سؤال
What is process modeling?

A) Illustrates the movement of information between external entities and the processes and data stores within the system
B) Software suites that automate systems analysis, design, and development
C) Involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment
D) None of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is not a phase in the SDLC?

A) Planning
B) Development
C) RFP
D) Testing
RFP is request for proposal and is not a phase in the SDLC.
سؤال
What is an economic feasibility study?

A) Identifies the financial benefits and costs associated with the systems development project
B) Determines the organization's ability to build and integrate the proposed system
C) Assesses the likelihood that all potential time frames and completion dates will be met
D) Examines all potential legal and contractual ramifications of the proposed system
سؤال
What represents the detailed set of knowledge worker requests that the system must meet in order to be successful?

A) JAD session
B) Business requirements
C) Sign-off
D) None of the above
سؤال
Which of the following is a phase in the SDLC?

A) Analysis
B) Design
C) Testing
D) All of the above
All of the above are phases in the SDLC.
سؤال
Which of the following is an evaluation criteria used to prioritize software development projects?

A) Value chain analysis
B) Strategic alignment
C) Resource availability
D) All of the above
سؤال
What is a feasibility study?

A) Determines if the proposed solution is feasible and achievable from a financial, technical, and organizational standpoint
B) Determines the amount and types of resources required to complete the project and determine if the organization has these resources available
C) Determine the number of individuals, amount of time, and technical difficulty of the project
D) A factor that is critical to an organization's success
سؤال
Which of the following is not a phase in the SDLC?

A) Maintenance
B) Change
C) Design
D) None of the above
Change is not a phase in the SDLC.
سؤال
Which evaluation criteria is an organization using that prioritizes its projects by giving priority to those projects that are in line with the organization's strategic goals and objectives?

A) Strategic analysis
B) Strategic alignment
C) Strategic availability
D) All of the above
سؤال
What is the second step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Analysis is the second step in the SDLC.
سؤال
What is the first step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Planning is the first phase in the SDLC.
سؤال
What is COTS?

A) Illustrates the movement of information between external entities and the processes and data stores within the system
B) Software suites that automate systems analysis, design, and development
C) Involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment
D) A software package or solution that is purchased to support one or more business functions and information systems
سؤال
Which of the following is not a key factor an organization should consider when contemplating the buy vs. build decision?

A) Time to market
B) Availability of corporate resources
C) Availability of CASE tools
D) Corporate core competencies
سؤال
What is a schedule feasibility study?

A) Identifies the financial benefits and costs associated with the systems development project
B) Determines the organization's ability to build and integrate the proposed system
C) Assesses the likelihood that all potential time frames and completion dates will be met
D) Examines all potential legal and contractual ramifications of the proposed system
سؤال
What represents a session where employees meet, sometimes for several days, to define or review the business requirements for the system?

A) JAD session
B) Business requirement
C) Requirements definition document
D) Sign-off
سؤال
What contains the final set of business requirements, prioritized in order of business importance?

A) JAD session
B) Business requirement
C) Requirements definition document
D) Technical architecture
سؤال
Which of the following should an organization consider during the buy vs. build decision?

A) Are there any currently available products that fit the organizations needs
B) Can the organization customize or modify an existing COTS to fit its needs
C) Is there a justification to purchase or develop based on the cost of acquisition
D) All of the above
سؤال
Which of the following is not a type of feasibility study?

A) Operational feasibility study
B) Legal and contractual feasibility study
C) Critical success factor feasibility study
D) Technical feasibility study
سؤال
Which activity is performed during the planning phase?

A) Identify and select the system for development
B) Assess project feasibility
C) Develop the project plan
D) All of the above
سؤال
What is the system users' actual signatures indicating they approve all of the business requirements?

A) JAD session
B) Technical architecture
C) Requirements definition document
D) Sign-off
سؤال
What type of training is set in a classroom-type environment and lead by an instructor?

A) Online training
B) Workshop training
C) Help desk
D) None of the above
سؤال
Which of the following highlights how to use the system?

A) User documentation
B) GUI
C) COTS
D) UAT
سؤال
Which phase describes the desired features and operations of the system including screen layouts, business rules, process diagrams, pseudo code, and other documentation?

A) Analysis phase
B) Design phase
C) Development phase
D) Testing phase
سؤال
Which activity is performed during the implementation phase?

A) Build a help desk
B) Perform system maintenance
C) Build the database and programs
D) None of the above
سؤال
What are the detailed steps the system must perform along with the expected results of each step?

A) JAD
B) COTS
C) Technical architecture
D) Test conditions
سؤال
What is phased implementation?

A) Using both the old and new systems until it is evident that the new system performs correctly
B) Discarding the old system completely and immediately start to use the new system
C) Having only a small group of people use the new system until it is evident that the new system performs correctly and then adding the remaining people to the new system
D) Implementing the new system in phases until it is evident that the new system performs correctly and then implementing the remaining phases of the new system
سؤال
Which phase takes all of the detailed design documents from the design phase and transforming them into the actual system?

A) Analysis phase
B) Design phase
C) Development phase
D) Testing phase
سؤال
What is the ability to model the information system screens for an entire system using icons, buttons, menus, and submenus?

A) GUI screen design
B) Graphical user interface
C) ERD
D) Data models
سؤال
The assess project feasibility activity typically occurs during the analysis phase.
سؤال
Provide training for the system users typically occurs during the testing phase.
سؤال
What is one of the most common reasons why systems development projects fail?

A) Unclear or missing business requirements
B) Lack of JAD sessions
C) Purchasing COTS
D) All of the above
سؤال
Which of the following is a performed by a CCB?

A) Includes a collection of procedures to document a change request and define the steps necessary to consider the change based on the expected impact of the change
B) A group of people who respond to internal system user questions
C) Making changes to repair system defects
D) Responsible for approving or rejecting all change requests
سؤال
What verifies that all units of code work together and the total system satisfies all of its functional and operational requirements?

A) Unit testing
B) Application testing
C) Integration testing
D) Regression testing
سؤال
Which of the following is not performed during the implementation phase?

A) Write detailed business requirements
B) Write detailed user documentation
C) Determine implementation method
D) Provide training for the system users
سؤال
What is parallel implementation?

A) Using both the old and new systems until it is evident that the new system performs correctly
B) Discarding the old system completely and immediately start to use the new system
C) Having only a small group of people use the new system until it is evident that the new system performs correctly and then adding the remaining people to the new system
D) Implementing the new system in phases until it is evident that the new system performs correctly and then implementing the remaining phases of the new system
سؤال
Testing is the fourth phase in the SDLC.
سؤال
Which of the following is not a common type of test performed during system testing?

A) Unit testing
B) Adaptive testing
C) Regression testing
D) UAT
سؤال
Which type of maintenance makes changes to enhance the system, which improves such things as processing performance and usability?

A) Adaptive maintenance
B) Corrective maintenance
C) Perfective maintenance
D) Preventive maintenance
سؤال
In which phase is it most expensive to make a system change?

A) Planning
B) Development
C) Design
D) Testing
سؤال
Designing the IT infrastructure typically occurs during the design phase.
سؤال
____________ implementation uses both the old and the new systems until it is evident that the new system performs correctly.
سؤال
____________ testing verifies that the instruction guides are helpful and accurate.
سؤال
____________ testing exposes faults in the integration of software components or software units.
سؤال
Test conditions are the detailed steps the system must perform along with the _______ results of each step.
سؤال
____________ testing is performed after making a functional improvement or repair to the system to determine if the change has affected (or impacted) the other functional aspects of the software.
سؤال
___________ is the activity of drawing a graphical representation of a design.
سؤال
____________ maintenance makes changes to enhance the system, which improves such things as processing performance and usability.
سؤال
Parallel implementation uses both the old and new systems until it is evident that the new system performs correctly.
سؤال
____________ testing tests each unit of code as soon as the unit is complete to expose faults in the unit regardless of its interaction with other units.
سؤال
____________ implementation discards the old system completely and immediately starts to use the new system.
سؤال
____________ implementation has only a small group of people use the new system until it is evident that the new system performs correctly and then adds the remaining people to the new system.
سؤال
_________ models represent a formal way to express data relationships to a database management system (DBMS).
سؤال
The systems development life cycle is the overall process for developing information systems from planning and analysis through _________________ and maintenance.
سؤال
_________ modeling involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment.
سؤال
The ______________ phase involves establishing a high-level plan of the intended project and determining project goals.
سؤال
The _________ phase involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system.
سؤال
A(n) _________ feasibility study identifies the financial benefits and costs associated with the systems development project.
سؤال
____________ maintenance makes changes to increase system functionality to meet new business requirements.
سؤال
____________ maintenance makes changes to repair system defects.
سؤال
A(n) _________ feasibility study examines the likelihood that the project will attain its desired objectives.
سؤال
List and provide a detailed description of all of the activities involved in one phase of the SDLC.
سؤال
____________ management system includes a collection of procedures to document a change request and define the steps necessary to consider the change based on the expected impact of the change.
سؤال
List and describe each phase in the systems development life cycle.
سؤال
List and define the five different types of feasibility studies.
سؤال
List and define the four different types of implementation methods.
سؤال
Summarize the activities associated with the design, development, and testing phases in the SDLC.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/66
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 14: Systems Development
1
What is process modeling?

A) Illustrates the movement of information between external entities and the processes and data stores within the system
B) Software suites that automate systems analysis, design, and development
C) Involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment
D) None of the above
C
2
Which of the following is not a phase in the SDLC?

A) Planning
B) Development
C) RFP
D) Testing
RFP is request for proposal and is not a phase in the SDLC.
C
3
What is an economic feasibility study?

A) Identifies the financial benefits and costs associated with the systems development project
B) Determines the organization's ability to build and integrate the proposed system
C) Assesses the likelihood that all potential time frames and completion dates will be met
D) Examines all potential legal and contractual ramifications of the proposed system
A
4
What represents the detailed set of knowledge worker requests that the system must meet in order to be successful?

A) JAD session
B) Business requirements
C) Sign-off
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is a phase in the SDLC?

A) Analysis
B) Design
C) Testing
D) All of the above
All of the above are phases in the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following is an evaluation criteria used to prioritize software development projects?

A) Value chain analysis
B) Strategic alignment
C) Resource availability
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
7
What is a feasibility study?

A) Determines if the proposed solution is feasible and achievable from a financial, technical, and organizational standpoint
B) Determines the amount and types of resources required to complete the project and determine if the organization has these resources available
C) Determine the number of individuals, amount of time, and technical difficulty of the project
D) A factor that is critical to an organization's success
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is not a phase in the SDLC?

A) Maintenance
B) Change
C) Design
D) None of the above
Change is not a phase in the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which evaluation criteria is an organization using that prioritizes its projects by giving priority to those projects that are in line with the organization's strategic goals and objectives?

A) Strategic analysis
B) Strategic alignment
C) Strategic availability
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
10
What is the second step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Analysis is the second step in the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
11
What is the first step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Planning is the first phase in the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
12
What is COTS?

A) Illustrates the movement of information between external entities and the processes and data stores within the system
B) Software suites that automate systems analysis, design, and development
C) Involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment
D) A software package or solution that is purchased to support one or more business functions and information systems
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following is not a key factor an organization should consider when contemplating the buy vs. build decision?

A) Time to market
B) Availability of corporate resources
C) Availability of CASE tools
D) Corporate core competencies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
14
What is a schedule feasibility study?

A) Identifies the financial benefits and costs associated with the systems development project
B) Determines the organization's ability to build and integrate the proposed system
C) Assesses the likelihood that all potential time frames and completion dates will be met
D) Examines all potential legal and contractual ramifications of the proposed system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
15
What represents a session where employees meet, sometimes for several days, to define or review the business requirements for the system?

A) JAD session
B) Business requirement
C) Requirements definition document
D) Sign-off
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
16
What contains the final set of business requirements, prioritized in order of business importance?

A) JAD session
B) Business requirement
C) Requirements definition document
D) Technical architecture
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following should an organization consider during the buy vs. build decision?

A) Are there any currently available products that fit the organizations needs
B) Can the organization customize or modify an existing COTS to fit its needs
C) Is there a justification to purchase or develop based on the cost of acquisition
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is not a type of feasibility study?

A) Operational feasibility study
B) Legal and contractual feasibility study
C) Critical success factor feasibility study
D) Technical feasibility study
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which activity is performed during the planning phase?

A) Identify and select the system for development
B) Assess project feasibility
C) Develop the project plan
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
20
What is the system users' actual signatures indicating they approve all of the business requirements?

A) JAD session
B) Technical architecture
C) Requirements definition document
D) Sign-off
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
21
What type of training is set in a classroom-type environment and lead by an instructor?

A) Online training
B) Workshop training
C) Help desk
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following highlights how to use the system?

A) User documentation
B) GUI
C) COTS
D) UAT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which phase describes the desired features and operations of the system including screen layouts, business rules, process diagrams, pseudo code, and other documentation?

A) Analysis phase
B) Design phase
C) Development phase
D) Testing phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which activity is performed during the implementation phase?

A) Build a help desk
B) Perform system maintenance
C) Build the database and programs
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
25
What are the detailed steps the system must perform along with the expected results of each step?

A) JAD
B) COTS
C) Technical architecture
D) Test conditions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
26
What is phased implementation?

A) Using both the old and new systems until it is evident that the new system performs correctly
B) Discarding the old system completely and immediately start to use the new system
C) Having only a small group of people use the new system until it is evident that the new system performs correctly and then adding the remaining people to the new system
D) Implementing the new system in phases until it is evident that the new system performs correctly and then implementing the remaining phases of the new system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which phase takes all of the detailed design documents from the design phase and transforming them into the actual system?

A) Analysis phase
B) Design phase
C) Development phase
D) Testing phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
28
What is the ability to model the information system screens for an entire system using icons, buttons, menus, and submenus?

A) GUI screen design
B) Graphical user interface
C) ERD
D) Data models
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
29
The assess project feasibility activity typically occurs during the analysis phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
30
Provide training for the system users typically occurs during the testing phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
31
What is one of the most common reasons why systems development projects fail?

A) Unclear or missing business requirements
B) Lack of JAD sessions
C) Purchasing COTS
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following is a performed by a CCB?

A) Includes a collection of procedures to document a change request and define the steps necessary to consider the change based on the expected impact of the change
B) A group of people who respond to internal system user questions
C) Making changes to repair system defects
D) Responsible for approving or rejecting all change requests
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
33
What verifies that all units of code work together and the total system satisfies all of its functional and operational requirements?

A) Unit testing
B) Application testing
C) Integration testing
D) Regression testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is not performed during the implementation phase?

A) Write detailed business requirements
B) Write detailed user documentation
C) Determine implementation method
D) Provide training for the system users
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
35
What is parallel implementation?

A) Using both the old and new systems until it is evident that the new system performs correctly
B) Discarding the old system completely and immediately start to use the new system
C) Having only a small group of people use the new system until it is evident that the new system performs correctly and then adding the remaining people to the new system
D) Implementing the new system in phases until it is evident that the new system performs correctly and then implementing the remaining phases of the new system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
36
Testing is the fourth phase in the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which of the following is not a common type of test performed during system testing?

A) Unit testing
B) Adaptive testing
C) Regression testing
D) UAT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which type of maintenance makes changes to enhance the system, which improves such things as processing performance and usability?

A) Adaptive maintenance
B) Corrective maintenance
C) Perfective maintenance
D) Preventive maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
39
In which phase is it most expensive to make a system change?

A) Planning
B) Development
C) Design
D) Testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
40
Designing the IT infrastructure typically occurs during the design phase.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
41
____________ implementation uses both the old and the new systems until it is evident that the new system performs correctly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
42
____________ testing verifies that the instruction guides are helpful and accurate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
43
____________ testing exposes faults in the integration of software components or software units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
44
Test conditions are the detailed steps the system must perform along with the _______ results of each step.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
45
____________ testing is performed after making a functional improvement or repair to the system to determine if the change has affected (or impacted) the other functional aspects of the software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
46
___________ is the activity of drawing a graphical representation of a design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
47
____________ maintenance makes changes to enhance the system, which improves such things as processing performance and usability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
48
Parallel implementation uses both the old and new systems until it is evident that the new system performs correctly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
49
____________ testing tests each unit of code as soon as the unit is complete to expose faults in the unit regardless of its interaction with other units.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
50
____________ implementation discards the old system completely and immediately starts to use the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
51
____________ implementation has only a small group of people use the new system until it is evident that the new system performs correctly and then adds the remaining people to the new system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
52
_________ models represent a formal way to express data relationships to a database management system (DBMS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
53
The systems development life cycle is the overall process for developing information systems from planning and analysis through _________________ and maintenance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
54
_________ modeling involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
55
The ______________ phase involves establishing a high-level plan of the intended project and determining project goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
56
The _________ phase involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
57
A(n) _________ feasibility study identifies the financial benefits and costs associated with the systems development project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
58
____________ maintenance makes changes to increase system functionality to meet new business requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
59
____________ maintenance makes changes to repair system defects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
60
A(n) _________ feasibility study examines the likelihood that the project will attain its desired objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
61
List and provide a detailed description of all of the activities involved in one phase of the SDLC.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
62
____________ management system includes a collection of procedures to document a change request and define the steps necessary to consider the change based on the expected impact of the change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
63
List and describe each phase in the systems development life cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
64
List and define the five different types of feasibility studies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
65
List and define the four different types of implementation methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 66 في هذه المجموعة.
فتح الحزمة
k this deck
66
Summarize the activities associated with the design, development, and testing phases in the SDLC.