Deck 37: Construction of Semicircular and Segmental Arches

ملء الشاشة (f)
exit full mode
سؤال
Any type of arch needs to have flashing and weep holes installed to prevent moisture from penetrating and staying in the wall.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The rule for segmental arch construction is that the minimum rise should always be _____ the width of the opening or span, if the arch is to be self supporting and not on a form.

A) equal to one-eighth
B) more than one-fourth
C) up to one-half
D) no more than one-sixteenth
سؤال
For arches _____ long, a good construction grade of ¾" plywood is excellent for the front and back of the arch form.

A) up to 6'
B) more than 6'
C) between 5' and 10'
D) more than 10'
سؤال
For minor arches _____ is usually enough time for curing if the temperature is not freezing and the mortar is setting correctly.

A) 3 hours
B) 24 hours
C) 48 hours
D) 3 days
سؤال
The bottom mortar joint that is set on an arch form should be slightly angled inward because it must be cut out with a chisel to a depth of _____ after the arch form is removed and repointed.

A) 1"
B) ¾"
C) ½"
D) ¼"
سؤال
The back of the arch should be parged.
سؤال
Construction of an arch is always begun at the two ends and laid up to the center of the arch.
سؤال
A bonded soldier course is a minimum of _____ in height.

A) 4" or a half brick
B) 8" or a whole brick
C) 12" or a brick and a half
D) 16" or two bricks
سؤال
A mason should not construct an arch form but rather find a carpenter to complete this task.
سؤال
The mortar joints on an arch should be large to give support to the arch.
سؤال
If a brick must be moved after the mortar in the arch has set, fresh mortar should be applied and the brick relaid.
سؤال
Rowlocks should not be used as a bonding arrangement for semicircular brick arches.
سؤال
Brick arches are for aesthetic purposes and should not be used to support a heavy load.
سؤال
Do not remove the arch forms until the arch has cured enough to carry its own weight without sagging.
سؤال
Arch brick can be laid in several positions for semicircular arches.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 37: Construction of Semicircular and Segmental Arches
1
Any type of arch needs to have flashing and weep holes installed to prevent moisture from penetrating and staying in the wall.
True
2
The rule for segmental arch construction is that the minimum rise should always be _____ the width of the opening or span, if the arch is to be self supporting and not on a form.

A) equal to one-eighth
B) more than one-fourth
C) up to one-half
D) no more than one-sixteenth
A
3
For arches _____ long, a good construction grade of ¾" plywood is excellent for the front and back of the arch form.

A) up to 6'
B) more than 6'
C) between 5' and 10'
D) more than 10'
A
4
For minor arches _____ is usually enough time for curing if the temperature is not freezing and the mortar is setting correctly.

A) 3 hours
B) 24 hours
C) 48 hours
D) 3 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
The bottom mortar joint that is set on an arch form should be slightly angled inward because it must be cut out with a chisel to a depth of _____ after the arch form is removed and repointed.

A) 1"
B) ¾"
C) ½"
D) ¼"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
The back of the arch should be parged.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Construction of an arch is always begun at the two ends and laid up to the center of the arch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
A bonded soldier course is a minimum of _____ in height.

A) 4" or a half brick
B) 8" or a whole brick
C) 12" or a brick and a half
D) 16" or two bricks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
A mason should not construct an arch form but rather find a carpenter to complete this task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
The mortar joints on an arch should be large to give support to the arch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
If a brick must be moved after the mortar in the arch has set, fresh mortar should be applied and the brick relaid.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
Rowlocks should not be used as a bonding arrangement for semicircular brick arches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
Brick arches are for aesthetic purposes and should not be used to support a heavy load.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Do not remove the arch forms until the arch has cured enough to carry its own weight without sagging.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Arch brick can be laid in several positions for semicircular arches.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.