Deck 11: Purchasing Logistics and Supply Chain Management

ملء الشاشة (f)
exit full mode
سؤال
Which of the following is a characteristic of 'priority management)'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following best explains the concept of 'supply chain'? 

A) A series of companies (links) in which the consecutive stages of production of an economic product take place, from primary producer to final consumer. 
B) The way in which finished products are distributed by the company to its customers. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
سؤال
Which of the following is a characteristic of 'pure competition'? 

A) Neither the supplier nor the buyer can influence the price of the product because there are a large number of buyers and sellers. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
سؤال
Which of the following best explains the concept of 'diverging supply chain'? 

A) The finished product of one link is the main or sole input for the next production stage of various other industry columns. 
B) The finished product of one link is the main or sole input for the subsequent link. 
C) Various finished products of links of various supply chains are the input for the next link. 
D) A company producing a diverse range of products.
سؤال
Which of the following best explains the concept of 'logistics management'? 

A) Identifying saving in direct and indirect activities. 
B) Recycling packaging materials and surplus materials. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
سؤال
Which of the following is a characteristic of 'oligopoly'? 

A) Neither the supplier nor the buyer can influence the price of the product because there are a large number of buyers and sellers. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
سؤال
Which of the following is a characteristic of 'master production scheduling (MPS)'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
سؤال
Which of the following is a characteristic of 'Manufacturing Resources Planning (MRP-II)'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
سؤال
Which of the following is not a characteristic of 'Materials Requirements Planning (MRP-I)'? 

A) Releasing manufacturing orders. 
B) Releasing purchasing requisitions. 
C) Managing manufacturing orders and purchasing requisitions. 
D) Controls relevant materials flows and production capacity.
سؤال
Which of the following best explains the concept of 'industrial branch'? 

A) A series of companies (links) in which the consecutive stages of production of an economic product take place, from primary producer to final consumer. 
B) A number of links (companies) that are connected via markets. 
C) The horizontal relationship of organizations that experience each other as effective competitors. 
D) A sub-division of an organization.
سؤال
Which of the following best explains the concept of 'external structure'? 

A) A series of companies (links) in which the consecutive stages of production of an economic product take place, from primary producer to final consumer. 
B) A number of links (companies) that are connected via markets. 
C) The horizontal relationship of organizations that experience each other as effective competitors. 
D) A sub-division of an organization.
سؤال
Which of the following is a characteristic of 'monopolistic competition'? 

A) Neither the supplier nor the buyer can influence the price of the product because there are a large number of buyers and sellers. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
سؤال
Which of the following best explains the concept of 'converging supply chain'? 

A) The finished product of one link is the main or sole input for the next production stage of various other industry columns. 
B) The finished product of one link is the main or sole input for the subsequent link. 
C) Various finished products of links of various supply chains are the input for the next link. 
D) A company producing a diverse range of products.
سؤال
Which of the following is a characteristic of 'monopoly'? 

A) Price can be set by a market- or price leader, or arranged through some form or price arrangement. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) Only one supplier a product.
سؤال
Which of the following best explains the concept of 'supply chain management'? 

A) Identifying saving in direct and indirect activities. 
B) Recycling packaging materials and surplus materials. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
سؤال
Which of the following is not a characteristic of 'Manufacturing Resources Planning (MRP-II)'? 

A) Controls production capacity. 
B) Releasing purchasing requisitions. 
C) Taking into account the relationship between materials flows and the required capacity. 
D) Controls relevant materials flows.
سؤال
Which of the following is a characteristic of 'master planning'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
سؤال
Which of the following best explains the concept of 'logistics'? 

A) The activities needed to optimize the goods flow from suppliers to the point of consumption. 
B) Recycling packaging materials and surplus materials. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
سؤال
Which of the following best explains the concept of 'outgoing materials flow'? 

A) The activities needed to optimize the goods flow from suppliers to the point of consumption. 
B) The way in which finished products are distributed by the company to its customers. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
سؤال
Which of the following is a characteristic of 'cartel'? 

A) Price can be set by a market- or price leader, or arranged through some form or price arrangement. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
سؤال
Which of the following best explains 'assembly to order (ATO)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all. 
D) Manufacture takes place based on forecasts and final assembly takes place based on customer orders.
سؤال
Which of the following is not a feature of 'make to stock (MTS)'? 

A) Finished products are kept in stock at the end of the production process. 
B) Finished products are distributed to various distribution points. 
C) Orders are not released to customers. 
D) Finished products are shipped directly to many geographically dispersed customers.
سؤال
Which of the following best explains 'Camp's formula'? 

A) Mathematical formula based upon inventory costs and ordering costs to decide on optimal economic order quantity (EOQ). 
B) Mathematical formula based upon ordering costs to decide on optimal economic order quantity (EOQ). 
C) Mathematical formula based upon inventory costs to decide on optimal economic order quantity (EOQ). 
D) Mathematical formula based upon forecasted demand.
سؤال
Which of the following best explains 'just-in-time management (JIT)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all the purchase and order of materials takes place on the basis of the specific customer order. 
D) All materials and products become available at the very moment when they are needed in the production process.
سؤال
Which of the following best explains 'pay for production'? 

A) Payment is made monthly based on units supplied. 
B) Payment is made by the manufacturer on the basis of labour costs of the component supplier. 
C) The manufacturer only pays the supplier for the components which have actually been consumed during the production of a given day or batch. 
D) Payment is based on the number of hours required for the production of each unit of the component.
سؤال
Which of the following best explains 'make to order (MTO)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all. 
D) Manufacture takes place based on forecasts and final assembly takes place based on customer orders.
سؤال
Which of the following is a disadvantage of JIT for the supplier? 

A) It may take some time for a supplier to deliver at zero defects or to produce zero defects. 
B) Not regularly informed about the quantities to be delivered. 
C) Delivery times and specification often change. 
D) Additional costs.
سؤال
Which of the following best explains the shape of the JIT management supply structure? 

A) Circular. 
B) Pyramid. 
C) Oval. 
D) Hexagonal.
سؤال
Which of the following best explains zero defects principle? 

A) Everything goes right the first time. 
B) Reduce defects over time. 
C) Learn from your mistakes. 
D) Continuous improvement.
سؤال
Which of the following best explains the term 'vendor managed inventory'? 

A) An infrequent replenishment programme that uses the exchange of information between the retailer and the supplier to allow the supplier to manage and replenish product at the store or warehouse level. 
B) A continuous replenishment programme that uses forecasts to allow the supplier to manage and replenish product at the store or warehouse level. 
C) A monthly replenishment programme that uses the exchange of information between the retailer and the supplier to allow the supplier to manage and replenish product at the store or warehouse level. 
D) A weekly replenishment programme that uses the exchange of information between the retailer and the supplier to allow the supplier to manage and replenish product at the store or warehouse level.
سؤال
Which of the following is a characteristic of the JIT approach? 

A) Minimum of two suppliers. 
B) Payment per order. 
C) Delivery times and specification often change. 
D) Delivery time and specifications fixed, quantities are adjusted within predetermined margins if necessary.
سؤال
Which of the following best explains 'customer order decoupling point (CODP)'? 

A) The point in the supply chain where a production order becomes customer specific. 
B) Activities are planned based upon customer order. 
C) Orders are ready for distribution. 
D) Activities are planned based upon forecast.
سؤال
Which of the following is not a feature of 'make and send stock (MSS)'? 

A) Products are manufactured and distributed to various distribution points which are dispersed and located close to the customer. 
B) Products are distributed to various distribution points. 
C) Orders are ready for distribution. 
D) Manufacturing is based upon forecasts and on expected stock turnover at the points of distribution.
سؤال
Which of the following is not a step in the process of setting up a production line? 

A) Preparation. 
B) Setting up. 
C) Distributing. 
D) Conversion.
سؤال
Which of the following is an advantage of JIT for the supplier? 

A) Higher profits. 
B) Suppliers regularly informed about the quantities to be delivered. 
C) Constant inspection of quantities and quality. 
D) Delivery time unknown.
سؤال
Which of the following is not a variable used in 'Camp's formula'? 

A) Fixed usage per period. 
B) Order quantity. 
C) Costs per order. 
D) Delivery time.
سؤال
Which of the following best explains 'Kanban'? 

A) A form of JIT based upon fixed volume lot delivery. 
B) The exact same as just-in-time (JIT). 
C) Where the ordering costs per unit is lowest. 
D) A form of JIT based upon fixed volume lot delivery. When a lot is used, the kanban (card) will be sent to the supplier as a signal to replenish that lot
سؤال
Which of the following best explains 'economic order quantity (EOQ)'? 

A) Where the inventory costs per unit is lowest. 
B) Where the sum of inventory costs and ordering costs per unit is lowest. 
C) Where the ordering costs per unit is lowest. 
D) Where inventory costs minus ordering costs per unit is lowest.
سؤال
Which of the following best explains 'engineering and make to order (ETO)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all the purchase and order of materials takes place on the basis of the specific customer order. 
D) Manufacture takes place based on forecasts and final assembly takes place based on customer orders.
سؤال
Which of the following best explains 'optimal batch size'? 

A) The optimal batch size is achieved when the sum of the inventory costs and set up costs per unit produced is lowest. 
B) The optimal batch size is achieved when the sum of price and the inventory costs is highest. 
C) The optimal batch size is achieved when the set up costs per unit produced is lowest. 
D) The optimal batch size is achieved when the inventory costs per unit produced is lowest.
سؤال
Which of the following is not an element of a purchasing information system? 

A) Delivery. 
B) Invoice handling and payment. 
C) Order follow-up. 
D) Reduced purchase prices.
سؤال
What is the driver for all activities upstream from the order penetration point? 

A) Customer orders. 
B) Forecast-based. 
C) Internal audit. 
D) Quality control.
سؤال
Which of the following is not a potential consequence of Just-in-time (JIT)? 

A) Single sourcing. 
B) Closing long-term contracts. 
C) Engaging local suppliers. 
D) Reduced purchase prices.
سؤال
Which of the following best explains an Enterprise Resource Planning (ERP) system? 

A) Company wide information system for managing the company's operational and support processes. 
B) Company wide information system for managing the company's administrative processes, its human resources and its materials resources. 
C) Company wide information system for managing the company's financial resources. 
D) Company wide information system for managing the company's operational and support processes, its administrative processes, its human resources, its materials resources and financial resources.
سؤال
Which of the following describe the focus of demand-chain management? 

A) Physical distribution. 
B) Purchasing. 
C) Material management. 
D) Suppliers.
سؤال
Which of the following are not logistic activities? 

A) Invoicing. 
B) The supply of raw materials. 
C) Internal transportation. 
D) Storage.
سؤال
Which of the following is not an aspiration of logistics management? 

A) Achieving the highest delivery reliability. 
B) Achieving the best order fulfilment. 
C) Achieving the shortest delivery time. 
D) Relationship management.
سؤال
Which of the following best explains reverse logistics? 

A) Recycling packaging materials. 
B) Outsourcing transportation. 
C) Achieving the shortest delivery time. 
D) Relationship management between the company and its suppliers as well as its customers.
سؤال
Which of the following e-procurement system activities is out of sequence? 

A) Get another approval. 
B) Send order electronically to supplier. 
C) Order delivery. 
D) Electronic invoice matching and payment.
سؤال
Which of the following describe the focus of supply-chain management? 

A) Physical distribution. 
B) Marketing. 
C) Customers. 
D) Suppliers.
سؤال
Which of the following is not a co-ordination problem between purchasing and logistics? 

A) Insufficient integration of purchasing in logistics management. 
B) Frequent changes in materials planning. 
C) Standardization. 
D) Unreliable planning information.
سؤال
Which of the following is an aspiration of supply chain management? 

A) Achieving the highest delivery reliability. 
B) Achieving the best order fulfilment. 
C) Achieving the shortest delivery time. 
D) Relationship management between the company and its suppliers as well as its customers.
سؤال
What is the driver for all activities downstream from the order penetration point? 

A) Customer orders. 
B) Forecast-based. 
C) Internal audit. 
D) Quality control.
سؤال
Which of the following are not logistic activities? 

A) The management of materials planning. 
B) The supply of raw materials. 
C) Internal transportation. 
D) Quality control.
سؤال
Which of the following is not a co-ordination problem between purchasing and logistics? 

A) Lack of well-defined specifications. 
B) Frequent changes in materials planning. 
C) Lack of standardization. 
D) Electronic invoice matching and payment.
سؤال
Which of the following best explains an e-procurement system? 

A) A system which enables authorized users within organizations to order directly from an electronic catalogue without the interference of a purchasing department. 
B) A system which enables authorized users within organizations to order directly from a purchasing department. 
C) A system which enables authorized users within organizations to order directly from a purchasing department who then us an electronic catalogue. 
D) A system which enables anyone to order directly from an electronic catalogue without the interference of a purchasing department.
سؤال
Which of the following e-procurement system activities is out of sequence? 

A) Search catalogue. 
B) Fill in electronic shopping list. 
C) Order delivery. 
D) Get budgetary approval.
سؤال
Which of the following are not logistic activities? 

A) The management of materials planning. 
B) The supply of raw materials. 
C) Internal transportation. 
D) Quality control.
سؤال
Which of the following are not logistic activities? 

A) Physical distribution. 
B) Recycling packaging materials. 
C) Recycling surplus materials. 
D) Customer feedback.
سؤال
Which of the following is not an element of a purchasing information system? 

A) Requisitioning and ordering. 
B) Product, contract and supplier database. 
C) Order follow-up. 
D) Reduced purchase prices.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/60
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Purchasing Logistics and Supply Chain Management
1
Which of the following is a characteristic of 'priority management)'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
  D
2
Which of the following best explains the concept of 'supply chain'? 

A) A series of companies (links) in which the consecutive stages of production of an economic product take place, from primary producer to final consumer. 
B) The way in which finished products are distributed by the company to its customers. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
  A
3
Which of the following is a characteristic of 'pure competition'? 

A) Neither the supplier nor the buyer can influence the price of the product because there are a large number of buyers and sellers. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
  A
4
Which of the following best explains the concept of 'diverging supply chain'? 

A) The finished product of one link is the main or sole input for the next production stage of various other industry columns. 
B) The finished product of one link is the main or sole input for the subsequent link. 
C) Various finished products of links of various supply chains are the input for the next link. 
D) A company producing a diverse range of products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following best explains the concept of 'logistics management'? 

A) Identifying saving in direct and indirect activities. 
B) Recycling packaging materials and surplus materials. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is a characteristic of 'oligopoly'? 

A) Neither the supplier nor the buyer can influence the price of the product because there are a large number of buyers and sellers. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following is a characteristic of 'master production scheduling (MPS)'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is a characteristic of 'Manufacturing Resources Planning (MRP-II)'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is not a characteristic of 'Materials Requirements Planning (MRP-I)'? 

A) Releasing manufacturing orders. 
B) Releasing purchasing requisitions. 
C) Managing manufacturing orders and purchasing requisitions. 
D) Controls relevant materials flows and production capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following best explains the concept of 'industrial branch'? 

A) A series of companies (links) in which the consecutive stages of production of an economic product take place, from primary producer to final consumer. 
B) A number of links (companies) that are connected via markets. 
C) The horizontal relationship of organizations that experience each other as effective competitors. 
D) A sub-division of an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following best explains the concept of 'external structure'? 

A) A series of companies (links) in which the consecutive stages of production of an economic product take place, from primary producer to final consumer. 
B) A number of links (companies) that are connected via markets. 
C) The horizontal relationship of organizations that experience each other as effective competitors. 
D) A sub-division of an organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following is a characteristic of 'monopolistic competition'? 

A) Neither the supplier nor the buyer can influence the price of the product because there are a large number of buyers and sellers. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following best explains the concept of 'converging supply chain'? 

A) The finished product of one link is the main or sole input for the next production stage of various other industry columns. 
B) The finished product of one link is the main or sole input for the subsequent link. 
C) Various finished products of links of various supply chains are the input for the next link. 
D) A company producing a diverse range of products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is a characteristic of 'monopoly'? 

A) Price can be set by a market- or price leader, or arranged through some form or price arrangement. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) Only one supplier a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following best explains the concept of 'supply chain management'? 

A) Identifying saving in direct and indirect activities. 
B) Recycling packaging materials and surplus materials. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is not a characteristic of 'Manufacturing Resources Planning (MRP-II)'? 

A) Controls production capacity. 
B) Releasing purchasing requisitions. 
C) Taking into account the relationship between materials flows and the required capacity. 
D) Controls relevant materials flows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following is a characteristic of 'master planning'? 

A) Customer orders, the sales plan, the planned stocks of finished products, and the purchasing plans are linked together. 
B) The resources needed are recorded in a document from which the required composition of manufacturing resources is derived. 
C) This is a basis for computing the quantities of materials, semi-manufactured products and components which must be manufactured. 
D) Priorities are derived directly from the master production schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following best explains the concept of 'logistics'? 

A) The activities needed to optimize the goods flow from suppliers to the point of consumption. 
B) Recycling packaging materials and surplus materials. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following best explains the concept of 'outgoing materials flow'? 

A) The activities needed to optimize the goods flow from suppliers to the point of consumption. 
B) The way in which finished products are distributed by the company to its customers. 
C) Includes the management of materials planning, the supply of raw materials and other purchased goods, internal transportation, storage and physical distribution. 
D) The way in which materials processes are managed within a company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following is a characteristic of 'cartel'? 

A) Price can be set by a market- or price leader, or arranged through some form or price arrangement. 
B) There is a high degree of product differentiation. 
C) A limited number of suppliers and a limited product differentiation. 
D) The supplier cannot influence the price of the product because there are a large number of buyers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following best explains 'assembly to order (ATO)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all. 
D) Manufacture takes place based on forecasts and final assembly takes place based on customer orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is not a feature of 'make to stock (MTS)'? 

A) Finished products are kept in stock at the end of the production process. 
B) Finished products are distributed to various distribution points. 
C) Orders are not released to customers. 
D) Finished products are shipped directly to many geographically dispersed customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following best explains 'Camp's formula'? 

A) Mathematical formula based upon inventory costs and ordering costs to decide on optimal economic order quantity (EOQ). 
B) Mathematical formula based upon ordering costs to decide on optimal economic order quantity (EOQ). 
C) Mathematical formula based upon inventory costs to decide on optimal economic order quantity (EOQ). 
D) Mathematical formula based upon forecasted demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following best explains 'just-in-time management (JIT)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all the purchase and order of materials takes place on the basis of the specific customer order. 
D) All materials and products become available at the very moment when they are needed in the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following best explains 'pay for production'? 

A) Payment is made monthly based on units supplied. 
B) Payment is made by the manufacturer on the basis of labour costs of the component supplier. 
C) The manufacturer only pays the supplier for the components which have actually been consumed during the production of a given day or batch. 
D) Payment is based on the number of hours required for the production of each unit of the component.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following best explains 'make to order (MTO)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all. 
D) Manufacture takes place based on forecasts and final assembly takes place based on customer orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following is a disadvantage of JIT for the supplier? 

A) It may take some time for a supplier to deliver at zero defects or to produce zero defects. 
B) Not regularly informed about the quantities to be delivered. 
C) Delivery times and specification often change. 
D) Additional costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which of the following best explains the shape of the JIT management supply structure? 

A) Circular. 
B) Pyramid. 
C) Oval. 
D) Hexagonal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following best explains zero defects principle? 

A) Everything goes right the first time. 
B) Reduce defects over time. 
C) Learn from your mistakes. 
D) Continuous improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following best explains the term 'vendor managed inventory'? 

A) An infrequent replenishment programme that uses the exchange of information between the retailer and the supplier to allow the supplier to manage and replenish product at the store or warehouse level. 
B) A continuous replenishment programme that uses forecasts to allow the supplier to manage and replenish product at the store or warehouse level. 
C) A monthly replenishment programme that uses the exchange of information between the retailer and the supplier to allow the supplier to manage and replenish product at the store or warehouse level. 
D) A weekly replenishment programme that uses the exchange of information between the retailer and the supplier to allow the supplier to manage and replenish product at the store or warehouse level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is a characteristic of the JIT approach? 

A) Minimum of two suppliers. 
B) Payment per order. 
C) Delivery times and specification often change. 
D) Delivery time and specifications fixed, quantities are adjusted within predetermined margins if necessary.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following best explains 'customer order decoupling point (CODP)'? 

A) The point in the supply chain where a production order becomes customer specific. 
B) Activities are planned based upon customer order. 
C) Orders are ready for distribution. 
D) Activities are planned based upon forecast.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is not a feature of 'make and send stock (MSS)'? 

A) Products are manufactured and distributed to various distribution points which are dispersed and located close to the customer. 
B) Products are distributed to various distribution points. 
C) Orders are ready for distribution. 
D) Manufacturing is based upon forecasts and on expected stock turnover at the points of distribution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is not a step in the process of setting up a production line? 

A) Preparation. 
B) Setting up. 
C) Distributing. 
D) Conversion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is an advantage of JIT for the supplier? 

A) Higher profits. 
B) Suppliers regularly informed about the quantities to be delivered. 
C) Constant inspection of quantities and quality. 
D) Delivery time unknown.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is not a variable used in 'Camp's formula'? 

A) Fixed usage per period. 
B) Order quantity. 
C) Costs per order. 
D) Delivery time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following best explains 'Kanban'? 

A) A form of JIT based upon fixed volume lot delivery. 
B) The exact same as just-in-time (JIT). 
C) Where the ordering costs per unit is lowest. 
D) A form of JIT based upon fixed volume lot delivery. When a lot is used, the kanban (card) will be sent to the supplier as a signal to replenish that lot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following best explains 'economic order quantity (EOQ)'? 

A) Where the inventory costs per unit is lowest. 
B) Where the sum of inventory costs and ordering costs per unit is lowest. 
C) Where the ordering costs per unit is lowest. 
D) Where inventory costs minus ordering costs per unit is lowest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following best explains 'engineering and make to order (ETO)'? 

A) Only raw materials and components are kept in stock. 
B) All activities are planned based upon customer order. 
C) There is no stock held at all the purchase and order of materials takes place on the basis of the specific customer order. 
D) Manufacture takes place based on forecasts and final assembly takes place based on customer orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following best explains 'optimal batch size'? 

A) The optimal batch size is achieved when the sum of the inventory costs and set up costs per unit produced is lowest. 
B) The optimal batch size is achieved when the sum of price and the inventory costs is highest. 
C) The optimal batch size is achieved when the set up costs per unit produced is lowest. 
D) The optimal batch size is achieved when the inventory costs per unit produced is lowest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following is not an element of a purchasing information system? 

A) Delivery. 
B) Invoice handling and payment. 
C) Order follow-up. 
D) Reduced purchase prices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
42
What is the driver for all activities upstream from the order penetration point? 

A) Customer orders. 
B) Forecast-based. 
C) Internal audit. 
D) Quality control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is not a potential consequence of Just-in-time (JIT)? 

A) Single sourcing. 
B) Closing long-term contracts. 
C) Engaging local suppliers. 
D) Reduced purchase prices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following best explains an Enterprise Resource Planning (ERP) system? 

A) Company wide information system for managing the company's operational and support processes. 
B) Company wide information system for managing the company's administrative processes, its human resources and its materials resources. 
C) Company wide information system for managing the company's financial resources. 
D) Company wide information system for managing the company's operational and support processes, its administrative processes, its human resources, its materials resources and financial resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following describe the focus of demand-chain management? 

A) Physical distribution. 
B) Purchasing. 
C) Material management. 
D) Suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which of the following are not logistic activities? 

A) Invoicing. 
B) The supply of raw materials. 
C) Internal transportation. 
D) Storage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following is not an aspiration of logistics management? 

A) Achieving the highest delivery reliability. 
B) Achieving the best order fulfilment. 
C) Achieving the shortest delivery time. 
D) Relationship management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following best explains reverse logistics? 

A) Recycling packaging materials. 
B) Outsourcing transportation. 
C) Achieving the shortest delivery time. 
D) Relationship management between the company and its suppliers as well as its customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following e-procurement system activities is out of sequence? 

A) Get another approval. 
B) Send order electronically to supplier. 
C) Order delivery. 
D) Electronic invoice matching and payment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following describe the focus of supply-chain management? 

A) Physical distribution. 
B) Marketing. 
C) Customers. 
D) Suppliers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is not a co-ordination problem between purchasing and logistics? 

A) Insufficient integration of purchasing in logistics management. 
B) Frequent changes in materials planning. 
C) Standardization. 
D) Unreliable planning information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
52
Which of the following is an aspiration of supply chain management? 

A) Achieving the highest delivery reliability. 
B) Achieving the best order fulfilment. 
C) Achieving the shortest delivery time. 
D) Relationship management between the company and its suppliers as well as its customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
53
What is the driver for all activities downstream from the order penetration point? 

A) Customer orders. 
B) Forecast-based. 
C) Internal audit. 
D) Quality control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following are not logistic activities? 

A) The management of materials planning. 
B) The supply of raw materials. 
C) Internal transportation. 
D) Quality control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is not a co-ordination problem between purchasing and logistics? 

A) Lack of well-defined specifications. 
B) Frequent changes in materials planning. 
C) Lack of standardization. 
D) Electronic invoice matching and payment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following best explains an e-procurement system? 

A) A system which enables authorized users within organizations to order directly from an electronic catalogue without the interference of a purchasing department. 
B) A system which enables authorized users within organizations to order directly from a purchasing department. 
C) A system which enables authorized users within organizations to order directly from a purchasing department who then us an electronic catalogue. 
D) A system which enables anyone to order directly from an electronic catalogue without the interference of a purchasing department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following e-procurement system activities is out of sequence? 

A) Search catalogue. 
B) Fill in electronic shopping list. 
C) Order delivery. 
D) Get budgetary approval.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following are not logistic activities? 

A) The management of materials planning. 
B) The supply of raw materials. 
C) Internal transportation. 
D) Quality control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
59
Which of the following are not logistic activities? 

A) Physical distribution. 
B) Recycling packaging materials. 
C) Recycling surplus materials. 
D) Customer feedback.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
60
Which of the following is not an element of a purchasing information system? 

A) Requisitioning and ordering. 
B) Product, contract and supplier database. 
C) Order follow-up. 
D) Reduced purchase prices.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 60 في هذه المجموعة.