Deck 14: Lean Supply Chains

ملء الشاشة (f)
exit full mode
سؤال
Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In the textbook, the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.
سؤال
One of the aims of value stream mapping to eliminate waste in a process.
سؤال
Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
سؤال
Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.
سؤال
JIT manufacturing forces a firm to work with a lower water level despite safety hazards.
سؤال
Lean production requires a "push and pull" system of inventory replenishment.
سؤال
Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900s.
سؤال
Value stream mapping is used to visualize product flows through various processing steps.
سؤال
Group technology cells help to eliminate movement and queue (waiting) time between operations.
سؤال
A principle of value stream mapping is to concentrate on speeding up value-added operations.
سؤال
Lean production makes implementing green strategies in manufacturing processes more difficult.
سؤال
Group technology includes the set of psychological tests and training exercises given to group workers to ensure a high level of teamwork.
سؤال
JIT production means that we produce the product before it is required so the customer does not wait for the product.
سؤال
"Quality at the source" requires factory workers to become their own inspectors.
سؤال
Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.
سؤال
Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, work-in-process, and finished goods.
سؤال
The goal of JIT production is to drive all inventory queues lower.
سؤال
JIT is typically applied to nonrepetitive manufacturing.
سؤال
Lean production is a management philosophy and a pull system throughout the plant.
سؤال
Firms in Japan tend to have short-term relationships with their suppliers and customers.
سؤال
One of the many lean techniques that have been successfully applied in service firms is leveling facility load.
سؤال
Kanban means "symbol" or "box" in Japanese.
سؤال
One of the many lean techniques that have been successfully applied in service firms is the eliminating of unnecessary activities.
سؤال
Value stream mapping is used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant.
سؤال
A kanban control system uses a signaling device to regulate JIT flows.
سؤال
One of the few lean techniques that does not work well in service firms is demand-pull scheduling.
سؤال
"Kanban squares" is an educational game played in kanban training sessions.
سؤال
The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.
سؤال
Preventive maintenance is emphasized in lean production to ensure that flows are not interrupted by downtime or malfunctioning equipment.
سؤال
Value stream mapping involves materials, not information.
سؤال
One of the many lean techniques that have been successfully applied in service firms is the upgrading of housekeeping.
سؤال
Respect for people is a key to Toyota's improvement ideas in manufacturing.
سؤال
A kaizen burst is an overfilled kanban container.
سؤال
A kaizen burst is a symbol on a value stream map.
سؤال
In Japanese manufacturing, automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.
سؤال
Company unions in Japan exist to foster a cooperative relationship with management.
سؤال
One of the many lean techniques that have been successfully applied in service firms is the upgrading of quality.
سؤال
Using the formula in the textbook, the only parameters we need to determine the number of kanban card sets is the average number of units demanded over some time period, the container size, and the safety stock.
سؤال
Subcontractor networks are not very important in Japanese manufacturing.
سؤال
Which of the following are related to lean production?

A)A philosophy of waste elimination
B)Lean consumption
C)Never running out of inventory
D)The Wahei-Subaru method
E)Full use of capacity
سؤال
Automation is a key to lean procurement.
سؤال
In implementing a lean production system, you should work with suppliers to do which of the following?

A)Open facilities near your factory.
B)Focus workstation capacities.
C)Backflush.
D)Provide quality at the source.
E)Reduce lead times.
سؤال
Applying lean concepts in manufacturing balances increases in cost with quality improvement.
سؤال
In implementing a lean production system you should work with suppliers to do which of the following?

A)Calculate lead times.
B)Use quality circles.
C)Freeze windows.
D)Make frequent deliveries.
E)Achieve bottom-round management.
سؤال
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Excess quality
B)Overproduction
C)Underproduction
D)Environmental
E)Over-thinking
سؤال
Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.
سؤال
Group technology (GT) is credited with which of the following benefits?

A)Reducing waiting time between process operations
B)Improving inventory discipline
C)Reducing required workforce skills
D)Improved labor relations
E)Improved small group functioning
سؤال
You have been called in as a consultant to set up a kanban control system.The first thing you do is to determine the number of kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5 percent of the demand during lead time.The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours.Which of the following is the number of kanban card sets necessary to support this situation?

A)5,000
B)5,500
C)6,300
D)6,500
E)7,000
سؤال
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Excess quality
B)Motion
C)Excess capacity
D)Underproduction
E)Excess demand
سؤال
Which of the following statements holds true for kanban production control systems?

A)The authority to produce or supply additional parts comes from upstream operations.
B)In a paperless control system, containers can be used instead of cards.
C)The cards or containers make up the kanban push system.
D)They require substantial quantitative analysis prior to implementation.
E)They have not been successful outside of Japan and the United States.
سؤال
Which of the following address elimination of waste under lean production?

A)Info-matic warehouse networks
B)Outsourced housekeeping
C)Quality at the source
D)Backflush
E)Bottom-round management
سؤال
Which of the following is an element that addresses elimination of waste under lean production?

A)Production ahead of demand
B)Group plant loading technology
C)Kanban production control system
D)Minimized run times
E)Full capacity utilization
سؤال
To implement lean production schedules, a firm would do which of the following?

A)Have excess capacity.
B)Force demand.
C)Hire a consultant.
D)Achieve bottom-up management.
E)Implement kanban groups.
سؤال
In setting up a Kanban control system you need to determine the number of kanban card sets needed.If assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?

A)60
B)80
C)90
D)120
E)150
سؤال
In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?

A)5
B)20
C)27
D)30
E)34
سؤال
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Underproduction
B)Excess quality
C)Preventive maintenance
D)Product defects
E)Kaizen
سؤال
When implementing a lean production system, a stabilized schedule is achieved using which of the following?

A)Level scheduling
B)Demand pull
C)Freeze window
D)Reduced lot sizes
E)Bottom-round management
سؤال
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25 percent of the demand during lead time.The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

A)42
B)47
C)68
D)89
E)94
سؤال
In designing a lean production facility layout, a designer should do which of the following?

A)Design for work flow balance.
B)Locate flexible workstations offline.
C)Link operations through a push system.
D)Balance capacity using job shop analysis.
E)Always keep operations on a single floor of the factory.
سؤال
Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?

A)Organization of problem-solving groups
B)Upgraded housekeeping
C)Upgraded quality
D)Frozen windows
E)Elimination of unnecessary activities
سؤال
Name Fujio Cho's seven prominent types of waste to be eliminated.(1) ___________________
(2) ___________________
(3) ___________________
(4) ___________________
(5) ___________________
(6) ___________________
(7) ___________________
سؤال
Explain why lean manufacturing requires a stable demand environment.
سؤال
Which of the following is not listed in the textbook as a component of a lean supply chain?

A)Lean customers
B)Lean management
C)Lean logistics
D)Lean warehousing
E)Lean procurement
سؤال
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?

A)Inventory holding cost will increase nonlinearly with inventory.
B)Total costs will be lower for the regular lot-size operation.
C)Total costs will be lower for the kanban/lean production operation.
D)The order quantity will be larger for the kanban/lean production approach.
E)As long as the total quantity is the same, total costs will be the same.
سؤال
To develop a lean manufacturing system a firm might do which of the following?

A)Eliminate anything that does not add value for the customer.
B)Standardize product configurations.
C)Process design with product design.
D)Adopt a kaizen philosophy.
E)Implement top-down management controls.
سؤال
An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?

A)Frozen window
B)Backflush
C)Level schedule
D)Group technology
E)Kanban
سؤال
To implement a flow process in developing a lean system a firm might do which of the following?

A)Improve capacity utilization.
B)Build product in anticipation of demand.
C)Reduce setup/changeover time.
D)Eliminate some fixed costs.
E)Implement groupware.
سؤال
In a lean production system, we expect to see which of the following?

A)No extra inventory
B)Extra inventory of critical parts held "just-in-case"
C)More parts and fewer standardized product configurations
D)Managers being held responsible for quality of the work turned out
E)Closer management-labor relationships
سؤال
In setting up a kanban control system, you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 2 hours, what number of kanban card sets is needed? ___________________
سؤال
In setting up a kanban control system, you need to determine the number of kanban card sets needed.If the expected demand during lead time is 24 per hour, safety stock is 10 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what number of kanban card sets is needed? ___________________
سؤال
Which of the following is a lean production technique that has been successfully applied in service firms?

A)Decision trees
B)Leveling the facility load
C)Linear programming
D)Fully utilized capacity
E)Backflushing
سؤال
As lean production methods reduce changeover and setup times and thus enable smaller economic lot sizes and less work-in-process inventory, is the importance of quality increased or decreased? Why?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/73
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Lean Supply Chains
1
Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.
False
Explanation: (Uniform plant loading is) building the same mix of products every day in small quantities.Thus, a total mix is always available to respond to variations in demand.
2
In the textbook, the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide.
False
Explanation: Quality at the source means do it right the first time and, when something goes wrong, stop the process or assembly line immediately.
3
One of the aims of value stream mapping to eliminate waste in a process.
True
Explanation: With value stream mapping, identification of wasteful processes and flows can be made so that they can be modified or eliminated, and the manufacturing system can be made more productive.
4
Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
5
Group technology is a philosophy wherein similar parts are grouped together and the processes required to make the parts are arranged as a work cell.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
6
JIT manufacturing forces a firm to work with a lower water level despite safety hazards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
7
Lean production requires a "push and pull" system of inventory replenishment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
8
Henry Ford used JIT concepts as he streamlined his moving assembly lines to make automobiles in the early 1900s.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
9
Value stream mapping is used to visualize product flows through various processing steps.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
10
Group technology cells help to eliminate movement and queue (waiting) time between operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
11
A principle of value stream mapping is to concentrate on speeding up value-added operations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
12
Lean production makes implementing green strategies in manufacturing processes more difficult.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
13
Group technology includes the set of psychological tests and training exercises given to group workers to ensure a high level of teamwork.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
14
JIT production means that we produce the product before it is required so the customer does not wait for the product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
15
"Quality at the source" requires factory workers to become their own inspectors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
16
Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
17
Lean production is an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, work-in-process, and finished goods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
18
The goal of JIT production is to drive all inventory queues lower.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
19
JIT is typically applied to nonrepetitive manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
20
Lean production is a management philosophy and a pull system throughout the plant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
21
Firms in Japan tend to have short-term relationships with their suppliers and customers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
22
One of the many lean techniques that have been successfully applied in service firms is leveling facility load.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
23
Kanban means "symbol" or "box" in Japanese.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
24
One of the many lean techniques that have been successfully applied in service firms is the eliminating of unnecessary activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
25
Value stream mapping is used to identify all of the value-adding as well as non-value-adding processes that materials are subjected to within a plant.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
26
A kanban control system uses a signaling device to regulate JIT flows.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
27
One of the few lean techniques that does not work well in service firms is demand-pull scheduling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
28
"Kanban squares" is an educational game played in kanban training sessions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
29
The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
30
Preventive maintenance is emphasized in lean production to ensure that flows are not interrupted by downtime or malfunctioning equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
31
Value stream mapping involves materials, not information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
32
One of the many lean techniques that have been successfully applied in service firms is the upgrading of housekeeping.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
33
Respect for people is a key to Toyota's improvement ideas in manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
34
A kaizen burst is an overfilled kanban container.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
35
A kaizen burst is a symbol on a value stream map.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
36
In Japanese manufacturing, automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
37
Company unions in Japan exist to foster a cooperative relationship with management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
38
One of the many lean techniques that have been successfully applied in service firms is the upgrading of quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
39
Using the formula in the textbook, the only parameters we need to determine the number of kanban card sets is the average number of units demanded over some time period, the container size, and the safety stock.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
40
Subcontractor networks are not very important in Japanese manufacturing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which of the following are related to lean production?

A)A philosophy of waste elimination
B)Lean consumption
C)Never running out of inventory
D)The Wahei-Subaru method
E)Full use of capacity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
42
Automation is a key to lean procurement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
43
In implementing a lean production system, you should work with suppliers to do which of the following?

A)Open facilities near your factory.
B)Focus workstation capacities.
C)Backflush.
D)Provide quality at the source.
E)Reduce lead times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
44
Applying lean concepts in manufacturing balances increases in cost with quality improvement.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
45
In implementing a lean production system you should work with suppliers to do which of the following?

A)Calculate lead times.
B)Use quality circles.
C)Freeze windows.
D)Make frequent deliveries.
E)Achieve bottom-round management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
46
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Excess quality
B)Overproduction
C)Underproduction
D)Environmental
E)Over-thinking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
47
Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
48
Group technology (GT) is credited with which of the following benefits?

A)Reducing waiting time between process operations
B)Improving inventory discipline
C)Reducing required workforce skills
D)Improved labor relations
E)Improved small group functioning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
49
You have been called in as a consultant to set up a kanban control system.The first thing you do is to determine the number of kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5 percent of the demand during lead time.The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours.Which of the following is the number of kanban card sets necessary to support this situation?

A)5,000
B)5,500
C)6,300
D)6,500
E)7,000
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
50
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Excess quality
B)Motion
C)Excess capacity
D)Underproduction
E)Excess demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
51
Which of the following statements holds true for kanban production control systems?

A)The authority to produce or supply additional parts comes from upstream operations.
B)In a paperless control system, containers can be used instead of cards.
C)The cards or containers make up the kanban push system.
D)They require substantial quantitative analysis prior to implementation.
E)They have not been successful outside of Japan and the United States.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
52
Which of the following address elimination of waste under lean production?

A)Info-matic warehouse networks
B)Outsourced housekeeping
C)Quality at the source
D)Backflush
E)Bottom-round management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
53
Which of the following is an element that addresses elimination of waste under lean production?

A)Production ahead of demand
B)Group plant loading technology
C)Kanban production control system
D)Minimized run times
E)Full capacity utilization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
54
To implement lean production schedules, a firm would do which of the following?

A)Have excess capacity.
B)Force demand.
C)Hire a consultant.
D)Achieve bottom-up management.
E)Implement kanban groups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
55
In setting up a Kanban control system you need to determine the number of kanban card sets needed.If assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?

A)60
B)80
C)90
D)120
E)150
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
56
In setting up a kanban control system you need to determine the number of kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?

A)5
B)20
C)27
D)30
E)34
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
57
In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?

A)Underproduction
B)Excess quality
C)Preventive maintenance
D)Product defects
E)Kaizen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
58
When implementing a lean production system, a stabilized schedule is achieved using which of the following?

A)Level scheduling
B)Demand pull
C)Freeze window
D)Reduced lot sizes
E)Bottom-round management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
59
You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 150 per hour.You estimate the safety stock should be set at 25 percent of the demand during lead time.The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours.Which of the following is the number of Kanban card sets necessary to support this situation?

A)42
B)47
C)68
D)89
E)94
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
60
In designing a lean production facility layout, a designer should do which of the following?

A)Design for work flow balance.
B)Locate flexible workstations offline.
C)Link operations through a push system.
D)Balance capacity using job shop analysis.
E)Always keep operations on a single floor of the factory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
61
Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?

A)Organization of problem-solving groups
B)Upgraded housekeeping
C)Upgraded quality
D)Frozen windows
E)Elimination of unnecessary activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
62
Name Fujio Cho's seven prominent types of waste to be eliminated.(1) ___________________
(2) ___________________
(3) ___________________
(4) ___________________
(5) ___________________
(6) ___________________
(7) ___________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
63
Explain why lean manufacturing requires a stable demand environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
64
Which of the following is not listed in the textbook as a component of a lean supply chain?

A)Lean customers
B)Lean management
C)Lean logistics
D)Lean warehousing
E)Lean procurement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
65
Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?

A)Inventory holding cost will increase nonlinearly with inventory.
B)Total costs will be lower for the regular lot-size operation.
C)Total costs will be lower for the kanban/lean production operation.
D)The order quantity will be larger for the kanban/lean production approach.
E)As long as the total quantity is the same, total costs will be the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
66
To develop a lean manufacturing system a firm might do which of the following?

A)Eliminate anything that does not add value for the customer.
B)Standardize product configurations.
C)Process design with product design.
D)Adopt a kaizen philosophy.
E)Implement top-down management controls.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
67
An activity where the parts that go into each unit of a product are periodically removed from inventory and accounted for based on the number of units produced is called which of the following?

A)Frozen window
B)Backflush
C)Level schedule
D)Group technology
E)Kanban
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
68
To implement a flow process in developing a lean system a firm might do which of the following?

A)Improve capacity utilization.
B)Build product in anticipation of demand.
C)Reduce setup/changeover time.
D)Eliminate some fixed costs.
E)Implement groupware.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
69
In a lean production system, we expect to see which of the following?

A)No extra inventory
B)Extra inventory of critical parts held "just-in-case"
C)More parts and fewer standardized product configurations
D)Managers being held responsible for quality of the work turned out
E)Closer management-labor relationships
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
70
In setting up a kanban control system, you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 2 hours, what number of kanban card sets is needed? ___________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
71
In setting up a kanban control system, you need to determine the number of kanban card sets needed.If the expected demand during lead time is 24 per hour, safety stock is 10 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what number of kanban card sets is needed? ___________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
72
Which of the following is a lean production technique that has been successfully applied in service firms?

A)Decision trees
B)Leveling the facility load
C)Linear programming
D)Fully utilized capacity
E)Backflushing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
73
As lean production methods reduce changeover and setup times and thus enable smaller economic lot sizes and less work-in-process inventory, is the importance of quality increased or decreased? Why?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 73 في هذه المجموعة.