches that are used to accomplish planned change are continuous improvement and sudden new product development.
سؤال
The "old" barriers to entry still apply in the automobile industry.
سؤال
Capabilities-based strategies reflect smart management of business processes.
سؤال
Downsizing obscures vision unless it is clearly identified as part of a plan to achieve the vision.
سؤال
Benchmarking plays the guiding role in reengineering business processes.It provides the basis for course corrections on the road to excellence.
سؤال
Many "old" barriers to entry have fallen by the wayside.For example,large investments that use to keep competitors out of the market no longer act as deterrents because there is ample capital on a global scale that is constantly searching for good investments.
سؤال
Cycle time,net margins,and return on equity are considered to be target variables in a list of smart benchmarks.
سؤال
The Gleicher model has been used in change management.
سؤال
The factors of the conditions for change equation (D × V × P) > C stand for: D = dissatisfaction with the current situation,V = visions of what the future can become,P = practical first steps to achieve the vision,and C = change flexibility.
سؤال
Time-based management is responsible for fast delivery of goods and services to customers and rapid development of new products.
سؤال
The need for speed in project completion has decreased as global competitors are empowered by technology.
سؤال
Successful reengineering emphasizes maximizing production flow rates,not balancing process flows.
سؤال
Identifying all core processes is the first step in the general principles of REE.
سؤال
With instantaneous global communication,transitions slow down.
سؤال
Methods for shortening project life-cycle time include the use of PERT analysis with particular emphasis on cutting out slack without jeopardizing quality.
سؤال
Using quadrant differentiation,processes in quadrant I are the most important processes for delivering special competitively beneficial capabilities.They also have the greatest potential for improvement.
سؤال
Business process redesign seeks radical improvement over a reasonable period of time.
سؤال
Breakpoint business process redesign is an important variant of REE that focuses on creating strategic-level competitive advantages through breakthroughs in the core business processes that most affect customers and shareholders.
سؤال
Raising standards of quality is part of a continuing dynamic that new competitors turn to their advantage.
سؤال
Bureaucracies tend to develop strategies dedicated to changing the status quo.
سؤال
The prescription for achieving successful continuous improvement changes includes total management involvement for implementation.
سؤال
Pilot studies are scaled-down models of the factory or service system.
سؤال
Change is met by counterchange,and stimulus by response.
سؤال
A well-managed project wheel is constantly turning.The number of turns of this wheel measures the revenue-generating energy of the system.The wheel is an analog model of the behavior of a Ferris Wheel in an amusement park.Although the model is an imperfect analog of a continuous project development system,it is powerful conceptually.
سؤال
Reengineering is the same as continuous improvement.
سؤال
Concurrent engineering is a time-based management approach that employs more resources earlier in a team-oriented framework than the sequential,compartmentalized project engineering method.
سؤال
A multifunctional project team can facilitate the coordination of finding,designing,making,and shipping the product.
سؤال
Successful companies are becoming global in activities and mind-set.
سؤال
Continuous improvement and reengineering should be used simultaneously.
سؤال
Practical first steps include which of the following?

A)design studies aimed at using fewer parts and allowing quicker assembly
B)process improvement studies to replace workers with faster machines for tedious and repetitive work
C)work simplification studies to redesign workstations so that teamwork can make the job more productive and less arduous
D)all of the above
سؤال
The product of three factors,D,V,and P,must be greater than C,which refers to

A)cycle time.
B)costs of continuous improvement.
C)cost of change.
D)carrying cost.
سؤال
_____ reflect integrity to protect employees from noxious fumes,toxic substances,unsafe machines,nonsanitary facilities,jumbled storage,and combustible materials.

A)Union complaints about safety measures
B)Safety laws of the federal government
C)Ethics of the workplace
D)Safety records on the wall
سؤال
The advantages of dealing with established suppliers-certified by P/OM for their current capabilities-must be _____

A)weighed against the advantages of using start-up suppliers with new ideas.
B)weighed against the problems of switching suppliers because their prices are lower.
C)weighed against the strategy of switching purchasing agents to reduce the bonds of friendship between buyer and supplier.
D)weighed against the community's expectations that local suppliers will be used.
سؤال
People seldom resist change.
سؤال
If D × V × P > C,then change is

A)likely,assuming that no other factors negatively impact the change.
B)unlikely,assuming there are no possible improvements to this decision.
C)not possible.
D)definite.
سؤال
Self-benchmarking over time provides few insights concerning self-improvement.
سؤال
The American Assembly met to discuss how to get declining U.S.productivity back on track.At this conference,major discussions centered around

A)David B.Gleicher's model for change.
B)ways to block imports entering the U.S.
C)how to register complaints.
D)none of the above
سؤال
Which of the following are the factors for David B.Gleicher's model?

A)dissatisfaction with the current situation,vision of what the future can become,and probabilities of achieving the vision
B)dissatisfaction with the past situation,vision of what the present can become,and practical first steps to achieve the vision
C)dissatisfaction with the planned future,vision of what tomorrow can be like,and probable pitfalls in trying to change
D)none of the above
سؤال
The need for behavioral change arises because of marketplace dynamics.
سؤال
_____ is the term that best describes the means by which managers will reach strategic decisions leading to actions that will help their organizations adapt to significant changes in the competitive realm.

A)The Gleicher model
B)Company alteration
C)Change management
D)Management adaptation
سؤال
The need to change is always sufficient to bring about change.
سؤال
The "old" barriers to entry that kept competitors out of a market included

A)large investments to play in the same league with existing suppliers.
B)great difficulty in taking customers away from existing suppliers.
C)lack of experience with the technology and a steep learning curve to become as good as the existing suppliers.
D)all of the above
سؤال
P/OM brings special knowledge to the change management team.Which choice(s) below would best signify this special knowledge?

A)familiarity with technology
B)understanding responsibility for ethical production practices
C)understanding the interaction between technology and environmental protection
D)all of the above
سؤال
Design studies to replace workers with faster machines for tedious and repetitive work are part of an organization's _____.

A)vision
B)dissatisfaction
C)practical first steps
D)P/OM's benchmarking
سؤال
Vision is supported by

A)adaptability.
B)experience.
C)benchmarking.
D)none of the above
سؤال
A continuing dynamic that new competitors turn to their advantage is

A)raising standards of quality.
B)raising expenditures on quality.
C)increasing core capabilities.
D)better use of old technology.
سؤال
Habits can actually change physical brain patterns.
سؤال
Wind turbines produce emission-free electricity and free power as their upkeep costs little.
سؤال
Benchmarking may be used in many ways.For example,it is helpful to comparing your own personal ability,say in lifting weights,with a friend's ability.You can chart your progress and compare it with your colleague's progress.You can compare your department's performance,with Best Practices in other firms and/or other departments in your own firm.
سؤال
Which of the following is one of the four principles of capabilities-based management?

A)Competitive success depends on transforming a company's key processes into strategic capabilities that consistently provide superior value to the customer.
B)Because capabilities necessarily cross functions,the champion of a capabilities-based strategy is the middle management.
C)Companies create these capabilities by making strategic investments in a support infrastructure that separates traditional SBUs and functions.
D)The building blocks of corporate strategy are not business processes but products and markets.
E)all of the above
سؤال
_____ seeks radical improvements over a reasonable period of time.It starts with a blank slate meaning all old assumptions are discarded.

A)Continuous improvement
B)REE
C)Planning transition
D)Business redesign
سؤال
Time (as the fundamental variable of time-based management) is considered a surrogate for which of the following?

A)market share
B)customers' satisfaction
C)profitability
D)all of the above
سؤال
_____ describes how project teams function that complete one project before beginning another.

A)Never-completing
B)Continuity
C)Group studying
D)Cycle managing
سؤال
The management of many resource systems to achieve start-up-spending benefits of early project completion is called

A)high-velocity project completion.
B)concurrent engineering.
C)time-based management.
D)none of the above
سؤال
Which of the following is considered to be one of the most useful insight-building benchmarks for group motivation?

A)product life-cycle mapping
B)team accomplishments
C)best-practice measures
D)use of the company gym
سؤال
Benchmarking can only be as good as the relevance of the measures that are used.Which of the following is a determinant of the measures that should be used?

A)Measures must be done quickly and accurately.
B)Measure only what it is convenient to measure.
C)What are being compared must be comparable in some useful sense.
D)The entities being measured must be compared to those of competitors.
سؤال
Which of the following is measured by net annual sales divided by average inventory level?

A)cycle time
B)inventory turns per year
C)days of inventory
D)optimal inventory order quantities
سؤال
_____ is parallel and simultaneous work along many project paths.

A)Concurrent engineering
B)Smart use of pilot study
C)Duplicate experimentation
D)none of the above
سؤال
Which quadrant,using the quadrant differentiation chart,is low in delivering the selected capabilities but high in improvement potential.

A)Quadrant I
B)Quadrant II
C)Quadrant III
D)Quadrant IV
سؤال
The procedure for making comparative measurements is

A)practical first steps toward the vision.
B)the list of P/OM factors.
C)hit-and-miss,inexpensive benchmarking.
D)smart benchmarking.
سؤال
_____ are small-scale models of the factory or service system.

A)REEs
B)Pilot studies
C)Micro studies
D)Continuous benchmarking
سؤال
_____ uses constant effort to find better ways to produce the products and deliver services.

A)Simultaneous engineering of projects
B)Concurrent project management
C)Continuous improvement
D)REE
سؤال
_____ elevates time to a position that is equal in importance to cost,quality,and productivity.

A)PERT
B)TBM
C)Concurrent engineering
D)Productivity management
سؤال
_____ plays a guiding role in continuous improvement.

A)Reengineering
B)Planning
C)Benchmarking
D)Ethics
سؤال
_____ are based on those dimensions that are most valuable for steering tactics and for redirecting strategies.

A)Project life cycle intervals
B)Smart benchmarks
C)Traditional benchmarks
D)Old benchmarks
سؤال
Which of the following is a teamwork concept as long as it is used to encourage cooperative improvement and not as a basis for penalizing lower-grade departments?

A)benchmarking old technology departments against new-technology departments
B)benchmarking similar departments
C)benchmarking dissimilar departments
D)benchmarking competitor's departments
سؤال
Concurrent engineering,which is widely used for project management,requires

A)multifunctional teamwork.
B)multitasking or parallel capabilities.
C)team-oriented approach.
D)all of the above
سؤال
_____ separate(s) regions using boundaries that reflect combined power to deliver improvements.The more the power the greater the circumference.

A)Process improvements
B)Breakpoint business process redesign
C)Efficiency frontiers
D)Reengineering
سؤال
Which of the following should we focus on for successful reengineering?

A)task execution
B)task design
C)task equation
D)task approach
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/103
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Change Management With Faster Project Completions
1
Long cycle times are chosen to increase throughput rates.
False
2
The measure of "inventory turns per year" is increasingly used by retailers in preference to direct measures of profit.
True
3
Government regulations apply to design for manufacturability and design for assembly.Both are subject to the conditions of design for safe use by competitors.
False
4
Industries that have used downsizing extensively have done so because they have never observed signs of dissatisfaction on the part of their stakeholders and employees.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
5
If (D × V × P) < C,then change is likely,assuming that no other factors negatively impact the change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
6
Benchmarking is useful and effective even when there is no clear correspondence between processes and their purposes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
7
Start-up companies are disadvantaged when compared to established companies because they start with old designs and obsolete equipment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
8
Benchmarking can trigger dissatisfaction with the status quo.Conversely,benchmarks have the power to influence behavior in unexpected ways,even counter-productive ways.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
9
Companies that would like to benchmark themselves against the competition can only use measures that are available through information in the public domain.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
10
Change management decreases the capabilities and competencies of the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
11
Inventory turns per year equals net annual sales divided by the total inventory level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
12
Two major approaches that are used to accomplish planned change are continuous improvement and sudden new product development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
13
The "old" barriers to entry still apply in the automobile industry.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
14
Capabilities-based strategies reflect smart management of business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
15
Downsizing obscures vision unless it is clearly identified as part of a plan to achieve the vision.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
16
Benchmarking plays the guiding role in reengineering business processes.It provides the basis for course corrections on the road to excellence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
17
Many "old" barriers to entry have fallen by the wayside.For example,large investments that use to keep competitors out of the market no longer act as deterrents because there is ample capital on a global scale that is constantly searching for good investments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
18
Cycle time,net margins,and return on equity are considered to be target variables in a list of smart benchmarks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
19
The Gleicher model has been used in change management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
20
The factors of the conditions for change equation (D × V × P) > C stand for: D = dissatisfaction with the current situation,V = visions of what the future can become,P = practical first steps to achieve the vision,and C = change flexibility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
21
Time-based management is responsible for fast delivery of goods and services to customers and rapid development of new products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
22
The need for speed in project completion has decreased as global competitors are empowered by technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
23
Successful reengineering emphasizes maximizing production flow rates,not balancing process flows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
24
Identifying all core processes is the first step in the general principles of REE.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
25
With instantaneous global communication,transitions slow down.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
26
Methods for shortening project life-cycle time include the use of PERT analysis with particular emphasis on cutting out slack without jeopardizing quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
27
Using quadrant differentiation,processes in quadrant I are the most important processes for delivering special competitively beneficial capabilities.They also have the greatest potential for improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
28
Business process redesign seeks radical improvement over a reasonable period of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
29
Breakpoint business process redesign is an important variant of REE that focuses on creating strategic-level competitive advantages through breakthroughs in the core business processes that most affect customers and shareholders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
30
Raising standards of quality is part of a continuing dynamic that new competitors turn to their advantage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
31
Bureaucracies tend to develop strategies dedicated to changing the status quo.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
32
The prescription for achieving successful continuous improvement changes includes total management involvement for implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
33
Pilot studies are scaled-down models of the factory or service system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
34
Change is met by counterchange,and stimulus by response.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
35
A well-managed project wheel is constantly turning.The number of turns of this wheel measures the revenue-generating energy of the system.The wheel is an analog model of the behavior of a Ferris Wheel in an amusement park.Although the model is an imperfect analog of a continuous project development system,it is powerful conceptually.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
36
Reengineering is the same as continuous improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
37
Concurrent engineering is a time-based management approach that employs more resources earlier in a team-oriented framework than the sequential,compartmentalized project engineering method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
38
A multifunctional project team can facilitate the coordination of finding,designing,making,and shipping the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
39
Successful companies are becoming global in activities and mind-set.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
40
Continuous improvement and reengineering should be used simultaneously.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
41
Practical first steps include which of the following?

A)design studies aimed at using fewer parts and allowing quicker assembly
B)process improvement studies to replace workers with faster machines for tedious and repetitive work
C)work simplification studies to redesign workstations so that teamwork can make the job more productive and less arduous
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
42
The product of three factors,D,V,and P,must be greater than C,which refers to

A)cycle time.
B)costs of continuous improvement.
C)cost of change.
D)carrying cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
43
_____ reflect integrity to protect employees from noxious fumes,toxic substances,unsafe machines,nonsanitary facilities,jumbled storage,and combustible materials.

A)Union complaints about safety measures
B)Safety laws of the federal government
C)Ethics of the workplace
D)Safety records on the wall
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
44
The advantages of dealing with established suppliers-certified by P/OM for their current capabilities-must be _____

A)weighed against the advantages of using start-up suppliers with new ideas.
B)weighed against the problems of switching suppliers because their prices are lower.
C)weighed against the strategy of switching purchasing agents to reduce the bonds of friendship between buyer and supplier.
D)weighed against the community's expectations that local suppliers will be used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
45
People seldom resist change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
46
If D × V × P > C,then change is

A)likely,assuming that no other factors negatively impact the change.
B)unlikely,assuming there are no possible improvements to this decision.
C)not possible.
D)definite.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
47
Self-benchmarking over time provides few insights concerning self-improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
48
The American Assembly met to discuss how to get declining U.S.productivity back on track.At this conference,major discussions centered around

A)David B.Gleicher's model for change.
B)ways to block imports entering the U.S.
C)how to register complaints.
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following are the factors for David B.Gleicher's model?

A)dissatisfaction with the current situation,vision of what the future can become,and probabilities of achieving the vision
B)dissatisfaction with the past situation,vision of what the present can become,and practical first steps to achieve the vision
C)dissatisfaction with the planned future,vision of what tomorrow can be like,and probable pitfalls in trying to change
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
50
The need for behavioral change arises because of marketplace dynamics.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
51
_____ is the term that best describes the means by which managers will reach strategic decisions leading to actions that will help their organizations adapt to significant changes in the competitive realm.

A)The Gleicher model
B)Company alteration
C)Change management
D)Management adaptation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
52
The need to change is always sufficient to bring about change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
53
The "old" barriers to entry that kept competitors out of a market included

A)large investments to play in the same league with existing suppliers.
B)great difficulty in taking customers away from existing suppliers.
C)lack of experience with the technology and a steep learning curve to become as good as the existing suppliers.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
54
P/OM brings special knowledge to the change management team.Which choice(s) below would best signify this special knowledge?

A)familiarity with technology
B)understanding responsibility for ethical production practices
C)understanding the interaction between technology and environmental protection
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
55
Design studies to replace workers with faster machines for tedious and repetitive work are part of an organization's _____.

A)vision
B)dissatisfaction
C)practical first steps
D)P/OM's benchmarking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
56
Vision is supported by

A)adaptability.
B)experience.
C)benchmarking.
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
57
A continuing dynamic that new competitors turn to their advantage is

A)raising standards of quality.
B)raising expenditures on quality.
C)increasing core capabilities.
D)better use of old technology.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
58
Habits can actually change physical brain patterns.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
59
Wind turbines produce emission-free electricity and free power as their upkeep costs little.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
60
Benchmarking may be used in many ways.For example,it is helpful to comparing your own personal ability,say in lifting weights,with a friend's ability.You can chart your progress and compare it with your colleague's progress.You can compare your department's performance,with Best Practices in other firms and/or other departments in your own firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
61
Which of the following is one of the four principles of capabilities-based management?

A)Competitive success depends on transforming a company's key processes into strategic capabilities that consistently provide superior value to the customer.
B)Because capabilities necessarily cross functions,the champion of a capabilities-based strategy is the middle management.
C)Companies create these capabilities by making strategic investments in a support infrastructure that separates traditional SBUs and functions.
D)The building blocks of corporate strategy are not business processes but products and markets.
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
62
_____ seeks radical improvements over a reasonable period of time.It starts with a blank slate meaning all old assumptions are discarded.

A)Continuous improvement
B)REE
C)Planning transition
D)Business redesign
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
63
Time (as the fundamental variable of time-based management) is considered a surrogate for which of the following?

A)market share
B)customers' satisfaction
C)profitability
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
64
_____ describes how project teams function that complete one project before beginning another.

A)Never-completing
B)Continuity
C)Group studying
D)Cycle managing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
65
The management of many resource systems to achieve start-up-spending benefits of early project completion is called

A)high-velocity project completion.
B)concurrent engineering.
C)time-based management.
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following is considered to be one of the most useful insight-building benchmarks for group motivation?

A)product life-cycle mapping
B)team accomplishments
C)best-practice measures
D)use of the company gym
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
67
Benchmarking can only be as good as the relevance of the measures that are used.Which of the following is a determinant of the measures that should be used?

A)Measures must be done quickly and accurately.
B)Measure only what it is convenient to measure.
C)What are being compared must be comparable in some useful sense.
D)The entities being measured must be compared to those of competitors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
68
Which of the following is measured by net annual sales divided by average inventory level?

A)cycle time
B)inventory turns per year
C)days of inventory
D)optimal inventory order quantities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
69
_____ is parallel and simultaneous work along many project paths.

A)Concurrent engineering
B)Smart use of pilot study
C)Duplicate experimentation
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
70
Which quadrant,using the quadrant differentiation chart,is low in delivering the selected capabilities but high in improvement potential.

A)Quadrant I
B)Quadrant II
C)Quadrant III
D)Quadrant IV
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
71
The procedure for making comparative measurements is

A)practical first steps toward the vision.
B)the list of P/OM factors.
C)hit-and-miss,inexpensive benchmarking.
D)smart benchmarking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
72
_____ are small-scale models of the factory or service system.

A)REEs
B)Pilot studies
C)Micro studies
D)Continuous benchmarking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
73
_____ uses constant effort to find better ways to produce the products and deliver services.

A)Simultaneous engineering of projects
B)Concurrent project management
C)Continuous improvement
D)REE
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
74
_____ elevates time to a position that is equal in importance to cost,quality,and productivity.

A)PERT
B)TBM
C)Concurrent engineering
D)Productivity management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
75
_____ plays a guiding role in continuous improvement.

A)Reengineering
B)Planning
C)Benchmarking
D)Ethics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
76
_____ are based on those dimensions that are most valuable for steering tactics and for redirecting strategies.

A)Project life cycle intervals
B)Smart benchmarks
C)Traditional benchmarks
D)Old benchmarks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of the following is a teamwork concept as long as it is used to encourage cooperative improvement and not as a basis for penalizing lower-grade departments?

A)benchmarking old technology departments against new-technology departments
B)benchmarking similar departments
C)benchmarking dissimilar departments
D)benchmarking competitor's departments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
78
Concurrent engineering,which is widely used for project management,requires

A)multifunctional teamwork.
B)multitasking or parallel capabilities.
C)team-oriented approach.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
79
_____ separate(s) regions using boundaries that reflect combined power to deliver improvements.The more the power the greater the circumference.

A)Process improvements
B)Breakpoint business process redesign
C)Efficiency frontiers
D)Reengineering
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
80
Which of the following should we focus on for successful reengineering?

A)task execution
B)task design
C)task equation
D)task approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 103 في هذه المجموعة.