If a system is being updated due to operating necessity,the project was selected because__________.

A)the system is worth saving at any cost
B)the system is worth saving at the estimated cost of the project
C)the dimension of cost is not relevant to execution of the project
D)the cost overruns can be hidden in someone else's budget
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The __________is the value of an opportunity foregone.

A)real option
B)profit
C)opportunity cost
D)revenue
سؤال
A project selected using the sacred cow model is likely to be maintained until successfully completed or until __________.

A)the project exceeds its budget
B)the project falls behind schedule
C)the boss recognizes the project as a failure and terminates it
D)the project manager is terminated
سؤال
The Åstebro study (2004)of R&D projects found that all the characteristics below were excellent predictors of project commercial success,except __________.

A)technological opportunity
B)managerial support
C)expected profitability
D)development risk
سؤال
If the NPV for a project is < 0,it indicates that the project will __________.

A)report a profit loss
B)report a profit gain
C)fail to cover its required rate of return
D)fail to generate cash inflows
سؤال
The drawback of the __________ model is that it fails to consider cash flows obtained once the initial investment has been recovered.

A)payback period
B)average rate of return
C)discounted cash flow
D)profitability index
سؤال
Which of the following is not an advantage of the discounted cash flow approach to project selection?

A)Simple to use and understand
B)The accounting data is usually available
C)The accounting data is possibly inaccurate
D)They can be adjusted to account for project risk
سؤال
__________ is the process of evaluating individual projects or groups of projects,and then choosing to implement some set of them so that the objectives of the parent organization will be achieved.

A)Project selection
B)Project initiation
C)Project management
D)Project control
سؤال
For a project selected using nonnumeric models,identify the true statement regarding relative priorities for project selection.

A)Operating necessity projects have priority over competitive necessity projects.
B)Competitive necessity projects have priority over operating necessity projects.
C)Operating necessity and competitive necessity projects have equal priority.
D)Product line extension projects have priority over operating necessity projects.
سؤال
A project selection criteria that focuses on environmental and social issues is

A)sustainability
B)comparative benefit model
C)production line extension
D)operating necessity
سؤال
A small project has a cost of $12,000 to implement and is expected to have annual cash flows of $3,000.What is its payback period?

A)One year
B)Two years
C)Three years
D)Four years
سؤال
The two basic types of project selection models identified in the text are ________.

A)biased and unbiased
B)numeric and nonnumeric
C)active and passive
D)numeric and qualitative
سؤال
A project selection criteria that focuses on how well new products would fit the firm's existing product line would be

A)sustainability
B)comparative benefit model
C)production line extension
D)operating necessity
سؤال
The __________ is the interest rate set by an organization as the minimum acceptable rate of return for a project.

A)hurdle rate
B)acceptable rate
C)internal rate of return
D)net present value
سؤال
There is usually some oversight committee,typically called a _____ or such,for every project,of which the project owner is usually a member.

A)task force
B)steering committee
C)project management office
D)project council
سؤال
If a company predicted rate of inflation goes down (deflation),what happens to the net present value (NPV)of their projects?

A)Goes up
B)Unchanged
C)Goes down
D)Positive NPV's go up,negative NPV's go down
سؤال
If a company raises their hurdle rate,what happens to the net present value (NPV)of their projects?

A)Goes up
B)Unchanged
C)Goes down
D)Positive NPV's go up,negative NPV's go down
سؤال
Which of the following is a type of numeric model?

A)the sacred cow
B)the operating necessity
C)payback period
D)the product line extension
سؤال
The underlying premise of the real options approach is that __________.

A)delaying an investment may lead to greater returns or may lead to elimination of marginal projects
B)rushing into an investment more quickly may lead to lower returns or may lead to elimination of marginal projects
C)delaying an investment may lead to increased costs due to delays
D)rushing into an investment more quickly may lead to less risk
سؤال
The mastery of the skills required to manage projects competently is referred to in the literature as __________.

A)project management conformance
B)project management maturity
C)project success
D)project portfolio management
سؤال
______ is a modeling technique for emulating a process,usually conducted a considerable number of times to understand the process better and measure its outcomes under different policies.

A)Simulation
B)Project management
C)Projectizing
D)Modeling
سؤال
Which of the following is not a disadvantage of the discounted cash flow approach to project selection?

A)It cannot account for project risk
B)It ignores all nonmonetary factors
C)It is strongly biased toward short-term solutions
D)It is highly sensitive to data errors in the early years of a project
سؤال
Occasionally,organizations will approve projects that are forecast to lose money when fully costed and sometimes even when only direct costed.Which of the following is not a good reason for doing this.

A)Acquire knowledge concerning a specific or new technology
B)Get the organization's "foot in the door"
C)Improve their competitive position
D)They plan on cutting corners on work and material,or forcing subsequent contract changes to make up the cost
سؤال
Which of the following should not be members of the project council?

A)Senior management
B)Accounting department
C)Project owners or sponsors of major projects
D)Head of the project management office
سؤال
The discounted cash flow method determines the net present value of all cash flows by discounting them by the __________.

A)hurdle rate
B)acceptable rate
C)internal rate of return
D)net present value
سؤال
According to research by Sanchez and Robert (2010),which of the following is not a reason why strategic benefits may be difficult to appraise?

A)Not immediately realized
B)Difficult to quantify
C)May be confounded with other factors
D)Easy to plan for when they occur
سؤال
Wheelwright identified four separate categories of projects.Which of the following are not one of those categories?

A)Sacred cow projects
B)Platform projects
C)Breakthrough projects
D)R&D projects
سؤال
In a project portfolio,a project that involves a new technology or even a disruptive technology that is known to the industry would serve as an example of a __________ project.

A)breakthrough
B)R&D
C)platform
D)derivative
سؤال
A technique useful for developing numeric values that are equivalent to subjective,verbal measures of relative value is the __________.

A)Delphi system
B)expert system
C)portfolio
D)simulation
سؤال
Which of the following is not a disadvantage that favors the use of weighted scoring models?

A)Scores are relative measures
B)Easy to include too many factors
C)Can handle non-numeric criteria
D)Can only include profits in a non-numeric fashion
سؤال
Firms usually have two or more projects and this collection of projects is referred to as __________.

A)a portfolio
B)an initiation
C)a program
D)a stochastic model
سؤال
Scoring models are most often used to overcome this disadvantage of profitability models.

A)The inability to account for the time value of money.
B)The inability to account for project results beyond the payback period.
C)The inability to account for multiple decision criteria.
D)The inability to account for cash flow.
سؤال
Project Typhoon has a net present value of $10,000 and a profitability index of 1.01.Project Cyclone has a net present value of $10,000 and a profitability index of 1.10.Project Surf'sUp has a net present value of $10,000 and a profitability index of 1.05.If only one project could be undertaken,the organization should select __________.

A)Project Typhoon
B)Project Cyclone
C)Project Surf'sUp
D)Not enough information is provided
سؤال
Which of the following demonstrates the quality of realism required of a project selection model?

A)It does not require special interpretation,data that are difficult to acquire,or excessive personnel.
B)It gives valid results within the range of conditions that the firm might experience.
C)It reflects the multiple objectives of both the firm and its managers.
D)It deals with situations both internal and external to the project.
سؤال
In a project portfolio,__________ projects have objectives or deliverables that are only incrementally different in both product and process from existing offerings.

A)breakthrough
B)R&D
C)platform
D)derivative
سؤال
Real options seek to reduce which of the following risks in projects?

A)political
B)environmental
C)technological and commercial
D)sociological
سؤال
When the decision maker's information is not complete,he / she will have to make a decision under conditions of __________.

A)proof
B)uncertainty
C)management
D)risk mitigation
سؤال
A project has four criteria,represented by A-D.There weights are 0.1,0.2,0.4,and 0.3.A particular project has scores of 4,5,8,and 9 respectively.What is its total score for the project?

A)6)5
B)7)1
C)7)3
D)26
سؤال
Financial forecasts are reported as __________ financial statements.

A)final
B)initial
C)pro forma
D)hypothetical
سؤال
Which of the following is not an advantage that favors the use of weighted scoring models?

A)Multiple objectives can be considered.
B)Decision makers are compelled to stick with the decision once it has been made.
C)The models can be adapted to changes in managerial philosophy.
D)They can help avoid a short-term focus on profitability.
سؤال
Explain the difference between risk and uncertainty.
سؤال
Contrast the real options selection approach with profitability models.
سؤال
Suppose that you have been assigned as the project manager to execute a project that was selected using the sacred cow method of project selection.The project sponsor is an executive who has been with the company for three years.Based on past employment history,the average tenure of a senior executive at your company is 5 years.After reviewing the project's expectations and requirements,the project team has determined that the payback period will be 3.5 years.What are the implications for you and the project team?
سؤال
Project Boulder has a payback period of 2.4 years,an NPV of $10,000,and a profitability index of 1.10.Project Flintstone has a payback period of 3.0 years,an NPV of $10,000 and a profitability index of 1.05.If only one project can be executed,which project should be selected? Explain your reasoning.
سؤال
Consider the following three-year projects A and B each with the same initial investment of $1000.You are presented with the following measures for the projects:
Project A: NPV $400; Payback 24 months
Project B: NPV $545; Payback 26 months
Which project would you choose and why?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/45
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: Strategic Management and Project Selection
1
If a system is being updated due to operating necessity,the project was selected because__________.

A)the system is worth saving at any cost
B)the system is worth saving at the estimated cost of the project
C)the dimension of cost is not relevant to execution of the project
D)the cost overruns can be hidden in someone else's budget
B
2
The __________is the value of an opportunity foregone.

A)real option
B)profit
C)opportunity cost
D)revenue
C
3
A project selected using the sacred cow model is likely to be maintained until successfully completed or until __________.

A)the project exceeds its budget
B)the project falls behind schedule
C)the boss recognizes the project as a failure and terminates it
D)the project manager is terminated
C
4
The Åstebro study (2004)of R&D projects found that all the characteristics below were excellent predictors of project commercial success,except __________.

A)technological opportunity
B)managerial support
C)expected profitability
D)development risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
5
If the NPV for a project is < 0,it indicates that the project will __________.

A)report a profit loss
B)report a profit gain
C)fail to cover its required rate of return
D)fail to generate cash inflows
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
6
The drawback of the __________ model is that it fails to consider cash flows obtained once the initial investment has been recovered.

A)payback period
B)average rate of return
C)discounted cash flow
D)profitability index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following is not an advantage of the discounted cash flow approach to project selection?

A)Simple to use and understand
B)The accounting data is usually available
C)The accounting data is possibly inaccurate
D)They can be adjusted to account for project risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
8
__________ is the process of evaluating individual projects or groups of projects,and then choosing to implement some set of them so that the objectives of the parent organization will be achieved.

A)Project selection
B)Project initiation
C)Project management
D)Project control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
9
For a project selected using nonnumeric models,identify the true statement regarding relative priorities for project selection.

A)Operating necessity projects have priority over competitive necessity projects.
B)Competitive necessity projects have priority over operating necessity projects.
C)Operating necessity and competitive necessity projects have equal priority.
D)Product line extension projects have priority over operating necessity projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
10
A project selection criteria that focuses on environmental and social issues is

A)sustainability
B)comparative benefit model
C)production line extension
D)operating necessity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
11
A small project has a cost of $12,000 to implement and is expected to have annual cash flows of $3,000.What is its payback period?

A)One year
B)Two years
C)Three years
D)Four years
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
12
The two basic types of project selection models identified in the text are ________.

A)biased and unbiased
B)numeric and nonnumeric
C)active and passive
D)numeric and qualitative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
13
A project selection criteria that focuses on how well new products would fit the firm's existing product line would be

A)sustainability
B)comparative benefit model
C)production line extension
D)operating necessity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
14
The __________ is the interest rate set by an organization as the minimum acceptable rate of return for a project.

A)hurdle rate
B)acceptable rate
C)internal rate of return
D)net present value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
15
There is usually some oversight committee,typically called a _____ or such,for every project,of which the project owner is usually a member.

A)task force
B)steering committee
C)project management office
D)project council
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
16
If a company predicted rate of inflation goes down (deflation),what happens to the net present value (NPV)of their projects?

A)Goes up
B)Unchanged
C)Goes down
D)Positive NPV's go up,negative NPV's go down
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
17
If a company raises their hurdle rate,what happens to the net present value (NPV)of their projects?

A)Goes up
B)Unchanged
C)Goes down
D)Positive NPV's go up,negative NPV's go down
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is a type of numeric model?

A)the sacred cow
B)the operating necessity
C)payback period
D)the product line extension
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
19
The underlying premise of the real options approach is that __________.

A)delaying an investment may lead to greater returns or may lead to elimination of marginal projects
B)rushing into an investment more quickly may lead to lower returns or may lead to elimination of marginal projects
C)delaying an investment may lead to increased costs due to delays
D)rushing into an investment more quickly may lead to less risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
20
The mastery of the skills required to manage projects competently is referred to in the literature as __________.

A)project management conformance
B)project management maturity
C)project success
D)project portfolio management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
21
______ is a modeling technique for emulating a process,usually conducted a considerable number of times to understand the process better and measure its outcomes under different policies.

A)Simulation
B)Project management
C)Projectizing
D)Modeling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is not a disadvantage of the discounted cash flow approach to project selection?

A)It cannot account for project risk
B)It ignores all nonmonetary factors
C)It is strongly biased toward short-term solutions
D)It is highly sensitive to data errors in the early years of a project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
23
Occasionally,organizations will approve projects that are forecast to lose money when fully costed and sometimes even when only direct costed.Which of the following is not a good reason for doing this.

A)Acquire knowledge concerning a specific or new technology
B)Get the organization's "foot in the door"
C)Improve their competitive position
D)They plan on cutting corners on work and material,or forcing subsequent contract changes to make up the cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following should not be members of the project council?

A)Senior management
B)Accounting department
C)Project owners or sponsors of major projects
D)Head of the project management office
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
25
The discounted cash flow method determines the net present value of all cash flows by discounting them by the __________.

A)hurdle rate
B)acceptable rate
C)internal rate of return
D)net present value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
26
According to research by Sanchez and Robert (2010),which of the following is not a reason why strategic benefits may be difficult to appraise?

A)Not immediately realized
B)Difficult to quantify
C)May be confounded with other factors
D)Easy to plan for when they occur
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
27
Wheelwright identified four separate categories of projects.Which of the following are not one of those categories?

A)Sacred cow projects
B)Platform projects
C)Breakthrough projects
D)R&D projects
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
28
In a project portfolio,a project that involves a new technology or even a disruptive technology that is known to the industry would serve as an example of a __________ project.

A)breakthrough
B)R&D
C)platform
D)derivative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
29
A technique useful for developing numeric values that are equivalent to subjective,verbal measures of relative value is the __________.

A)Delphi system
B)expert system
C)portfolio
D)simulation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is not a disadvantage that favors the use of weighted scoring models?

A)Scores are relative measures
B)Easy to include too many factors
C)Can handle non-numeric criteria
D)Can only include profits in a non-numeric fashion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
31
Firms usually have two or more projects and this collection of projects is referred to as __________.

A)a portfolio
B)an initiation
C)a program
D)a stochastic model
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
32
Scoring models are most often used to overcome this disadvantage of profitability models.

A)The inability to account for the time value of money.
B)The inability to account for project results beyond the payback period.
C)The inability to account for multiple decision criteria.
D)The inability to account for cash flow.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
33
Project Typhoon has a net present value of $10,000 and a profitability index of 1.01.Project Cyclone has a net present value of $10,000 and a profitability index of 1.10.Project Surf'sUp has a net present value of $10,000 and a profitability index of 1.05.If only one project could be undertaken,the organization should select __________.

A)Project Typhoon
B)Project Cyclone
C)Project Surf'sUp
D)Not enough information is provided
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following demonstrates the quality of realism required of a project selection model?

A)It does not require special interpretation,data that are difficult to acquire,or excessive personnel.
B)It gives valid results within the range of conditions that the firm might experience.
C)It reflects the multiple objectives of both the firm and its managers.
D)It deals with situations both internal and external to the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
35
In a project portfolio,__________ projects have objectives or deliverables that are only incrementally different in both product and process from existing offerings.

A)breakthrough
B)R&D
C)platform
D)derivative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
36
Real options seek to reduce which of the following risks in projects?

A)political
B)environmental
C)technological and commercial
D)sociological
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
37
When the decision maker's information is not complete,he / she will have to make a decision under conditions of __________.

A)proof
B)uncertainty
C)management
D)risk mitigation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
38
A project has four criteria,represented by A-D.There weights are 0.1,0.2,0.4,and 0.3.A particular project has scores of 4,5,8,and 9 respectively.What is its total score for the project?

A)6)5
B)7)1
C)7)3
D)26
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
39
Financial forecasts are reported as __________ financial statements.

A)final
B)initial
C)pro forma
D)hypothetical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which of the following is not an advantage that favors the use of weighted scoring models?

A)Multiple objectives can be considered.
B)Decision makers are compelled to stick with the decision once it has been made.
C)The models can be adapted to changes in managerial philosophy.
D)They can help avoid a short-term focus on profitability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
41
Explain the difference between risk and uncertainty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
42
Contrast the real options selection approach with profitability models.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
43
Suppose that you have been assigned as the project manager to execute a project that was selected using the sacred cow method of project selection.The project sponsor is an executive who has been with the company for three years.Based on past employment history,the average tenure of a senior executive at your company is 5 years.After reviewing the project's expectations and requirements,the project team has determined that the payback period will be 3.5 years.What are the implications for you and the project team?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
44
Project Boulder has a payback period of 2.4 years,an NPV of $10,000,and a profitability index of 1.10.Project Flintstone has a payback period of 3.0 years,an NPV of $10,000 and a profitability index of 1.05.If only one project can be executed,which project should be selected? Explain your reasoning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
45
Consider the following three-year projects A and B each with the same initial investment of $1000.You are presented with the following measures for the projects:
Project A: NPV $400; Payback 24 months
Project B: NPV $545; Payback 26 months
Which project would you choose and why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 45 في هذه المجموعة.