Deck 7: Scope Planning

ملء الشاشة (f)
exit full mode
سؤال
Failure to include project management in the WBS will increase the likelihood that the project will not be completed on time and within budget.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Organizing the second level of the Work Breakdown Structure by major design components facilitates rolling wave planning.
سؤال
When a project team needs to construct a WBS,it needs to include in its planning team a subject matter expert (SME)who understands how each segment of the work will be accomplished.
سؤال
It is important to assign a unique name and a unique number to every component in the project Work Breakdown Structure.
سؤال
Since work packages provide the basis for future project planning activities,they should be as detailed as possible.
سؤال
A deliverable is a condition or capability needed by a user to solve a problem or achieve an objective that satisfies a standard,a specification,or any other formally documented need.
سؤال
The project scope refers to the features and functions of a project outcome such as a product,and,in some cases,service or result.
سؤال
The project scope is the work that must be performed to deliver a product,service or result with the required features and functions.
سؤال
If a problem occurs during project execution,the WBS is helpful in understanding exactly where and why the problem occurred.
سؤال
The project scope statement establishes the project boundaries by stating what features and work elements are included (in scope)and which are excluded  (out of scope).
سؤال
A Work Breakdown Structure must be decomposed at least four levels in order to be effective.
سؤال
While many projects may have a primary deliverable such as a house,almost all projects have additional deliverables such as documentation and customer support.
سؤال
A WBS dictionary is a document that defines each of the terms used in the project scope statement.
سؤال
A WBS component is a work element that is part of the WBS at any level.
سؤال
The priority of the product in agile is more significant than in traditional project management,as the outcome,or product,will drive the elaboration of the project.
سؤال
The Work Breakdown Structure (WBS)is normally developed by listing deliverables - major deliverables first and then progressively smaller ones until the team feels that every deliverable has been identified.
سؤال
A "top-down" approach to creating a WBS is typically used when a project is unique and different from previous projects.
سؤال
By using a systematic process for creating a WBS,project team members can ensure that they include all deliverables that are required to be created.
سؤال
Plan scope management is the process of creating a project scope statement.
سؤال
Baselining is defined as a method of dividing the project scope into many parts that,when combined,would constitute the project deliverable.
سؤال
All of the following statements correctly describe a contemporary approach to create the Work Breakdown Structure (WBS)for a project EXCEPT:​ 

A) Project teams may adopt a top-down approach to construct the WBS. 
B) Project teams may use a template or a WBS from a previous project as a starting point. 
C) Project teams may rely upon the project manager to create all levels of the WBS. 
D) Project teams may jump start the WBS construction with a brainstorming session.
سؤال
Which of the following is NOT a format that is typically used to represent a Work Breakdown Structure?​ 

A) Hierarchical or "org chart" 
B) Indented outline 
C) Requirements Traceability Matrix 
D) Free format
سؤال
The method of dividing the project scope into many parts that,when combined,would constitute the project deliverable is called _____: 

A) rolling wave planning 
B) decomposition 
C) collect requirements 
D) requirements traceability
سؤال
The Work Breakdown Structure (WBS)is a framework that will be used as a basis for further planning activities including all the following EXCEPT:​ 

A) developing the project schedule 
B) developing the project cost estimate 
C) identifying key stakeholders 
D) identifying project risks
سؤال
The project scope planning processes include all of the following EXCEPT: 

A) how the project scope will be defined 
B) how the requirements will be collected 
C) how the work breakdown structure will be created 
D) how the business case will be created
سؤال
The overall project is considered to be the first level of the WBS.All of the following methods can be used to organize the second level of the WBS EXCEPT:​ 

A) Organized by project phase. 
B) Organized by design components / deliverables. 
C) Organized by work function./ subproject 
D) Organized by activities and tasks
سؤال
The work component at the lowest level of the WBS for which cost and duration can be estimated and managed is called the ______:​ 

A) work element 
B) work package 
C) activity 
D) control account
سؤال
Once the plan baseline has been approved and the project is underway,project teams deal with change by establishing and using a change control system to receive and review change proposals and accept or reject them after evaluating their impact on project scope,cost and schedule.
سؤال
On agile projects,the scope definition begins with :​ 

A) requirements 
B) work packages 
C) stories and personas 
D) large chunks of work, or features
سؤال
Work Breakdown Structures typically include one or more intermediate levels.Which of the following statements correctly describe the nature of these intermediate levels?​ 

A) They generally represent items that need to be created in order to produce the final deliverables. 
B) They generally represent the raw materials required to create the final deliverables. 
C) They generally represent the resource assignments to create the final deliverables. 
D) They generally represent the sequence and timing of work packages
سؤال
This technique is an iterative process that identifies and defines the work to be completely accomplished in the near term,and plans the future work at a higher level.

A) Rolling wave planning. 
B) Decomposition. 
C) Traceability 
D) Agile
سؤال
Work Breakdown Structures can be displayed in a variety of formats including which of the following? 

A) a sequential process diagram 
B) an inverted pyramid 
C) an indented outline format 
D) fishbone or cause and effect diagram
سؤال
A _________ is a written request or formal proposal to propose changes to any project planning component such as a document,project deliverable,or baseline (scope,cost,and time).​ 

A) scope statement 
B) change request  
C) project charter 
D) request for proposal (RFP)
سؤال
Define Scope is the process of developing the:​ 

A) project scope management plan. 
B) detailed specifications of the project outcomes and products. 
C) project work breakdown structure. 
D) project scope network diagram.
سؤال
Which of the following items best describes a project Work Breakdown Structure (WBS)?​ 

A) an organizational chart depicting who will perform project work 
B) a schedule depicting when project work will be performed 
C) a tool that the team uses to progressively divide deliverables into smaller and smaller pieces 
D) a list of activities to complete the project work packages
سؤال
All of the following elements should be included in a project scope statement EXCEPT:​ 

A) project boundaries or exclusions 
B) names of the project team members 
C) constraints imposed on the project, and assumptions made during planning 
D) final and intermediate deliverables with acceptance criteria
سؤال
Which of the information below would NOT typically be included in the WBS dictionary for a specific work package?​ 

A) description of the work 
B) communication requirements 
C) activities 
D) expected duration
سؤال
A _______ is the approved project plan mainly consisting of scope,schedule,and cost that is not normally altered unless a  formal change control request is approved for modifying these plans.​ 

A) requirement. 
B) baseline. 
C) benchmark. 
D) component.
سؤال
It is helpful to list requirements and supporting information in a requirements traceability matrix.When requirements are complete,they should meet all of these criteria EXCEPT:​ 

A) Identified with the stakeholder(s) who needs it 
B) Assigned to a team member who will be the requirement owner 
C) Qualified by measurable conditions 
D) Prioritized according to value, cost, time, risk, or mandate so trade-off decisions can be made if needed
سؤال
Which of the following statements concerning work packages is NOT correct?​ 

A) Work packages are the basis for subsequent project planning activities. 
B) Work packages are the basis for subsequent project control activities. 
C) Work packages are activity elements with detailed descriptions of tasks and dependencies 
D) Work packages are the elements at the lowest level of the WBS.
سؤال
What are some of the benefits of creating a Work Breakdown Structure (WBS)?
سؤال
Explain how scope is defined on agile projects.
سؤال
A typical change request form will include which of the following content items?​ 

A) a description of the change along with the impact expected from the potential change 
B) a summary of previous changes to the project 
C) an issues log 
D) a change control process flow diagram
سؤال
Identify and describe the three steps that the team should follow in order to define project scope and create a project scope statement.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/44
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Scope Planning
1
Failure to include project management in the WBS will increase the likelihood that the project will not be completed on time and within budget.
True
2
Organizing the second level of the Work Breakdown Structure by major design components facilitates rolling wave planning.
False
3
When a project team needs to construct a WBS,it needs to include in its planning team a subject matter expert (SME)who understands how each segment of the work will be accomplished.
True
4
It is important to assign a unique name and a unique number to every component in the project Work Breakdown Structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
5
Since work packages provide the basis for future project planning activities,they should be as detailed as possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
6
A deliverable is a condition or capability needed by a user to solve a problem or achieve an objective that satisfies a standard,a specification,or any other formally documented need.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
7
The project scope refers to the features and functions of a project outcome such as a product,and,in some cases,service or result.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
8
The project scope is the work that must be performed to deliver a product,service or result with the required features and functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
9
If a problem occurs during project execution,the WBS is helpful in understanding exactly where and why the problem occurred.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
10
The project scope statement establishes the project boundaries by stating what features and work elements are included (in scope)and which are excluded  (out of scope).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
11
A Work Breakdown Structure must be decomposed at least four levels in order to be effective.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
12
While many projects may have a primary deliverable such as a house,almost all projects have additional deliverables such as documentation and customer support.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
13
A WBS dictionary is a document that defines each of the terms used in the project scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
14
A WBS component is a work element that is part of the WBS at any level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
15
The priority of the product in agile is more significant than in traditional project management,as the outcome,or product,will drive the elaboration of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
16
The Work Breakdown Structure (WBS)is normally developed by listing deliverables - major deliverables first and then progressively smaller ones until the team feels that every deliverable has been identified.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
17
A "top-down" approach to creating a WBS is typically used when a project is unique and different from previous projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
18
By using a systematic process for creating a WBS,project team members can ensure that they include all deliverables that are required to be created.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
19
Plan scope management is the process of creating a project scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
20
Baselining is defined as a method of dividing the project scope into many parts that,when combined,would constitute the project deliverable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
21
All of the following statements correctly describe a contemporary approach to create the Work Breakdown Structure (WBS)for a project EXCEPT:​ 

A) Project teams may adopt a top-down approach to construct the WBS. 
B) Project teams may use a template or a WBS from a previous project as a starting point. 
C) Project teams may rely upon the project manager to create all levels of the WBS. 
D) Project teams may jump start the WBS construction with a brainstorming session.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is NOT a format that is typically used to represent a Work Breakdown Structure?​ 

A) Hierarchical or "org chart" 
B) Indented outline 
C) Requirements Traceability Matrix 
D) Free format
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
23
The method of dividing the project scope into many parts that,when combined,would constitute the project deliverable is called _____: 

A) rolling wave planning 
B) decomposition 
C) collect requirements 
D) requirements traceability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
24
The Work Breakdown Structure (WBS)is a framework that will be used as a basis for further planning activities including all the following EXCEPT:​ 

A) developing the project schedule 
B) developing the project cost estimate 
C) identifying key stakeholders 
D) identifying project risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
25
The project scope planning processes include all of the following EXCEPT: 

A) how the project scope will be defined 
B) how the requirements will be collected 
C) how the work breakdown structure will be created 
D) how the business case will be created
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
26
The overall project is considered to be the first level of the WBS.All of the following methods can be used to organize the second level of the WBS EXCEPT:​ 

A) Organized by project phase. 
B) Organized by design components / deliverables. 
C) Organized by work function./ subproject 
D) Organized by activities and tasks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
27
The work component at the lowest level of the WBS for which cost and duration can be estimated and managed is called the ______:​ 

A) work element 
B) work package 
C) activity 
D) control account
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
28
Once the plan baseline has been approved and the project is underway,project teams deal with change by establishing and using a change control system to receive and review change proposals and accept or reject them after evaluating their impact on project scope,cost and schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
29
On agile projects,the scope definition begins with :​ 

A) requirements 
B) work packages 
C) stories and personas 
D) large chunks of work, or features
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
30
Work Breakdown Structures typically include one or more intermediate levels.Which of the following statements correctly describe the nature of these intermediate levels?​ 

A) They generally represent items that need to be created in order to produce the final deliverables. 
B) They generally represent the raw materials required to create the final deliverables. 
C) They generally represent the resource assignments to create the final deliverables. 
D) They generally represent the sequence and timing of work packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
31
This technique is an iterative process that identifies and defines the work to be completely accomplished in the near term,and plans the future work at a higher level.

A) Rolling wave planning. 
B) Decomposition. 
C) Traceability 
D) Agile
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
32
Work Breakdown Structures can be displayed in a variety of formats including which of the following? 

A) a sequential process diagram 
B) an inverted pyramid 
C) an indented outline format 
D) fishbone or cause and effect diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
33
A _________ is a written request or formal proposal to propose changes to any project planning component such as a document,project deliverable,or baseline (scope,cost,and time).​ 

A) scope statement 
B) change request  
C) project charter 
D) request for proposal (RFP)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
34
Define Scope is the process of developing the:​ 

A) project scope management plan. 
B) detailed specifications of the project outcomes and products. 
C) project work breakdown structure. 
D) project scope network diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following items best describes a project Work Breakdown Structure (WBS)?​ 

A) an organizational chart depicting who will perform project work 
B) a schedule depicting when project work will be performed 
C) a tool that the team uses to progressively divide deliverables into smaller and smaller pieces 
D) a list of activities to complete the project work packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
36
All of the following elements should be included in a project scope statement EXCEPT:​ 

A) project boundaries or exclusions 
B) names of the project team members 
C) constraints imposed on the project, and assumptions made during planning 
D) final and intermediate deliverables with acceptance criteria
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the information below would NOT typically be included in the WBS dictionary for a specific work package?​ 

A) description of the work 
B) communication requirements 
C) activities 
D) expected duration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
38
A _______ is the approved project plan mainly consisting of scope,schedule,and cost that is not normally altered unless a  formal change control request is approved for modifying these plans.​ 

A) requirement. 
B) baseline. 
C) benchmark. 
D) component.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
39
It is helpful to list requirements and supporting information in a requirements traceability matrix.When requirements are complete,they should meet all of these criteria EXCEPT:​ 

A) Identified with the stakeholder(s) who needs it 
B) Assigned to a team member who will be the requirement owner 
C) Qualified by measurable conditions 
D) Prioritized according to value, cost, time, risk, or mandate so trade-off decisions can be made if needed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following statements concerning work packages is NOT correct?​ 

A) Work packages are the basis for subsequent project planning activities. 
B) Work packages are the basis for subsequent project control activities. 
C) Work packages are activity elements with detailed descriptions of tasks and dependencies 
D) Work packages are the elements at the lowest level of the WBS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
41
What are some of the benefits of creating a Work Breakdown Structure (WBS)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
42
Explain how scope is defined on agile projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
43
A typical change request form will include which of the following content items?​ 

A) a description of the change along with the impact expected from the potential change 
B) a summary of previous changes to the project 
C) an issues log 
D) a change control process flow diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
44
Identify and describe the three steps that the team should follow in order to define project scope and create a project scope statement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 44 في هذه المجموعة.