Deck 22: Workcenter Scheduling

ملء الشاشة (f)
exit full mode
سؤال
Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A backward schedule tells when an order must be started in order to be done by a specific date.
سؤال
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
سؤال
The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.
سؤال
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and work centers.
سؤال
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
سؤال
Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.
سؤال
Shop-floor control (or production activity control) can involve reviewing the status and controlling the progress of orders as they are being worked on.
سؤال
Priority rules are the rules used to obtain a job sequence in production scheduling.
سؤال
In production scheduling, the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.
سؤال
A work center is a physical area of the business in which productive resources are organized and work is completed.
سؤال
In infinite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
سؤال
The assignment method of job sequencing is a special case of the transportation method of linear programming.
سؤال
Theoretically, all schedules are feasible when finite loading is used.
سؤال
In finite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
سؤال
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
سؤال
The FCFS priority rule used in sequencing production jobs will always result in a better solution than the LCFS rule.
سؤال
Under the STR/OP sequencing priority rule, orders with the jobs with the longest STR/OP are run first.
سؤال
The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow, and scheduling lies at the heart of the process."
سؤال
Shop-floor control (or production activity control) can involve expediting late and critical orders.
سؤال
A material requirements planning system is an example of which of the following scheduling systems?

A)Infinite loading, backward scheduling
B)Finite loading, backward scheduling
C)Infinite loading, forward scheduling
D)Finite loading, forward scheduling
E)None of these
سؤال
For a mid-volume type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Precision forward scheduling
سؤال
When work is scheduled in detail using the setup and run time required for each order, it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
سؤال
When work is scheduled in detail using the setup and run time required for each order, then theoretically all schedules will be feasible.
سؤال
Which of the following is not an objective of work center scheduling?

A)Meeting due dates
B)Providing time for quality at the source
C)Minimizing setup time or cost
D)Minimizing work-in-process inventory
E)Minimizing lead time
سؤال
For a continuous-process type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Shortest due date
سؤال
When work is assigned to a work center based on what is needed over time it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
سؤال
When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time, the system that generated the schedule is called which of the following?

A)Infinite loading
B)Machine-limited
C)Finite loading
D)Labor-limited
E)Constrained
سؤال
MES and SES are acronyms for "manufacturing environment scheduler" and "service environment scheduler" systems, respectively.
سؤال
Which of the following is not a way in which a work center can be organized?

A)According to function in a work center configuration
B)According to function in an assembly line
C)By product in assembly line
D)As a group technology cell (GT cell)
E)By product in a flow operation
سؤال
Scheduling hourly work times using the "first-hour principle" ensures that no excess labor will be used during the work shift.
سؤال
The objectives of work center scheduling include which of the following?

A)Minimizing worker alienation
B)Providing variety to workforce
C)Following all the priority rules
D)Avoiding tradeoffs
E)Minimizing setup costs
سؤال
Which of the following is not a function performed in scheduling and controlling an operation?

A)Allocating orders and equipment
B)Setting priorities and sequencing jobs
C)Allocating personnel to work centers
D)Expediting late orders
E)Reporting bottleneck operations
سؤال
For a low-volume job shop type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite backward scheduling
D)Infinite forward scheduling
E)Soonest due date
سؤال
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
سؤال
One of the principles of work center scheduling is that, while certainty of standards, routings, and so forth is not entirely possible in a shop, certainty should always be an objective to work toward.
سؤال
For a high-volume type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite backward scheduling
B)Finite forward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Assignment method
سؤال
Which of the following is not a standard measure of schedule performance that can be used to evaluate priority rules?

A)The schedule quality index
B)Minimizing the time a job spends in the process
C)Minimizing work-in-process inventory
D)Minimizing idle time of machines or workers
E)Meeting due dates of customers
سؤال
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
سؤال
One of the principles of work center scheduling is that once started, a job should not be interrupted.
سؤال
Which of the following is a priority rule used to schedule the sequence of jobs in a production operation?

A)Last-come, first-served
B)Last complaint first
C)First on hand first
D)Longest slack time first
E)Parts on hand first
سؤال
Which of the following is not one of the major functions of shop-floor control?

A)Measure efficiency, utilization, and productivity of manpower and machines.
B)Assign a priority to each shop order.
C)Load machine hours into workstations.
D)Track WIP quantity by location by shop order to accounting.
E)Convey shop order status information to the office.
سؤال
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days.Which job should be scheduled first if you use the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
سؤال
A job has 10 days of processing time left to do before completion, and today is the 5th day of the month.If the job is due on the 15th day of the month, what is its critical ratio?

A)3
B)2
C)1
D)0.8
E)- 0.8
سؤال
Assume you are sequencing jobs using Johnson's rule.A particular job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence.
B)As late as possible in the unfilled job sequence.
C)The schedule would depend on the due date.
D)Does not matter.
E)Johnson's Rule does not apply.
سؤال
Which priority rule is so powerful that it has been called "the most important concept in the entire aspect of sequencing?" ______________________________________.
سؤال
Which of the following might be a status and exception report used in shop-floor control?

A)Absentee report
B)Quality failure report
C)Shortage lists
D)Expediting report
E)Union activity report
سؤال
Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations, with the smallest value being run first?

A)STR
B)Johnson's
C)STR/OP
D)LCFS
E)FCFS
سؤال
Which of the following priority rules used in scheduling the sequence of production is calculated as the time remaining before the due date minus the remaining processing time, with the smallest value being run first?

A)STR
B)CR
C)SOT
D)LCFS
E)EDD
سؤال
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?

A)First-come, first-served
B)Shortest operating time
C)Last-in, first-out
D)Critical ratio
E)Slack-time-remaining per operation
سؤال
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.In what order will these jobs be scheduled if using the SOT priority rule for job sequencing?

A)A-B-D-E-C
B)A-D-C-E-B
C)D-C-A-B-E
D)B-E-C-D-A
E)E-D-A-B-C
سؤال
A machine shop has two machines, A and
B.Four jobs need to be processed through machine A first and B second.Job 1 will take one hour on machine A and three hours on machine
B.Job 2 will take three hours on A and two hours on
B.Job 3, seven on A and three on
B.Job 4, five hours on A and one hour on
B.Using Johnson's rule, in what order should these jobs be done? ___________________________________.
سؤال
Assume you are sequencing jobs using Johnson's rule.A particular job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence.
B)As late as possible in the unfilled job sequence.
C)The schedule would depend on the due date.
D)Does not matter.
E)Johnson's rule does not apply.
سؤال
Which of the following is a tool of shop-floor control?

A)The hours worked per employee report
B)The anticipated delay report
C)The permanent work-in-process report
D)Time and motion studies
E)Product and process control report
سؤال
Which of the following is one of the major functions of shop-floor control?

A)Observing the priorities set for each shop order
B)Keeping work-in-process inventory out of the way
C)Conveying shop-order status information to the office
D)Controlling cost and materials waste
E)Keeping the workforce fully utilized
سؤال
Which of the following is a principle of work center scheduling?

A)Once started, a job can and should be finished even if unavoidably interrupted.
B)Reschedule every day.
C)Achieve certainty in standards and routings.
D)Give work centers less to do then their maximum.
E)Assign the first worker to all of the days that require staffing.
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the first-come, first-served priority rule, in what order should these jobs be undertaken? ___________________________________.
سؤال
A job has 5 days of processing time left to do before completion, and today is the 10th day of the month.If the job is due on the 14th day of the month, what is its critical ratio?

A)5
B)2
C)0.8
D)0.5
E)0.1
سؤال
The assignment method is useful in solving scheduling problems that have which of the following characteristics?

A)There are n jobs to be distributed to n machines or workers.
B)Each job can only be done on one particular machine.
C)Speed and efficiency are important.
D)The objective is to minimize cost and lateness of delivery.
E)The jobs have to go through more than one process.
سؤال
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
سؤال
What is sub-optimization in scheduling? ______________________________________________.
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule, what will be the average lateness of these orders? ______________________________________.
سؤال
What is dispatching? __________________________________________.
سؤال
Distinguish between forward scheduling and backward scheduling.
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the slack time remaining priority rule, what will be the average lateness of these orders? _______________________________________.
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the earliest due date (EDD) priority rule, in what order should these jobs be undertaken? _______________________________________.
سؤال
What is the difference between finite and infinite loading?
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule, in what order should these jobs be undertaken? _________________________________.
سؤال
What is Johnson's rule?
سؤال
In the context of work assignment, what is infinite loading? ___________________________________________.
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the slack time remaining priority rule, in what order should these jobs be undertaken? _______________________________________.
سؤال
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the earliest due date (EDD) priority rule, what will be the average lateness of these orders? _______________________________________.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/72
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 22: Workcenter Scheduling
1
Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.
False
Explanation: Johnson's rule is used when there are n jobs to schedule on two machines.
2
A backward schedule tells when an order must be started in order to be done by a specific date.
True
Explanation: Backward scheduling starts from some date in the future (possibly a due date) and schedules the required operations in reverse sequence.The backward schedule tells when an order must be started in order to be done by a specific date.
3
A system that "backward schedules" is designed to determine and report the earliest date an order can be completed.
False
Explanation: Backward scheduling starts from some date in the future (possibly a due date) and schedules the required operations in reverse sequence.The backward schedule tells when an order must be started in order to be done by a specific date.
4
The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
5
A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and work centers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
6
The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
7
Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
8
Shop-floor control (or production activity control) can involve reviewing the status and controlling the progress of orders as they are being worked on.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
9
Priority rules are the rules used to obtain a job sequence in production scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
10
In production scheduling, the process of determining which job to start first on some machine or in some work center is known as sequencing or priority sequencing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
11
A work center is a physical area of the business in which productive resources are organized and work is completed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
12
In infinite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
13
The assignment method of job sequencing is a special case of the transportation method of linear programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
14
Theoretically, all schedules are feasible when finite loading is used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
15
In finite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
16
Initiating performance of scheduled work is commonly termed "dispatching" of orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
17
The FCFS priority rule used in sequencing production jobs will always result in a better solution than the LCFS rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
18
Under the STR/OP sequencing priority rule, orders with the jobs with the longest STR/OP are run first.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
19
The textbook underscores the importance of scheduling with the phrase "workflow equals cash flow, and scheduling lies at the heart of the process."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
20
Shop-floor control (or production activity control) can involve expediting late and critical orders.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
21
A material requirements planning system is an example of which of the following scheduling systems?

A)Infinite loading, backward scheduling
B)Finite loading, backward scheduling
C)Infinite loading, forward scheduling
D)Finite loading, forward scheduling
E)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
22
For a mid-volume type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Precision forward scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
23
When work is scheduled in detail using the setup and run time required for each order, it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
24
When work is scheduled in detail using the setup and run time required for each order, then theoretically all schedules will be feasible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is not an objective of work center scheduling?

A)Meeting due dates
B)Providing time for quality at the source
C)Minimizing setup time or cost
D)Minimizing work-in-process inventory
E)Minimizing lead time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
26
For a continuous-process type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Shortest due date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
27
When work is assigned to a work center based on what is needed over time it is called which of the following?

A)Infinite loading
B)Finite loading
C)Machine-limited
D)Labor-limited
E)Johnson's rule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
28
When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time, the system that generated the schedule is called which of the following?

A)Infinite loading
B)Machine-limited
C)Finite loading
D)Labor-limited
E)Constrained
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
29
MES and SES are acronyms for "manufacturing environment scheduler" and "service environment scheduler" systems, respectively.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following is not a way in which a work center can be organized?

A)According to function in a work center configuration
B)According to function in an assembly line
C)By product in assembly line
D)As a group technology cell (GT cell)
E)By product in a flow operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
31
Scheduling hourly work times using the "first-hour principle" ensures that no excess labor will be used during the work shift.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
32
The objectives of work center scheduling include which of the following?

A)Minimizing worker alienation
B)Providing variety to workforce
C)Following all the priority rules
D)Avoiding tradeoffs
E)Minimizing setup costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which of the following is not a function performed in scheduling and controlling an operation?

A)Allocating orders and equipment
B)Setting priorities and sequencing jobs
C)Allocating personnel to work centers
D)Expediting late orders
E)Reporting bottleneck operations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
34
For a low-volume job shop type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite forward scheduling
B)Finite backward scheduling
C)Infinite backward scheduling
D)Infinite forward scheduling
E)Soonest due date
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
35
One of the principles of work center scheduling is to match work center input information to what the worker can actually do.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
36
One of the principles of work center scheduling is that, while certainty of standards, routings, and so forth is not entirely possible in a shop, certainty should always be an objective to work toward.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
37
For a high-volume type of manufacturing, which of the following is the typical production scheduling approach?

A)Finite backward scheduling
B)Finite forward scheduling
C)Infinite forward scheduling
D)Infinite backward scheduling
E)Assignment method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is not a standard measure of schedule performance that can be used to evaluate priority rules?

A)The schedule quality index
B)Minimizing the time a job spends in the process
C)Minimizing work-in-process inventory
D)Minimizing idle time of machines or workers
E)Meeting due dates of customers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
39
One of the principles of work center scheduling is that the effectiveness of any shop should be measured by speed of flow through the shop.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
40
One of the principles of work center scheduling is that once started, a job should not be interrupted.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following is a priority rule used to schedule the sequence of jobs in a production operation?

A)Last-come, first-served
B)Last complaint first
C)First on hand first
D)Longest slack time first
E)Parts on hand first
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which of the following is not one of the major functions of shop-floor control?

A)Measure efficiency, utilization, and productivity of manpower and machines.
B)Assign a priority to each shop order.
C)Load machine hours into workstations.
D)Track WIP quantity by location by shop order to accounting.
E)Convey shop order status information to the office.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
43
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days to complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days.Which job should be scheduled first if you use the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
44
A job has 10 days of processing time left to do before completion, and today is the 5th day of the month.If the job is due on the 15th day of the month, what is its critical ratio?

A)3
B)2
C)1
D)0.8
E)- 0.8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
45
Assume you are sequencing jobs using Johnson's rule.A particular job requires 7 hours to assemble and then is followed by 8 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence.
B)As late as possible in the unfilled job sequence.
C)The schedule would depend on the due date.
D)Does not matter.
E)Johnson's Rule does not apply.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
46
Which priority rule is so powerful that it has been called "the most important concept in the entire aspect of sequencing?" ______________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following might be a status and exception report used in shop-floor control?

A)Absentee report
B)Quality failure report
C)Shortage lists
D)Expediting report
E)Union activity report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations, with the smallest value being run first?

A)STR
B)Johnson's
C)STR/OP
D)LCFS
E)FCFS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which of the following priority rules used in scheduling the sequence of production is calculated as the time remaining before the due date minus the remaining processing time, with the smallest value being run first?

A)STR
B)CR
C)SOT
D)LCFS
E)EDD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of the following is not a priority rule used to schedule the sequence of jobs in a production operation?

A)First-come, first-served
B)Shortest operating time
C)Last-in, first-out
D)Critical ratio
E)Slack-time-remaining per operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
51
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.In what order will these jobs be scheduled if using the SOT priority rule for job sequencing?

A)A-B-D-E-C
B)A-D-C-E-B
C)D-C-A-B-E
D)B-E-C-D-A
E)E-D-A-B-C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
52
A machine shop has two machines, A and
B.Four jobs need to be processed through machine A first and B second.Job 1 will take one hour on machine A and three hours on machine
B.Job 2 will take three hours on A and two hours on
B.Job 3, seven on A and three on
B.Job 4, five hours on A and one hour on
B.Using Johnson's rule, in what order should these jobs be done? ___________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
53
Assume you are sequencing jobs using Johnson's rule.A particular job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence.
B)As late as possible in the unfilled job sequence.
C)The schedule would depend on the due date.
D)Does not matter.
E)Johnson's rule does not apply.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which of the following is a tool of shop-floor control?

A)The hours worked per employee report
B)The anticipated delay report
C)The permanent work-in-process report
D)Time and motion studies
E)Product and process control report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following is one of the major functions of shop-floor control?

A)Observing the priorities set for each shop order
B)Keeping work-in-process inventory out of the way
C)Conveying shop-order status information to the office
D)Controlling cost and materials waste
E)Keeping the workforce fully utilized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following is a principle of work center scheduling?

A)Once started, a job can and should be finished even if unavoidably interrupted.
B)Reschedule every day.
C)Achieve certainty in standards and routings.
D)Give work centers less to do then their maximum.
E)Assign the first worker to all of the days that require staffing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
57
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the first-come, first-served priority rule, in what order should these jobs be undertaken? ___________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
58
A job has 5 days of processing time left to do before completion, and today is the 10th day of the month.If the job is due on the 14th day of the month, what is its critical ratio?

A)5
B)2
C)0.8
D)0.5
E)0.1
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
59
The assignment method is useful in solving scheduling problems that have which of the following characteristics?

A)There are n jobs to be distributed to n machines or workers.
B)Each job can only be done on one particular machine.
C)Speed and efficiency are important.
D)The objective is to minimize cost and lateness of delivery.
E)The jobs have to go through more than one process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
60
Assume there are five jobs (i.e., A, B, C, D, and E) that need to be sequenced in a production schedule.The remaining operating time necessary for completion of job A is 3 days (i.e., job A will take 3 more days to complete), B will take 9 days, C will take 6 days, D will take 5 days and E will take 8 days.Which job should be scheduled last if using the SOT priority rule for job sequencing?

A)A
B)B
C)C
D)D
E)E
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
61
What is sub-optimization in scheduling? ______________________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
62
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule, what will be the average lateness of these orders? ______________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
63
What is dispatching? __________________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
64
Distinguish between forward scheduling and backward scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
65
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the slack time remaining priority rule, what will be the average lateness of these orders? _______________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
66
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the earliest due date (EDD) priority rule, in what order should these jobs be undertaken? _______________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
67
What is the difference between finite and infinite loading?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
68
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the shortest operating time priority rule, in what order should these jobs be undertaken? _________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
69
What is Johnson's rule?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
70
In the context of work assignment, what is infinite loading? ___________________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
71
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the slack time remaining priority rule, in what order should these jobs be undertaken? _______________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
72
A work center has five jobs assigned to it.They are labeled, in the order of their arrival in the shop, as jobs A, B, C, D, and
E.The work center may work on only one job at a time and must complete any job it starts before starting another job.Job A has a processing time of 6 days and is due to the customer in 9 days.Job B has a processing time of 2 days and is due in 16 days.Job C has a processing time of 4 days and is due in 10 days.Job D has a processing time of 3 days and is due in 7 days.Job E has a processing time of 5 days and is due in 12 days.Using the earliest due date (EDD) priority rule, what will be the average lateness of these orders? _______________________________________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 72 في هذه المجموعة.