Deck 6: Project Time Management

ملء الشاشة (f)
exit full mode
سؤال
Project schedules grow out of basic documents such as the project charter.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A disadvantage of using Gantt charts is that they do not provide a standard format for displaying planned project schedule information.
سؤال
A merge occurs when one node precedes mutiple nodes.
سؤال
After defining project activities, the next step in project time management is developing the schedule.
سؤال
Start-to-finish relationships are the most frequently used dependencies between activities.
سؤال
In a network diagram, it is mandatory for every item on the WBS to be shown instead of only those activities with dependencies.
سؤال
In project time management, the next step after sequencing activities is to define these activities.
سؤال
A schedule management plan includes information which describes the format and frequency of schedule reports required for the project.
سؤال
In project time management, the primary output of defining activities is a schedule management plan.
سؤال
To define activities, the project team should start with reviewing the schedule management plan, scope baseline, enterprise environmental factors, and organizational processes.
سؤال
In a Gantt chart, thick black bars represent milestones achieved in a project.
سؤال
Network diagrams are the preferred technique for showing activity sequencing.
سؤال
In project time management, one should control the schedule before estimating the duration for each activity.
سؤال
Milestones are easy to achieve and are always achieved through one main activity.
سؤال
A drawback of the precedence diagramming method is that it cannot be used unless dummy activities are employed.
سؤال
The arrows in a network diagram represent missed milestones in a project.
سؤال
It is important for the activity list and activity attributes to be in agreement with the work breakdown structure.
سؤال
A Tracking Gantt chart is based on the percentage of work completed for project tasks or the actual start and finish dates.
سؤال
A dependency pertains to the sequencing of project activities or tasks.
سؤال
An activity is an element of work that has an expected duration, cost, and resource requirements.
سؤال
In project time management, which of the following processes involve calculating the number of work periods that are needed to complete individual activities?

A)Defining activities
B)Sequencing activities  
C)Planning schedule management
D)Estimating activity durations
سؤال
One of PERT's main disadvantages is that it does not address the risk associated with duration estimates.
سؤال
Knowing the amount of float allows project managers to know whether a project schedule is flexible.
سؤال
The main disadvantage of crashing is that it lengthens the time needed to finish a project.
سؤال
In project time management, which of the following processes generate the main outputs of an activity list, activity attributes, and a milestone list?

A)Sequencing activities
B)Defining activities  
C)Resource estimating activities
D)Estimating activity durations
سؤال
Which of the following processes in project time management involves identifying the specific tasks that the project team members and stakeholders must perform to produce the project deliverables?

A)Defining activities
B)Sequencing activities  
C)Developing the schedule
D)Estimating activity durations
سؤال
A drawback of the project management software is that it does not have the capacity to calculate the critical path(s) for a project.
سؤال
The final process in project time management is developing the schedule.
سؤال
In project time management, a(n) _____ is an output of controlling the schedule

A)activity duration estimate
B)project management plan update  
C)activity attribute
D)milestones list
سؤال
Which of the following is a difference between an activity list and an activity attribute?

A)As opposed to an activity attribute, an activity list provides resource requirements and constraints related to activities. 
B)An activity list provides a more concrete list of milestones for a project than an activity attribute. 
C)An activity attribute is a tabulation of activities to be included on a project schedule whereas an activity list is not. 
D)An activity attribute provides more schedule-related information about each activity than an activity list.
سؤال
The first process involved in project time management is _____ .

A)defining activities
B)estimating activity durations  
C)planning schedule management
D)sequencing activities
سؤال
In a critical path analysis, the shortest path is what drives the completion date for the project.
سؤال
A backward pass through the network diagram determines the early start and early finish dates for each activity.
سؤال
In project time management, which of the following processes primarily involve identifying and documenting the relationships between project activities?

A)Defining activities
B)Sequencing activities  
C)Planning schedule management
D)Estimating activity durations
سؤال
In project time management, which of the following processes involve analyzing activity sequences, activity resource estimates, and activity duration estimates to create the project schedule?

A)Planning schedule management
B)Developing the schedule  
C)Controlling the schedule
D)Defining activities
سؤال
The critical path on a project can change as the project progresses.
سؤال
Which of the following documents is most likely to include planned project start and end dates which serve as the starting points for a detailed schedule?

A)Resource breakdown structure
B)Milestones list  
C)Organizational process assets update
D)Project charter
سؤال
The technique of fast tracking can result in lengthening the project schedule.
سؤال
Critical chain scheduling assumes that resources multitask and maximizes multitasking.
سؤال
In project time management, the process of_____ primarily involves checking and managing changes to the project schedule.

A)estimating activity durations
B)developing the schedule  
C)controlling the schedule
D)estimating activity resources
سؤال
_____ dependencies are sometimes referred to as soft logic and should be used with care because they may limit later scheduling options.

A)Mandatory
B)Discretionary  
C)External
D)Inherent
سؤال
Which of the following is one of the main outputs of estimating activity resources process?

A)Project documents update
B)Milestone list  
C)Work breakdown structure
D)Activity duration estimate
سؤال
In project time management, the main goal of _____ is to ensure that the project team has complete understanding of all the work they must do as part of the project scope so they can start scheduling the work.

A)defining activities
B)estimating activity durations  
C)estimating activity resources
D)controlling the schedule
سؤال
After working with key stakeholders to define activities and calculate their resources, the next process in project time management is to:

A)develop the schedule.
B)control the schedule. 
C)determine their dependencies.
D)estimate the duration of activities.
سؤال
Which of the following is a network diagramming technique used primarily to predict total project duration?

A)Gantt chart
B)Critical path analysis  
C)Resource breakdown structure
D)Arrow diagramming method
سؤال
In project time management, the ultimate goal of _____ is to provide a basis for monitoring project progress for the time dimension of the project.

A)defining activities
B)sequencing activities  
C)developing a schedule
D)estimating activity resources
سؤال
_____ is the amount of time an activity can be delayed from its early start without delaying the planned project finish date.

A)Total slack
B)Free float  
C)Backward pass
D)Forward pass
سؤال
A(n) _____ on a project is a significant event that normally has no duration.

A)milestone
B)activity attribute  
C)activity sequence
D)schedule baseline
سؤال
Which of the following types of dependencies are inherent in the nature of work being performed on a project?

A)Mandatory
B)Discretionary  
C)External
D)Random
سؤال
AOA network diagrams use only _____ dependencies.

A)start-to-start
B)finish-to-start  
C)finish-to-finish
D)start-to-finish
سؤال
In project time management, the next step after defining project activities is:

A)planning schedule management.
B)determining their dependencies. 
C)controlling the schedule.
D)estimating activity duration.
سؤال
A network diagramming technique in which boxes represent activities is known as a(n) _____.

A)PDM
B)CPM  
C)ADM
D)PERT
سؤال
Which of the following is a relationship in which the "from" activity cannot start until the "to" activity is started?

A)Start-to-start
B)Finish-to-finish  
C)Finish-to-start
D)Start-to-finish
سؤال
Which of the following is true of a finsih-to-finish dependency?

A)It is a dependency in which the "from" activity cannot start until the "to" activity or successor is started. 
B)It is a dependency in which in which the "from" activity must finish before the "to" activity or successor can start. 
C)It is a dependency in which the "from" activity must be finished before the "to" activity can be finished. 
D)It is a dependency in which the "from" activity must start before the "to" activity can be finished.
سؤال
_____ provide(s) a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format.

A)Gantt charts
B)Critical path analysis  
C)Arrow diagramming method
D)PERT analysis
سؤال
In an AOA network diagram, _____ occur when two or more activities follow a single node.

A)combinations
B)buffers  
C)mergers
D)bursts
سؤال
The amount of time an activity can be delayed without delaying the early start date of any immediately following activities is known as a _____.

A)forward pass
B)backward pass  
C)fast tracking
D)free slack
سؤال
The critical path is the _____ path through a network diagram, and it represents the _____ amount of slack or float.

A)longest; longest
B)longest; shortest  
C)shortest; longest
D)shortest; shortest
سؤال
Which of the following is true of dummy activities?

A)They have long durations. 
B)They show logical relationships between activities. 
C)They have a large range of resources. 
D)They have limited time periods.
سؤال
Which of the following dependencies involve relationships between project and non-project activities?

A)Mandatory
B)Discretionary  
C)External
D)Inherent
سؤال
In the activity defining process, the project team should review the _____ and activity attributes with project stakeholders before moving on to the next step in project time management.
سؤال
A difference between the Program Evaluation and Review Technique (PERT) and critical path method (CPM) is that:

A)CPM addresses the risk associated with duration estimates whereas PERT does not. 
B)unlike CPM, PERT estimates only when there is no risk of uncertainty. 
C)CPM involves more work than PERT because it requires several duration estimates. 
D)PERT uses different duration estimates whereas CPM uses one specific duration estimate.
سؤال
The technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost is known as _____.

A)dependency
B)crashing  
C)critical chain scheduling
D)feeding buffers
سؤال
In project time management, the process of _____ involves deciding how many people, equipment, and materials a project team should use to perform project activities.
سؤال
_____ states that work expands to fill the time allowed.

A)Murphy's Law
B)Miller's Law  
C)Parkinson's Law
D)Einstein's Law
سؤال
Which of the following techniques involve doing activities in parallel that one would normally do in sequence?

A)Critical chain scheduling
B)Crashing  
C)Fast tracking
D)PERT analysis
سؤال
Which of the following is an output of schedule control?

A)Lessons-learned reports
B)Activity attributes  
C)Resource requirements
D)Milestones list
سؤال
Critical chain scheduling protects tasks on the critical chain from being delayed by using _____, which consist of additional time added before tasks on the critical chain that are preceded by non-critical-path tasks.

A)critical paths
B)feeding buffers  
C)dummy activities
D)fast tracking
سؤال
A similarity between the crashing technique and the fast tracking technique is that:

A)both spread out tasks over a long period of time to ensure the quality of work is maintained. 
B)both invariably result in increases in total project costs. 
C)both can shorten the time needed to finish a project. 
D)both are network diagramming techniques used primarily to predict total project duration.
سؤال
In project procurement management, which of the following is an output of the executing process?

A)Make-or-buy decisions
B)Statements of work  
C)Source selection criteria
D)Resource calendars
سؤال
The _____ is a tabulation of activities to be included on a project schedule.
سؤال
_____ involves the processes required to ensure timely completion of a project.
سؤال
Which of the following is a silimarity between scope control and schedule control?

A)Both are initial processes of project time management. 
B)Both of their primary goals is to define project goals and miestones. 
C)Both are portions of the integrated change control process under project integration management. 
D)Both of these processes should occur before estimating activity durations.
سؤال
In a project schedule, the variable that has the least amount of flexibility is _____.
سؤال
The activity list should include the _____, an activity identifier, and a brief description of the activity.
سؤال
A draft schedule for a project is most likely to be found in a _____.

A)project buffer
B)project charter  
C)resource breakdown structure
D)project's dummy activities list
سؤال
After reviewing the project management plan, project charter, enterprise environmental factors, and organizational process assets, the project team uses expert judgment, analytical techniques, and meetings to develop the _____.
سؤال
In a network diagram, a(n) _____ is the starting and ending point of an activity.
سؤال
The _____ for an activity is the latest possible time an activity might begin without delaying the project finish date.

A)early finish date
B)late finish date  
C)late start date
D)early start date
سؤال
A(n) _____ is a schematic display of the logical relationships among project activities and?their sequencing.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/102
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Project Time Management
1
Project schedules grow out of basic documents such as the project charter.
True
Explanation: Project schedules grow out of the basic documents that initiate a project. The project charter often mentions planned project start and end dates, which serve as the starting points for a more detailed schedule.
2
A disadvantage of using Gantt charts is that they do not provide a standard format for displaying planned project schedule information.
False
Explanation: The main advantage of using Gantt charts is that they provide a standard format for displaying planned and actual project schedule information.
3
A merge occurs when one node precedes mutiple nodes.
False
Explanation: A merge occurs when two or more nodes precede a single node. On the other hand, bursts occur when two or more activities follow a single node.
4
After defining project activities, the next step in project time management is developing the schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
5
Start-to-finish relationships are the most frequently used dependencies between activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
6
In a network diagram, it is mandatory for every item on the WBS to be shown instead of only those activities with dependencies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
7
In project time management, the next step after sequencing activities is to define these activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
8
A schedule management plan includes information which describes the format and frequency of schedule reports required for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
9
In project time management, the primary output of defining activities is a schedule management plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
10
To define activities, the project team should start with reviewing the schedule management plan, scope baseline, enterprise environmental factors, and organizational processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
11
In a Gantt chart, thick black bars represent milestones achieved in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
12
Network diagrams are the preferred technique for showing activity sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
13
In project time management, one should control the schedule before estimating the duration for each activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
14
Milestones are easy to achieve and are always achieved through one main activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
15
A drawback of the precedence diagramming method is that it cannot be used unless dummy activities are employed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
16
The arrows in a network diagram represent missed milestones in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
17
It is important for the activity list and activity attributes to be in agreement with the work breakdown structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
18
A Tracking Gantt chart is based on the percentage of work completed for project tasks or the actual start and finish dates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
19
A dependency pertains to the sequencing of project activities or tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
20
An activity is an element of work that has an expected duration, cost, and resource requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
21
In project time management, which of the following processes involve calculating the number of work periods that are needed to complete individual activities?

A)Defining activities
B)Sequencing activities  
C)Planning schedule management
D)Estimating activity durations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
22
One of PERT's main disadvantages is that it does not address the risk associated with duration estimates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
23
Knowing the amount of float allows project managers to know whether a project schedule is flexible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
24
The main disadvantage of crashing is that it lengthens the time needed to finish a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
25
In project time management, which of the following processes generate the main outputs of an activity list, activity attributes, and a milestone list?

A)Sequencing activities
B)Defining activities  
C)Resource estimating activities
D)Estimating activity durations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following processes in project time management involves identifying the specific tasks that the project team members and stakeholders must perform to produce the project deliverables?

A)Defining activities
B)Sequencing activities  
C)Developing the schedule
D)Estimating activity durations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
27
A drawback of the project management software is that it does not have the capacity to calculate the critical path(s) for a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
28
The final process in project time management is developing the schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
29
In project time management, a(n) _____ is an output of controlling the schedule

A)activity duration estimate
B)project management plan update  
C)activity attribute
D)milestones list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is a difference between an activity list and an activity attribute?

A)As opposed to an activity attribute, an activity list provides resource requirements and constraints related to activities. 
B)An activity list provides a more concrete list of milestones for a project than an activity attribute. 
C)An activity attribute is a tabulation of activities to be included on a project schedule whereas an activity list is not. 
D)An activity attribute provides more schedule-related information about each activity than an activity list.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
31
The first process involved in project time management is _____ .

A)defining activities
B)estimating activity durations  
C)planning schedule management
D)sequencing activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
32
In a critical path analysis, the shortest path is what drives the completion date for the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
33
A backward pass through the network diagram determines the early start and early finish dates for each activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
34
In project time management, which of the following processes primarily involve identifying and documenting the relationships between project activities?

A)Defining activities
B)Sequencing activities  
C)Planning schedule management
D)Estimating activity durations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
35
In project time management, which of the following processes involve analyzing activity sequences, activity resource estimates, and activity duration estimates to create the project schedule?

A)Planning schedule management
B)Developing the schedule  
C)Controlling the schedule
D)Defining activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
36
The critical path on a project can change as the project progresses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following documents is most likely to include planned project start and end dates which serve as the starting points for a detailed schedule?

A)Resource breakdown structure
B)Milestones list  
C)Organizational process assets update
D)Project charter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
38
The technique of fast tracking can result in lengthening the project schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
39
Critical chain scheduling assumes that resources multitask and maximizes multitasking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
40
In project time management, the process of_____ primarily involves checking and managing changes to the project schedule.

A)estimating activity durations
B)developing the schedule  
C)controlling the schedule
D)estimating activity resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
41
_____ dependencies are sometimes referred to as soft logic and should be used with care because they may limit later scheduling options.

A)Mandatory
B)Discretionary  
C)External
D)Inherent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which of the following is one of the main outputs of estimating activity resources process?

A)Project documents update
B)Milestone list  
C)Work breakdown structure
D)Activity duration estimate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
43
In project time management, the main goal of _____ is to ensure that the project team has complete understanding of all the work they must do as part of the project scope so they can start scheduling the work.

A)defining activities
B)estimating activity durations  
C)estimating activity resources
D)controlling the schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
44
After working with key stakeholders to define activities and calculate their resources, the next process in project time management is to:

A)develop the schedule.
B)control the schedule. 
C)determine their dependencies.
D)estimate the duration of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is a network diagramming technique used primarily to predict total project duration?

A)Gantt chart
B)Critical path analysis  
C)Resource breakdown structure
D)Arrow diagramming method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
46
In project time management, the ultimate goal of _____ is to provide a basis for monitoring project progress for the time dimension of the project.

A)defining activities
B)sequencing activities  
C)developing a schedule
D)estimating activity resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
47
_____ is the amount of time an activity can be delayed from its early start without delaying the planned project finish date.

A)Total slack
B)Free float  
C)Backward pass
D)Forward pass
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
48
A(n) _____ on a project is a significant event that normally has no duration.

A)milestone
B)activity attribute  
C)activity sequence
D)schedule baseline
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following types of dependencies are inherent in the nature of work being performed on a project?

A)Mandatory
B)Discretionary  
C)External
D)Random
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
50
AOA network diagrams use only _____ dependencies.

A)start-to-start
B)finish-to-start  
C)finish-to-finish
D)start-to-finish
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
51
In project time management, the next step after defining project activities is:

A)planning schedule management.
B)determining their dependencies. 
C)controlling the schedule.
D)estimating activity duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
52
A network diagramming technique in which boxes represent activities is known as a(n) _____.

A)PDM
B)CPM  
C)ADM
D)PERT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is a relationship in which the "from" activity cannot start until the "to" activity is started?

A)Start-to-start
B)Finish-to-finish  
C)Finish-to-start
D)Start-to-finish
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is true of a finsih-to-finish dependency?

A)It is a dependency in which the "from" activity cannot start until the "to" activity or successor is started. 
B)It is a dependency in which in which the "from" activity must finish before the "to" activity or successor can start. 
C)It is a dependency in which the "from" activity must be finished before the "to" activity can be finished. 
D)It is a dependency in which the "from" activity must start before the "to" activity can be finished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
55
_____ provide(s) a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format.

A)Gantt charts
B)Critical path analysis  
C)Arrow diagramming method
D)PERT analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
56
In an AOA network diagram, _____ occur when two or more activities follow a single node.

A)combinations
B)buffers  
C)mergers
D)bursts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
57
The amount of time an activity can be delayed without delaying the early start date of any immediately following activities is known as a _____.

A)forward pass
B)backward pass  
C)fast tracking
D)free slack
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
58
The critical path is the _____ path through a network diagram, and it represents the _____ amount of slack or float.

A)longest; longest
B)longest; shortest  
C)shortest; longest
D)shortest; shortest
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following is true of dummy activities?

A)They have long durations. 
B)They show logical relationships between activities. 
C)They have a large range of resources. 
D)They have limited time periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following dependencies involve relationships between project and non-project activities?

A)Mandatory
B)Discretionary  
C)External
D)Inherent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
61
In the activity defining process, the project team should review the _____ and activity attributes with project stakeholders before moving on to the next step in project time management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
62
A difference between the Program Evaluation and Review Technique (PERT) and critical path method (CPM) is that:

A)CPM addresses the risk associated with duration estimates whereas PERT does not. 
B)unlike CPM, PERT estimates only when there is no risk of uncertainty. 
C)CPM involves more work than PERT because it requires several duration estimates. 
D)PERT uses different duration estimates whereas CPM uses one specific duration estimate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
63
The technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost is known as _____.

A)dependency
B)crashing  
C)critical chain scheduling
D)feeding buffers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
64
In project time management, the process of _____ involves deciding how many people, equipment, and materials a project team should use to perform project activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
65
_____ states that work expands to fill the time allowed.

A)Murphy's Law
B)Miller's Law  
C)Parkinson's Law
D)Einstein's Law
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
66
Which of the following techniques involve doing activities in parallel that one would normally do in sequence?

A)Critical chain scheduling
B)Crashing  
C)Fast tracking
D)PERT analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is an output of schedule control?

A)Lessons-learned reports
B)Activity attributes  
C)Resource requirements
D)Milestones list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
68
Critical chain scheduling protects tasks on the critical chain from being delayed by using _____, which consist of additional time added before tasks on the critical chain that are preceded by non-critical-path tasks.

A)critical paths
B)feeding buffers  
C)dummy activities
D)fast tracking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
69
A similarity between the crashing technique and the fast tracking technique is that:

A)both spread out tasks over a long period of time to ensure the quality of work is maintained. 
B)both invariably result in increases in total project costs. 
C)both can shorten the time needed to finish a project. 
D)both are network diagramming techniques used primarily to predict total project duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
70
In project procurement management, which of the following is an output of the executing process?

A)Make-or-buy decisions
B)Statements of work  
C)Source selection criteria
D)Resource calendars
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
71
The _____ is a tabulation of activities to be included on a project schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
72
_____ involves the processes required to ensure timely completion of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
73
Which of the following is a silimarity between scope control and schedule control?

A)Both are initial processes of project time management. 
B)Both of their primary goals is to define project goals and miestones. 
C)Both are portions of the integrated change control process under project integration management. 
D)Both of these processes should occur before estimating activity durations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
74
In a project schedule, the variable that has the least amount of flexibility is _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
75
The activity list should include the _____, an activity identifier, and a brief description of the activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
76
A draft schedule for a project is most likely to be found in a _____.

A)project buffer
B)project charter  
C)resource breakdown structure
D)project's dummy activities list
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
77
After reviewing the project management plan, project charter, enterprise environmental factors, and organizational process assets, the project team uses expert judgment, analytical techniques, and meetings to develop the _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
78
In a network diagram, a(n) _____ is the starting and ending point of an activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
79
The _____ for an activity is the latest possible time an activity might begin without delaying the project finish date.

A)early finish date
B)late finish date  
C)late start date
D)early start date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
80
A(n) _____ is a schematic display of the logical relationships among project activities and?their sequencing.
فتح الحزمة