Deck 16: Laying Concrete Block to the Line
1
Do not cut concrete block _____ .
A) on the ground
B) if it has been scored
C) with a brick hammer
D) on a hard surface such as a concrete slab
A) on the ground
B) if it has been scored
C) with a brick hammer
D) on a hard surface such as a concrete slab
D
2
By tipping the block _____ , you can position the block in relation to the top edge of the block in the course below.
A) a little away from the body and looking down the back side of the block
B) away from the body and looking down the face side of the block
C) a little toward the body and looking down the face side of the block
D) away from the body and looking down the back side of the block
A) a little away from the body and looking down the back side of the block
B) away from the body and looking down the face side of the block
C) a little toward the body and looking down the face side of the block
D) away from the body and looking down the back side of the block
C
3
The ______ block is the last block laid in a wall and is most prone to leakage.
A) header
B) closure
C) edge
D) top
A) header
B) closure
C) edge
D) top
B
4
When lifting the block, try to keep your feet close together and the block close to your body.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
In places where two pieces of wire meet, there should be a _____ .
A) maximum overlap of 5"
B) maximum overlap of 4"
C) minimum overlap of 6"
D) minimum overlap of 3"
A) maximum overlap of 5"
B) maximum overlap of 4"
C) minimum overlap of 6"
D) minimum overlap of 3"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
The end edges of the block are also known as ______ .
A) flaps
B) arms
C) shoulders
D) ears
A) flaps
B) arms
C) shoulders
D) ears
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Poured-in-place insulation is usually made up of vermiculate or perlite.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
_____ is composed of small beads or pellets and can be poured into blocks upon completion of the wall or in stages as the courses are built.
A) Poured-in-place insulation
B) Foam-in-place insulation
C) Expanded polystyrene
D) A molded insert
A) Poured-in-place insulation
B) Foam-in-place insulation
C) Expanded polystyrene
D) A molded insert
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
In an insulated concrete block wall, a _____ should be applied to seal off the joint.
A) center bed joint
B) head joint
C) sled runner joint
D) closure block
A) center bed joint
B) head joint
C) sled runner joint
D) closure block
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
Block should always be laid in the wall _____.
A) with the wider web of the block facing up
B) with the narrower web of the block facing up
C) with the wider web of the block facing down
D) with the narrower web of the block facing out
A) with the wider web of the block facing up
B) with the narrower web of the block facing up
C) with the wider web of the block facing down
D) with the narrower web of the block facing out
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
As a rule, walls _____ should be braced-particularly, long masonry walls that have not intersecting walls connected to them.
A) longer than 6'
B) higher than 8' to 10'
C) of double-thickness
D) constructed below grade line
A) longer than 6'
B) higher than 8' to 10'
C) of double-thickness
D) constructed below grade line
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
As a rule, mortar is bedded only on the outside edges of concrete block.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
Job specifications should always be consulted before wire reinforcements are installed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Bedding on the outside webs of block is known as _____ bedding.
A) face shell
B) solid
C) swiped edge
D) webbed
A) face shell
B) solid
C) swiped edge
D) webbed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Full head joints should be formed on one ear (end edge) of the block to be laid.