The two principles to follow when crashing a project focuses on the __________.

A)critical path and selects the least expensive alternative
B)critical path and selects the most expensive alternative
C)shortest path and selects the least expensive alternative
D)critical path and selects the most expensive alternative
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The formula for computing the cost / time slope for each activity that can be crashed is __________.

A)(crash cost + normal cost) / (crash time + normal time)
B)(crash cost - normal cost) / (crash time - normal time)
C)(normal cost + crash cost) / (normal time + crash time)
D)(normal cost - crash cost) / (normal time - crash time)
سؤال
When we change technology,we may also be changing the level of __________ in carrying out the activity.

A)risk
B)money
C)time
D)all of the above
سؤال
One cannot save __________,rather one can only spend more or less of it.

A)time
B)money
C)scope
D)risk
سؤال
If the crash cost is $1,000,the normal cost is $500,the crash time is 3,and the normal time is 5,what is the slope?

A)-500
B)-250
C)250
D)500
سؤال
The __________ technique overlaps the design and build phases of a project to expedite its completion.

A)crashing
B)fast-tracking
C)leading
D)blitzing
سؤال
Economically speaking,crashing a project creates a technology change in the __________ for an activity.

A)deliverable demand function
B)production function
C)audit function
D)deliverable supply function
سؤال
__________ describes the amounts of individual resources an existing schedule requires during specific time periods.

A)Resource loading
B)Resource leveling
C)Scope loading
D)Resource succeeding
سؤال
__________ times result from an attempt to expedite the activity by the application of additional resources.

A)Leveling
B)Crash
C)Post
D)Constraint
سؤال
When crashing a project,our first task is to develop __________.

A)a table or graph of the cost of a project as a function of the project's possible completion dates
B)a schedule that shows the risks associated with each activity in the project
C)a list that shows the activities and the events of a project without referring to the costs
D)a table showing the noncritical activities and the cost associated with each of those activities
سؤال
If the crash cost is $2,500,the normal cost is $1,500,the crash time is 4,and the normal time is 6,what is the slope?

A)-1,500
B)-1,000
C)-750
D)-500
سؤال
A project task is said to be __________ if it requires a fixed amount of time and known quantities of resources.

A)scope constrained
B)time constrained
C)resource constrained
D)system constrained
سؤال
The use of __________ activity time estimates may reduce the chance that crashing the project will be needed.

A)one probabilistic
B)two probabilistic
C)three probabilistic
D)four probabilistic
سؤال
If the crash cost is $2,500,the normal cost is $2,000,the crash time is 1,and the normal time is 6,what is the slope?

A)-300
B)-200
C)-100
D)None of the above are correct
سؤال
If deterministic time estimates are used,and if project deadlines are firm,there is a high likelihood that it will __________.

A)not be necessary to crash any activities in projects
B)be necessary to crash the last few activities of most projects
C)be completed on time and within budget
D)be completed as per schedule
سؤال
In CPM,__________ are specified.

A)exact levels of uncertainty associated with activities
B)an expected time,a crash time,and the standard deviation time
C)three costs
D)two activity times and two costs
سؤال
The points between the extreme points of the relationship between time use and resource use represent __________.

A)time constrained projects
B)resource constrained projects
C)alternative trade-offs between time and resources
D)a non-feasible solution space of trade-off alternatives related to time and resource use
سؤال
The standard practice with AOA and AON is to estimate activity times under the assumption of resource loadings that are __________.

A)probabilistic
B)crashed
C)normal
D)dynamic
سؤال
Fast-tracking is a partial use of the basic concept in ______ project management and is dependent on effective feedback and feedforward communication.

A)crashing
B)construction
C)IT
D)phase-gate
سؤال
_____ itself is always a critical resource in project management,one that is unique because it can neither be inventoried nor renewed.

A)Crashed resources
B)Labor
C)Manpower
D)Time
سؤال
The __________ heuristic provides a general solution for critical path and time and is usually the default rule for a schedule.

A)as soon as possible
B)as late as possible
C)minimum slack first
D)shortest task first
سؤال
The usual purpose of the __________ scheduling heuristic is to delay cash outflows as long as possible.

A)minimum slack first
B)shortest task first
C)most successors
D)as late as possible
سؤال
Using Goldratt's meaning of the word "dependent," the activities of a project can be ordered into paths based on their resource dependencies as well as on their technological precedence requirements.The longest of these paths of sequentially time-dependent activities is known as the ______________.

A)priority chain
B)critical chain
C)dependency path
D)heuristic path
سؤال
One of the problems that Goldratt observed was that if an activity has slack time,the task might become delayed until the slack is removed.This is referred to as __________.

A)Goldratt's Law
B)Murphy's Law
C)the delay game
D)the student syndrome
سؤال
The two fundamental approaches to constrained allocation problems are __________.

A)heuristic approaches and rules of thumb
B)linear programming approaches and optimization models
C)heuristic approaches and optimization models
D)goal programming and trial and error
سؤال
The __________ approach to constrained resource scheduling problems is the only feasible method of attacking large,nonlinear,complex problems that tend to occur in the real world of project management.

A)goal programming
B)heuristic
C)optimization modeling
D)linear programming
سؤال
The principal reason why a project manager is surprised by resource constraints on a project is the failure to include __________ in risk identification activities.

A)resource availability
B)resource cost
C)resource mobility
D)resource skill
سؤال
Thoughtless optimism,the "student syndrome," and multitasking to reduce idle time can each contribute to __________.

A)slack
B)pessimistic bias
C)optimistic bias
D)feeder buffer
سؤال
Studies have shown that the __________ scheduling heuristic method usually results in the minimum amount of project schedule slippage,best utilization of facilities,and minimum total system occupancy time.

A)as soon as possible
B)as late as possible
C)shortest task first
D)minimum slack first
سؤال
Most heuristic solution methods start with the __________ and analyze resource usage period by period,resource by resource.

A)GERT schedule
B)Gantt chart
C)PERT / CPM schedule
D)Master schedule
سؤال
If a contradiction or conflict between constraints is detected,__________ should always take precedence.

A)technological necessities
B)time constraints
C)resource constraints
D)managerial preferences
سؤال
Which of the following describes a situation where priorities are assigned to activities according to some rule not associated with task length,slack,or resource requirements?

A)student's syndrome
B)arbitrary
C)most successors
D)most resources
سؤال
Using the __________ heuristic method,the project team should be able to complete the maximum number of tasks during a given period of time.

A)as soon as possible
B)as late as possible
C)shortest task first
D)minimum slack first
سؤال
The methods to find an optimal solution to the constrained resource scheduling problem fall into two categories.They are __________.

A)mathematical programming and linear programming
B)mathematical programming and enumeration
C)statistical analysis and simulation
D)quantified heuristics and gaming
سؤال
Because the project _____ is the source of information on activity precedence's,durations,and resources requirements,it is the primary input for both the project schedule and its budget.

A)schedules
B)Gantt chart
C)WBS
D)charter
سؤال
Assume two activities,printing and binding.Printing is a predecessor of binding.If printing is _______,then binding will start late by whatever amount of lateness is bequeathed to it by printing.

A)necessary
B)early
C)late
D)time-neutral
سؤال
In some situations,two activities are scheduled to be carried out in parallel and using the same scarce resource.If the supply of the scarce resource is not sufficient to allow both activities to be carried out simultaneously,then whichever of the two is given priority immediately lengthens the other activity's path but not its actual __________.

A)duration
B)slack
C)float
D)buffer
سؤال
The tasks that logically precede a particular task in time are referred to as __________.

A)successors
B)followers
C)predecessors
D)priorities
سؤال
Three important parameters used to assess the effectiveness of a scheduling system include schedule slippage,in-process inventory,and __________.

A)resource utilization
B)time utilization
C)management delay
D)schedule utilization
سؤال
__________ aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances.The purpose is to create a smoother distribution of resource usage.

A)Resource loading
B)Resource leveling
C)Scope loading
D)Resource succeeding
سؤال
Discuss the advantages obtained from resource leveling.
سؤال
Describe the basic procedure for resource leveling.
سؤال
List some of the common priority rules utilized when following heuristic solution methods.
سؤال
Match the following priority rules with their descriptions.

A)As Soon As Possible
B)As Late As Possible
C)Shortest Task First
D)Most Resources First
1)Activities are ordered by use of a specific resource,with the largest user heading the list.
2)Tasks are ordered in terms of duration,with the shortest first.
3)All activities are scheduled as late as possible without delaying the project.
4)The default rule for scheduling.This provides the general solution for critical path and time.
سؤال
Match the following priority rules with additional information provided about them.

A)As Soon As Possible
B)As Late As Possible
C)Shortest Task First
D)Most Resources First
1)The usual purpose of this heuristic is to defer cash outflows as long as possible.
2)The assumption behind this rule is that more important tasks usually place a higher demand on scarce resources.
3)This provides the general solution for critical path and time.
4)In general,this rule will maximize the number of tasks that can be completed by a system during some time period.
سؤال
Discuss some other causes of the strong optimistic bias in a project schedule.
سؤال
List the factors that lead to strong optimistic bias.
سؤال
If a predecessor activity finishes early,will the following activity start early? Why?
سؤال
Match the following priority rules with their descriptions.

A)Minimum Slack First
B)Most Critical Followers
C)Most Successors
D)Arbitrary
1)This heuristic orders activities by the amount of slack,least slack going first.
2)Tasks are arranged by number of activities following them.
3)Priorities are assigned to activities according to some rule not associated with task length,slack,or resource requirements.
4)Tasks are arranged by number of critical activities following them.
سؤال
Suggest some options for leveling the load placed on resources.
سؤال
__________ are tasks that logically follow a particular task in time.

A)Successor
B)Strays
C)Predecessors
D)Critical
سؤال
With respect to project scheduling,__________ is the amount of work waiting to be processed because there is a shortage of some resource.

A)in-process inventory
B)schedule slippage
C)resource utilization
D)management delay
سؤال
Describe the extreme points of the relationship between time use and resource use.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/53
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Resource Allocation
1
The two principles to follow when crashing a project focuses on the __________.

A)critical path and selects the least expensive alternative
B)critical path and selects the most expensive alternative
C)shortest path and selects the least expensive alternative
D)critical path and selects the most expensive alternative
A
2
The formula for computing the cost / time slope for each activity that can be crashed is __________.

A)(crash cost + normal cost) / (crash time + normal time)
B)(crash cost - normal cost) / (crash time - normal time)
C)(normal cost + crash cost) / (normal time + crash time)
D)(normal cost - crash cost) / (normal time - crash time)
B
3
When we change technology,we may also be changing the level of __________ in carrying out the activity.

A)risk
B)money
C)time
D)all of the above
D
4
One cannot save __________,rather one can only spend more or less of it.

A)time
B)money
C)scope
D)risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
5
If the crash cost is $1,000,the normal cost is $500,the crash time is 3,and the normal time is 5,what is the slope?

A)-500
B)-250
C)250
D)500
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
6
The __________ technique overlaps the design and build phases of a project to expedite its completion.

A)crashing
B)fast-tracking
C)leading
D)blitzing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
7
Economically speaking,crashing a project creates a technology change in the __________ for an activity.

A)deliverable demand function
B)production function
C)audit function
D)deliverable supply function
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
8
__________ describes the amounts of individual resources an existing schedule requires during specific time periods.

A)Resource loading
B)Resource leveling
C)Scope loading
D)Resource succeeding
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
9
__________ times result from an attempt to expedite the activity by the application of additional resources.

A)Leveling
B)Crash
C)Post
D)Constraint
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
10
When crashing a project,our first task is to develop __________.

A)a table or graph of the cost of a project as a function of the project's possible completion dates
B)a schedule that shows the risks associated with each activity in the project
C)a list that shows the activities and the events of a project without referring to the costs
D)a table showing the noncritical activities and the cost associated with each of those activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
11
If the crash cost is $2,500,the normal cost is $1,500,the crash time is 4,and the normal time is 6,what is the slope?

A)-1,500
B)-1,000
C)-750
D)-500
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
12
A project task is said to be __________ if it requires a fixed amount of time and known quantities of resources.

A)scope constrained
B)time constrained
C)resource constrained
D)system constrained
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
13
The use of __________ activity time estimates may reduce the chance that crashing the project will be needed.

A)one probabilistic
B)two probabilistic
C)three probabilistic
D)four probabilistic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
14
If the crash cost is $2,500,the normal cost is $2,000,the crash time is 1,and the normal time is 6,what is the slope?

A)-300
B)-200
C)-100
D)None of the above are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
15
If deterministic time estimates are used,and if project deadlines are firm,there is a high likelihood that it will __________.

A)not be necessary to crash any activities in projects
B)be necessary to crash the last few activities of most projects
C)be completed on time and within budget
D)be completed as per schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
16
In CPM,__________ are specified.

A)exact levels of uncertainty associated with activities
B)an expected time,a crash time,and the standard deviation time
C)three costs
D)two activity times and two costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
17
The points between the extreme points of the relationship between time use and resource use represent __________.

A)time constrained projects
B)resource constrained projects
C)alternative trade-offs between time and resources
D)a non-feasible solution space of trade-off alternatives related to time and resource use
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
18
The standard practice with AOA and AON is to estimate activity times under the assumption of resource loadings that are __________.

A)probabilistic
B)crashed
C)normal
D)dynamic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
19
Fast-tracking is a partial use of the basic concept in ______ project management and is dependent on effective feedback and feedforward communication.

A)crashing
B)construction
C)IT
D)phase-gate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
20
_____ itself is always a critical resource in project management,one that is unique because it can neither be inventoried nor renewed.

A)Crashed resources
B)Labor
C)Manpower
D)Time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
21
The __________ heuristic provides a general solution for critical path and time and is usually the default rule for a schedule.

A)as soon as possible
B)as late as possible
C)minimum slack first
D)shortest task first
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
22
The usual purpose of the __________ scheduling heuristic is to delay cash outflows as long as possible.

A)minimum slack first
B)shortest task first
C)most successors
D)as late as possible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
23
Using Goldratt's meaning of the word "dependent," the activities of a project can be ordered into paths based on their resource dependencies as well as on their technological precedence requirements.The longest of these paths of sequentially time-dependent activities is known as the ______________.

A)priority chain
B)critical chain
C)dependency path
D)heuristic path
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
24
One of the problems that Goldratt observed was that if an activity has slack time,the task might become delayed until the slack is removed.This is referred to as __________.

A)Goldratt's Law
B)Murphy's Law
C)the delay game
D)the student syndrome
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
25
The two fundamental approaches to constrained allocation problems are __________.

A)heuristic approaches and rules of thumb
B)linear programming approaches and optimization models
C)heuristic approaches and optimization models
D)goal programming and trial and error
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
26
The __________ approach to constrained resource scheduling problems is the only feasible method of attacking large,nonlinear,complex problems that tend to occur in the real world of project management.

A)goal programming
B)heuristic
C)optimization modeling
D)linear programming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
27
The principal reason why a project manager is surprised by resource constraints on a project is the failure to include __________ in risk identification activities.

A)resource availability
B)resource cost
C)resource mobility
D)resource skill
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
28
Thoughtless optimism,the "student syndrome," and multitasking to reduce idle time can each contribute to __________.

A)slack
B)pessimistic bias
C)optimistic bias
D)feeder buffer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
29
Studies have shown that the __________ scheduling heuristic method usually results in the minimum amount of project schedule slippage,best utilization of facilities,and minimum total system occupancy time.

A)as soon as possible
B)as late as possible
C)shortest task first
D)minimum slack first
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
30
Most heuristic solution methods start with the __________ and analyze resource usage period by period,resource by resource.

A)GERT schedule
B)Gantt chart
C)PERT / CPM schedule
D)Master schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
31
If a contradiction or conflict between constraints is detected,__________ should always take precedence.

A)technological necessities
B)time constraints
C)resource constraints
D)managerial preferences
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following describes a situation where priorities are assigned to activities according to some rule not associated with task length,slack,or resource requirements?

A)student's syndrome
B)arbitrary
C)most successors
D)most resources
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
33
Using the __________ heuristic method,the project team should be able to complete the maximum number of tasks during a given period of time.

A)as soon as possible
B)as late as possible
C)shortest task first
D)minimum slack first
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
34
The methods to find an optimal solution to the constrained resource scheduling problem fall into two categories.They are __________.

A)mathematical programming and linear programming
B)mathematical programming and enumeration
C)statistical analysis and simulation
D)quantified heuristics and gaming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
35
Because the project _____ is the source of information on activity precedence's,durations,and resources requirements,it is the primary input for both the project schedule and its budget.

A)schedules
B)Gantt chart
C)WBS
D)charter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
36
Assume two activities,printing and binding.Printing is a predecessor of binding.If printing is _______,then binding will start late by whatever amount of lateness is bequeathed to it by printing.

A)necessary
B)early
C)late
D)time-neutral
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
37
In some situations,two activities are scheduled to be carried out in parallel and using the same scarce resource.If the supply of the scarce resource is not sufficient to allow both activities to be carried out simultaneously,then whichever of the two is given priority immediately lengthens the other activity's path but not its actual __________.

A)duration
B)slack
C)float
D)buffer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
38
The tasks that logically precede a particular task in time are referred to as __________.

A)successors
B)followers
C)predecessors
D)priorities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
39
Three important parameters used to assess the effectiveness of a scheduling system include schedule slippage,in-process inventory,and __________.

A)resource utilization
B)time utilization
C)management delay
D)schedule utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
40
__________ aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances.The purpose is to create a smoother distribution of resource usage.

A)Resource loading
B)Resource leveling
C)Scope loading
D)Resource succeeding
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
41
Discuss the advantages obtained from resource leveling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
42
Describe the basic procedure for resource leveling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
43
List some of the common priority rules utilized when following heuristic solution methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
44
Match the following priority rules with their descriptions.

A)As Soon As Possible
B)As Late As Possible
C)Shortest Task First
D)Most Resources First
1)Activities are ordered by use of a specific resource,with the largest user heading the list.
2)Tasks are ordered in terms of duration,with the shortest first.
3)All activities are scheduled as late as possible without delaying the project.
4)The default rule for scheduling.This provides the general solution for critical path and time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
45
Match the following priority rules with additional information provided about them.

A)As Soon As Possible
B)As Late As Possible
C)Shortest Task First
D)Most Resources First
1)The usual purpose of this heuristic is to defer cash outflows as long as possible.
2)The assumption behind this rule is that more important tasks usually place a higher demand on scarce resources.
3)This provides the general solution for critical path and time.
4)In general,this rule will maximize the number of tasks that can be completed by a system during some time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
46
Discuss some other causes of the strong optimistic bias in a project schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
47
List the factors that lead to strong optimistic bias.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
48
If a predecessor activity finishes early,will the following activity start early? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
49
Match the following priority rules with their descriptions.

A)Minimum Slack First
B)Most Critical Followers
C)Most Successors
D)Arbitrary
1)This heuristic orders activities by the amount of slack,least slack going first.
2)Tasks are arranged by number of activities following them.
3)Priorities are assigned to activities according to some rule not associated with task length,slack,or resource requirements.
4)Tasks are arranged by number of critical activities following them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
50
Suggest some options for leveling the load placed on resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
51
__________ are tasks that logically follow a particular task in time.

A)Successor
B)Strays
C)Predecessors
D)Critical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
52
With respect to project scheduling,__________ is the amount of work waiting to be processed because there is a shortage of some resource.

A)in-process inventory
B)schedule slippage
C)resource utilization
D)management delay
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
53
Describe the extreme points of the relationship between time use and resource use.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 53 في هذه المجموعة.