Deck 5: Process Focus

ملء الشاشة (f)
exit full mode
سؤال
Processes must be measurable and repeatable in order to apply the techniques of process management.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A kaizen blitz is an improvement initiative that is gradual and continuous and is performed on a part-time basis.
سؤال
The outputs of service processes are not as well defined as manufactured products.
سؤال
The impact of other process on a particular process must be considered while designing the process,as processes rarely operate in isolation.
سؤال
The design aspect of process management focuses on continually seeking to achieve higher levels of performance,such as reduced variation,higher yields,fewer defects and errors,and smaller cycle times.
سؤال
A process is a sequence of linked activities that is intended to achieve some result,such as producing a good or service for a customer within or outside the organization.
سؤال
For a manufacturing company,legal services will be considered an example of a value-creation process.
سؤال
Value-creation process requirements are driven by internal customer needs.
سؤال
Control in manufacturing starts with purchasing and receiving processes.
سؤال
Identifying potential defects and errors and stopping a process before they occur is the best approach to avoid mistakes in a process.
سؤال
Support processes generally add value directly to a product or service.
سؤال
Assembly of products in a manufacturing plant is an example of a support process.
سؤال
Services that emphasize on professional judgement of the employees often succeed in providing good solutions to customer problems.
سؤال
The Kaizen philosophy requires a significant cultural change from all employees in the organization including the top management.
سؤال
Reduction in cycle time of a process leads to improvement in quality of products as it reduces the potential for mistakes and errors.
سؤال
Control is the activity of ensuring conformance to the requirements and taking corrective action when necessary to correct problems and maintain stable performance.
سؤال
Projects generally cut across organizational boundaries and require the coordination of many different departments and functions.
سؤال
Support processes generally require a higher level of attention than do value-creation processes.
سؤال
Process control is the responsibility of those who directly accomplish the work.
سؤال
Flowcharts enable management to study and analyze processes prior to implementation.
سؤال
In the case of a manufacturing company,which of the following is an example of a value-creation process?

A)Product designing
B)Human resource services
C)Public relations
D)Legal services
سؤال
Which of the following is true of support processes?

A)They align closely to an organization's core competencies and strategic objectives.
B)They are sometimes called core processes.
C)They require lesser attention from the employees compared to value-creation processes.
D)They add value directly to the product or service being produced.
سؤال
The materials supplied by a certified supplier do not require manufacturers to conduct routine testing on all the lots supplied.
سؤال
Which of the following is one of the three major activities in process management that focuses on achieving higher yields of products with reduced variation and fewer defects and errors?

A)Design
B)Control
C)Improvement
D)Process mapping
سؤال
The quality team at Nigre,a cosmetics company,is continuously involved in monitoring the production process to ensure that the products are meeting specifications.They are also responsible for taking corrective measures when they identify variations in the products.In the context of the three major activities involved in process management,the quality team at Nigre,is engaged in the _____ activity of process management.

A)improvement
B)design
C)mapping
D)control
سؤال
For a manufacturing company,which of the following is an example of a support process?

A)Product designing
B)Legal services
C)Testing of products
D)Product manufacturing
سؤال
The management team at Kyra Electronics,is looking for ways to achieve higher levels of performance.It is trying to obtain higher yields and reduce cycle times.In the context of the three major activities involved in process management,the management team at Kyra,is engaged in the _____ activity of process management.

A)mapping
B)improvement
C)design
D)control
سؤال
Value-creation processes are sometimes called _____ processes.

A)core
B)support
C)job enrichment
D)quality circle
سؤال
Value-creation processes differ from support processes in that value-creation processes:

A)provide the infrastructure for production or deliver processes to create or deliver the actual product.
B)rarely align with the organization's core competencies and strategic objectives.
C)generally do not add value directly to the product or service.
D)are driven by external customer needs.
سؤال
Benchmarking encourages employees to continuously innovate.
سؤال
Breakthrough improvement refers to discontinuous change,as opposed to the gradual,continuous improvement philosophy of kaizen.
سؤال
The design activity of process management focuses on:

A)identifying new markets and product opportunities.
B)ensuring that the inputs to the process,such as materials,technology,and a trained workforce are adequate.
C)maintaining consistency in output by assessing performance and taking corrective action when necessary.
D)continually seeking to achieve higher levels of performance.
سؤال
A _____ is a temporary work structure that starts up,produces products or services,and then shuts down.

A)kaizen program
B)poka-yoke program
C)project
D)quality circle
سؤال
Which of the following is one of the three major activities in process management that focuses on maintaining consistency in output by assessing performance and taking corrective action when necessary?

A)Design
B)Improvement
C)Process mapping
D)Control
سؤال
Supplier certification processes can be time-consuming and expensive to administer.
سؤال
Suppliers include only those companies that provide materials and components that are required for manufacturing a product.
سؤال
Reengineering focuses on improving the existing procedures rather than eliminating them and reinventing the process.
سؤال
Which of the following is a reason why process management is important for organizations?

A)It assists organizations in recruiting the most suitable employees whose values match the culture of the organization.
B)It helps organizations to segment customers into natural groups in order to customize products that are better able to meet customers' needs.
C)It assists organizations in identifying opportunities for improving quality and operational performance.
D)It helps organizations to increase employee morale and commitment to the organization.
سؤال
Which of the following statements best describes process owners?

A)They have the authority to certify the processes used by the suppliers of their organization.
B)They have the authority to design the processes that will be used by the top management team in their organization.
C)They test the accuracy of the processes used in the marketing management.
D)They are accountable for process performance and have the authority to control and improve their process.
سؤال
To apply the techniques of process management,processes must be _____.

A)costly and time consuming
B)repeatable and measurable
C)centrally controlled and random
D)simple and lengthy
سؤال
As customization of services increases,_____ become(s) a bigger factor in the ability to provide high quality service to the customers.

A)professional judgement of the employees
B)processes and procedures
C)employee behavior
D)physical facilities
سؤال
A(n) _____ is a design tool that enables management to study and analyze processes prior to implementation in order to improve quality and operational performance.

A)Likert's scale
B)flowchart
C)quality manual
D)affinity diagram
سؤال
The organizations that emphasize more on the behavior of the employees rather than the processes and procedures involved are aiming to:

A)improve the efficiency and timing of their service.
B)improve the reliability of their service.
C)provide a friendly and personable environment to their customers.
D)minimize variations in their service standards.
سؤال
Which of the following statements is true regarding kaizen?

A)It involves only the top management of the organization.
B)It focuses on small,gradual,and frequent improvements.
C)It requires very large financial investments.
D)It attempts to achieve radical improvements in a very short time period.
سؤال
Process control in manufacturing starts with the _____ process.

A)assembly
B)delivery
C)purchasing
D)production
سؤال
The process of measuring a company's performance against best-in-class companies and using that information as a basis to define the company's targets,strategies,and implementation is known as _____.

A)total quality management
B)process mapping
C)benchmarking
D)reengineering
سؤال
Which of the following is true of the poka-yoke approach used for mistake-proofing processes?

A)It was developed by Kaoru Ishikawa.
B)It is ineffective in providing immediate feedback to the employees regarding the error in the process.
C)It helps to engage workers in continuous improvement activities.
D)Most of the techniques of poka-yoke are expensive and extremely complex to implement.
سؤال
After using an ATM machine,Deborah forgets to remove her card from the machine.This is an example of:

A)a treatment error between the server and the customer.
B)a customer error in preparation.
C)a customer error at the resolution stage of a service.
D)a customer error during an encounter.
سؤال
Which of the following can be regarded as a task error in a service process?

A)Lack of courteous behavior
B)Failure to acknowledge a customer
C)Unclean facilities
D)Working on the wrong order
سؤال
Strategically placed tray-return stands and trash receptacles remind customers to return trays in fast-food facilities.This is an example of a poka-yoke technique designed to prevent:

A)customer errors in preparation.
B)customer errors during an encounter.
C)customer errors at the resolution stage of a service.
D)treatment errors between the server and the customer.
سؤال
In the context of service errors,which of the following is an example of a treatment error?

A)Working on the wrong order
B)Unclean facilities
C)Lack of courteous behavior
D)Doing work incorrectly
سؤال
Supply chains help organizations to create a competitive advantage in _____.

A)workforce engagement
B)process mapping
C)flexibility
D)benchmarking
سؤال
Which of the following is a type of customer error that results during an encounter?

A)Failure to follow the instructions provided
B)Failure to signal service inadequacies
C)Failure to bring the necessary materials for the encounter
D)Failure to understand the role in the service transaction
سؤال
When a service ranks low on the dimensions of customer contact,labor intensity,and customization,the service providers need to emphasize on _____ to provide a high quality service to the customers.

A)training provided to the employees
B)employee behavior
C)professional judgement of the employees
D)physical facilities and procedures
سؤال
Which of the following is the first step involved in designing a manufacturing process?

A)Defining the sequence of steps that need to be performed
B)Documenting the procedures and requirements in a flowchart
C)Analyzing the processes prior to implementation to improve quality
D)Conducting a detailed technical analysis of the characteristics of the product
سؤال
Which of the following is regarded as the best approach to prevent mistakes in a process because of its ability to avoid rework and wastage of time and resources?

A)Identifying potential defects and errors and stopping a process before they occur
B)Conducting a cost-benefit analysis to determine the impact of stopping a process
C)Designing potential defects and errors out of the process
D)Identifying defects and errors soon after they occur and quickly correcting the process
سؤال
_____ is defined as the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical,contemporary measures of performance,such as cost,quality,service,and speed.

A)Process mapping
B)Total quality management
C)Reengineering
D)Benchmarking
سؤال
Value-creation services that take the form of "projects":

A)are typically completed by individuals rather than by groups.
B)do not add value directly to the product or service.
C)tend to deliver unique products that are tailored to the specific needs of an individual customer.
D)are generally completed by a single department and they do not cut across organizational boundaries.
سؤال
After-action review or debrief is a process control approach used by organizations to:

A)reduce the cost of conducting a process.
B)improve the process by increasing the efficiency of the manufacturing systems.
C)decrease the time required for completing a process.
D)prevent the errors in a process from occurring again in the future.
سؤال
_____ is an approach for mistake-proofing processes,developed by Shigeo Shingo,that involves using automatic devices or simple methods to avoid human error.

A)Kaizen
B)Poka-yoke
C)Process mapping
D)Job enrichment
سؤال
How is the kaizen philosophy implemented at the Lexus plant in Cambridge,Ontario?
سؤال
What is the last step in K&N's process management framework?

A)Measuring and auditing to specifications
B)Evaluation and improvement
C)Mapping and documenting the process
D)Replicating the process to all applicable areas
سؤال
What is K&N's terminology for its employees?

A)Grand-aides
B)Representative members
C)Friendly team members
D)Group partners
سؤال
How does the cleanliness process at the Lexus plant in Cambridge support the achievement of high product quality?
سؤال
How are team members empowered at K&N?
سؤال
Explain the concept of "quality gates" at the Cambridge plant of Lexus with an example.
سؤال
Describe the various elements of a control system.
سؤال
Why do organizations focus on improving the agility and flexibility of their processes?
سؤال
How has the problem-solving process helped K&N?
سؤال
Briefly discuss the K&N process management framework.
سؤال
What are shipping quality audits at the Lexus plant in Cambridge?
سؤال
In K&N's process management framework,which of the following is considered during process control and improvement?

A)Equipment needs
B)Training team members
C)Operating procedures
D)Design of workstations
سؤال
What is meant by operational steps?
سؤال
Which of the following is considered during the design/redesign process in K&N's comprehensive system for process management framework?

A)Cycle time
B)Operating procedures
C)Measuring to specifications
D)Auditing to specifications
سؤال
Differentiate between value-creation processes and support processes.
سؤال
How does K&N deal with a formal new process or a process change?
سؤال
Define process management and list the major activities involved in process management.
سؤال
What is a supplier certification process? What is the purpose of this process?
سؤال
How does K&N identify work process improvements?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/79
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Process Focus
1
Processes must be measurable and repeatable in order to apply the techniques of process management.
True
2
A kaizen blitz is an improvement initiative that is gradual and continuous and is performed on a part-time basis.
False
3
The outputs of service processes are not as well defined as manufactured products.
True
4
The impact of other process on a particular process must be considered while designing the process,as processes rarely operate in isolation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
5
The design aspect of process management focuses on continually seeking to achieve higher levels of performance,such as reduced variation,higher yields,fewer defects and errors,and smaller cycle times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
6
A process is a sequence of linked activities that is intended to achieve some result,such as producing a good or service for a customer within or outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
7
For a manufacturing company,legal services will be considered an example of a value-creation process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
8
Value-creation process requirements are driven by internal customer needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
9
Control in manufacturing starts with purchasing and receiving processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
10
Identifying potential defects and errors and stopping a process before they occur is the best approach to avoid mistakes in a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
11
Support processes generally add value directly to a product or service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
12
Assembly of products in a manufacturing plant is an example of a support process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
13
Services that emphasize on professional judgement of the employees often succeed in providing good solutions to customer problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
14
The Kaizen philosophy requires a significant cultural change from all employees in the organization including the top management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
15
Reduction in cycle time of a process leads to improvement in quality of products as it reduces the potential for mistakes and errors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
16
Control is the activity of ensuring conformance to the requirements and taking corrective action when necessary to correct problems and maintain stable performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
17
Projects generally cut across organizational boundaries and require the coordination of many different departments and functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
18
Support processes generally require a higher level of attention than do value-creation processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
19
Process control is the responsibility of those who directly accomplish the work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
20
Flowcharts enable management to study and analyze processes prior to implementation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
21
In the case of a manufacturing company,which of the following is an example of a value-creation process?

A)Product designing
B)Human resource services
C)Public relations
D)Legal services
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following is true of support processes?

A)They align closely to an organization's core competencies and strategic objectives.
B)They are sometimes called core processes.
C)They require lesser attention from the employees compared to value-creation processes.
D)They add value directly to the product or service being produced.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
23
The materials supplied by a certified supplier do not require manufacturers to conduct routine testing on all the lots supplied.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which of the following is one of the three major activities in process management that focuses on achieving higher yields of products with reduced variation and fewer defects and errors?

A)Design
B)Control
C)Improvement
D)Process mapping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
25
The quality team at Nigre,a cosmetics company,is continuously involved in monitoring the production process to ensure that the products are meeting specifications.They are also responsible for taking corrective measures when they identify variations in the products.In the context of the three major activities involved in process management,the quality team at Nigre,is engaged in the _____ activity of process management.

A)improvement
B)design
C)mapping
D)control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
26
For a manufacturing company,which of the following is an example of a support process?

A)Product designing
B)Legal services
C)Testing of products
D)Product manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
27
The management team at Kyra Electronics,is looking for ways to achieve higher levels of performance.It is trying to obtain higher yields and reduce cycle times.In the context of the three major activities involved in process management,the management team at Kyra,is engaged in the _____ activity of process management.

A)mapping
B)improvement
C)design
D)control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
28
Value-creation processes are sometimes called _____ processes.

A)core
B)support
C)job enrichment
D)quality circle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
29
Value-creation processes differ from support processes in that value-creation processes:

A)provide the infrastructure for production or deliver processes to create or deliver the actual product.
B)rarely align with the organization's core competencies and strategic objectives.
C)generally do not add value directly to the product or service.
D)are driven by external customer needs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
30
Benchmarking encourages employees to continuously innovate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
31
Breakthrough improvement refers to discontinuous change,as opposed to the gradual,continuous improvement philosophy of kaizen.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
32
The design activity of process management focuses on:

A)identifying new markets and product opportunities.
B)ensuring that the inputs to the process,such as materials,technology,and a trained workforce are adequate.
C)maintaining consistency in output by assessing performance and taking corrective action when necessary.
D)continually seeking to achieve higher levels of performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
33
A _____ is a temporary work structure that starts up,produces products or services,and then shuts down.

A)kaizen program
B)poka-yoke program
C)project
D)quality circle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is one of the three major activities in process management that focuses on maintaining consistency in output by assessing performance and taking corrective action when necessary?

A)Design
B)Improvement
C)Process mapping
D)Control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
35
Supplier certification processes can be time-consuming and expensive to administer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
36
Suppliers include only those companies that provide materials and components that are required for manufacturing a product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
37
Reengineering focuses on improving the existing procedures rather than eliminating them and reinventing the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is a reason why process management is important for organizations?

A)It assists organizations in recruiting the most suitable employees whose values match the culture of the organization.
B)It helps organizations to segment customers into natural groups in order to customize products that are better able to meet customers' needs.
C)It assists organizations in identifying opportunities for improving quality and operational performance.
D)It helps organizations to increase employee morale and commitment to the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
39
Which of the following statements best describes process owners?

A)They have the authority to certify the processes used by the suppliers of their organization.
B)They have the authority to design the processes that will be used by the top management team in their organization.
C)They test the accuracy of the processes used in the marketing management.
D)They are accountable for process performance and have the authority to control and improve their process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
40
To apply the techniques of process management,processes must be _____.

A)costly and time consuming
B)repeatable and measurable
C)centrally controlled and random
D)simple and lengthy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
41
As customization of services increases,_____ become(s) a bigger factor in the ability to provide high quality service to the customers.

A)professional judgement of the employees
B)processes and procedures
C)employee behavior
D)physical facilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
42
A(n) _____ is a design tool that enables management to study and analyze processes prior to implementation in order to improve quality and operational performance.

A)Likert's scale
B)flowchart
C)quality manual
D)affinity diagram
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
43
The organizations that emphasize more on the behavior of the employees rather than the processes and procedures involved are aiming to:

A)improve the efficiency and timing of their service.
B)improve the reliability of their service.
C)provide a friendly and personable environment to their customers.
D)minimize variations in their service standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
44
Which of the following statements is true regarding kaizen?

A)It involves only the top management of the organization.
B)It focuses on small,gradual,and frequent improvements.
C)It requires very large financial investments.
D)It attempts to achieve radical improvements in a very short time period.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
45
Process control in manufacturing starts with the _____ process.

A)assembly
B)delivery
C)purchasing
D)production
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
46
The process of measuring a company's performance against best-in-class companies and using that information as a basis to define the company's targets,strategies,and implementation is known as _____.

A)total quality management
B)process mapping
C)benchmarking
D)reengineering
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following is true of the poka-yoke approach used for mistake-proofing processes?

A)It was developed by Kaoru Ishikawa.
B)It is ineffective in providing immediate feedback to the employees regarding the error in the process.
C)It helps to engage workers in continuous improvement activities.
D)Most of the techniques of poka-yoke are expensive and extremely complex to implement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
48
After using an ATM machine,Deborah forgets to remove her card from the machine.This is an example of:

A)a treatment error between the server and the customer.
B)a customer error in preparation.
C)a customer error at the resolution stage of a service.
D)a customer error during an encounter.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following can be regarded as a task error in a service process?

A)Lack of courteous behavior
B)Failure to acknowledge a customer
C)Unclean facilities
D)Working on the wrong order
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
50
Strategically placed tray-return stands and trash receptacles remind customers to return trays in fast-food facilities.This is an example of a poka-yoke technique designed to prevent:

A)customer errors in preparation.
B)customer errors during an encounter.
C)customer errors at the resolution stage of a service.
D)treatment errors between the server and the customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
51
In the context of service errors,which of the following is an example of a treatment error?

A)Working on the wrong order
B)Unclean facilities
C)Lack of courteous behavior
D)Doing work incorrectly
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
52
Supply chains help organizations to create a competitive advantage in _____.

A)workforce engagement
B)process mapping
C)flexibility
D)benchmarking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is a type of customer error that results during an encounter?

A)Failure to follow the instructions provided
B)Failure to signal service inadequacies
C)Failure to bring the necessary materials for the encounter
D)Failure to understand the role in the service transaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
54
When a service ranks low on the dimensions of customer contact,labor intensity,and customization,the service providers need to emphasize on _____ to provide a high quality service to the customers.

A)training provided to the employees
B)employee behavior
C)professional judgement of the employees
D)physical facilities and procedures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is the first step involved in designing a manufacturing process?

A)Defining the sequence of steps that need to be performed
B)Documenting the procedures and requirements in a flowchart
C)Analyzing the processes prior to implementation to improve quality
D)Conducting a detailed technical analysis of the characteristics of the product
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following is regarded as the best approach to prevent mistakes in a process because of its ability to avoid rework and wastage of time and resources?

A)Identifying potential defects and errors and stopping a process before they occur
B)Conducting a cost-benefit analysis to determine the impact of stopping a process
C)Designing potential defects and errors out of the process
D)Identifying defects and errors soon after they occur and quickly correcting the process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
57
_____ is defined as the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical,contemporary measures of performance,such as cost,quality,service,and speed.

A)Process mapping
B)Total quality management
C)Reengineering
D)Benchmarking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
58
Value-creation services that take the form of "projects":

A)are typically completed by individuals rather than by groups.
B)do not add value directly to the product or service.
C)tend to deliver unique products that are tailored to the specific needs of an individual customer.
D)are generally completed by a single department and they do not cut across organizational boundaries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
59
After-action review or debrief is a process control approach used by organizations to:

A)reduce the cost of conducting a process.
B)improve the process by increasing the efficiency of the manufacturing systems.
C)decrease the time required for completing a process.
D)prevent the errors in a process from occurring again in the future.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
60
_____ is an approach for mistake-proofing processes,developed by Shigeo Shingo,that involves using automatic devices or simple methods to avoid human error.

A)Kaizen
B)Poka-yoke
C)Process mapping
D)Job enrichment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
61
How is the kaizen philosophy implemented at the Lexus plant in Cambridge,Ontario?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
62
What is the last step in K&N's process management framework?

A)Measuring and auditing to specifications
B)Evaluation and improvement
C)Mapping and documenting the process
D)Replicating the process to all applicable areas
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
63
What is K&N's terminology for its employees?

A)Grand-aides
B)Representative members
C)Friendly team members
D)Group partners
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
64
How does the cleanliness process at the Lexus plant in Cambridge support the achievement of high product quality?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
65
How are team members empowered at K&N?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
66
Explain the concept of "quality gates" at the Cambridge plant of Lexus with an example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
67
Describe the various elements of a control system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
68
Why do organizations focus on improving the agility and flexibility of their processes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
69
How has the problem-solving process helped K&N?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
70
Briefly discuss the K&N process management framework.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
71
What are shipping quality audits at the Lexus plant in Cambridge?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
72
In K&N's process management framework,which of the following is considered during process control and improvement?

A)Equipment needs
B)Training team members
C)Operating procedures
D)Design of workstations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
73
What is meant by operational steps?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following is considered during the design/redesign process in K&N's comprehensive system for process management framework?

A)Cycle time
B)Operating procedures
C)Measuring to specifications
D)Auditing to specifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
75
Differentiate between value-creation processes and support processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
76
How does K&N deal with a formal new process or a process change?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
77
Define process management and list the major activities involved in process management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
78
What is a supplier certification process? What is the purpose of this process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
79
How does K&N identify work process improvements?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 79 في هذه المجموعة.