سؤال
A disadvantage of a matrix project organizational structure is that a project manager is held responsible for successful completion of the project.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The critical path in a CPM analysis is always the shortest path through the network.
سؤال
Upper-level management must decide between pure, functional, and matrix structures as ways to organize projects.
سؤال
Project management can be defined as planning, directing, and controlling resources to meet the technical, cost, and time constraints of the project.
سؤال
The second step in managing a project is writing the statement of work.
سؤال
A matrix project structure is often referred to as a "skunkworks."
سؤال
Complex projects are often subdivided into a series of tasks that are typically configured to be not longer than several months in duration.
سؤال
One of the disadvantages of a pure project organizational structure is that the project manager has full authority over the project.
سؤال
One of the advantages of a functional project organizational structure is that a team member can work on several projects.
سؤال
Slack activity time is the difference between the early start and the late finish of a project activity time.
سؤال
A work breakdown structure is used in project management but it is not used when the critical path method is involved.
سؤال
The Gantt chart is an example of a project control chart.
سؤال
An event unit package is a subdivision of a project.
سؤال
The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.
سؤال
A project may be defined as a series of related jobs directed toward some major output and requiring a significant period of time to perform.
سؤال
In CPM, the late start time estimate is the latest time you can start an activity and still keep the entire project on schedule.
سؤال
The fact that organizations are flattening is one of the reasons that project management is important.
سؤال
A matrix project attempts to blend properties of functional and pure project structures.
سؤال
The critical path in a project is that sequence of activities that consume the longest amount of time in a project network of activities.
سؤال
CPM is an abbreviation for critical path method.
سؤال
The valuations in an earned value management analysis must be either profits or revenue.
سؤال
The project indirect costs associated with a project include overhead, facilities, and resource opportunity costs.
سؤال
Derivative projects are those that address incremental changes to products or processes.
سؤال
Using the time-cost CPM model, the crash time is the shortest possible time allowed for each activity in the project.
سؤال
Breakthrough projects are those that provide fundamental improvements to existing products.
سؤال
Project management software available today combines CPM and other scheduling aids, like Gantt charting, to aid in tracking progress of project completion.
سؤال
A project milestone is a specific event to be reached by a particular point in time.
سؤال
The critical path in a CPM analysis is found by locating the activities times with zero slack.
سؤال
One of the assumptions made using CPM is that project activities can be identified with clear beginning and ending points.
سؤال
In a CPM analysis, if you subtract the early start from the late start, the result is the activity's slack time.
سؤال
In a CPM analysis, if you subtract the late finish from the early finish, the result is the activity's slack time.
سؤال
One of the assumptions made using CPM is that project activity sequence relationships can be specified and networked.
سؤال
Earned value management (EVM) is a technique for measuring project progress in an objective manner.
سؤال
When reducing the planned duration of a project using the time-cost CPM model, we select the activity to crash by determining the cost of each alternative and selecting the one whose cost is the greatest.
سؤال
Earned value management (EVM) has the capability to combine measurements of scope, schedule, and cost in a project.
سؤال
Calculating the early start and early finish times for each activity in a CPM analysis does not provide any useful information.
سؤال
You are managing a project and need to cut the cost of the project.You decide to transfer workers to another job to cut the project's costs.Costs associated with transferring the workers are an example of project indirect costs.
سؤال
A project can be subdivided into which of the following?

A)Job orders
B)Sub-jobs
C)Work packages
D)Sub-paths
E)Events and decisions
سؤال
In the time-cost CPM model, cost is assumed to be a linear function of time.
سؤال
The activity direct costs associated with a project might include giving workers overtime to complete a project in less than the expected time.
سؤال
What is a work breakdown structure?

A)A list of the activities making up the higher levels of the project
B)A definition of the hierarchy of project tasks, subtasks, and work packages
C)A depiction of the activities making up a project
D)A Gantt chart
E)A structure that is incompatible with the critical path method
سؤال
You are looking at a chart that has the terms BCWS, BCWP, and AC indicating lines on the chart.What kind of chart are you looking at?

A)Gantt chart
B)PERT chart
C)Bar/milestone chart
D)Total program cost breakdown
E)EVM chart
سؤال
Which of the following is a graphic project report used in project management?

A)Project proposal
B)Approved project plan
C)Humphrey chart
D)Equipment and supplies chart
E)Cost and performance tracking schedule
سؤال
A simple project listing of five activities, their predecessors, and their respective time estimates are presented here: <strong>A simple project listing of five activities, their predecessors, and their respective time estimates are presented here:   Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?</strong> A)10 days B)7 days C)8 days D)12 days E)9 days <div style=padding-top: 35px> Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?

A)10 days
B)7 days
C)8 days
D)12 days
E)9 days
سؤال
For an activity in a CPM analysis, the early start time is 8 and the late start time is 10.Which of the following statements is true?

A)The late finish is 12.
B)The early finish is 10.
C)The slack for this activity is 2.
D)The duration of this activity is 2.
E)The activity is on the critical path.
سؤال
A project starts out as which of the following?

A)A statement of work
B)Critical path method (CPM)
C)A series of milestones
D)A Gantt chart
E)A latest-start-time estimate
سؤال
You have just been assigned to oversee a series of projects.Functional areas will loan you personnel for each project, and separate project managers will be responsible for separate projects.These project managers will report to you.Which project management structure is being used?

A)Pure project
B)Task force
C)Matrix project
D)Functional project
E)PERT
سؤال
A simple project listing of five activities, their predecessors, and their respective time estimates are presented here: <strong>A simple project listing of five activities, their predecessors, and their respective time estimates are presented here:   Using the CPM, which activities have slack in this project?</strong> A)A B)B C)C D)D E)C and E <div style=padding-top: 35px> Using the CPM, which activities have slack in this project?

A)A
B)B
C)C
D)D
E)C and E
سؤال
A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: <strong>A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here:   Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?</strong> A)9 days B)10 days C)11 days D)12 days E)13 days <div style=padding-top: 35px> Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?

A)9 days
B)10 days
C)11 days
D)12 days
E)13 days
سؤال
A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: <strong>A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here:   Using CPM, which activities make up the critical path?</strong> A)A, B, D, F, G B)A, C, E, F, G C)A, C, B, F, E D)A, D, E E)None of these <div style=padding-top: 35px> Using CPM, which activities make up the critical path?

A)A, B, D, F, G
B)A, C, E, F, G
C)A, C, B, F, E
D)A, D, E
E)None of these
سؤال
PERT is an abbreviation for which of the following methodologies?

A)Product evaluation, result, and treatment
B)Programming and evaluation realization technology
C)Program evaluation and review technique
D)Process evaluation and review technology
E)It is a name, not an abbreviation for anything.
سؤال
A series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?

A)Matrix project
B)Integrated task force
C)Functional project
D)Pure project
E)Cross-functional flexible team
سؤال
A simple project listing of five activities and their respective time estimates are presented here: <strong>A simple project listing of five activities and their respective time estimates are presented here:   Using CPM, which activities make up the critical path?</strong> A)A, C, D, E B)A, B, D, E C)A, C, B, D, E D)A, D, E E)None of these <div style=padding-top: 35px> Using CPM, which activities make up the critical path?

A)A, C, D, E
B)A, B, D, E
C)A, C, B, D, E
D)A, D, E
E)None of these
سؤال
You have been placed in charge of a large project.Shortened communication lines are required to ensure quick resolution of problems as they arise.You recognize that the project is going to take a lot of time and require a lot of team pride, motivation, and commitment by all members.Which project management structure should you use in this situation?

A)Pure project
B)Task force
C)Matrix project
D)Functional project
E)PERT
سؤال
In a Gantt chart, the horizontal axis is usually which of the following?

A)Activities
B)Cost
C)Profit
D)Time
E)Milestones
سؤال
Some of the advantages of a functional project where the project is housed in a functional division include which of the following?

A)The project manager has full authority over the project.
B)Team pride, motivation, and commitment are high.
C)A team member can work on several projects.
D)Needs of the client are secondary.
E)None of these
سؤال
For an activity in a CPM analysis, the early finish time is 20 and the late finish time is 20.Which of the following statements is true?

A)The activity's late start must happen before its early start.
B)The activity is on the critical path.
C)The slack for this activity is 20.
D)The duration of this task is zero.
E)The duration of this task is 20.
سؤال
A listing of immediate predecessor activities is important information in a CPM analysis for which of the following reasons?

A)It specifies the relationships in the CPM network of activities.
B)It provides useful timing information.
C)It includes cost information.
D)It is the probability information required in the final step of CPM.
E)None of these
سؤال
A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: <strong>A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here:   Using CPM, which activities have slack in this project?</strong> A)A, B, C B)B, D C)Only C D)C, E E)F, G <div style=padding-top: 35px> Using CPM, which activities have slack in this project?

A)A, B, C
B)B, D
C)Only C
D)C, E
E)F, G
سؤال
An advantage of a pure project where self-contained teams work full time on a project is which of the following?

A)Team members can work on several projects.
B)Functional area is a "home" after the project is completed.
C)There are duplicated resources.
D)Lines of communication are shortened.
E)Overall organizational policies and goals can be ignored.
سؤال
What is the most basic requirement of an EVM system? _____________________________________________________________
سؤال
Popular project management software used in mid-sized projects is

A)Microsoft Word.
B)Microsoft Primavera.
C)Microsoft Project.
D)Microsoft Excel.
E)None of these
سؤال
You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project "direct costs" are given here. <strong>You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project direct costs are given here.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs)?</strong> A) 16 days B) 15 days C) 14 days D) 13 days E) 12 days <div style=padding-top: 35px> The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs)?

A) 16 days
B) 15 days
C) 14 days
D) 13 days
E) 12 days
سؤال
You have the following time and cost information for use in a time-cost CPM scheduling model. <strong>You have the following time and cost information for use in a time-cost CPM scheduling model.   What are the three costs per unit of time to expedite each activity?</strong> A)A = $300, B = $200, C = $300 B)A = $100, B = $200, C = $400 C)A = $200, B = $200, C = $200 D)A = $100, B = $400, C = $300 E)A = $200, B = $300, C = $400 <div style=padding-top: 35px> What are the three costs per unit of time to expedite each activity?

A)A = $300, B = $200, C = $300
B)A = $100, B = $200, C = $400
C)A = $200, B = $200, C = $200
D)A = $100, B = $400, C = $300
E)A = $200, B = $300, C = $400
سؤال
Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs. <strong>Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs.   What are the total time of this project and total normal cost?</strong> A)Total time is 13 days, total cost is $1,200. B)Total time is 12 days, total cost is $1,700. C)Total time is 11 days, total cost is $1,600. D)Total time is 10 days, total cost is $1,750. E)Total time is 9 days, total cost is $1,700. <div style=padding-top: 35px> What are the total time of this project and total normal cost?

A)Total time is 13 days, total cost is $1,200.
B)Total time is 12 days, total cost is $1,700.
C)Total time is 11 days, total cost is $1,600.
D)Total time is 10 days, total cost is $1,750.
E)Total time is 9 days, total cost is $1,700.
سؤال
What do the initials EVM stand for? _______________________________________
سؤال
You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project "direct costs" are given here. You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project direct costs are given here.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day what is the total (i.e., direct and indirect) project cost? ____________________ E.A costs $100/day to crash, D costs $150/day to crash, and E costs $400/day to crash.Reducing the duration of A by one day at an additional cost of $100 is the most economical.Direct costs are now $400 + $100 + $200 + $400 + $500 + $200 + $100 = $1,900.Overall duration of the project is 15 days, and indirect costs are $250.The total cost of crashing this project for one day is $2,150.<div style=padding-top: 35px> The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day what is the total (i.e., direct and indirect) project cost? ____________________
E.A costs $100/day to crash, D costs $150/day to crash, and E costs $400/day to crash.Reducing the duration of A by one day at an additional cost of $100 is the most economical.Direct costs are now $400 + $100 + $200 + $400 + $500 + $200 + $100 = $1,900.Overall duration of the project is 15 days, and indirect costs are $250.The total cost of crashing this project for one day is $2,150.
سؤال
You have just performed a CPM analysis and have found that more than one path through the project network has zero slack values.What can you conclude?

A)You have incorrectly performed the analysis.
B)You have multiple critical paths.
C)Only one path is optimal.
D)More than one path is optimal.
E)The project will not be completed by the desired time.
سؤال
In CPM analysis, it is generally expected that the relationship between activity direct costs and project indirect costs will be which of the following?

A)Positively related
B)Optimally related
C)Negatively related
D)Not related
E)Fractionally related
سؤال
What are "project milestones?" _________________________________________
سؤال
Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs. <strong>Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by four days, what is the total time of the project and total cost?</strong> A)Total time is 10 days, total cost is $2,500. B)Total time is 9 days, total cost is $2,300. C)Total time is 8 days, total cost is $2,750. D)Total time is 8 days, total cost is $1,850. E)Total time is 9 days, total cost is $2,350. <div style=padding-top: 35px> If you crash this project to reduce the total time by four days, what is the total time of the project and total cost?

A)Total time is 10 days, total cost is $2,500.
B)Total time is 9 days, total cost is $2,300.
C)Total time is 8 days, total cost is $2,750.
D)Total time is 8 days, total cost is $1,850.
E)Total time is 9 days, total cost is $2,350.
سؤال
Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs. Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by four days, what is the total time of the project and total cost? __________________<div style=padding-top: 35px> If you crash this project to reduce the total time by four days, what is the total time of the project and total cost? __________________
سؤال
What is that sequence of activities that consume the longest amount of time in a project network of activities called? _______________________________
سؤال
You know when you have arrived at the optimal solution in using the time-cost CPM scheduling model analysis when what happens?

A)You have found the critical path.
B)You have run out of crash time.
C)You no longer have a linear relationship with costs.
D)You have reached the minimum total cost.
E)You have run out of crash costs.
سؤال
Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs. <strong>Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by one day, what is the total time of the project and total cost?</strong> A)Total time is 13 days, total cost is $1,500. B)Total time is 12 days, total cost is $2,000. C)Total time is 12 days, total cost is $2,300. D)Total time is 11 days, total cost is $1,850. E)Total time is 11 days, total cost is $2,350. <div style=padding-top: 35px> If you crash this project to reduce the total time by one day, what is the total time of the project and total cost?

A)Total time is 13 days, total cost is $1,500.
B)Total time is 12 days, total cost is $2,000.
C)Total time is 12 days, total cost is $2,300.
D)Total time is 11 days, total cost is $1,850.
E)Total time is 11 days, total cost is $2,350.
سؤال
Describe how CPM handles the trade-offs between time and cost in the scheduling of a project.
سؤال
What is the criterion for determining whether a project activity is on the "critical path" or not?
سؤال
You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project "direct costs" are given here. <strong>You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project direct costs are given here.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day, what is the total (i.e., direct and indirect) project cost?</strong> A) $2,150 B) $2,300 C) $2,400 D) $2,450 E) $2,500 <div style=padding-top: 35px> The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day, what is the total (i.e., direct and indirect) project cost?

A) $2,150
B) $2,300
C) $2,400
D) $2,450
E) $2,500
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/78
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Project Management
1
A disadvantage of a matrix project organizational structure is that a project manager is held responsible for successful completion of the project.
False
Explanation: That a project manager is held responsible for successful completion of the project is listed as an advantage of a matrix organizational structure.
2
The critical path in a CPM analysis is always the shortest path through the network.
False
Explanation: The critical path of activities in a project is the sequence of activities that form the longest chain in terms of their time to complete.
3
Upper-level management must decide between pure, functional, and matrix structures as ways to organize projects.
True
Explanation: Before the project starts, senior management must decide which of three organizational structures will be used to tie the project to the parent firm: pure project, functional project, or matrix project.
4
Project management can be defined as planning, directing, and controlling resources to meet the technical, cost, and time constraints of the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
5
The second step in managing a project is writing the statement of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
6
A matrix project structure is often referred to as a "skunkworks."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
7
Complex projects are often subdivided into a series of tasks that are typically configured to be not longer than several months in duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
8
One of the disadvantages of a pure project organizational structure is that the project manager has full authority over the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
9
One of the advantages of a functional project organizational structure is that a team member can work on several projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
10
Slack activity time is the difference between the early start and the late finish of a project activity time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
11
A work breakdown structure is used in project management but it is not used when the critical path method is involved.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
12
The Gantt chart is an example of a project control chart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
13
An event unit package is a subdivision of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
14
The critical path of activities in a project is the sequence of activities that form the shortest chain in a project network of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
15
A project may be defined as a series of related jobs directed toward some major output and requiring a significant period of time to perform.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
16
In CPM, the late start time estimate is the latest time you can start an activity and still keep the entire project on schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
17
The fact that organizations are flattening is one of the reasons that project management is important.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
18
A matrix project attempts to blend properties of functional and pure project structures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
19
The critical path in a project is that sequence of activities that consume the longest amount of time in a project network of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
20
CPM is an abbreviation for critical path method.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
21
The valuations in an earned value management analysis must be either profits or revenue.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
22
The project indirect costs associated with a project include overhead, facilities, and resource opportunity costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
23
Derivative projects are those that address incremental changes to products or processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
24
Using the time-cost CPM model, the crash time is the shortest possible time allowed for each activity in the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
25
Breakthrough projects are those that provide fundamental improvements to existing products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
26
Project management software available today combines CPM and other scheduling aids, like Gantt charting, to aid in tracking progress of project completion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
27
A project milestone is a specific event to be reached by a particular point in time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
28
The critical path in a CPM analysis is found by locating the activities times with zero slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
29
One of the assumptions made using CPM is that project activities can be identified with clear beginning and ending points.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
30
In a CPM analysis, if you subtract the early start from the late start, the result is the activity's slack time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
31
In a CPM analysis, if you subtract the late finish from the early finish, the result is the activity's slack time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
32
One of the assumptions made using CPM is that project activity sequence relationships can be specified and networked.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
33
Earned value management (EVM) is a technique for measuring project progress in an objective manner.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
34
When reducing the planned duration of a project using the time-cost CPM model, we select the activity to crash by determining the cost of each alternative and selecting the one whose cost is the greatest.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
35
Earned value management (EVM) has the capability to combine measurements of scope, schedule, and cost in a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
36
Calculating the early start and early finish times for each activity in a CPM analysis does not provide any useful information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
37
You are managing a project and need to cut the cost of the project.You decide to transfer workers to another job to cut the project's costs.Costs associated with transferring the workers are an example of project indirect costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
38
A project can be subdivided into which of the following?

A)Job orders
B)Sub-jobs
C)Work packages
D)Sub-paths
E)Events and decisions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
39
In the time-cost CPM model, cost is assumed to be a linear function of time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
40
The activity direct costs associated with a project might include giving workers overtime to complete a project in less than the expected time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
41
What is a work breakdown structure?

A)A list of the activities making up the higher levels of the project
B)A definition of the hierarchy of project tasks, subtasks, and work packages
C)A depiction of the activities making up a project
D)A Gantt chart
E)A structure that is incompatible with the critical path method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
42
You are looking at a chart that has the terms BCWS, BCWP, and AC indicating lines on the chart.What kind of chart are you looking at?

A)Gantt chart
B)PERT chart
C)Bar/milestone chart
D)Total program cost breakdown
E)EVM chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
43
Which of the following is a graphic project report used in project management?

A)Project proposal
B)Approved project plan
C)Humphrey chart
D)Equipment and supplies chart
E)Cost and performance tracking schedule
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
44
A simple project listing of five activities, their predecessors, and their respective time estimates are presented here: <strong>A simple project listing of five activities, their predecessors, and their respective time estimates are presented here:   Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?</strong> A)10 days B)7 days C)8 days D)12 days E)9 days Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?

A)10 days
B)7 days
C)8 days
D)12 days
E)9 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
45
For an activity in a CPM analysis, the early start time is 8 and the late start time is 10.Which of the following statements is true?

A)The late finish is 12.
B)The early finish is 10.
C)The slack for this activity is 2.
D)The duration of this activity is 2.
E)The activity is on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
46
A project starts out as which of the following?

A)A statement of work
B)Critical path method (CPM)
C)A series of milestones
D)A Gantt chart
E)A latest-start-time estimate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
47
You have just been assigned to oversee a series of projects.Functional areas will loan you personnel for each project, and separate project managers will be responsible for separate projects.These project managers will report to you.Which project management structure is being used?

A)Pure project
B)Task force
C)Matrix project
D)Functional project
E)PERT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
48
A simple project listing of five activities, their predecessors, and their respective time estimates are presented here: <strong>A simple project listing of five activities, their predecessors, and their respective time estimates are presented here:   Using the CPM, which activities have slack in this project?</strong> A)A B)B C)C D)D E)C and E Using the CPM, which activities have slack in this project?

A)A
B)B
C)C
D)D
E)C and E
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
49
A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: <strong>A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here:   Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?</strong> A)9 days B)10 days C)11 days D)12 days E)13 days Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?

A)9 days
B)10 days
C)11 days
D)12 days
E)13 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
50
A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: <strong>A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here:   Using CPM, which activities make up the critical path?</strong> A)A, B, D, F, G B)A, C, E, F, G C)A, C, B, F, E D)A, D, E E)None of these Using CPM, which activities make up the critical path?

A)A, B, D, F, G
B)A, C, E, F, G
C)A, C, B, F, E
D)A, D, E
E)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
51
PERT is an abbreviation for which of the following methodologies?

A)Product evaluation, result, and treatment
B)Programming and evaluation realization technology
C)Program evaluation and review technique
D)Process evaluation and review technology
E)It is a name, not an abbreviation for anything.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
52
A series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?

A)Matrix project
B)Integrated task force
C)Functional project
D)Pure project
E)Cross-functional flexible team
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
53
A simple project listing of five activities and their respective time estimates are presented here: <strong>A simple project listing of five activities and their respective time estimates are presented here:   Using CPM, which activities make up the critical path?</strong> A)A, C, D, E B)A, B, D, E C)A, C, B, D, E D)A, D, E E)None of these Using CPM, which activities make up the critical path?

A)A, C, D, E
B)A, B, D, E
C)A, C, B, D, E
D)A, D, E
E)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
54
You have been placed in charge of a large project.Shortened communication lines are required to ensure quick resolution of problems as they arise.You recognize that the project is going to take a lot of time and require a lot of team pride, motivation, and commitment by all members.Which project management structure should you use in this situation?

A)Pure project
B)Task force
C)Matrix project
D)Functional project
E)PERT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
55
In a Gantt chart, the horizontal axis is usually which of the following?

A)Activities
B)Cost
C)Profit
D)Time
E)Milestones
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
56
Some of the advantages of a functional project where the project is housed in a functional division include which of the following?

A)The project manager has full authority over the project.
B)Team pride, motivation, and commitment are high.
C)A team member can work on several projects.
D)Needs of the client are secondary.
E)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
57
For an activity in a CPM analysis, the early finish time is 20 and the late finish time is 20.Which of the following statements is true?

A)The activity's late start must happen before its early start.
B)The activity is on the critical path.
C)The slack for this activity is 20.
D)The duration of this task is zero.
E)The duration of this task is 20.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
58
A listing of immediate predecessor activities is important information in a CPM analysis for which of the following reasons?

A)It specifies the relationships in the CPM network of activities.
B)It provides useful timing information.
C)It includes cost information.
D)It is the probability information required in the final step of CPM.
E)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
59
A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: <strong>A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here:   Using CPM, which activities have slack in this project?</strong> A)A, B, C B)B, D C)Only C D)C, E E)F, G Using CPM, which activities have slack in this project?

A)A, B, C
B)B, D
C)Only C
D)C, E
E)F, G
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
60
An advantage of a pure project where self-contained teams work full time on a project is which of the following?

A)Team members can work on several projects.
B)Functional area is a "home" after the project is completed.
C)There are duplicated resources.
D)Lines of communication are shortened.
E)Overall organizational policies and goals can be ignored.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
61
What is the most basic requirement of an EVM system? _____________________________________________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
62
Popular project management software used in mid-sized projects is

A)Microsoft Word.
B)Microsoft Primavera.
C)Microsoft Project.
D)Microsoft Excel.
E)None of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
63
You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project "direct costs" are given here. <strong>You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project direct costs are given here.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs)?</strong> A) 16 days B) 15 days C) 14 days D) 13 days E) 12 days The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.At what day do we achieve the lowest total project cost (i.e., direct plus indirect costs)?

A) 16 days
B) 15 days
C) 14 days
D) 13 days
E) 12 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
64
You have the following time and cost information for use in a time-cost CPM scheduling model. <strong>You have the following time and cost information for use in a time-cost CPM scheduling model.   What are the three costs per unit of time to expedite each activity?</strong> A)A = $300, B = $200, C = $300 B)A = $100, B = $200, C = $400 C)A = $200, B = $200, C = $200 D)A = $100, B = $400, C = $300 E)A = $200, B = $300, C = $400 What are the three costs per unit of time to expedite each activity?

A)A = $300, B = $200, C = $300
B)A = $100, B = $200, C = $400
C)A = $200, B = $200, C = $200
D)A = $100, B = $400, C = $300
E)A = $200, B = $300, C = $400
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
65
Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs. <strong>Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs.   What are the total time of this project and total normal cost?</strong> A)Total time is 13 days, total cost is $1,200. B)Total time is 12 days, total cost is $1,700. C)Total time is 11 days, total cost is $1,600. D)Total time is 10 days, total cost is $1,750. E)Total time is 9 days, total cost is $1,700. What are the total time of this project and total normal cost?

A)Total time is 13 days, total cost is $1,200.
B)Total time is 12 days, total cost is $1,700.
C)Total time is 11 days, total cost is $1,600.
D)Total time is 10 days, total cost is $1,750.
E)Total time is 9 days, total cost is $1,700.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
66
What do the initials EVM stand for? _______________________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
67
You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project "direct costs" are given here. You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project direct costs are given here.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day what is the total (i.e., direct and indirect) project cost? ____________________ E.A costs $100/day to crash, D costs $150/day to crash, and E costs $400/day to crash.Reducing the duration of A by one day at an additional cost of $100 is the most economical.Direct costs are now $400 + $100 + $200 + $400 + $500 + $200 + $100 = $1,900.Overall duration of the project is 15 days, and indirect costs are $250.The total cost of crashing this project for one day is $2,150. The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day what is the total (i.e., direct and indirect) project cost? ____________________
E.A costs $100/day to crash, D costs $150/day to crash, and E costs $400/day to crash.Reducing the duration of A by one day at an additional cost of $100 is the most economical.Direct costs are now $400 + $100 + $200 + $400 + $500 + $200 + $100 = $1,900.Overall duration of the project is 15 days, and indirect costs are $250.The total cost of crashing this project for one day is $2,150.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
68
You have just performed a CPM analysis and have found that more than one path through the project network has zero slack values.What can you conclude?

A)You have incorrectly performed the analysis.
B)You have multiple critical paths.
C)Only one path is optimal.
D)More than one path is optimal.
E)The project will not be completed by the desired time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
69
In CPM analysis, it is generally expected that the relationship between activity direct costs and project indirect costs will be which of the following?

A)Positively related
B)Optimally related
C)Negatively related
D)Not related
E)Fractionally related
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
70
What are "project milestones?" _________________________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
71
Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs. <strong>Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by four days, what is the total time of the project and total cost?</strong> A)Total time is 10 days, total cost is $2,500. B)Total time is 9 days, total cost is $2,300. C)Total time is 8 days, total cost is $2,750. D)Total time is 8 days, total cost is $1,850. E)Total time is 9 days, total cost is $2,350. If you crash this project to reduce the total time by four days, what is the total time of the project and total cost?

A)Total time is 10 days, total cost is $2,500.
B)Total time is 9 days, total cost is $2,300.
C)Total time is 8 days, total cost is $2,750.
D)Total time is 8 days, total cost is $1,850.
E)Total time is 9 days, total cost is $2,350.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
72
Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs. Here are the data for a time-cost CPM scheduling analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by four days, what is the total time of the project and total cost? __________________ If you crash this project to reduce the total time by four days, what is the total time of the project and total cost? __________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
73
What is that sequence of activities that consume the longest amount of time in a project network of activities called? _______________________________
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
74
You know when you have arrived at the optimal solution in using the time-cost CPM scheduling model analysis when what happens?

A)You have found the critical path.
B)You have run out of crash time.
C)You no longer have a linear relationship with costs.
D)You have reached the minimum total cost.
E)You have run out of crash costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
75
Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs. <strong>Here are the data for a time-cost CPM scheduling model analysis.The time is in days and the costs include both direct and indirect costs.   If you crash this project to reduce the total time by one day, what is the total time of the project and total cost?</strong> A)Total time is 13 days, total cost is $1,500. B)Total time is 12 days, total cost is $2,000. C)Total time is 12 days, total cost is $2,300. D)Total time is 11 days, total cost is $1,850. E)Total time is 11 days, total cost is $2,350. If you crash this project to reduce the total time by one day, what is the total time of the project and total cost?

A)Total time is 13 days, total cost is $1,500.
B)Total time is 12 days, total cost is $2,000.
C)Total time is 12 days, total cost is $2,300.
D)Total time is 11 days, total cost is $1,850.
E)Total time is 11 days, total cost is $2,350.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
76
Describe how CPM handles the trade-offs between time and cost in the scheduling of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
77
What is the criterion for determining whether a project activity is on the "critical path" or not?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
78
You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project "direct costs" are given here. <strong>You have collected the data for a time-cost CPM scheduling model analysis.The time is in days and the project direct costs are given here.   The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day, what is the total (i.e., direct and indirect) project cost?</strong> A) $2,150 B) $2,300 C) $2,400 D) $2,450 E) $2,500 The indirect costs for the project are determined on a daily duration basis.If the project lasts 16 days, the total indirect costs are $400; 15 days, they will be $250; 14 days, they will be $200; and 13 days, they will be $100.If you crash this project by one day, what is the total (i.e., direct and indirect) project cost?

A) $2,150
B) $2,300
C) $2,400
D) $2,450
E) $2,500
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 78 في هذه المجموعة.