Deck 4: A: Learning Curves
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/49
العب
ملء الشاشة (f)
Deck 4: A: Learning Curves
1
The unit improvement factor for a 60% learning curve at 25 units is 0.0933.The first and second timings of a person doing a job are 5 minutes and 3 minutes respectively.The learning-adjusted time estimate for the unit number 25 is 0.0933 minutes.
False
2
learning curve shows the decrease in time required for each successive unit completed.
True
3
An assumption of learning curves is that the time required to complete a unit will decrease at an increasing rate as the
cumulative number of units completed increases.
cumulative number of units completed increases.
False
4
The unit improvement factor is not as useful as arithmetic tabulation of learning curve statistics in adjusting time estimates for learning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
5
An assumption of learning curves is that the time required to complete a unit will decrease at a decreasing rate as the
cumulative number of units completed increases.
cumulative number of units completed increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
6
You time someone completing a single task the first time at 120 minutes and the second time they do the task it takes 108 minutes.You should use a 90 percent Learning Curve to estimate the length of time this worker will take to complete this task in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
7
When plotted on a graph,the learning curve can't be expressed as logarithm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
8
The point at which the scale economy curve and the learning curve intersect is called the capacity optimum.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
9
You time someone completing a single task the first time at 100 minutes and the second time they do the task it takes 90 minutes.You should use a 90 percent learning curve to estimate the length of time this worker will take to complete this task in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
10
learning curve shows the increase in time required for each successive unit completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
11
An assumption of learning curves is that the time required to complete a unit will increase at an increasing rate as the
cumulative number of units completed increases.
cumulative number of units completed increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
12
Economies of scale and the learning curve have opposite effects on capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
13
You time someone completing a single task the first time at 10 minutes and the second time they do the task it takes 9
minutes.You should use an 80 percent learning curve to estimate the length of time this worker will take to complete
take to complete this task in the future.
minutes.You should use an 80 percent learning curve to estimate the length of time this worker will take to complete
take to complete this task in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
14
The unit improvement factor for a 60% learning curve at 25 units is 0.0933.The first and second timings of a person doing a job are 10 minutes and 6 minutes respectively.The learning-adjusted time estimate for the unit number 25 is 0.9330 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
15
On a learning curve plot,the time per unit is usually displayed on the vertical axis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
16
learning curve is a line displaying the relationship between unit production time and the cumulative number of units produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
17
You time someone completing a single task the first time at 100 minutes and the fourth time they do the task it takes 81
minutes.You should use an 81 percent learning curve to estimate the length of time this worker will take to complete
this task in the future.
minutes.You should use an 81 percent learning curve to estimate the length of time this worker will take to complete
this task in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
18
The learning curve states that the more experience you have in a particular activity;the less surprised you will be when something goes wrong.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
19
You time someone completing a single task the first time at 100 minutes and the fourth time they do the task it takes 81 minutes.You should use a 90 percent learning curve to estimate the length of time this worker will take to complete this task in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
20
learning curve is a line displaying the way unit production time decreases as time passes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
21
If a person performing a task has been achieving an 80 percent learning curve and it took 10 minutes to produce the first unit,the total time to produce 100 units will be 326.5 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
22
The 50th repetition of a job is timed at 100 minutes.If the learning curve for this job is 90 percent,what is the estimated time for the 200th repetition of this job?
A)44.69 minutes
B)81 minutes
C)90 minutes
D)100 minutes
E)110 minutes
A)44.69 minutes
B)81 minutes
C)90 minutes
D)100 minutes
E)110 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
23
An assumption of learning curve theory is which of the following?
A)The reduction in unit time will follow a predictable pattern
B)Unit time will decrease at an increasing rate
C)The time required to do a task will vary randomly each time the task is repeated
D)Learning will not be transferred from one worker to the next
E)Organizational learning is not included in learning theory
A)The reduction in unit time will follow a predictable pattern
B)Unit time will decrease at an increasing rate
C)The time required to do a task will vary randomly each time the task is repeated
D)Learning will not be transferred from one worker to the next
E)Organizational learning is not included in learning theory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
24
With a 70 percent unit improvement factor learning curve and an initial time of 100 minutes to do a job,at what number of repetitions does the job take less than 50 minutes?
A)2 repetitions of the job
B)3 repetitions of the job
C)4 repetitions of the job
D)5 repetitions of the job
E)6 repetitions of the job
A)2 repetitions of the job
B)3 repetitions of the job
C)4 repetitions of the job
D)5 repetitions of the job
E)6 repetitions of the job
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
25
Learning curves have a wide range of business applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following computational methods are used to calculate learning curve statistics?
A)Simple compounding
B)Exponential smoothing
C)Logarithms
D)Calculus
E)Negative recursive multiplication
A)Simple compounding
B)Exponential smoothing
C)Logarithms
D)Calculus
E)Negative recursive multiplication
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
27
The unit improvement factor for a 60% learning curve at 25 units is 0.0933.The first and second timings of a person doing a job are 5 minutes and 3 minutes respectively.Which of the below is the learning-adjusted time estimate for unit number 25?
A)0.4665 minutes
B)0.0933 minutes
C)4.665 minutes
D)9.33 minutes
E)3 minutes
A)0.4665 minutes
B)0.0933 minutes
C)4.665 minutes
D)9.33 minutes
E)3 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
28
With an 80 percent unit improvement factor learning curve and an initial time of 100 minutes to do a job,at what number of repetitions will the job take less than 50 minutes?
A)5 repetitions of the job
B)6 repetitions of the job
C)7 repetitions of the job
D)8 repetitions of the job
E)9 repetitions of the job
A)5 repetitions of the job
B)6 repetitions of the job
C)7 repetitions of the job
D)8 repetitions of the job
E)9 repetitions of the job
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
29
An assumption of learning curve theory is which of the following?
A)Unit time will decrease at a decreasing rate
B)Unit time will increase at a decreasing rate
C)Unit time will decrease at an increasing rate
D)Unit time will increase at an increasing rate
E)Unit time will hold constant
A)Unit time will decrease at a decreasing rate
B)Unit time will increase at a decreasing rate
C)Unit time will decrease at an increasing rate
D)Unit time will increase at an increasing rate
E)Unit time will hold constant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
30
The 50th repetition of a job is timed at 100 minutes.If the learning curve for this job is 90 percent,what is the estimated time for the 100th repetition of this job?
A)49.66 minutes
B)81 minutes
C)90 minutes
D)100 minutes
E)110 minutes
A)49.66 minutes
B)81 minutes
C)90 minutes
D)100 minutes
E)110 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
31
The unit improvement factor for an 80% learning curve at 100 units is 0.2271.The first and second timings of a person doing a job are 20 minutes and 16 minutes respectively,what is the learning-adjusted time estimate for unit number 100?
A)20 minutes
B)16 minutes
C)2.271 minutes
D)4.542 minutes
E)0.800 minutes
A)20 minutes
B)16 minutes
C)2.271 minutes
D)4.542 minutes
E)0.800 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
32
You have just timed a person doing a job a four times.The first time it took the person 120 minutes,the second time it took 90 minutes,the third time it took 76.1 minutes,and the fourth time it took 67.5 minutes.Which Learning Curve Unit Improvement Factor should you use?
A)25 percent
B)75 percent
C)80 percent
D)85 percent
E)90 percent
A)25 percent
B)75 percent
C)80 percent
D)85 percent
E)90 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
33
If a person performing a task has been achieving a 75 percent learning curve and you know that the task will end after the 80th unit,the last unit produced will take 17.12 percent as much time as the first unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
34
If a person performing a task has been achieving a 95 percent learning curve and you know that the task will end after the 100th unit,the last unit produced will take 71.12 percent as much time as the first unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
35
You have just timed a person doing a job a few times.The first time it took the person 25 minutes,the second time it took 20 minutes,and the third time it took 17.55 minutes.Which learning curve unit improvement factor should you use?
A)25 percent
B)75 percent
C)80 percent
D)85 percent
E)90 percent
A)25 percent
B)75 percent
C)80 percent
D)85 percent
E)90 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
36
Learning curves can be applied to individuals and to organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
37
You have just timed a person doing a hair cut for the first time.It took 50 minutes.What unit improvement factor learning curve would you use if the person took 35 minutes on the second hair cut?
A)35 percent
B)50 percent
C)70 percent
D)75 percent
E)80 percent
A)35 percent
B)50 percent
C)70 percent
D)75 percent
E)80 percent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
38
You have determined that a 60 percent learning curve is appropriate for a task.If your initial timing of person performing that task was 35 minutes and if you need the task performed 1,000 times,how many minutes of work will be required?
A)3,500.0 minutes
B)1,062.5 minutes
C)705.25 minutes
D)450.5 minutes
E)220.3 minutes
A)3,500.0 minutes
B)1,062.5 minutes
C)705.25 minutes
D)450.5 minutes
E)220.3 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
39
You have determined that a 75 percent learning curve is appropriate for a task.If the initial timing of the person performing that job was 50 minutes,and if you need the job performed 500 times,how many minutes of work will be required?
A)25,000 minutes
B)3,184 minutes
C)1,895 minutes
D)1,379 minutes
E)636.8 minutes
A)25,000 minutes
B)3,184 minutes
C)1,895 minutes
D)1,379 minutes
E)636.8 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
40
If a person performing a task has been achieving an 85 percent learning curve and if it took 1 minute to produce the
first unit,the total time to produce 1,000 units will be 437.5 minutes.
first unit,the total time to produce 1,000 units will be 437.5 minutes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
41
company's production process has an 80 percent learning curve rate.The process has produced 1,000 units to date.process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent.However,the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process.At what point,using the new process,will the production rate exceed the production rate achieved by the old process?
A)Before the 50th unit
B)Before the 80th unit
C)Before the 100th unit
D)Before the 120th unit
E)Before the 250th unit
A)Before the 50th unit
B)Before the 80th unit
C)Before the 100th unit
D)Before the 120th unit
E)Before the 250th unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
42
At the 10th repetition of job it is timed at 100 minutes.If the learning curve for this job is 80 percent,what is the estimated time for the 100th repetition of this job?
A)47.66 minutes
B)62.50 minutes
C)80 minutes
D)92.50 minutes
E)100 minutes
A)47.66 minutes
B)62.50 minutes
C)80 minutes
D)92.50 minutes
E)100 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
43
You are a consultant specializing in estimating the costs after the employees learn how to do a job more efficiently by repetition.Your client can produce a product the first time at a cost of $2,500.If their 65 percent Learning Curve allows them to reduce their costs on each product,what is the total cost of producing 400 units of the new product?
A)$100,000
B)$78,900
C)$58,600
D)$45,765
E)$37,850
A)$100,000
B)$78,900
C)$58,600
D)$45,765
E)$37,850
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
44
company's production process has an 85 percent learning curve rate.The process has produced 1,000 units to date.process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent.However,the initial unit made using the new process will take the same amount of time as the very first unit produced using the old process.At what point,using the new process,will the production rate exceed the production rate achieved by the old process?
A)By the 50th unit
B)By the 80th unit
C)By the 100th unit
D)By the 120th unit
E)By the 250th unit
A)By the 50th unit
B)By the 80th unit
C)By the 100th unit
D)By the 120th unit
E)By the 250th unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
45
company can produce a small lot of products the first time at a cost of $3,000.If their 65 percent learning curve allows them to reduce their costs on each lot,what is the cost of producing the 12th lot?
A)$14,340
B)$3,000
C)$2,896
D)$640.50
E)$213.50
A)$14,340
B)$3,000
C)$2,896
D)$640.50
E)$213.50
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
46
company can produce a small lot of products the first time at a cost of $3,000.If their 65 percent Learning Curve allows them to reduce their costs on each lot,what is the cost of producing the 20th lot?
A)$60,000
B)$18,585
C)$1,950
D)$466.20
E)$155.40
A)$60,000
B)$18,585
C)$1,950
D)$466.20
E)$155.40
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
47
company can produce a small lot of products the first time at a cost of $10,000.If their 75 percent learning curve allows them to reduce their costs on each lot,what is the total cost of producing 10 lots?
A)$100,000
B)$93,978
C)$65,432
D)$55,890
E)$49,310
A)$100,000
B)$93,978
C)$65,432
D)$55,890
E)$49,310
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
48
You are a consultant called in to estimate the costs after the employees learn how to do a job more efficiently by repetition of new product.You find a company can produce a product the first time at a cost of $5,000.If their 90 percent learning curve allows them to reduce their costs on each unit,what is the total cost of producing 100 units of the new product?
A)$500,000
B)$390,000
C)$290,700
D)$250,687
E)$250,000
A)$500,000
B)$390,000
C)$290,700
D)$250,687
E)$250,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 49 في هذه المجموعة.
فتح الحزمة
k this deck
49
company can produce a small lot of products the first time at a cost of $2,000.If their 85 percent learning curve allows them to reduce their costs on each lot,what is the total cost of producing 5 lots?
A)$10,000.00
B)$9,376.50
C)$8,062.00
D)$4,031.00
E)$1,191.20
A)$10,000.00
B)$9,376.50
C)$8,062.00
D)$4,031.00
E)$1,191.20