Deck 4: Strategic Capacity Management

ملء الشاشة (f)
exit full mode
سؤال
The basic notion of economies of scale is that as a plant gets larger and volume increases,the average cost per unit of output drops.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Best operating level is the volume of output at which average unit cost is minimized.
سؤال
Making adjustments to eliminate the variance between planned and actual output is tied into intermediate range capacity planning.
سؤال
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
سؤال
Long-range capacity planning requires top management participation.
سؤال
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
سؤال
When evaluating capacity,managers need to consider both resource inputs and product outputs.
سؤال
production facility works best when it focuses on a fairly limited set of production objectives.
سؤال
piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
سؤال
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.
سؤال
The ultimate in plant flexibility is a one-hour-changeover time plant.
سؤال
production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
سؤال
Capacity planning is generally viewed in three time durations: Immediate,Intermediate,and Indeterminate.
سؤال
At some point,the size of a growing plant can become too large and diseconomies of scale becomes a capacity planning problem.
سؤال
Best operating level is usually a multiple of the level of capacity for which a process was designed.
سؤال
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's short-range competitive strategy.
سؤال
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
سؤال
Capacity can be defined as the ability to hold,receive,store,or accommodate.
سؤال
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's long-range competitive strategy.
سؤال
The capacity utilization rate is found by dividing best operating level by capacity used.
سؤال
When a firm's design capacity is less than the capacity required to meet its demand,it is said to have a negative capacity cushion.
سؤال
In a decision tree,the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
سؤال
Capacity flexibility means having the ability to rapidly increase or decrease production levels,or to shift production capacity quickly from one product or service to another.
سؤال
The smaller the capacity cushion the better.
سؤال
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

A)Economies of scale
B)Economies of size
C)Economies of shape
D)Economies of scope
E)Economies of shipping
سؤال
The larger the capacity cushion the better.
سؤال
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
سؤال
Sharing capacity is a common source of external capacity.
سؤال
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
سؤال
In solving a decision tree problem,calculations start at the ends of the "branches" of the tree and work backwards to the base of the tree.
سؤال
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
سؤال
In practice achieving a perfectly balanced plant is usually both impossible and undesirable.
سؤال
Low rates of capacity utilization in service organizations are never appropriate.
سؤال
Because services cannot be stored for later use,service managers consider time as one of their supplies or resources.
سؤال
In practice,achieving a perfectly balanced plant is usually desirable but impossible.
سؤال
decision tree problem does not need probabilities or payoffs to generate a solution.
سؤال
In decision tree analysis the time value of money is ignored because you are only concerned with cash costs.
سؤال
Outsourcing is a common source of external capacity.
سؤال
capacity cushion is the amount of capacity less than expected demand.
سؤال
The capacity cushion is the ratio of capacity used to the best capacity level.
سؤال
If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour,which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.25
D)1.33
E)100
سؤال
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?

A)Intermediate-range
B)Long-range
C)Short-range
D)Current
E)Upcoming
سؤال
Capacity planning that involves hiring,layoffs,some new tooling,minor equipment purchases,and subcontracting is considered as which one of the following planning horizons?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
سؤال
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity cushion?

A)25 percent
B)100 units per hour
C)75 percent
D)125 percent
E)133 percent
سؤال
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

A)Probability indexing
B)Johnson's sequencing rule
C)Decision trees
C)Activity System Maps
D)Decision mapping
سؤال
Capacity planning involving acquisition or disposal of fixed assets such as buildings,equipment or facilities is considered as which one of the following planning horizons?

A)Intermediate-range
B)Long-range
C)Short-range
D)Current
E)Upcoming
سؤال
What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?

A)Time
B)Location
C)Demand volatility
D)Utilization impacts service
E)All of these
سؤال
At a decision point in a decision tree,which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%;the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?

A)Machine A
B)Machine B
C)Machine C
D)You would be indifferent between machines A and C
سؤال
When deciding to add capacity to a factory which of the following need not be considered?

A)Maintaining system balance
B)The frequency of capacity additions
C)Use of external capacity
D)Immediate product demand
E)Availability of raw materials
سؤال
The way to build in greater flexibility in your workers is to do which of the following?

A)Pay higher wages to motivate a willingness to do a variety to tasks
B)Provide a broader range of training
C)Provide a wide variety of technology to augment workers skills
D)Institute a "pay for skills" program
E)Use part-time employees with specialized skills as needed
سؤال
Which of the following is not a step used in determining production capacity requirements?

A)Forecasting to predict product sales
B)Forecasting raw material usage
C)Projecting availability of labor
D)Calculating equipment and labor needs
E)Projecting equipment availability
سؤال
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.33
D)2.33
E)300
سؤال
The optimal utilization rate of a service operation is context specific.Planning for low utilization rates is appropriate when both the degree of uncertainty and the stakes are high as in emergency response services.Which of the following services should plan for a high utilization rate?

A)The fire department
B)An expensive restaurant
C)A hospital ambulance service
D)A stage performance
E)A customer help line
سؤال
The capacity focus concept can be put into practice through a mechanism called which of the following?

A)Best operating level (BOL)
B)Plant within a plant (PWP)
C)Total quality management (TQM)
D)Capacity utilization rate (CUR)
E)Zero-changeover-time (ZXT)
سؤال
Compared with a service operation,a manufacturing operation's capacity is which of the following?

A)More dependent on time and location
B)Subject to more volatile demand fluctuations
C)Utilization more directly impacts quality
D)Demand can be smoothed by inventory policies
E)More capable of reacting to demand fluctuations
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/55
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Strategic Capacity Management
1
The basic notion of economies of scale is that as a plant gets larger and volume increases,the average cost per unit of output drops.
True
2
Best operating level is the volume of output at which average unit cost is minimized.
True
3
Making adjustments to eliminate the variance between planned and actual output is tied into intermediate range capacity planning.
False
4
Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
5
Long-range capacity planning requires top management participation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
6
The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
7
When evaluating capacity,managers need to consider both resource inputs and product outputs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
8
production facility works best when it focuses on a fairly limited set of production objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
9
piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
10
The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
11
The ultimate in plant flexibility is a one-hour-changeover time plant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
12
production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
13
Capacity planning is generally viewed in three time durations: Immediate,Intermediate,and Indeterminate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
14
At some point,the size of a growing plant can become too large and diseconomies of scale becomes a capacity planning problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
15
Best operating level is usually a multiple of the level of capacity for which a process was designed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
16
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's short-range competitive strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
17
Overtime and personnel transfers are solutions to capacity problems in the intermediate term.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
18
Capacity can be defined as the ability to hold,receive,store,or accommodate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
19
The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities,equipment,and overall labor force size)that best supports the company's long-range competitive strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
20
The capacity utilization rate is found by dividing best operating level by capacity used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
21
When a firm's design capacity is less than the capacity required to meet its demand,it is said to have a negative capacity cushion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
22
In a decision tree,the only time probabilities are applied to a decision node is when the decision is being made by someone else such as you customer or your competitor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
23
Capacity flexibility means having the ability to rapidly increase or decrease production levels,or to shift production capacity quickly from one product or service to another.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
24
The smaller the capacity cushion the better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
25
The ability to rapidly and inexpensively switch production from one product to another enables what are sometimes referred to as:

A)Economies of scale
B)Economies of size
C)Economies of shape
D)Economies of scope
E)Economies of shipping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
26
The larger the capacity cushion the better.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
27
The probability of each occurrence at a decision tree chance node is the reciprocal of the number of possibilities at the chance node.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
28
Sharing capacity is a common source of external capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
29
Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
30
In solving a decision tree problem,calculations start at the ends of the "branches" of the tree and work backwards to the base of the tree.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
31
The frequency of adding to productive capacity should balance the costs of upgrading too frequently and the costs of upgrading too infrequently.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
32
In practice achieving a perfectly balanced plant is usually both impossible and undesirable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
33
Low rates of capacity utilization in service organizations are never appropriate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
34
Because services cannot be stored for later use,service managers consider time as one of their supplies or resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
35
In practice,achieving a perfectly balanced plant is usually desirable but impossible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
36
decision tree problem does not need probabilities or payoffs to generate a solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
37
In decision tree analysis the time value of money is ignored because you are only concerned with cash costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
38
Outsourcing is a common source of external capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
39
capacity cushion is the amount of capacity less than expected demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
40
The capacity cushion is the ratio of capacity used to the best capacity level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
41
If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour,which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.25
D)1.33
E)100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
42
Capacity planning involving consideration of production scheduling and inventory position is characterized by which one of the following time durations?

A)Intermediate-range
B)Long-range
C)Short-range
D)Current
E)Upcoming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
43
Capacity planning that involves hiring,layoffs,some new tooling,minor equipment purchases,and subcontracting is considered as which one of the following planning horizons?

A)Intermediate range
B)Long range
C)Short range
D)Current
E)Upcoming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
44
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity cushion?

A)25 percent
B)100 units per hour
C)75 percent
D)125 percent
E)133 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following models uses a schematic model of the sequence of steps in a problem and the conditions and consequences of each step?

A)Probability indexing
B)Johnson's sequencing rule
C)Decision trees
C)Activity System Maps
D)Decision mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
46
Capacity planning involving acquisition or disposal of fixed assets such as buildings,equipment or facilities is considered as which one of the following planning horizons?

A)Intermediate-range
B)Long-range
C)Short-range
D)Current
E)Upcoming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
47
What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?

A)Time
B)Location
C)Demand volatility
D)Utilization impacts service
E)All of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
48
At a decision point in a decision tree,which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%;the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?

A)Machine A
B)Machine B
C)Machine C
D)You would be indifferent between machines A and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
49
When deciding to add capacity to a factory which of the following need not be considered?

A)Maintaining system balance
B)The frequency of capacity additions
C)Use of external capacity
D)Immediate product demand
E)Availability of raw materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
50
The way to build in greater flexibility in your workers is to do which of the following?

A)Pay higher wages to motivate a willingness to do a variety to tasks
B)Provide a broader range of training
C)Provide a wide variety of technology to augment workers skills
D)Institute a "pay for skills" program
E)Use part-time employees with specialized skills as needed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following is not a step used in determining production capacity requirements?

A)Forecasting to predict product sales
B)Forecasting raw material usage
C)Projecting availability of labor
D)Calculating equipment and labor needs
E)Projecting equipment availability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
52
If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units,which of the following is the capacity utilization rate?

A)0.75
B)1.00
C)1.33
D)2.33
E)300
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
53
The optimal utilization rate of a service operation is context specific.Planning for low utilization rates is appropriate when both the degree of uncertainty and the stakes are high as in emergency response services.Which of the following services should plan for a high utilization rate?

A)The fire department
B)An expensive restaurant
C)A hospital ambulance service
D)A stage performance
E)A customer help line
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
54
The capacity focus concept can be put into practice through a mechanism called which of the following?

A)Best operating level (BOL)
B)Plant within a plant (PWP)
C)Total quality management (TQM)
D)Capacity utilization rate (CUR)
E)Zero-changeover-time (ZXT)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 55 في هذه المجموعة.
فتح الحزمة
k this deck
55
Compared with a service operation,a manufacturing operation's capacity is which of the following?

A)More dependent on time and location
B)Subject to more volatile demand fluctuations
C)Utilization more directly impacts quality
D)Demand can be smoothed by inventory policies
E)More capable of reacting to demand fluctuations