Deck 8: Manufacture of Concrete Block Masonry

ملء الشاشة (f)
exit full mode
سؤال
A controlled amount of water and additives are then fed into the mixer and each batch is mixed for _____ .

A) 2 to 3 minutes
B) 5 to 7 minutes
C) 6 to 8 minutes
D) 10 to 12 minutes
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Concrete block have become very popular with landscaping masonry contractors and home owners for many uses.
سؤال
On the special trucks used to deliver block to the job site, the boom of the forklift has a drop reach of about _____ and is able to swing in any direction.

A) 5 feet
B) 6 feet
C) 12 feet
D) 15 feet
سؤال
Most block today have three cells instead of the older design of three cells.
سؤال
Cubes of block are allowed to open-air cure for another _____ in the storage yard before being delivered to the customer or builder.

A) 10 days
B) 28 days
C) 1 week
D) 2 weeks
سؤال
The molding machine operates at _____ cycles per minute.

A) 8
B) 10
C) 12
D) 15
سؤال
Compressive strength and size variation tests are performed ______ .

A) on one batch of block per day
B) and recorded for 14-day tests
C) as soon as the block are removed from the kilns
D) only at the customer's or contractor's request
سؤال
The cubes are moved by forklift tractors from the cubing area to the storage yard.
سؤال
Raw materials may vary in geographical areas, but all have to be able to produce a concrete masonry Chapter that conforms to ASTM requirements.
سؤال
Lighter weight concrete masonry Chapters are not required to meet the same ASTM requirements as heavy-weight block.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Manufacture of Concrete Block Masonry
1
A controlled amount of water and additives are then fed into the mixer and each batch is mixed for _____ .

A) 2 to 3 minutes
B) 5 to 7 minutes
C) 6 to 8 minutes
D) 10 to 12 minutes
C
2
Concrete block have become very popular with landscaping masonry contractors and home owners for many uses.
True
3
On the special trucks used to deliver block to the job site, the boom of the forklift has a drop reach of about _____ and is able to swing in any direction.

A) 5 feet
B) 6 feet
C) 12 feet
D) 15 feet
C
4
Most block today have three cells instead of the older design of three cells.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
Cubes of block are allowed to open-air cure for another _____ in the storage yard before being delivered to the customer or builder.

A) 10 days
B) 28 days
C) 1 week
D) 2 weeks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
The molding machine operates at _____ cycles per minute.

A) 8
B) 10
C) 12
D) 15
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
Compressive strength and size variation tests are performed ______ .

A) on one batch of block per day
B) and recorded for 14-day tests
C) as soon as the block are removed from the kilns
D) only at the customer's or contractor's request
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
The cubes are moved by forklift tractors from the cubing area to the storage yard.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
Raw materials may vary in geographical areas, but all have to be able to produce a concrete masonry Chapter that conforms to ASTM requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Lighter weight concrete masonry Chapters are not required to meet the same ASTM requirements as heavy-weight block.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.