Deck 9: Business Continuity Preparation and Implementation
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/50
العب
ملء الشاشة (f)
Deck 9: Business Continuity Preparation and Implementation
1
In the ____ section of the business continuity policy,the training requirements for the various employee groups are defined and highlighted.
A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
B
2
BC is specifically designed to get the organization's most critical services up and running as quickly as possible in order to enable the continued operation of the organization and thereby assure its existence and minimize the financial losses from the disruption.
True
3
A ____ is a fully configured computer facility,with all services,communications links,and physical plant operations.
A)cold site
B)service bureau
C)warm site
D)hot site
A)cold site
B)service bureau
C)warm site
D)hot site
D
4
____ planning represents the final response of the organization when faced with any interruption of its critical operations.
A)Relocation
B)Event
C)Technology watch
D)Business continuity
A)Relocation
B)Event
C)Technology watch
D)Business continuity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
5
A ____ provides many of the same services and options of the hot site,but typically software applications are either not included,or not installed and configured.
A)warm site
B)cold site
C)service bureau
D)shared site
A)warm site
B)cold site
C)service bureau
D)shared site
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
6
The ____ is the point in the past to which the recovered applications and data at the alternate infrastructure will be restored.
A)recovery point objective
B)relocation point objective
C)simulation point objective
D)warm site objective
A)recovery point objective
B)relocation point objective
C)simulation point objective
D)warm site objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
7
A ____ allows the organization to provide a disaster recovery/business continuity option while reducing the overall cost.
A)service bureau
B)mutual agreement
C)time-share
D)service agreement
A)service bureau
B)mutual agreement
C)time-share
D)service agreement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
8
The ____ is the amount of time that passes before an infrastructure is available once the need for BC is declared.
A)incidence response time
B)disaster recovery time
C)recovery time objective
D)reaction time objective
A)incidence response time
B)disaster recovery time
C)recovery time objective
D)reaction time objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
9
The ____ section of the business continuity policy identifies the roles and responsibilities of the key players in the business continuity operation.
A)scope
B)education requirements
C)roles and responsibilities
D)training requirements
A)scope
B)education requirements
C)roles and responsibilities
D)training requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
10
Unlike DR planning,the identification of critical business functions and the resources to support them are the cornerstone of the process used to create the business continuity (BC)plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
11
____ involves the batch transfer of data to an off-site facility.
A)Database shadowing
B)Remote journaling
C)Six-tape rotation
D)Electronic vaulting
A)Database shadowing
B)Remote journaling
C)Six-tape rotation
D)Electronic vaulting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
12
____ involves the storage of duplicate online transaction data,along with the duplication of the databases at the remote site to a redundant server.
A)Remote journaling
B)Database shadowing
C)Data warehousing
D)Electronic vaulting
A)Remote journaling
B)Database shadowing
C)Data warehousing
D)Electronic vaulting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
13
It requires several hours,perhaps days,to make a warm site fully functional.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
14
____ is the rapid relocation of an organization's critical business functions to another location.
A)Business relocation
B)Business continuity
C)Incidence response
D)Reactive review
A)Business relocation
B)Business continuity
C)Incidence response
D)Reactive review
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
15
____ involves the transfer of live transactions to an off-site facility.
A)Remote journaling
B)Database shadowing
C)Six-tape rotation
D)Electronic vaulting
A)Remote journaling
B)Database shadowing
C)Six-tape rotation
D)Electronic vaulting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
16
The primary disadvantage of a cold site is cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
17
A ____ is a contract between two organizations for each to assist the other in the event of a disaster.
A)time-share
B)six-tape rotation
C)business continuity plan
D)mutual agreement
A)time-share
B)six-tape rotation
C)business continuity plan
D)mutual agreement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
18
Unlike the IR plan and the DR plan,testing the BC plan is an ongoing activity,with each scenario tested at least semiannually and at least at a walk-through level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
19
The ____ section of the business continuity policy identifies the organizational units and groups of employees to which the policy applies.
A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
20
A ____ is a service agency that provides a service for a fee.
A)time-share
B)service bureau
C)mobile site
D)mirrored site
A)time-share
B)service bureau
C)mobile site
D)mirrored site
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
21
Match each statement with an item below.
-Provides only rudimentary services and facilities.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Provides only rudimentary services and facilities.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following groups should be represented on the BC team?
A)IT managers
B)Information security managers
C)Senior managers
D)All of the above
A)IT managers
B)Information security managers
C)Senior managers
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
23
The BC ____________________ is most likely a general manager from the operations or production division,appointed by the chief operations officer,chief finance officer,or chief executive officer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
24
Match each statement with an item below.
-Concentrates on resuming critical functions at an alternate site.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Concentrates on resuming critical functions at an alternate site.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
25
Match each statement with an item below.
-Serves as the go-to team to physically acquire and transport the needed resources to the appropriate location.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Serves as the go-to team to physically acquire and transport the needed resources to the appropriate location.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
26
In the ____ phase of the BC plan,is the official beginning of actual BC operations.
A)preparation for BC actions
B)training requirements
C)relocation to the alternate site
D)special considerations
A)preparation for BC actions
B)training requirements
C)relocation to the alternate site
D)special considerations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
27
The term ____________________ is used in the military and government sectors to represent the process of moving out of temporary facilities and returning them to the owners or managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
28
Match each statement with an item below.
-Installs wireless networks in the short term to provide immediate connectivity,unless wired services can be brought online quickly.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Installs wireless networks in the short term to provide immediate connectivity,unless wired services can be brought online quickly.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
29
A ____ agreement usually guarantees space when needed,even if this means that the service bureau has to acquire additional space in the event of a widespread disaster.
A)mutual
B)noncompete
C)service
D)nondisclosure
A)mutual
B)noncompete
C)service
D)nondisclosure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
30
A(n)____________________ stipulates that each organization is obligated to provide the necessary facilities,resources,and services until the receiving organization is able to recover from the disaster.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
31
The ____ section of the business continuity policy provides an overview of the information storage and retrieval plans of the organization.
A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
A)scope
B)training requirements
C)roles and responsibilities
D)special considerations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
32
Match each statement with an item below.
-A duplicate facility that only needs the latest data backups and the personnel to function.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-A duplicate facility that only needs the latest data backups and the personnel to function.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
33
Match each statement with an item below.
-Involves online activities on a systems level.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Involves online activities on a systems level.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
34
In the ____ phase of the BC plan,the organization specifies what type of relocation services are desired and what type of data management strategies are deployed to support relocation.
A)preparation for BC actions
B)training requirements
C)roles and responsibilities
D)special considerations
A)preparation for BC actions
B)training requirements
C)roles and responsibilities
D)special considerations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
35
____________________ duplicate computing resources,peripherals,phone systems,applications,and workstations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
36
The ____ is the group responsible for initiating the occupation of the alternate facility.
A)advance party
B)disaster recovery team
C)applications development team
D)forensic team
A)advance party
B)disaster recovery team
C)applications development team
D)forensic team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
37
A(n)____________________ site is an empty room with standard heating,air conditioning,and electrical service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
38
Match each statement with an item below.
-Focuses on resuming operations at the primary site.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Focuses on resuming operations at the primary site.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
39
Match each statement with an item below.
-Works closely with the hardware,apps,and data teams to establish system functions during relocation.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Works closely with the hardware,apps,and data teams to establish system functions during relocation.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
40
Match each statement with an item below.
-Must be renegotiated periodically.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
-Must be renegotiated periodically.
A)Disaster recovery
B)Business continuity
C)Hot site
D)Cold site
E)Service contracts
F)Remote journaling
G)System recovery team
H)Network team
I)Logistics team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is the purpose of the business continuity program at the organization?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
42
What are the disadvantages of a time-share?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
43
What is the difference between the recovery time objective and the recovery point objective?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
44
Discuss five tips for effective BC planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
45
Why should the should BC and DR teams contain different individuals?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
46
What are the responsibilities of the business continuity management team,the operations team,and the computer setup (hardware)team?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
47
What are the responsibilities of the applications recovery team,the data management team,and the logistics team?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
48
What is the seven-step process used to develop and maintain a viable contingency planning program?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
49
Briefly describe the following two operations that must be specified in the BC plan to support return to the primary site: scheduling of employee move and vanguard clearing responsibilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
50
How does remote journaling differ from electronic vaulting?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck