Deck 10: Laying the Brick to the Line

ملء الشاشة (f)
exit full mode
سؤال
When brick are protruding past the wall line, they are said to be _____ .

A) hard to the line
B) uneven to the line
C) hard to the wall
D) uneven to the wall
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The end against which the line is pulled is called the _____ end.

A) nail
B) block
C) pin
D) peg
سؤال
Applying mortar for the head joint is also know as _____ a mortar joint.

A) throwing
B) closing
C) filling
D) adjoining
سؤال
To _____ means to apply mortar to a brick.

A) joint
B) throw
C) butter
D) close
سؤال
Checking to be sure the brick are laid to the proper height using a rule or a gauge rod is a process known as _____ the brick.

A) stacking
B) spotting
C) ruling
D) gauging
سؤال
After the line has been tested, the person at the _____ end calls _____ to the person at the other end.

A) left, tight away
B) right, tight away
C) left, safe
D) right, safe
سؤال
A corner pole is any type of post that is propped and braced into a plumb position so that a line can be fastened to it.
سؤال
Laying brick so that they touch the line is known as _____ .

A) laying brick correctly
B) edging the line
C) correcting the course
D) crowding the line
سؤال
When tightening the line, the right hand, which pulls the line, should be angled a little toward the wall.
سؤال
Always place the pin at a(n) _____ in the head joint so it will hold better.

A) upward (approximately 45º)
B) upward (nearly 90º)
C) downward angle (approximately 45º)
D) downward angle (nearly 90º)
سؤال
The last brick to be laid in a wall is the _____ brick, usually located near the center of the wall.

A) center
B) closure
C) joining
D) head
سؤال
Line block have a slot cut in the center to allow the line to pass through.
سؤال
When brick is too far away from the line, it is said to be _____ .

A) indented to the line
B) indented to the wall
C) slack to the line
D) slack to the wall
سؤال
When building walls _____, a line should be used as a guide for laying the Chapters.

A) 3' or longer
B) 5' or longer
C) longer in length than 4'
D) longer in length than 3'
سؤال
Setting the trig brick is also called _____ in the trade.

A) carrying the trig
B) stacking the trig
C) holding the line
D) checking the line
سؤال
To prevent the line from sagging or being blown out of alignment by the wind, it may be necessary to set a trig brick.
سؤال
It is always a bad idea to tap the brick into final position.
سؤال
A _____ is a metal clip-on fastener or loop of line.

A) spacer
B) trig
C) tight away
D) line pin
سؤال
A _____ is set to stabilize the line when there are many masons working on the wall.

A) test pin
B) line peg
C) spotting gauge
D) trig brick
سؤال
Another name for a corner pole is a _____ .

A) deadman
B) line pole
C) brick pole
D) peg end
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Laying the Brick to the Line
1
When brick are protruding past the wall line, they are said to be _____ .

A) hard to the line
B) uneven to the line
C) hard to the wall
D) uneven to the wall
A
2
The end against which the line is pulled is called the _____ end.

A) nail
B) block
C) pin
D) peg
D
3
Applying mortar for the head joint is also know as _____ a mortar joint.

A) throwing
B) closing
C) filling
D) adjoining
A
4
To _____ means to apply mortar to a brick.

A) joint
B) throw
C) butter
D) close
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
Checking to be sure the brick are laid to the proper height using a rule or a gauge rod is a process known as _____ the brick.

A) stacking
B) spotting
C) ruling
D) gauging
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
After the line has been tested, the person at the _____ end calls _____ to the person at the other end.

A) left, tight away
B) right, tight away
C) left, safe
D) right, safe
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
A corner pole is any type of post that is propped and braced into a plumb position so that a line can be fastened to it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
Laying brick so that they touch the line is known as _____ .

A) laying brick correctly
B) edging the line
C) correcting the course
D) crowding the line
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
When tightening the line, the right hand, which pulls the line, should be angled a little toward the wall.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
Always place the pin at a(n) _____ in the head joint so it will hold better.

A) upward (approximately 45º)
B) upward (nearly 90º)
C) downward angle (approximately 45º)
D) downward angle (nearly 90º)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
The last brick to be laid in a wall is the _____ brick, usually located near the center of the wall.

A) center
B) closure
C) joining
D) head
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
Line block have a slot cut in the center to allow the line to pass through.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
When brick is too far away from the line, it is said to be _____ .

A) indented to the line
B) indented to the wall
C) slack to the line
D) slack to the wall
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
When building walls _____, a line should be used as a guide for laying the Chapters.

A) 3' or longer
B) 5' or longer
C) longer in length than 4'
D) longer in length than 3'
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
Setting the trig brick is also called _____ in the trade.

A) carrying the trig
B) stacking the trig
C) holding the line
D) checking the line
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
To prevent the line from sagging or being blown out of alignment by the wind, it may be necessary to set a trig brick.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
It is always a bad idea to tap the brick into final position.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
A _____ is a metal clip-on fastener or loop of line.

A) spacer
B) trig
C) tight away
D) line pin
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
A _____ is set to stabilize the line when there are many masons working on the wall.

A) test pin
B) line peg
C) spotting gauge
D) trig brick
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
Another name for a corner pole is a _____ .

A) deadman
B) line pole
C) brick pole
D) peg end
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.