Deck 19: Estimating Brick Masonry by Rule of Thumb

ملء الشاشة (f)
exit full mode
سؤال
The least commonly used method of estimation is the wall-area method.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
When using the rule-of-thumb estimation method, materials _____ .

A) can be grossly overestimated
B) should not be grossly overestimated or underestimated
C) can be underestimated but never overestimated
D) should not be overestimated
سؤال
There are _____ standard brick to each square foot of wall area.

A) 6
B) 6.25
C) 6.75
D) 7
سؤال
In estimating labor costs, the contractor must know how many brick each mason in his crew can lay per day.
سؤال
Another name for the wall-area method is the _____ method.

A) simple estimation
B) wall-minus-openings
C) Multiplication
D) square foot
سؤال
The national average for masons using running bond is about ______ brick laid per 8-hour day.

A) 675
B) 500
C) 475
D) 400
سؤال
There are always going to be some hidden or unexpected costs that crop up on a masonry job and you have to add a buffer to compensate for this.
سؤال
One way of estimating masonry cement is by calculating the number of cubic feet per _____ square feet of wall area.

A) 50
B) 100
C) 200
D) 250
سؤال
The majority of mistakes made in estimating occur in the process of complex mathematical equations.
سؤال
Masonry cement can be estimated only by using a base figure of eight bags per 1000 brick.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 19: Estimating Brick Masonry by Rule of Thumb
1
The least commonly used method of estimation is the wall-area method.
False
2
When using the rule-of-thumb estimation method, materials _____ .

A) can be grossly overestimated
B) should not be grossly overestimated or underestimated
C) can be underestimated but never overestimated
D) should not be overestimated
B
3
There are _____ standard brick to each square foot of wall area.

A) 6
B) 6.25
C) 6.75
D) 7
C
4
In estimating labor costs, the contractor must know how many brick each mason in his crew can lay per day.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
Another name for the wall-area method is the _____ method.

A) simple estimation
B) wall-minus-openings
C) Multiplication
D) square foot
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
The national average for masons using running bond is about ______ brick laid per 8-hour day.

A) 675
B) 500
C) 475
D) 400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
There are always going to be some hidden or unexpected costs that crop up on a masonry job and you have to add a buffer to compensate for this.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
One way of estimating masonry cement is by calculating the number of cubic feet per _____ square feet of wall area.

A) 50
B) 100
C) 200
D) 250
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
The majority of mistakes made in estimating occur in the process of complex mathematical equations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Masonry cement can be estimated only by using a base figure of eight bags per 1000 brick.