Deck 11: Project Control

ملء الشاشة (f)
exit full mode
سؤال
Which of the following is the key feature of cybernetic control systems?

A)Manual operations
B)Directional controls
C)Automatic operation
D)Specific preconditions
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
There are no purely mechanistic problems on projects.All problems have a _____ element,too.

A)computer
B)client
C)workers
D)human
سؤال
Most control systems used in project management today fall into this category of control system.

A)cybernetic control
B)robotic control
C)go / no-go control
D)postcontrol
سؤال
The stewardship of human resources requires __________ the growth and development of people.

A)flattening
B)demolition
C)controlling and maintaining
D)mandating
سؤال
A majority of uncertainty has its source in systems that lie outside the project,in its __________.

A)environment
B)stakeholder area
C)sourcing model
D)control zone
سؤال
With respect to financial controls,courts will require the practice of __________ regarding financial controls,practices,and record-keeping.

A)efficiency
B)due diligence
C)effectiveness
D)management
سؤال
The __________ controls take the form of testing to see if some specific precondition has been met.

A)postcontrol
B)go / no-go
C)cybernetic
D)monitoring
سؤال
The most common type of control system is the __________,or steering control.

A)postcontrol
B)go / no-go
C)cybernetic
D)monitoring
سؤال
Identify the item that is not one of the three types of control processes described by the authors.

A)cybernetic control
B)robotic control
C)go / no-go control
D)postcontrol
سؤال
By and large,people respond to the goal-directedness of control systems in one of three general ways.Which of the following is not one of these ways?

A)By active and positive participation and goal seeking
B)By passive participation in order to avoid loss
C)By active but negative participation and resistance
D)By actively working to change the goals of the project
سؤال
In a cybernetic control system using a negative feedback loop,the speed or force with which the control operates is,in general,__________ to the size of the deviation from standard.

A)customary
B)proportional
C)reciprocal
D)double
سؤال
Physical asset control is concerned with asset maintenance,whether __________.

A)detective or estimative
B)addition or removal
C)detection or estimation
D)preventive or corrective
سؤال
When performing control,project managers need to be attentive to __________.

A)maintaining laissez faire leadership
B)avoiding directive behaviors
C)regulation and conservation equally
D)regulation more than conservation
سؤال
__________ controls are usually viewed as helpful rather than as a source of unwelcome pressure if the controlees perceive themselves as able to perform inside the prescribed limits.

A)Steering
B)Negative feedback
C)Postcontrols
D)Cybernetic
سؤال
Control is focused on three elements of a project.They are __________.

A)scope,quality,and customer satisfaction
B)performance,delivery,and cost
C)scope,cost,and time
D)cost,time,and customer satisfaction
سؤال
The cybernetic control system that acts to reduce deviations from standard is called a __________.

A)nonautomatic modification
B)critical ratio
C)positive feedback loop
D)negative feedback loop
سؤال
Physical asset control requires control of the __________ of physical assets and is concerned with asset maintenance,whether preventative or corrective.

A)use
B)location
C)storage
D)repair
سؤال
Perhaps the most difficult task in creating a cybernetic control system is what?

A)Finding a common standard for all the elements we wish to control
B)Limiting the elements we wish to control to a reasonable number
C)Setting the standards for each element of output we wish to control
D)Selling top management on the list of elements to be controlled
سؤال
An automatic control system containing a negative feedback loop is referred to as

A)cybernetic
B)go / no-go
C)postcontrol
D)critical ratio
سؤال
The two fundamental objectives of control are the regulation of results and the __________.

A)procurement of organizational assets
B)distribution of organizational assets
C)stewardship of organizational assets
D)refurbishing of organizational assets
سؤال
The critical ratio control chart uses a ratio made up of two parts -- the ratio of actual progress to scheduled progress,and the __________.

A)ratio of earned value to planned cost
B)ratio of budgeted cost to actual cost
C)ratio of actual cost to budgeted cost
D)ratio of planned cost to earned value
سؤال
Because project milestones may not occur at periodic intervals,go / no-go controls should be linked to the __________; not simply to the calendar.

A)actual plans and to the occurrence of real events
B)corporate budgeting process
C)portfolio management review process
D)capital budgeting process
سؤال
The __________ process controls the project at various points in the life cycle to make sure that the project remains on course.This is opposed to waiting until the project is completed and then finding out it doesn't meet the objectives of the organization

A)portfolio
B)phased-step
C)phase-gate
D)overarching
سؤال
The ___________ is calculated as (actual progress / scheduled progress)× (budgeted cost / actual cost)

A)critical ratio
B)highlighted ratio
C)cybernetic ratio
D)efficiency ratio
سؤال
Project changes result from three basic causes.Which of the following is not one of those causes?

A)Uncertainty about the technology on which the work of the project or its output is based
B)An increase in the knowledge base or sophistication of the client / user leading to scope creep
C)Changes to the environment in which the project is being completed
D)A modification of the rules applying to the process of carrying out the project or to its output
سؤال
__________ are seen as much the same as a report card.

A)Postcontrols
B)WBSs
C)Critical ratios
D)Cybernetics
سؤال
Change control systems,in some industries,are part of a firm's __________.

A)configuration management system
B)internal IDC system
C)cybernetic system
D)early warning system
سؤال
PMBOK recognizes the importance of what is called OPA.What does OPA stand for?

A)Organizational Process Assets
B)Operational Project Accounts
C)Optimal Program Arrangements
D)Original Procedural Architecture
سؤال
_________ is a management approach that may be used to make comparisons to "best in class" practices across organizations

A)Processing
B)Benchmarking
C)Leveling
D)Standardizing
سؤال
Postproject controls or reviews are examples of __________.

A)postcontrols
B)go / no-go decisions
C)cybernetics
D)inefficiencies
سؤال
The most important rule for any subordinate is the Prime Law of Life on any project: __________.

A)Never let the boss be surprised!
B)Newton's Law
C)Parkinson's Law
D)Murphy's Law
سؤال
The process review focuses on the process of __________ outcomes rather than the outcomes per se.

A)reaching
B)passing
C)eliminating
D)managing
سؤال
Scope creep can be caused by the

A)customer
B)team members
C)audit team
D)customer and team members
سؤال
For all but __________ changes,a risk identification and analysis should be performed.

A)minor
B)major
C)most
D)few
سؤال
The culmination of the postcontrol report is a set of recommendations covering what?

A)Everything that went wrong with the project
B)Who was at fault for the errors in the project
C)How the project performed relative to the initial project plan
D)The ways that future projects can be improved
سؤال
The project manager should ensure that the status reports given to senior management contain information that is current enough to be what?

A)Understandable
B)Explainable
C)Meaningful
D)Actionable
سؤال
Go / no-go controls operate __________.

A)continuously
B)only when exceptions are detected
C)only when and if the controller uses them
D)only at phase gate reviews
سؤال
__________ are directed towards improving chances for future projects to meet their goals.

A)Postcontrols
B)Go / no-go decisions
C)Cybernetics
D)Negative feedback loops
سؤال
Thamhain (2013)found that ______was / were not only the most frequent risk class but also had the most impact on project performance.

A)increasing stakeholder involvement
B)changing leadership
C)decreasing costs
D)changing project requirements
سؤال
In order to control creative projects the project manager must adopt one or some combination of three general approaches to the problem.Which of the following is not one of these approaches?

A)control of input resources
B)creativity check
C)process review
D)personnel reassignments
سؤال
Describe the information requirements of a cybernetic controller.
سؤال
Identify some of the factors that can cause a project to require control of performance.
سؤال
Identify some of the factors that can cause a project to require control of time.
سؤال
What are the two fundamental objectives of control?
سؤال
A person with organizational clout who takes on personal responsibility for the successful completion of a project for the organization is referred to as a(n)__________.

A)champion
B)leader
C)program manager
D)campaigner
سؤال
Identify some of the factors that can cause a project to require control of cost.
سؤال
A(n)__________ is a monitoring system that forewarns the project manager if trouble arises.

A)configuration management system
B)internal IDC system
C)cybernetic system
D)early warning system
سؤال
A(n)__________ measures performance over time,showing how it changes compared to a desired mean and upper and lower limits.

A)critical ratio
B)control chart
C)early warning system
D)Gantt chart
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/48
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Project Control
1
Which of the following is the key feature of cybernetic control systems?

A)Manual operations
B)Directional controls
C)Automatic operation
D)Specific preconditions
C
2
There are no purely mechanistic problems on projects.All problems have a _____ element,too.

A)computer
B)client
C)workers
D)human
D
3
Most control systems used in project management today fall into this category of control system.

A)cybernetic control
B)robotic control
C)go / no-go control
D)postcontrol
C
4
The stewardship of human resources requires __________ the growth and development of people.

A)flattening
B)demolition
C)controlling and maintaining
D)mandating
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
5
A majority of uncertainty has its source in systems that lie outside the project,in its __________.

A)environment
B)stakeholder area
C)sourcing model
D)control zone
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
6
With respect to financial controls,courts will require the practice of __________ regarding financial controls,practices,and record-keeping.

A)efficiency
B)due diligence
C)effectiveness
D)management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
7
The __________ controls take the form of testing to see if some specific precondition has been met.

A)postcontrol
B)go / no-go
C)cybernetic
D)monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
8
The most common type of control system is the __________,or steering control.

A)postcontrol
B)go / no-go
C)cybernetic
D)monitoring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
9
Identify the item that is not one of the three types of control processes described by the authors.

A)cybernetic control
B)robotic control
C)go / no-go control
D)postcontrol
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
10
By and large,people respond to the goal-directedness of control systems in one of three general ways.Which of the following is not one of these ways?

A)By active and positive participation and goal seeking
B)By passive participation in order to avoid loss
C)By active but negative participation and resistance
D)By actively working to change the goals of the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
11
In a cybernetic control system using a negative feedback loop,the speed or force with which the control operates is,in general,__________ to the size of the deviation from standard.

A)customary
B)proportional
C)reciprocal
D)double
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
12
Physical asset control is concerned with asset maintenance,whether __________.

A)detective or estimative
B)addition or removal
C)detection or estimation
D)preventive or corrective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
13
When performing control,project managers need to be attentive to __________.

A)maintaining laissez faire leadership
B)avoiding directive behaviors
C)regulation and conservation equally
D)regulation more than conservation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
14
__________ controls are usually viewed as helpful rather than as a source of unwelcome pressure if the controlees perceive themselves as able to perform inside the prescribed limits.

A)Steering
B)Negative feedback
C)Postcontrols
D)Cybernetic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
15
Control is focused on three elements of a project.They are __________.

A)scope,quality,and customer satisfaction
B)performance,delivery,and cost
C)scope,cost,and time
D)cost,time,and customer satisfaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
16
The cybernetic control system that acts to reduce deviations from standard is called a __________.

A)nonautomatic modification
B)critical ratio
C)positive feedback loop
D)negative feedback loop
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
17
Physical asset control requires control of the __________ of physical assets and is concerned with asset maintenance,whether preventative or corrective.

A)use
B)location
C)storage
D)repair
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
18
Perhaps the most difficult task in creating a cybernetic control system is what?

A)Finding a common standard for all the elements we wish to control
B)Limiting the elements we wish to control to a reasonable number
C)Setting the standards for each element of output we wish to control
D)Selling top management on the list of elements to be controlled
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
19
An automatic control system containing a negative feedback loop is referred to as

A)cybernetic
B)go / no-go
C)postcontrol
D)critical ratio
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
20
The two fundamental objectives of control are the regulation of results and the __________.

A)procurement of organizational assets
B)distribution of organizational assets
C)stewardship of organizational assets
D)refurbishing of organizational assets
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
21
The critical ratio control chart uses a ratio made up of two parts -- the ratio of actual progress to scheduled progress,and the __________.

A)ratio of earned value to planned cost
B)ratio of budgeted cost to actual cost
C)ratio of actual cost to budgeted cost
D)ratio of planned cost to earned value
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
22
Because project milestones may not occur at periodic intervals,go / no-go controls should be linked to the __________; not simply to the calendar.

A)actual plans and to the occurrence of real events
B)corporate budgeting process
C)portfolio management review process
D)capital budgeting process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
23
The __________ process controls the project at various points in the life cycle to make sure that the project remains on course.This is opposed to waiting until the project is completed and then finding out it doesn't meet the objectives of the organization

A)portfolio
B)phased-step
C)phase-gate
D)overarching
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
24
The ___________ is calculated as (actual progress / scheduled progress)× (budgeted cost / actual cost)

A)critical ratio
B)highlighted ratio
C)cybernetic ratio
D)efficiency ratio
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
25
Project changes result from three basic causes.Which of the following is not one of those causes?

A)Uncertainty about the technology on which the work of the project or its output is based
B)An increase in the knowledge base or sophistication of the client / user leading to scope creep
C)Changes to the environment in which the project is being completed
D)A modification of the rules applying to the process of carrying out the project or to its output
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
26
__________ are seen as much the same as a report card.

A)Postcontrols
B)WBSs
C)Critical ratios
D)Cybernetics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
27
Change control systems,in some industries,are part of a firm's __________.

A)configuration management system
B)internal IDC system
C)cybernetic system
D)early warning system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
28
PMBOK recognizes the importance of what is called OPA.What does OPA stand for?

A)Organizational Process Assets
B)Operational Project Accounts
C)Optimal Program Arrangements
D)Original Procedural Architecture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
29
_________ is a management approach that may be used to make comparisons to "best in class" practices across organizations

A)Processing
B)Benchmarking
C)Leveling
D)Standardizing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
30
Postproject controls or reviews are examples of __________.

A)postcontrols
B)go / no-go decisions
C)cybernetics
D)inefficiencies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
31
The most important rule for any subordinate is the Prime Law of Life on any project: __________.

A)Never let the boss be surprised!
B)Newton's Law
C)Parkinson's Law
D)Murphy's Law
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
32
The process review focuses on the process of __________ outcomes rather than the outcomes per se.

A)reaching
B)passing
C)eliminating
D)managing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
33
Scope creep can be caused by the

A)customer
B)team members
C)audit team
D)customer and team members
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
34
For all but __________ changes,a risk identification and analysis should be performed.

A)minor
B)major
C)most
D)few
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
35
The culmination of the postcontrol report is a set of recommendations covering what?

A)Everything that went wrong with the project
B)Who was at fault for the errors in the project
C)How the project performed relative to the initial project plan
D)The ways that future projects can be improved
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
36
The project manager should ensure that the status reports given to senior management contain information that is current enough to be what?

A)Understandable
B)Explainable
C)Meaningful
D)Actionable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
37
Go / no-go controls operate __________.

A)continuously
B)only when exceptions are detected
C)only when and if the controller uses them
D)only at phase gate reviews
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
38
__________ are directed towards improving chances for future projects to meet their goals.

A)Postcontrols
B)Go / no-go decisions
C)Cybernetics
D)Negative feedback loops
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
39
Thamhain (2013)found that ______was / were not only the most frequent risk class but also had the most impact on project performance.

A)increasing stakeholder involvement
B)changing leadership
C)decreasing costs
D)changing project requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
40
In order to control creative projects the project manager must adopt one or some combination of three general approaches to the problem.Which of the following is not one of these approaches?

A)control of input resources
B)creativity check
C)process review
D)personnel reassignments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
41
Describe the information requirements of a cybernetic controller.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
42
Identify some of the factors that can cause a project to require control of performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
43
Identify some of the factors that can cause a project to require control of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
44
What are the two fundamental objectives of control?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
45
A person with organizational clout who takes on personal responsibility for the successful completion of a project for the organization is referred to as a(n)__________.

A)champion
B)leader
C)program manager
D)campaigner
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
46
Identify some of the factors that can cause a project to require control of cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
47
A(n)__________ is a monitoring system that forewarns the project manager if trouble arises.

A)configuration management system
B)internal IDC system
C)cybernetic system
D)early warning system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
48
A(n)__________ measures performance over time,showing how it changes compared to a desired mean and upper and lower limits.

A)critical ratio
B)control chart
C)early warning system
D)Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 48 في هذه المجموعة.