سؤال
If a project budget is underfunded,it will often __________.

A)stimulate increased performance
B)improve utilization of resources
C)frustrate committed stakeholders
D)reduce costs
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A budget strategy that is based on collecting the judgments and experiences of top and middle managers is referred to as the __________ approach or method.

A)parametric estimating
B)statistical equivalence
C)bottom-up estimating
D)top-down estimating
سؤال
Unless the project manager is familiar with the firm's __________ it will be very difficult to exercise budget control.

A)accounting system
B)budget plans
C)marketing procedures
D)cost accounting
سؤال
You have been asked to estimate the costs for a project to build an industrial power plant.Based on historical data,the steam turbine accounts for 30 percent of the total costs for the plant.If the steam turbine costs $300,000,the expected top-down estimated cost for this project would be __________.

A)$10,000
B)$100,000
C)$900,000
D)$1,000,000
سؤال
Many lower-level managers often treat the entire budgeting process as if it were a __________,a situation in which any individual's gain is another individual's loss.This can make competition among junior managers quite intense.

A)zero-sum game
B)pie-chart dilemma
C)Brooks' Law result
D)Top-down approach
سؤال
If a project budget is over funded,it will often __________.

A)produce waste
B)encourage slack management
C)improve morale
D)produce waste and encourage slack management
سؤال
The advantage of the______ process is that it is generally associated with participative management.

A)bottom-up
B)top-down
C)Murphy's
D)Efficient
سؤال
In order to develop a budget,the project manager must forecast __________.

A)the resources required
B)when resources will be needed
C)the cost of resources
D)All of the above
سؤال
The Pathfinder Mission was to go where?

A)The moon
B)Mars
C)Saturn
D)Venus
سؤال
The __________ form of budgeting has the advantage of using individuals closer to the work to provide estimates of resource requirements.

A)top-down budgeting
B)work element costing
C)bottom-up budgeting
D)iterative budgeting
سؤال
Identify the statement that is not correct regarding a project budget.

A)The budget is included in a project plan.
B)The budget is not an expression of organizational policy.
C)The budget serves as a control mechanism for the project.
D)The budget serves as a standard for comparison of planned and actual usage of resources.
سؤال
A work element whose cost is fully developed would __________.

A)exclude the cost of labor and resources
B)include only the profit and direct costs
C)exclude the cost of special machinery and overheads
D)include direct costs plus overhead and G&A charges
سؤال
The project's budget should __________.

A)associate resource use with the achievement of organizational goals
B)allow funds to be spent without linkage to achievement
C)not reflect the timing of expenses associated with the use of resources
D)never be changed during project execution
سؤال
__________ is a plan for allocating resources.The allocation of resources indicates the degree to which different activities of an organization are supported fully.

A)A budget
B)Direct cost
C)A management plan
D)An allocation effort
سؤال
A work element in the project plan requires 50 hours of labor each by four carpenters.The carpenters are paid $15 per hour and incur an overhead rate equal to 80 percent of their direct labor charges.Based on this data,the appropriate total cost is __________.

A)$2,400
B)$3,000
C)$4,600
D)$5,400
سؤال
The pattern of constraints in a budget embodies organizational __________.

A)policy
B)effort
C)human resource management
E)risk management
سؤال
The __________ charge is composed of the costs of senior management,the various data functions,and any other expenses not included in overhead.Often,these charges are a fixed percentage of either the direct costs or the total of all direct and indirect costs.

A)salary
B)project management
C)ethical
D)G&A
سؤال
__________ relies on well-known statistical correlations between various factors such as the total cost of a house relative to the square feet of living area.

A)Parametric estimating
B)Statistical equivalence
C)Bottom-up estimating
D)Top-down estimating
سؤال
____ are where the defined responses to the risks are detailed,but their amounts are not yet precisely known.

A)Known unknowns
B)Unknown knowns
C)Known knowns
D)Unknown unknowns
سؤال
Unknown unknowns are not part of the baseline budget and are referred to as what?

A)management reserves
B)contingency reserves
C)PMBOK reserves
D)Buffered reserves
سؤال
__________ states that adding manpower to a late software project makes it later.

A)Brooks' Law
B)Murphy's Law
C)Smith's Law
D)The Rule of Thumb
سؤال
When a firm has professional cost estimators,what is their main responsibility?

A)Coordinate with the client to develop an acceptable cost estimate
B)Work with senior management to keep costs in line
C)Develop costs that maximize profits
D)Reduce the level of uncertainty in cost estimates
سؤال
The budget process generally begins when the top management invites each division to submit a__________ for the upcoming year.

A)budget request
B)predictive budget
C)budget estimate
D)predictive request
سؤال
Each time the output doubles,the worker hours per unit decrease to a fixed percentage of their previous value.That percentage is called the __________ rate.

A)inflation
B)hurdle
C)interest
D)learning
سؤال
The traditional organizational budget is __________.

A)category-oriented
B)project-oriented
C)program-oriented
D)project-oriented or program-oriented
سؤال
Suppose that a person requires 60 minutes to complete a work element on the first attempt.On the second attempt,the work element is completed in 48 minutes.The learning rate for this person is __________% for this work element.

A)60
B)70
C)80
D)120
سؤال
Suppose that a person requires eight hours to complete a work element on the first attempt.That person has a learning rate of 90 percent for this work element.This person should require __________ hours to complete this work element on the fourth attempt.

A)5)83
B)6)48
C)7)2
D)8)8
سؤال
A work element in the project plan requires 50 hours of labor each by four carpenters.The carpenters are paid $15 per hour and incur an overhead rate equal to 80 percent of their direct labor charges.The total cost would be __________ if the carpenters consume 10 percent of the workday performing personal activities.

A)$4,860
B)$5,000
C)$5,360
D)$5,940
سؤال
______________ issues are present when bidders "low ball" a bid or when some bidders get a "last look."

A)Ethical
B)Strategic
C)Efficient
D)Effective
سؤال
A project manager must ______ as a type of risk response planning in order to soften the danger of a threat by reducing the likelihood that it will occur or by reducing its impact if it does occur.

A)avoid
B)transfer
C)accept
D)mitigate
سؤال
Which of the following is not a type of quantitative risk analysis?

A)FMEA
B)decision tree analysis
C)Monte Carlo simulation
D)expert judgment
سؤال
Several issues face firms preparing bid proposals,particularly firms in the aerospace,construction,defense,and consulting industries.Which of the following is not one of those issues?

A)How should the proposal-preparation process be organized and staffed?
B)How much should be spent on preparing proposals for bids?
C)Is it ethical?
D)How long will the project take?
سؤال
__________ budgeting allows income and expenditures to be aggregated across projects.

A)Category-oriented
B)Activity-oriented
C)Project-oriented
D)Expense-oriented
سؤال
If projects include repetitive tasks with significant human input,the __________ rate should be factored into the cost estimate.

A)inflation
B)hurdle
C)interest
D)learning
سؤال
The allowance for contingencies is usually in what range?

A)One to five percent
B)Five to ten percent
C)Six to nine percent
D)Seven to eleven percent
سؤال
Overhead costs are all of the following except which one?

A)Generally within the project manager's control
B)Arbitrary
C)Source of annoyance and frustration
D)A amount that is unique to the firm
سؤال
Given a project salary cost of $400,000 per year and forecasted wage increases of 5 percent per year,calculate the non-discounted total salary cost over a three-year project lifecycle.

A)$61,000
B)$1,200,000
C)$1,240,000
D)$1,261,000
سؤال
Which of the following is not one of the risk management subprocesses?

A)risk identification
B)qualitative risk analysis
C)work breakdown schedule
D)risk response planning
سؤال
Which cost should the project manager completely ignore in managing a project?

A)Labor
B)Material
C)Overhead and G&A
D)Project manager should not ignore any costs
سؤال
In risk response planning,where the goal of the project manager is to increase the probability that the opportunity will occur,the project manager must __________

A)exploit
B)share
C)enhance
D)accept
سؤال
__________ budgeting aggregates income and expenditures by project or program,often in addition to aggregation by organizational unit or activity.

A)Activity based
B)Capital
C)Operational
D)Project
سؤال
Kaplan et al.(2012)identified three types of risk that must be faced.List and describe each one.
سؤال
Briefly describe the seven processes for risk management.
سؤال
The determination of costs for a new process should utilize a __________,or operations sequence sheet,which describes the operation in which the new process would be used.

A)route sheet
B)budget sheet
C)cost estimation fld)owchart
سؤال
Suggest some reasons why an organization would support projects that show a significant incremental profit over direct costs but are not profitable when costs fully accounted for.
سؤال
Identify some of the common problems faced by the project budgeter.
سؤال
__________ costs vary with output.

A)General and administrative
B)Overhead
C)Direct
D)Indirect
سؤال
Describe the bottom-up budgeting process.
سؤال
Explain why senior managers view the bottom-up budgeting process as being risky.
سؤال
___________ costs are not associated with any specific product or class of products and are typically charged as a fixed percentage of some direct cost.

A)General and administrative
B)Overhead
C)Direct
D)Indirect
سؤال
An easy method of evaluating risk in certain situations by modifying project parameters and evaluating the corresponding changes is __________.

A)Monte Carlo simulations
B)risk mitigation
C)project budgeting
D)risk analysis
سؤال
Describe the top-down budgeting process.
سؤال
According to the authors,the task of risk identification will be horrendous if the risk management system has no memory.Discuss the important elements of a risk management system that would compensate for a lack of memory by the organization.
سؤال
Suggest some reasons why the authors insist that the project manager must be familiar with the organization's accounting system.
سؤال
The pattern of deviations in cost and usage used for exception reporting to management is called __________.

A)simulations
B)assumptions
C)variances
D)summaries
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Budgeting and Risk Management
1
If a project budget is underfunded,it will often __________.

A)stimulate increased performance
B)improve utilization of resources
C)frustrate committed stakeholders
D)reduce costs
C
2
A budget strategy that is based on collecting the judgments and experiences of top and middle managers is referred to as the __________ approach or method.

A)parametric estimating
B)statistical equivalence
C)bottom-up estimating
D)top-down estimating
D
3
Unless the project manager is familiar with the firm's __________ it will be very difficult to exercise budget control.

A)accounting system
B)budget plans
C)marketing procedures
D)cost accounting
A
4
You have been asked to estimate the costs for a project to build an industrial power plant.Based on historical data,the steam turbine accounts for 30 percent of the total costs for the plant.If the steam turbine costs $300,000,the expected top-down estimated cost for this project would be __________.

A)$10,000
B)$100,000
C)$900,000
D)$1,000,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
Many lower-level managers often treat the entire budgeting process as if it were a __________,a situation in which any individual's gain is another individual's loss.This can make competition among junior managers quite intense.

A)zero-sum game
B)pie-chart dilemma
C)Brooks' Law result
D)Top-down approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
If a project budget is over funded,it will often __________.

A)produce waste
B)encourage slack management
C)improve morale
D)produce waste and encourage slack management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
The advantage of the______ process is that it is generally associated with participative management.

A)bottom-up
B)top-down
C)Murphy's
D)Efficient
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
In order to develop a budget,the project manager must forecast __________.

A)the resources required
B)when resources will be needed
C)the cost of resources
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
The Pathfinder Mission was to go where?

A)The moon
B)Mars
C)Saturn
D)Venus
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
The __________ form of budgeting has the advantage of using individuals closer to the work to provide estimates of resource requirements.

A)top-down budgeting
B)work element costing
C)bottom-up budgeting
D)iterative budgeting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
Identify the statement that is not correct regarding a project budget.

A)The budget is included in a project plan.
B)The budget is not an expression of organizational policy.
C)The budget serves as a control mechanism for the project.
D)The budget serves as a standard for comparison of planned and actual usage of resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
A work element whose cost is fully developed would __________.

A)exclude the cost of labor and resources
B)include only the profit and direct costs
C)exclude the cost of special machinery and overheads
D)include direct costs plus overhead and G&A charges
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
The project's budget should __________.

A)associate resource use with the achievement of organizational goals
B)allow funds to be spent without linkage to achievement
C)not reflect the timing of expenses associated with the use of resources
D)never be changed during project execution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
__________ is a plan for allocating resources.The allocation of resources indicates the degree to which different activities of an organization are supported fully.

A)A budget
B)Direct cost
C)A management plan
D)An allocation effort
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
A work element in the project plan requires 50 hours of labor each by four carpenters.The carpenters are paid $15 per hour and incur an overhead rate equal to 80 percent of their direct labor charges.Based on this data,the appropriate total cost is __________.

A)$2,400
B)$3,000
C)$4,600
D)$5,400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
The pattern of constraints in a budget embodies organizational __________.

A)policy
B)effort
C)human resource management
E)risk management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
The __________ charge is composed of the costs of senior management,the various data functions,and any other expenses not included in overhead.Often,these charges are a fixed percentage of either the direct costs or the total of all direct and indirect costs.

A)salary
B)project management
C)ethical
D)G&A
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
__________ relies on well-known statistical correlations between various factors such as the total cost of a house relative to the square feet of living area.

A)Parametric estimating
B)Statistical equivalence
C)Bottom-up estimating
D)Top-down estimating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
____ are where the defined responses to the risks are detailed,but their amounts are not yet precisely known.

A)Known unknowns
B)Unknown knowns
C)Known knowns
D)Unknown unknowns
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
Unknown unknowns are not part of the baseline budget and are referred to as what?

A)management reserves
B)contingency reserves
C)PMBOK reserves
D)Buffered reserves
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
__________ states that adding manpower to a late software project makes it later.

A)Brooks' Law
B)Murphy's Law
C)Smith's Law
D)The Rule of Thumb
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
When a firm has professional cost estimators,what is their main responsibility?

A)Coordinate with the client to develop an acceptable cost estimate
B)Work with senior management to keep costs in line
C)Develop costs that maximize profits
D)Reduce the level of uncertainty in cost estimates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
The budget process generally begins when the top management invites each division to submit a__________ for the upcoming year.

A)budget request
B)predictive budget
C)budget estimate
D)predictive request
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
Each time the output doubles,the worker hours per unit decrease to a fixed percentage of their previous value.That percentage is called the __________ rate.

A)inflation
B)hurdle
C)interest
D)learning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
The traditional organizational budget is __________.

A)category-oriented
B)project-oriented
C)program-oriented
D)project-oriented or program-oriented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
Suppose that a person requires 60 minutes to complete a work element on the first attempt.On the second attempt,the work element is completed in 48 minutes.The learning rate for this person is __________% for this work element.

A)60
B)70
C)80
D)120
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
Suppose that a person requires eight hours to complete a work element on the first attempt.That person has a learning rate of 90 percent for this work element.This person should require __________ hours to complete this work element on the fourth attempt.

A)5)83
B)6)48
C)7)2
D)8)8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
A work element in the project plan requires 50 hours of labor each by four carpenters.The carpenters are paid $15 per hour and incur an overhead rate equal to 80 percent of their direct labor charges.The total cost would be __________ if the carpenters consume 10 percent of the workday performing personal activities.

A)$4,860
B)$5,000
C)$5,360
D)$5,940
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
______________ issues are present when bidders "low ball" a bid or when some bidders get a "last look."

A)Ethical
B)Strategic
C)Efficient
D)Effective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
A project manager must ______ as a type of risk response planning in order to soften the danger of a threat by reducing the likelihood that it will occur or by reducing its impact if it does occur.

A)avoid
B)transfer
C)accept
D)mitigate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is not a type of quantitative risk analysis?

A)FMEA
B)decision tree analysis
C)Monte Carlo simulation
D)expert judgment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
Several issues face firms preparing bid proposals,particularly firms in the aerospace,construction,defense,and consulting industries.Which of the following is not one of those issues?

A)How should the proposal-preparation process be organized and staffed?
B)How much should be spent on preparing proposals for bids?
C)Is it ethical?
D)How long will the project take?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
__________ budgeting allows income and expenditures to be aggregated across projects.

A)Category-oriented
B)Activity-oriented
C)Project-oriented
D)Expense-oriented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
If projects include repetitive tasks with significant human input,the __________ rate should be factored into the cost estimate.

A)inflation
B)hurdle
C)interest
D)learning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
The allowance for contingencies is usually in what range?

A)One to five percent
B)Five to ten percent
C)Six to nine percent
D)Seven to eleven percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
Overhead costs are all of the following except which one?

A)Generally within the project manager's control
B)Arbitrary
C)Source of annoyance and frustration
D)A amount that is unique to the firm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
Given a project salary cost of $400,000 per year and forecasted wage increases of 5 percent per year,calculate the non-discounted total salary cost over a three-year project lifecycle.

A)$61,000
B)$1,200,000
C)$1,240,000
D)$1,261,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is not one of the risk management subprocesses?

A)risk identification
B)qualitative risk analysis
C)work breakdown schedule
D)risk response planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which cost should the project manager completely ignore in managing a project?

A)Labor
B)Material
C)Overhead and G&A
D)Project manager should not ignore any costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
In risk response planning,where the goal of the project manager is to increase the probability that the opportunity will occur,the project manager must __________

A)exploit
B)share
C)enhance
D)accept
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
__________ budgeting aggregates income and expenditures by project or program,often in addition to aggregation by organizational unit or activity.

A)Activity based
B)Capital
C)Operational
D)Project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
Kaplan et al.(2012)identified three types of risk that must be faced.List and describe each one.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
Briefly describe the seven processes for risk management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
The determination of costs for a new process should utilize a __________,or operations sequence sheet,which describes the operation in which the new process would be used.

A)route sheet
B)budget sheet
C)cost estimation fld)owchart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
Suggest some reasons why an organization would support projects that show a significant incremental profit over direct costs but are not profitable when costs fully accounted for.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
Identify some of the common problems faced by the project budgeter.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
__________ costs vary with output.

A)General and administrative
B)Overhead
C)Direct
D)Indirect
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
Describe the bottom-up budgeting process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
Explain why senior managers view the bottom-up budgeting process as being risky.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
___________ costs are not associated with any specific product or class of products and are typically charged as a fixed percentage of some direct cost.

A)General and administrative
B)Overhead
C)Direct
D)Indirect
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
An easy method of evaluating risk in certain situations by modifying project parameters and evaluating the corresponding changes is __________.

A)Monte Carlo simulations
B)risk mitigation
C)project budgeting
D)risk analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
Describe the top-down budgeting process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
According to the authors,the task of risk identification will be horrendous if the risk management system has no memory.Discuss the important elements of a risk management system that would compensate for a lack of memory by the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
Suggest some reasons why the authors insist that the project manager must be familiar with the organization's accounting system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
The pattern of deviations in cost and usage used for exception reporting to management is called __________.

A)simulations
B)assumptions
C)variances
D)summaries
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.