Deck 20: Estimating Concrete Block Masonry Materials

ملء الشاشة (f)
exit full mode
سؤال
When estimating blocks with a square feet method, use this as a guide: the square feet of wall are multiplied by _____ will equal total blocks.

A) 0.75
B) 1.125
C) 1.25
D) 1.275
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Water does not require estimating as a material.
سؤال
Be conservative when estimating sand, as storage and disposal are costly.
سؤال
Since one concrete block measures _____ in height including the mortar joint, _____ the height expressed in inches to find the number of blocks of which the height consists.

A) 6.75 inches; divide7 into
B) 8 inches; divide 8 into
C) 8 inches; multiply 0.8 by
D) 10 inches; multiply .010 by
سؤال
The ratio of block to feet in length of a wall is ______ .

A) 0.75 to 1.00
B) 0.66 to 1.00
C) 0.5 to 1.0
D) 1 to 1
سؤال
Labor costs for block work are affected by many of the same factors that affect labor costs for brickwork.
سؤال
Estimating by determining the number of Chapters involves adding the wall lengths and figuring the total linear feet.
سؤال
One ton of sand is needed for each _____ bags of masonry cement.

A) five
B) six
C) eight
D) ten
سؤال
If more than three tons of sand are needed, _____ should be allowed for waste.

A) none
B) 1 ton
C) ½ the estimated sand
D) ½ ton
سؤال
Estimating by rule of thumb can be accomplished even by the most inexperienced mason.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 20: Estimating Concrete Block Masonry Materials
1
When estimating blocks with a square feet method, use this as a guide: the square feet of wall are multiplied by _____ will equal total blocks.

A) 0.75
B) 1.125
C) 1.25
D) 1.275
B
2
Water does not require estimating as a material.
True
3
Be conservative when estimating sand, as storage and disposal are costly.
False
4
Since one concrete block measures _____ in height including the mortar joint, _____ the height expressed in inches to find the number of blocks of which the height consists.

A) 6.75 inches; divide7 into
B) 8 inches; divide 8 into
C) 8 inches; multiply 0.8 by
D) 10 inches; multiply .010 by
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
The ratio of block to feet in length of a wall is ______ .

A) 0.75 to 1.00
B) 0.66 to 1.00
C) 0.5 to 1.0
D) 1 to 1
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
Labor costs for block work are affected by many of the same factors that affect labor costs for brickwork.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
Estimating by determining the number of Chapters involves adding the wall lengths and figuring the total linear feet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
One ton of sand is needed for each _____ bags of masonry cement.

A) five
B) six
C) eight
D) ten
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
If more than three tons of sand are needed, _____ should be allowed for waste.

A) none
B) 1 ton
C) ½ the estimated sand
D) ½ ton
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Estimating by rule of thumb can be accomplished even by the most inexperienced mason.
فتح الحزمة