A linear programming problem can have multiple optimal solutions.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The term "isoprofit" line means that all points on the line will yield the same profit.
سؤال
If a single optimal solution exists to a graphical LP problem,it will exist at a corner point.
سؤال
Slack or surplus is associated with a binding constraint.
سؤال
The equation 3xy = 9 is linear.
سؤال
The feasible solution space is the set of all feasible combinations of decision variables as defined by only binding constraints.
سؤال
A maximization problem may be characterized by all greater than or equal to constraints.
سؤال
A change in the value of an objective function coefficient does not change the optimal solution.
سؤال
The removal of a redundant constraint does not affect the feasible solution space.
سؤال
An objective function represents a family of parallel lines.
سؤال
The simplex method is an LP algorithm that can be used for solving only large-scale problems.
سؤال
The equation 5x + 7y = 10 is linear.
سؤال
LP problems must have a single goal or objective specified.
سؤال
The feasible solution space only contains points that satisfy all constraints.
سؤال
Linear programming techniques will produce an optimal solution to problems that involve limitations on resources.
سؤال
An example of a decision variable in an LP problem is profit maximization.
سؤال
The value of an objective function decreases as it is moved away from the origin.
سؤال
Every constraint in a maximization problem has a slack variable.
سؤال
Constraints limit the alternatives available to a decision-maker.
سؤال
The graphical Solution Method can handle problems that involve any number of decision variables.
سؤال
Which of the following is not a necessary assumption in order for a linear programming model to be used effectively?

A) Linearity
B) Exponentiality
C) Divisibility
D) Certainty
E) Non-negativity
سؤال
What combination of x and y will yield the optimum solution for this problem?
Maximize Z = $3x + $15y; Subject to:
(1)2x + 4y ≤ 12 (2)5x + 2y ≤ 10

A) x = 2, y = 0
B) x = 0, y = 0
C) x = 0, y = 3
D) x = 1, y = 5
E) None of the choices are correct.
سؤال
The term "range of feasibility" refers to coefficients of the objective function.
سؤال
Which of the choices below constitutes a simultaneous solution to these equations?
(1)3x + 2y = 6 and (2)6x + 3y = 12

A) x = 1, y = 1.5
B) x = .5, y = 2
C) x = 0, y = 3
D) x = 2, y = 0
E) x = 0, y = 0
سؤال
Which of the following is not written in the standard form of a linear programming problem constraint?

A) 1A + 2B ≥ 3
B) 1A + 2B ≤ 3
C) 1A + 2B = 3
D) 1A + 2B + 3C + 4D ≤ 5
E) 2A ≤ 3B
سؤال
In the range of feasibility,the value of the shadow price remains constant.
سؤال
In graphical linear programming the objective function is:
I)linear.
II)a family of parallel lines.
III)a family of is profit lines.

A) I only
B) II only
C) III only
D) I and II only
E) I, II, and III
سؤال
A shadow price indicates how much a one-unit decrease/increase in the right-hand side value of a constraint will decrease/increase the optimal value of the objective function.
سؤال
Every change in the value of an objective function coefficient will lead to a changed optimal solution.
سؤال
When a change in the value of an objective function coefficient remains within the range of optimality,the optimal solution would also remain the same.
سؤال
The linear optimization technique for allocating constrained resources among different products is:

A) linear regression analysis.
B) linear disaggregation.
C) linear decomposition.
D) linear programming.
E) linear tracking analysis.
سؤال
For the constraints given below,which point is in the feasible solution space of this maximization problem?
(1)14x + 6y ≤ 42
(2)x - y ≤ 3

A) x = 1, y = 5
B) x = -1, y = 1
C) x = 4, y = 4
D) x = 2, y = 1
E) x = 2, y = 8
سؤال
Which objective function has the same slope as this one: $4x + $2y = $20?

A) $4x + $2y = $10
B) $2x + $4y = $20
C) $2x - $4y = $20
D) $4x - $2y = $20
E) $8x + $8y = $20
سؤال
A constraint that does not form a unique boundary of the feasible solution space is a:

A) redundant constraint.
B) binding constraint.
C) non-binding constraint.
D) feasible solution constraint.
E) none of the choices are correct.
سؤال
The region which satisfies all of the constraints in linear programming is called the:

A) optimum solution space.
B) region of optimality.
C) profit maximization space.
D) region of non-negativity.
E) feasible solution space.
سؤال
Which of the choices below constitutes a simultaneous solution to these equations?
(1)3x + 4y = 10 and (2)5x + 4y = 14

A) x = 2, y = .5
B) x = 4, y = -.5
C) x = 2, y = 1
D) x = y
E) y = 2x
سؤال
Which of the following is not a component of the structure of a linear programming model?

A) Constraints
B) Decision variables
C) Environment of certainty
D) A goal or objective
E) All of these are components
سؤال
The logical approach,from beginning to end,for assembling a linear programming model begins with:

A) identifying the decision variables.
B) identifying the objective function.
C) specifying the objective function parameters.
D) identifying the constraints.
E) specifying the constraint parameters.
سؤال
The term "range of optimality" refers to a constraint's right-hand side quantity.
سؤال
For the products A,B,C,and D,which of the following could be a linear programming objective function?

A) Z = 1A + 2B + 3C + 4D
B) Z = 1A + 2BC + 3D
C) Z = 1A + 2AB + 3ABC + 4ABCD
D) Z = 1A + 2B/C + 3D
E) All of the choices are correct.
سؤال
The theoretical limit on the number of decision variables that can be handled by the simplex method in a single problem is:

A) 1
B) 2
C) 3
D) 4
E) unlimited.
سؤال
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What are optimal daily profits?

A) $0
B) $240
C) $420
D) $405
E) $505
سؤال
For the constraints given below,which point is in the feasible solution space of this minimization problem?
(1)14x + 6y > 42 (2)x + 3y > 6

A) x = 0.5, y = 5.0
B) x = 0.0, y = 4.0
C) x = 2.0, y = 5.0
D) x = 1.0, y = 2.0
E) x = 2.0, y = 1.0
سؤال
In the graphical method of linear programming,when the objective function is parallel to one of the constraints,then:

A) the solution is suboptimal.
B) multiple optimal solutions exist.
C) a single corner point solution exists.
D) no feasible solution exists.
E) none of the choices are correct.
سؤال
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.Which of the following is not a feasible production combination?

A) 0 A & 0 B
B) 0 A & 400 B
C) 200 A & 300 B
D) 400 A & 0 B
E) 400 A & 400 B
سؤال
The theoretical limit on the number of constraints that can be handled by the simplex method in a single problem is:

A) 1
B) 2
C) 3
D) 4
E) unlimited.
سؤال
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.What is the objective function?

A) Z = $4 R + $6 S
B) Z = $2 R + $3 S
C) Z = $6 R + $4 S
D) Z = $3 R + $2 S
E) Z = $5 R + $5 S
سؤال
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What is the objective function?

A) Z = $2 L + $3 D
B) Z = $2 L + $4 D
C) Z = $3 L + $2 D
D) Z = $4 L + $2 D
E) Z = $5 L + $3 D
سؤال
A shadow price reflects which of the following in a maximization problem?

A) The marginal cost of adding additional resources
B) The marginal gain in the objective that would be realized by adding one unit of a resource
C) The net gain in the objective that would be realized by adding one unit of a resource
D) The marginal gain in the objective that would be realized by subtracting one unit of a resource
E) None of the choices are correct.
سؤال
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.For the production combination of 0 American and 400 British,which resource is "slack" (not fully used)?

A) Colombian beans (only)
B) Dominican beans (only)
C) Both Colombian beans and Dominican beans
D) Neither Colombian beans nor Dominican beans
E) Cannot be determined exactly
سؤال
What combination of x and y will provide a minimum for this problem?
Minimize Z = $3x + $15y; Subject to:
(1)2x + 4y > 12 (2)5x + 2y > 10

A) x = 0, y = 0
B) x = 0, y = 3
C) x = 0, y = 5
D) x = 1, y = 2.5
E) x = 6, y = 0
سؤال
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.What is the Dominican bean constraint?

A) 12A + 8B ≤ 4,800
B) 8A + 12B ≤ 4,800
C) 4A + 8B ≤ 3,200
D) 8A + 4B ≤ 3,200
E) 4A + 8B ≤ 4,800
سؤال
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.What is the objective function?

A) Z = $1 A + $2 B
B) Z = $12 A + $8 B
C) Z = $2 A + $1 B
D) Z = $8 A + $12 B
E) Z = $4 A + $8 B
سؤال
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.Using the graphical method,what are optimal weekly profits?

A) $0
B) $400
C) $700
D) $800
E) $900
سؤال
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.Which of the following is not a feasible production combination?

A) 0 L & 0 D
B) 0 L & 120 D
C) 90 L & 75 D
D) 135 L & 0 D
E) 135 L & 120 D
سؤال
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What is the time constraint?

A) 2 L + 3 D ≤ 480
B) 2 L + 4 D ≤ 480
C) 3 L + 2 D ≤ 480
D) 4 L + 2 D ≤ 480
E) 5 L + 3 D ≤ 480
سؤال
In linear programming,sensitivity analysis is associated with:
I)objective function coefficient.
II)right-hand side values of constraints.
III)constraint coefficient.

A) I and II only
B) II and III only
C) I, II, and III
D) I and III only
E) None of the choices are correct.
سؤال
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.For the production combination of 135 Lite and 0 Dark,which resource is "slack" (not fully used)?

A) Time (only)
B) Malt extract (only)
C) Both time and malt extract
D) Neither time nor malt extract
E) Cannot be determined exactly
سؤال
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Colombia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.What is the Colombian bean constraint?

A) 1 A + 2 B ≤ 4,800
B) 12 A + 8 B ≤ 4,800
C) 2 A + 1 B ≤ 4,800
D) 8 A + 12 B ≤ 4,800
E) 4 A + 8 B ≤ 4,800
سؤال
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.What is the production time constraint (in minutes)?

A) 2 R + 3 S ≤ 720
B) 2 R + 5 S ≤ 720
C) 3 R + 2 S ≤ 720
D) 3 R + 5 S ≤ 720
E) 5 R + 5 S ≤ 720
سؤال
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.Using the graphical method,what are profits for the optimal production combination?

A) $800
B) $500
C) $640
D) $620
E) $600
سؤال
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.What is the assembly time constraint (in hours)?

A) 1 A + 1 B ≤ 800
B) 0.25 A + 0.5 B ≤ 800
C) 0.5 A + 0.25 B ≤ 800
D) 1 A + 0.5 B ≤ 800
E) 0.25 A + 1 B ≤ 800
سؤال
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.What is the objective function?

A) Z = $0.30 B + $0.20 C
B) Z = $0.60 B + $0.30 C
C) Z = $0.20 B + $0.30 C
D) Z = $0.20 B + $0.40 C
E) Z = $0.10 B + $0.10 C
سؤال
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.Which of the following is not a feasible production/sales combination?

A) 0 A & 0 B
B) 0 A & 1,000 B
C) 1,800 A & 700 B
D) 2,500 A & 0 B
E) 100 A & 1,600 B
سؤال
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.What is the objective function?

A) Z = $0.50 D + $0.40 C
B) Z = $0.20 D + $0.30 C
C) Z = $0.40 D + $0.50 C
D) Z = $0.10 D + $0.20 C
E) Z = $0.60 D + $0.80 C
سؤال
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.For the production combination of 800 boxes of Deluxe and 600 boxes of Classic,which resource is slack (not fully used)?

A) Sugar (only)
B) Flour (only)
C) Salt (only)
D) Sugar and flour
E) Sugar and salt
سؤال
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.What is the sugar constraint (in tablespoons)?

A) 6 B + 3 C ≤ 4,800
B) 1 B + 1 C ≤ 4,800
C) 2 B + 4 C ≤ 4,800
D) 4 B + 2 C ≤ 4,800
E) 2 B + 3 C ≤ 4,800
سؤال
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.Which of the following is not a feasible production combination?

A) 0 B & 0 C
B) 0 B & 1,100 C
C) 800 B & 600 C
D) 1,100 B & 0 C
E) 0 B & 1,400 C
سؤال
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.For the production combination of 600 bagels and 800 croissants,which resource is "slack" (not fully used)?

A) Flour (only)
B) Sugar (only)
C) Flour and yeast
D) Flour and sugar
E) Yeast and sugar
سؤال
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.What is the objective function?

A) Z = $4.00 A + $1.00 B
B) Z = $0.25 A + $1.00 B
C) Z = $1.00 A + $4.00 B
D) Z = $1.00 A + $1.00 B
E) Z = $0.25 A + $0.50 B
سؤال
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.Which of the following is not a feasible production combination?

A) 0 D & 0 C
B) 0 D & 1,000 C
C) 800 D & 600 C
D) 1,600 D & 0 C
E) 0 D & 1,200 C
سؤال
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.For the production combination of 1,400 A-100's and 900 B-200's,which resource is "slack" (not fully used)?

A) Circuit boards (only)
B) Assembly time (only)
C) Both circuit boards and assembly time
D) Neither circuit boards nor assembly time
E) Cannot be determined exactly
سؤال
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.What is the constraint for sugar?

A) 2 D + 3 C ≤ 4,800
B) 6 D + 8 C ≤ 4,800
C) 1 D + 2 C ≤ 4,800
D) 3 D + 2 C ≤ 4,800
E) 4 D + 5 C ≤ 4,800
سؤال
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.Which of the following is not a feasible production combination?

A) 0 R & 0 S
B) 0 R & 240 S
C) 180 R & 120 S
D) 300 R & 0 S
E) 180 R & 240 S
سؤال
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.Using the graphical method,what are optimal profits for today's production run?

A) $580
B) $340
C) $220
D) $380
E) $420
سؤال
The logistics/operations manager of a mail order house purchases two products for resale: King Beds (K)and Queen Beds (Q).Each King Bed costs $500 and requires 100 cubic feet of storage space,and each Queen Bed costs $300 and requires 90 cubic feet of storage space.The manager has $75,000 to invest in beds this week,and her warehouse has 18,000 cubic feet available for storage.Profit for each King Bed is $300,and for each Queen Bed is $150.What is the objective function?

A) Z = $150K + $300Q
B) Z = $500K + $300Q
C) Z = $300K + $150Q
D) Z = $300K + $500Q
E) Z = $100K + $90Q
سؤال
The logistics/operations manager of a mail order house purchases two products for resale: King Beds (K)and Queen Beds (Q).Each King Bed costs $500 and requires 100 cubic feet of storage space,and each Queen Bed costs $300 and requires 90 cubic feet of storage space.The manager has $75,000 to invest in beds this week,and her warehouse has 18,000 cubic feet available for storage.Profit for each King Bed is $300,and for each Queen Bed is $150.What is the storage space constraint?

A) 100K - 90Q ≤ 18,000
B) 90K + 100Q ≤ 18,000
C) 300K + 90Q ≤ 18,000
D) 500K + 100Q ≤ 18,000
E) 100K + 90Q ≤ 18,000
سؤال
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.For the production combination of 180 Root beer and 0 Sassafras sodas,which resource is "slack" (not fully used)?

A) Production time (only)
B) Carbonated water (only)
C) Both production time and carbonated water
D) Neither production time nor carbonated water
E) Cannot be determined exactly
سؤال
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.What are optimal weekly profits?

A) $10,000
B) $4,600
C) $2,500
D) $5,200
E) $6,400
سؤال
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.Using the graphical method,what are optimal daily profits?

A) $960
B) $1,560
C) $1,800
D) $1,900
E) $2,520
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/99
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: B: Process Design and Facility Layout
1
A linear programming problem can have multiple optimal solutions.
True
2
The term "isoprofit" line means that all points on the line will yield the same profit.
True
3
If a single optimal solution exists to a graphical LP problem,it will exist at a corner point.
True
4
Slack or surplus is associated with a binding constraint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
5
The equation 3xy = 9 is linear.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
6
The feasible solution space is the set of all feasible combinations of decision variables as defined by only binding constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
7
A maximization problem may be characterized by all greater than or equal to constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
8
A change in the value of an objective function coefficient does not change the optimal solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
9
The removal of a redundant constraint does not affect the feasible solution space.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
10
An objective function represents a family of parallel lines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
11
The simplex method is an LP algorithm that can be used for solving only large-scale problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
12
The equation 5x + 7y = 10 is linear.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
13
LP problems must have a single goal or objective specified.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
14
The feasible solution space only contains points that satisfy all constraints.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
15
Linear programming techniques will produce an optimal solution to problems that involve limitations on resources.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
16
An example of a decision variable in an LP problem is profit maximization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
17
The value of an objective function decreases as it is moved away from the origin.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
18
Every constraint in a maximization problem has a slack variable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
19
Constraints limit the alternatives available to a decision-maker.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
20
The graphical Solution Method can handle problems that involve any number of decision variables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following is not a necessary assumption in order for a linear programming model to be used effectively?

A) Linearity
B) Exponentiality
C) Divisibility
D) Certainty
E) Non-negativity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
22
What combination of x and y will yield the optimum solution for this problem?
Maximize Z = $3x + $15y; Subject to:
(1)2x + 4y ≤ 12 (2)5x + 2y ≤ 10

A) x = 2, y = 0
B) x = 0, y = 0
C) x = 0, y = 3
D) x = 1, y = 5
E) None of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
23
The term "range of feasibility" refers to coefficients of the objective function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the choices below constitutes a simultaneous solution to these equations?
(1)3x + 2y = 6 and (2)6x + 3y = 12

A) x = 1, y = 1.5
B) x = .5, y = 2
C) x = 0, y = 3
D) x = 2, y = 0
E) x = 0, y = 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is not written in the standard form of a linear programming problem constraint?

A) 1A + 2B ≥ 3
B) 1A + 2B ≤ 3
C) 1A + 2B = 3
D) 1A + 2B + 3C + 4D ≤ 5
E) 2A ≤ 3B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
26
In the range of feasibility,the value of the shadow price remains constant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
27
In graphical linear programming the objective function is:
I)linear.
II)a family of parallel lines.
III)a family of is profit lines.

A) I only
B) II only
C) III only
D) I and II only
E) I, II, and III
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
28
A shadow price indicates how much a one-unit decrease/increase in the right-hand side value of a constraint will decrease/increase the optimal value of the objective function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
29
Every change in the value of an objective function coefficient will lead to a changed optimal solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
30
When a change in the value of an objective function coefficient remains within the range of optimality,the optimal solution would also remain the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
31
The linear optimization technique for allocating constrained resources among different products is:

A) linear regression analysis.
B) linear disaggregation.
C) linear decomposition.
D) linear programming.
E) linear tracking analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
32
For the constraints given below,which point is in the feasible solution space of this maximization problem?
(1)14x + 6y ≤ 42
(2)x - y ≤ 3

A) x = 1, y = 5
B) x = -1, y = 1
C) x = 4, y = 4
D) x = 2, y = 1
E) x = 2, y = 8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which objective function has the same slope as this one: $4x + $2y = $20?

A) $4x + $2y = $10
B) $2x + $4y = $20
C) $2x - $4y = $20
D) $4x - $2y = $20
E) $8x + $8y = $20
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
34
A constraint that does not form a unique boundary of the feasible solution space is a:

A) redundant constraint.
B) binding constraint.
C) non-binding constraint.
D) feasible solution constraint.
E) none of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
35
The region which satisfies all of the constraints in linear programming is called the:

A) optimum solution space.
B) region of optimality.
C) profit maximization space.
D) region of non-negativity.
E) feasible solution space.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the choices below constitutes a simultaneous solution to these equations?
(1)3x + 4y = 10 and (2)5x + 4y = 14

A) x = 2, y = .5
B) x = 4, y = -.5
C) x = 2, y = 1
D) x = y
E) y = 2x
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following is not a component of the structure of a linear programming model?

A) Constraints
B) Decision variables
C) Environment of certainty
D) A goal or objective
E) All of these are components
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
38
The logical approach,from beginning to end,for assembling a linear programming model begins with:

A) identifying the decision variables.
B) identifying the objective function.
C) specifying the objective function parameters.
D) identifying the constraints.
E) specifying the constraint parameters.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
39
The term "range of optimality" refers to a constraint's right-hand side quantity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
40
For the products A,B,C,and D,which of the following could be a linear programming objective function?

A) Z = 1A + 2B + 3C + 4D
B) Z = 1A + 2BC + 3D
C) Z = 1A + 2AB + 3ABC + 4ABCD
D) Z = 1A + 2B/C + 3D
E) All of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
41
The theoretical limit on the number of decision variables that can be handled by the simplex method in a single problem is:

A) 1
B) 2
C) 3
D) 4
E) unlimited.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
42
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What are optimal daily profits?

A) $0
B) $240
C) $420
D) $405
E) $505
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
43
For the constraints given below,which point is in the feasible solution space of this minimization problem?
(1)14x + 6y > 42 (2)x + 3y > 6

A) x = 0.5, y = 5.0
B) x = 0.0, y = 4.0
C) x = 2.0, y = 5.0
D) x = 1.0, y = 2.0
E) x = 2.0, y = 1.0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
44
In the graphical method of linear programming,when the objective function is parallel to one of the constraints,then:

A) the solution is suboptimal.
B) multiple optimal solutions exist.
C) a single corner point solution exists.
D) no feasible solution exists.
E) none of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
45
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.Which of the following is not a feasible production combination?

A) 0 A & 0 B
B) 0 A & 400 B
C) 200 A & 300 B
D) 400 A & 0 B
E) 400 A & 400 B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
46
The theoretical limit on the number of constraints that can be handled by the simplex method in a single problem is:

A) 1
B) 2
C) 3
D) 4
E) unlimited.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
47
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.What is the objective function?

A) Z = $4 R + $6 S
B) Z = $2 R + $3 S
C) Z = $6 R + $4 S
D) Z = $3 R + $2 S
E) Z = $5 R + $5 S
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
48
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What is the objective function?

A) Z = $2 L + $3 D
B) Z = $2 L + $4 D
C) Z = $3 L + $2 D
D) Z = $4 L + $2 D
E) Z = $5 L + $3 D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
49
A shadow price reflects which of the following in a maximization problem?

A) The marginal cost of adding additional resources
B) The marginal gain in the objective that would be realized by adding one unit of a resource
C) The net gain in the objective that would be realized by adding one unit of a resource
D) The marginal gain in the objective that would be realized by subtracting one unit of a resource
E) None of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
50
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.For the production combination of 0 American and 400 British,which resource is "slack" (not fully used)?

A) Colombian beans (only)
B) Dominican beans (only)
C) Both Colombian beans and Dominican beans
D) Neither Colombian beans nor Dominican beans
E) Cannot be determined exactly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
51
What combination of x and y will provide a minimum for this problem?
Minimize Z = $3x + $15y; Subject to:
(1)2x + 4y > 12 (2)5x + 2y > 10

A) x = 0, y = 0
B) x = 0, y = 3
C) x = 0, y = 5
D) x = 1, y = 2.5
E) x = 6, y = 0
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
52
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.What is the Dominican bean constraint?

A) 12A + 8B ≤ 4,800
B) 8A + 12B ≤ 4,800
C) 4A + 8B ≤ 3,200
D) 8A + 4B ≤ 3,200
E) 4A + 8B ≤ 4,800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
53
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.What is the objective function?

A) Z = $1 A + $2 B
B) Z = $12 A + $8 B
C) Z = $2 A + $1 B
D) Z = $8 A + $12 B
E) Z = $4 A + $8 B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
54
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Columbia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.Using the graphical method,what are optimal weekly profits?

A) $0
B) $400
C) $700
D) $800
E) $900
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
55
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.Which of the following is not a feasible production combination?

A) 0 L & 0 D
B) 0 L & 120 D
C) 90 L & 75 D
D) 135 L & 0 D
E) 135 L & 120 D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
56
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What is the time constraint?

A) 2 L + 3 D ≤ 480
B) 2 L + 4 D ≤ 480
C) 3 L + 2 D ≤ 480
D) 4 L + 2 D ≤ 480
E) 5 L + 3 D ≤ 480
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
57
In linear programming,sensitivity analysis is associated with:
I)objective function coefficient.
II)right-hand side values of constraints.
III)constraint coefficient.

A) I and II only
B) II and III only
C) I, II, and III
D) I and III only
E) None of the choices are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
58
The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L)and Dark (D).Two of his resources are constrained:
Production time,which is limited to 8 hours (480 minutes)per day; and malt extract (one of his ingredients),of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.For the production combination of 135 Lite and 0 Dark,which resource is "slack" (not fully used)?

A) Time (only)
B) Malt extract (only)
C) Both time and malt extract
D) Neither time nor malt extract
E) Cannot be determined exactly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
59
The production planner for Fine Coffees,Inc.produces two coffee blends: American (A)and British (B).Two of his resources are constrained:
Colombia beans,of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans,of which he can get at most 200 pounds (3,200 ounces)per week.Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans; while a pound of British blend coffee uses 8 ounces of each type of bean.Profits for the American blend are $2.00 per pound,and profits for the British blend are $1.00 per pound.What is the Colombian bean constraint?

A) 1 A + 2 B ≤ 4,800
B) 12 A + 8 B ≤ 4,800
C) 2 A + 1 B ≤ 4,800
D) 8 A + 12 B ≤ 4,800
E) 4 A + 8 B ≤ 4,800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
60
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.What is the production time constraint (in minutes)?

A) 2 R + 3 S ≤ 720
B) 2 R + 5 S ≤ 720
C) 3 R + 2 S ≤ 720
D) 3 R + 5 S ≤ 720
E) 5 R + 5 S ≤ 720
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
61
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.Using the graphical method,what are profits for the optimal production combination?

A) $800
B) $500
C) $640
D) $620
E) $600
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
62
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.What is the assembly time constraint (in hours)?

A) 1 A + 1 B ≤ 800
B) 0.25 A + 0.5 B ≤ 800
C) 0.5 A + 0.25 B ≤ 800
D) 1 A + 0.5 B ≤ 800
E) 0.25 A + 1 B ≤ 800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
63
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.What is the objective function?

A) Z = $0.30 B + $0.20 C
B) Z = $0.60 B + $0.30 C
C) Z = $0.20 B + $0.30 C
D) Z = $0.20 B + $0.40 C
E) Z = $0.10 B + $0.10 C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
64
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.Which of the following is not a feasible production/sales combination?

A) 0 A & 0 B
B) 0 A & 1,000 B
C) 1,800 A & 700 B
D) 2,500 A & 0 B
E) 100 A & 1,600 B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
65
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.What is the objective function?

A) Z = $0.50 D + $0.40 C
B) Z = $0.20 D + $0.30 C
C) Z = $0.40 D + $0.50 C
D) Z = $0.10 D + $0.20 C
E) Z = $0.60 D + $0.80 C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
66
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.For the production combination of 800 boxes of Deluxe and 600 boxes of Classic,which resource is slack (not fully used)?

A) Sugar (only)
B) Flour (only)
C) Salt (only)
D) Sugar and flour
E) Sugar and salt
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
67
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.What is the sugar constraint (in tablespoons)?

A) 6 B + 3 C ≤ 4,800
B) 1 B + 1 C ≤ 4,800
C) 2 B + 4 C ≤ 4,800
D) 4 B + 2 C ≤ 4,800
E) 2 B + 3 C ≤ 4,800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
68
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.Which of the following is not a feasible production combination?

A) 0 B & 0 C
B) 0 B & 1,100 C
C) 800 B & 600 C
D) 1,100 B & 0 C
E) 0 B & 1,400 C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
69
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.For the production combination of 600 bagels and 800 croissants,which resource is "slack" (not fully used)?

A) Flour (only)
B) Sugar (only)
C) Flour and yeast
D) Flour and sugar
E) Yeast and sugar
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
70
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.What is the objective function?

A) Z = $4.00 A + $1.00 B
B) Z = $0.25 A + $1.00 B
C) Z = $1.00 A + $4.00 B
D) Z = $1.00 A + $1.00 B
E) Z = $0.25 A + $0.50 B
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
71
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.Which of the following is not a feasible production combination?

A) 0 D & 0 C
B) 0 D & 1,000 C
C) 800 D & 600 C
D) 1,600 D & 0 C
E) 0 D & 1,200 C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
72
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.For the production combination of 1,400 A-100's and 900 B-200's,which resource is "slack" (not fully used)?

A) Circuit boards (only)
B) Assembly time (only)
C) Both circuit boards and assembly time
D) Neither circuit boards nor assembly time
E) Cannot be determined exactly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
73
The owner of Crackers,Inc.produces two kinds of crackers: Deluxe (D)and Classic (C).She has a limited amount of the three ingredients used to produce these crackers available for her next production run:
4,800 ounces of sugar; 9,600 ounces of flour,and 2,000 ounces of salt.A box of Deluxe crackers requires 2 ounces of sugar,6 ounces of flour,and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar,8 ounces of flour,and 2 ounces of salt.Profits for a box of Deluxe crackers are $0.40; and for a box of Classic crackers,$0.50.What is the constraint for sugar?

A) 2 D + 3 C ≤ 4,800
B) 6 D + 8 C ≤ 4,800
C) 1 D + 2 C ≤ 4,800
D) 3 D + 2 C ≤ 4,800
E) 4 D + 5 C ≤ 4,800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
74
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.Which of the following is not a feasible production combination?

A) 0 R & 0 S
B) 0 R & 240 S
C) 180 R & 120 S
D) 300 R & 0 S
E) 180 R & 240 S
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
75
A local bagel shop produces two products: bagels (B)and croissants (C).Each bagel requires 6 ounces of flour,1 gram of yeast,and 2 tablespoons of sugar.A croissant requires 3 ounces of flour,1 gram of yeast,and 4 tablespoons of sugar.The company has 6,600 ounces of flour,1,400 grams of yeast,and 4,800 tablespoons of sugar available for today's production run.Bagel profits are 20 cents each,and croissant profits are 30 cents each.Using the graphical method,what are optimal profits for today's production run?

A) $580
B) $340
C) $220
D) $380
E) $420
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
76
The logistics/operations manager of a mail order house purchases two products for resale: King Beds (K)and Queen Beds (Q).Each King Bed costs $500 and requires 100 cubic feet of storage space,and each Queen Bed costs $300 and requires 90 cubic feet of storage space.The manager has $75,000 to invest in beds this week,and her warehouse has 18,000 cubic feet available for storage.Profit for each King Bed is $300,and for each Queen Bed is $150.What is the objective function?

A) Z = $150K + $300Q
B) Z = $500K + $300Q
C) Z = $300K + $150Q
D) Z = $300K + $500Q
E) Z = $100K + $90Q
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
77
The logistics/operations manager of a mail order house purchases two products for resale: King Beds (K)and Queen Beds (Q).Each King Bed costs $500 and requires 100 cubic feet of storage space,and each Queen Bed costs $300 and requires 90 cubic feet of storage space.The manager has $75,000 to invest in beds this week,and her warehouse has 18,000 cubic feet available for storage.Profit for each King Bed is $300,and for each Queen Bed is $150.What is the storage space constraint?

A) 100K - 90Q ≤ 18,000
B) 90K + 100Q ≤ 18,000
C) 300K + 90Q ≤ 18,000
D) 500K + 100Q ≤ 18,000
E) 100K + 90Q ≤ 18,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
78
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.For the production combination of 180 Root beer and 0 Sassafras sodas,which resource is "slack" (not fully used)?

A) Production time (only)
B) Carbonated water (only)
C) Both production time and carbonated water
D) Neither production time nor carbonated water
E) Cannot be determined exactly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
79
An electronics firm produces two models of pocket calculators: the A-100 (A),which is an inexpensive four-function calculator,and the B-200 (B),which also features square root and percent functions.Each model uses one (the same)circuit board,of which there are only 2,500 available for this week's production.Also,the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators,of which the A-100 requires 15 minutes (.25 hours)each,and the B-200 requires 30 minutes (.5 hours)each to produce.The firm forecasts that it could sell a maximum of 4,000 A-100's this week and a maximum of 1,000 B-200's.Profits for the A-100 are $1.00 each,and profits for the B-200 are $4.00 each.What are optimal weekly profits?

A) $10,000
B) $4,600
C) $2,500
D) $5,200
E) $6,400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
80
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R)and sassafras soda (S).Two resources are constrained:
Production time (T),of which she has at most 12 hours per day; and carbonated water (W),of which she can get at most 1500 gallons per day.A case of root beer requires 2 minutes of time and 5 gallons of water to produce,while a case of sassafras soda requires 3 minutes of time and 5 gallons of water.Profits for the root beer are $6.00 per case,and profits for the sassafras soda are $4.00 per case.Using the graphical method,what are optimal daily profits?

A) $960
B) $1,560
C) $1,800
D) $1,900
E) $2,520
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 99 في هذه المجموعة.