Deck 11: Aggregate Planning and Master Scheduling

ملء الشاشة (f)
exit full mode
سؤال
Linear programming models yield the optimal solution.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
A level capacity strategy is also known as a chase demand strategy.
سؤال
Aggregate planning is used to establish general levels of employment, output, and inventories over an intermediate-range of time.
سؤال
Departmental budgeting is an example of aggregate planning.
سؤال
The output from aggregate planning is a detailed business plan covering the next 2 to 12 months.
سؤال
Aggregate planning is intermediate-range capacity planning that typically covers a time horizon of one to three months.
سؤال
An advantage of a "chase" strategy for aggregate planning is that inventories can be kept relatively low.
سؤال
Disaggregating an aggregate plan leads to a master schedule.
سؤال
Aggregate planners commonly use trial-and-error methods in developing aggregate plans.
سؤال
The assignment of work to specific machines and people are examples of aggregate planning.
سؤال
Demand can be altered in aggregate planning by promotion and producing additional product using overtime.
سؤال
Aggregate planners are concerned with the quality and quantity of expected demand.
سؤال
Seasonality in demand has the advantage of leveling out requirements for our product or service.
سؤال
Ultimately the overriding factor in choosing a strategy in aggregate planning is overall cost.
سؤال
The master schedule indicates the quantity and timing for delivery of a product, but not the dates production will need to start.
سؤال
Capacity can be modified in aggregate planning by promotion and producing additional product using overtime.
سؤال
Aggregate planners typically use mathematical techniques such as linear programming and linear decision rules for planning.
سؤال
Organizations facing seasonal changes in demand are prevented from using aggregate planning techniques.
سؤال
The goal of aggregate planning is to achieve a production plan that attempts to balance the organization's resources and meet expected demand.
سؤال
The use of tables and charts in aggregate planning usually enables planners to arrive at an optimal plan.
سؤال
Aggregate planners attempt to balance:

A)demand and inventories
B)demand and costs
C)capacity and inventories
D)capacity and costs
E)capacity and demand
سؤال
Aggregate planning is capacity planning for:

A)the long range
B)the intermediate range
C)the short range
D)typically one to three months
E)typically one or more years
سؤال
Which of the following is not an input to the aggregate planning process?

A)resources available
B)demand forecast
C)policies on work force changes
D)master production schedules
E)cost information
سؤال
Available-to-promise in the first week is equal to beginning inventory plus MPS quantity, if any, less committed customer orders before the next MPS quantity.
سؤال
After the first period of the planning horizon, available-to-promise is computed only for those periods in which there is an MPS quantity.
سؤال
One area to which aggregate planning decisions relate is:

A)job sequencing
B)customer order quantities
C)inventory levels
D)location
E)layout
سؤال
A time fence in the master schedule is used to prevent unauthorized people from making changes to the schedule.
سؤال
Subcontracting 'in' would apply to periods in which our organization has excess capacity.
سؤال
Aggregate planning requires which of the following information?

A)a forecast of expected demand
B)current levels of inventory
C)(a) and (b)
D)policies regarding employment levels
E)all of the above
سؤال
Which one of the following is not a basic option for altering demand?

A)promotion
B)backordering
C)pricing
D)subcontracting
E)All are demand options.
سؤال
Which of the following is not a basic option for altering the availability of capacity in a service environment?

A)overtime
B)hiring/layoff
C)part time
D)inventory
E)All of these are basic capacity options.
سؤال
Essentially, the output of aggregate planning is the:

A)marketing plan
B)production plan
C)rough-cut capacity plan
D)assignment plan
E)material requirements plan
سؤال
One option for altering the pattern of demand is:

A)backorders
B)overtime
C)part-time workers
D)inventories
E)subcontracting
سؤال
Which of the following best describes aggregate planning?

A)the link between intermediate term planning and short term operating decisions
B)a collection of objective planning tools
C)make or buy decisions
D)an attempt to respond to predicted demand within the constraints set by product, process and location decisions
E)manpower planning
سؤال
Master schedulers are employed primarily by service organizations.
سؤال
In the master production schedule, production is planned for the next period whenever the available-to-promise quantity becomes negative.
سؤال
Accommodating peak demands and effectively using labor resources during periods of low demand would be the goal of aggregate planners in ....

A)Manufacturing
B)Military
C)Archeology
D)Libraries
E)Financial Services
سؤال
Which of the following is an input to aggregate planning?

A)beginning inventory
B)forecasts for each period of the schedule
C)customer orders
D)all of the above
E)quantity discounts
سؤال
In doing "aggregate planning" for a firm producing paint, the aggregate planners would most likely deal with:

A)just gallons of paint, without concern for the different colors and sizes
B)gallons of paint, but be concerned with the different colors to be produced
C)gallons, quarts, pints, and all the different sizes to be produced
D)all the different sizes and all the different colors by size
E)none of the above
سؤال
Which one of the following would not be considered a decision option for purposes of aggregate planning?

A)inventory levels
B)manpower levels
C)pricing
D)production costs
E)promotion
سؤال
Aggregate planners seek to match supply and demand:

A)at minimum overall cost
B)by staying within company policy
C)(a) and (b)
D)keeping inventories at a minimum
E)all of the above
سؤال
Moving from the aggregate plan to a master production schedule requires:

A)rough cut capacity planning
B)disaggregation
C)sub-optimization
D)strategy formulation
E)chase strategies
سؤال
Given the projected demands for the next six months, prepare an aggregate plan that uses inventory, regular time and overtime, and backorders.The plan must wind up with no units in ending inventory in Period 6.Regular time capacity is 150 units per month.Overtime capacity is 20 units per month.Overtime cost is $30 per unit, backorder cost is $20 per unit, inventory holding cost is $5 per unit, regular time cost of $20 per unit, and beginning inventory is zero.
سؤال
Proactive and Reactive aggregate planning strategies are best associated with:

A)Input and Output
B)Make and Buy
C)Quantitative and Qualitative
D)Exact and Approximate
E)Demand and Capacity options
سؤال
Simulation to produce an aggregate plan:

A)will produce the best plan
B)is the most widely used technique
C)both (a) and (b)
D)will produce a plan that may not be the best plan
E)requires a minimum of 4 iterations to be accurate
سؤال
That portion of projected inventory which enables marketing to make realistic commitments about delivery dates for new orders is:

A)beginning inventory
B)safety stock inventory
C)available-to-promise inventory
D)high margin inventory
E)none of the above
سؤال
In using the "chase strategy" variations in demand could be met by:

A)varying output during regular time without changing employment levels
B)varying output during regular time by changing employment levels
C)(a) and (b)
D)varying inventory levels
E)price increases
سؤال
The main disadvantage(s) of informal techniques used for aggregate planning is(are):

A)they are expensive to do
B)they may not result in the best plan
C)they take a long time to do
D)they require use of a computer
E)lack of formal education of the planners
سؤال
One option for altering the availability of capacity is:

A)use of overtime or slack time
B)pricing
C)promotion
D)backorders
E)none of the above
سؤال
Linear programming to produce an aggregate plan:

A)will produce the best plan if accurate inputs are used
B)is the most widely used technique
C)(a) and (b)
D)will produce a plan that may not be the best plan
E)requires an excel spread sheet
سؤال
The direct result of disaggregating the aggregate plan is the:

A)marketing plan
B)production plan
C)rough-cut capacity plan
D)master schedule
E)material requirements plan
سؤال
A manager has prepared a forecast of expected aggregate demand for the next six months.Develop an aggregate plan to meet this demand given this additional information: A level production rate of 100 units per month will be used.Backorders are allowed, and they are charged at the rate of $8 per unit per month.Inventory holding costs are $1 per unit per month in ending inventory.Determine the cost of this plan if regular time cost is $20 per unit and beginning inventory is zero.
سؤال
Uncommitted inventory is called ....

A)Available-to-promise inventory
B)Free inventory
C)Safety stock
D)Lead time inventory
E)Obsolete inventory
سؤال
Which term is most closely associated with the term disaggregation?

A)subcontracting
B)master schedule
C)diversity
D)varying inventory levels
E)firing and laying off
سؤال
Which of the following would not be a strategy associated with adjusting aggregate capacity to meet expected demand?

A)subcontract
B)vary the size of the workforce
C)vary the intensity of workforce utilization
D)allow inventory levels to vary
E)use backorders
سؤال
Inventory information for firm ABC: <strong>Inventory information for firm ABC:   What was the inventory at the end of March, 1999?</strong> A)350 B)250 C)150 D)50 E)none of the above <div style=padding-top: 35px> What was the inventory at the end of March, 1999?

A)350
B)250
C)150
D)50
E)none of the above
سؤال
In order to use the "level capacity strategy," variations in demand are met by:

A)varying output during regular time without changing employment levels
B)varying output during regular time by changing employment levels
C)(a) and (b)
D)using combination of inventories, overtime, part time, and back orders
E)price adjustments
سؤال
Inventory information for firm ABC: <strong>Inventory information for firm ABC:   What is the expected inventory at the end of April, 1999?</strong> A)350 B)250 C)150 D)50 E)none of the above <div style=padding-top: 35px> What is the expected inventory at the end of April, 1999?

A)350
B)250
C)150
D)50
E)none of the above
سؤال
One option for altering the availability of manufacturing capacity is:

A)pricing
B)promotion
C)backorders
D)inventories
E)none of the above apply to manufacturing capacity
سؤال
In practice, the more commonly used techniques for aggregate planning are:

A)mathematical techniques
B)informal trial-and-error techniques
C)(a) and (b) about equally
D)simulation models
E)linear programming optimization
سؤال
What quantity is available for commitment to new customers in either of the first two periods?

A)21
B)1
C)20
D)4
E)impossible to say without more information
سؤال
What is total forecasted demand?
سؤال
In a service setting, the aggregate plan results in a time-phased projection of __________ requirements.

A)customer
B)staff
C)inventory
D)subcontracting
E)outsourcing
سؤال
What are total costs for the six periods?
سؤال
What quantity is available for commitment to new customers prior to the receipt of the MPS quantity in week 3?

A)14
B)32
C)12
D)20
E)impossible to say without additional information.
سؤال
What is the projected on-hand inventory at the end of period 2?

A)21
B)1
C)12
D)20
E)impossible to say without more information
سؤال
A master production schedule quantity of 300 units will arrive in week 6.Weekly demand over weeks 3 through 10 is forecasted at 50 units.At present, orders have been booked in various quantities in weeks 1, 2, 3 and 4.What is the available to promise for week 6?

A)50
B)6
C)300
D)100
E)Cannot be determined without projected on-hand information
سؤال
Prepare a master schedule based on the following information:
سؤال
What is total regular time capacity?
سؤال
Use either the transportation method or linear programming to develop an optimum aggregate plan, given the following data:
سؤال
What are total backorder costs?
سؤال
How should overtime capacity be utilized?
سؤال
When the opportunity cost of lost revenue is relatively high, _________ become(s) relatively more attractive.

A)Layoffs
B)Backorders
C)Excess capacity
D)Disaggregation
E)Both B and C
سؤال
Which of the following differs between aggregate planning in services and aggregate planning in manufacturing?

A)uncertainty in demand
B)costs of storing inventory
C)the perishability of capacity
D)cost of overtime
E)cost of hiring
سؤال
What are total carrying costs?
سؤال
What are total overtime costs?
سؤال
The more __________ demand is, the more the aggregate plan will tend to reflect the ____________ strategy.

A)Stable; Level
B)Aggregated; Outsourcing
C)Variable; Chase
D)Complex; Uncommitted
E)Both A and C
سؤال
What are total costs for each period?
سؤال
What is the projected on hand inventory at the end of period 2?

A)14
B)32
C)12
D)20
E)impossible to say without additional information
سؤال
What are total regular time costs?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/81
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Aggregate Planning and Master Scheduling
1
Linear programming models yield the optimal solution.
True
2
A level capacity strategy is also known as a chase demand strategy.
False
3
Aggregate planning is used to establish general levels of employment, output, and inventories over an intermediate-range of time.
True
4
Departmental budgeting is an example of aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
5
The output from aggregate planning is a detailed business plan covering the next 2 to 12 months.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
6
Aggregate planning is intermediate-range capacity planning that typically covers a time horizon of one to three months.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
7
An advantage of a "chase" strategy for aggregate planning is that inventories can be kept relatively low.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
8
Disaggregating an aggregate plan leads to a master schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
9
Aggregate planners commonly use trial-and-error methods in developing aggregate plans.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
10
The assignment of work to specific machines and people are examples of aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
11
Demand can be altered in aggregate planning by promotion and producing additional product using overtime.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
12
Aggregate planners are concerned with the quality and quantity of expected demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
13
Seasonality in demand has the advantage of leveling out requirements for our product or service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
14
Ultimately the overriding factor in choosing a strategy in aggregate planning is overall cost.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
15
The master schedule indicates the quantity and timing for delivery of a product, but not the dates production will need to start.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
16
Capacity can be modified in aggregate planning by promotion and producing additional product using overtime.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
17
Aggregate planners typically use mathematical techniques such as linear programming and linear decision rules for planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
18
Organizations facing seasonal changes in demand are prevented from using aggregate planning techniques.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
19
The goal of aggregate planning is to achieve a production plan that attempts to balance the organization's resources and meet expected demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
20
The use of tables and charts in aggregate planning usually enables planners to arrive at an optimal plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
21
Aggregate planners attempt to balance:

A)demand and inventories
B)demand and costs
C)capacity and inventories
D)capacity and costs
E)capacity and demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
22
Aggregate planning is capacity planning for:

A)the long range
B)the intermediate range
C)the short range
D)typically one to three months
E)typically one or more years
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following is not an input to the aggregate planning process?

A)resources available
B)demand forecast
C)policies on work force changes
D)master production schedules
E)cost information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
24
Available-to-promise in the first week is equal to beginning inventory plus MPS quantity, if any, less committed customer orders before the next MPS quantity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
25
After the first period of the planning horizon, available-to-promise is computed only for those periods in which there is an MPS quantity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
26
One area to which aggregate planning decisions relate is:

A)job sequencing
B)customer order quantities
C)inventory levels
D)location
E)layout
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
27
A time fence in the master schedule is used to prevent unauthorized people from making changes to the schedule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
28
Subcontracting 'in' would apply to periods in which our organization has excess capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
29
Aggregate planning requires which of the following information?

A)a forecast of expected demand
B)current levels of inventory
C)(a) and (b)
D)policies regarding employment levels
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which one of the following is not a basic option for altering demand?

A)promotion
B)backordering
C)pricing
D)subcontracting
E)All are demand options.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
31
Which of the following is not a basic option for altering the availability of capacity in a service environment?

A)overtime
B)hiring/layoff
C)part time
D)inventory
E)All of these are basic capacity options.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
32
Essentially, the output of aggregate planning is the:

A)marketing plan
B)production plan
C)rough-cut capacity plan
D)assignment plan
E)material requirements plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
33
One option for altering the pattern of demand is:

A)backorders
B)overtime
C)part-time workers
D)inventories
E)subcontracting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following best describes aggregate planning?

A)the link between intermediate term planning and short term operating decisions
B)a collection of objective planning tools
C)make or buy decisions
D)an attempt to respond to predicted demand within the constraints set by product, process and location decisions
E)manpower planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
35
Master schedulers are employed primarily by service organizations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
36
In the master production schedule, production is planned for the next period whenever the available-to-promise quantity becomes negative.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
37
Accommodating peak demands and effectively using labor resources during periods of low demand would be the goal of aggregate planners in ....

A)Manufacturing
B)Military
C)Archeology
D)Libraries
E)Financial Services
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
38
Which of the following is an input to aggregate planning?

A)beginning inventory
B)forecasts for each period of the schedule
C)customer orders
D)all of the above
E)quantity discounts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
39
In doing "aggregate planning" for a firm producing paint, the aggregate planners would most likely deal with:

A)just gallons of paint, without concern for the different colors and sizes
B)gallons of paint, but be concerned with the different colors to be produced
C)gallons, quarts, pints, and all the different sizes to be produced
D)all the different sizes and all the different colors by size
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which one of the following would not be considered a decision option for purposes of aggregate planning?

A)inventory levels
B)manpower levels
C)pricing
D)production costs
E)promotion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
41
Aggregate planners seek to match supply and demand:

A)at minimum overall cost
B)by staying within company policy
C)(a) and (b)
D)keeping inventories at a minimum
E)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
42
Moving from the aggregate plan to a master production schedule requires:

A)rough cut capacity planning
B)disaggregation
C)sub-optimization
D)strategy formulation
E)chase strategies
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
43
Given the projected demands for the next six months, prepare an aggregate plan that uses inventory, regular time and overtime, and backorders.The plan must wind up with no units in ending inventory in Period 6.Regular time capacity is 150 units per month.Overtime capacity is 20 units per month.Overtime cost is $30 per unit, backorder cost is $20 per unit, inventory holding cost is $5 per unit, regular time cost of $20 per unit, and beginning inventory is zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
44
Proactive and Reactive aggregate planning strategies are best associated with:

A)Input and Output
B)Make and Buy
C)Quantitative and Qualitative
D)Exact and Approximate
E)Demand and Capacity options
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
45
Simulation to produce an aggregate plan:

A)will produce the best plan
B)is the most widely used technique
C)both (a) and (b)
D)will produce a plan that may not be the best plan
E)requires a minimum of 4 iterations to be accurate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
46
That portion of projected inventory which enables marketing to make realistic commitments about delivery dates for new orders is:

A)beginning inventory
B)safety stock inventory
C)available-to-promise inventory
D)high margin inventory
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
47
In using the "chase strategy" variations in demand could be met by:

A)varying output during regular time without changing employment levels
B)varying output during regular time by changing employment levels
C)(a) and (b)
D)varying inventory levels
E)price increases
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
48
The main disadvantage(s) of informal techniques used for aggregate planning is(are):

A)they are expensive to do
B)they may not result in the best plan
C)they take a long time to do
D)they require use of a computer
E)lack of formal education of the planners
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
49
One option for altering the availability of capacity is:

A)use of overtime or slack time
B)pricing
C)promotion
D)backorders
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
50
Linear programming to produce an aggregate plan:

A)will produce the best plan if accurate inputs are used
B)is the most widely used technique
C)(a) and (b)
D)will produce a plan that may not be the best plan
E)requires an excel spread sheet
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
51
The direct result of disaggregating the aggregate plan is the:

A)marketing plan
B)production plan
C)rough-cut capacity plan
D)master schedule
E)material requirements plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
52
A manager has prepared a forecast of expected aggregate demand for the next six months.Develop an aggregate plan to meet this demand given this additional information: A level production rate of 100 units per month will be used.Backorders are allowed, and they are charged at the rate of $8 per unit per month.Inventory holding costs are $1 per unit per month in ending inventory.Determine the cost of this plan if regular time cost is $20 per unit and beginning inventory is zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
53
Uncommitted inventory is called ....

A)Available-to-promise inventory
B)Free inventory
C)Safety stock
D)Lead time inventory
E)Obsolete inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
54
Which term is most closely associated with the term disaggregation?

A)subcontracting
B)master schedule
C)diversity
D)varying inventory levels
E)firing and laying off
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
55
Which of the following would not be a strategy associated with adjusting aggregate capacity to meet expected demand?

A)subcontract
B)vary the size of the workforce
C)vary the intensity of workforce utilization
D)allow inventory levels to vary
E)use backorders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
56
Inventory information for firm ABC: <strong>Inventory information for firm ABC:   What was the inventory at the end of March, 1999?</strong> A)350 B)250 C)150 D)50 E)none of the above What was the inventory at the end of March, 1999?

A)350
B)250
C)150
D)50
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
57
In order to use the "level capacity strategy," variations in demand are met by:

A)varying output during regular time without changing employment levels
B)varying output during regular time by changing employment levels
C)(a) and (b)
D)using combination of inventories, overtime, part time, and back orders
E)price adjustments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
58
Inventory information for firm ABC: <strong>Inventory information for firm ABC:   What is the expected inventory at the end of April, 1999?</strong> A)350 B)250 C)150 D)50 E)none of the above What is the expected inventory at the end of April, 1999?

A)350
B)250
C)150
D)50
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
59
One option for altering the availability of manufacturing capacity is:

A)pricing
B)promotion
C)backorders
D)inventories
E)none of the above apply to manufacturing capacity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
60
In practice, the more commonly used techniques for aggregate planning are:

A)mathematical techniques
B)informal trial-and-error techniques
C)(a) and (b) about equally
D)simulation models
E)linear programming optimization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
61
What quantity is available for commitment to new customers in either of the first two periods?

A)21
B)1
C)20
D)4
E)impossible to say without more information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
62
What is total forecasted demand?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
63
In a service setting, the aggregate plan results in a time-phased projection of __________ requirements.

A)customer
B)staff
C)inventory
D)subcontracting
E)outsourcing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
64
What are total costs for the six periods?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
65
What quantity is available for commitment to new customers prior to the receipt of the MPS quantity in week 3?

A)14
B)32
C)12
D)20
E)impossible to say without additional information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
66
What is the projected on-hand inventory at the end of period 2?

A)21
B)1
C)12
D)20
E)impossible to say without more information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
67
A master production schedule quantity of 300 units will arrive in week 6.Weekly demand over weeks 3 through 10 is forecasted at 50 units.At present, orders have been booked in various quantities in weeks 1, 2, 3 and 4.What is the available to promise for week 6?

A)50
B)6
C)300
D)100
E)Cannot be determined without projected on-hand information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
68
Prepare a master schedule based on the following information:
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
69
What is total regular time capacity?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
70
Use either the transportation method or linear programming to develop an optimum aggregate plan, given the following data:
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
71
What are total backorder costs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
72
How should overtime capacity be utilized?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
73
When the opportunity cost of lost revenue is relatively high, _________ become(s) relatively more attractive.

A)Layoffs
B)Backorders
C)Excess capacity
D)Disaggregation
E)Both B and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which of the following differs between aggregate planning in services and aggregate planning in manufacturing?

A)uncertainty in demand
B)costs of storing inventory
C)the perishability of capacity
D)cost of overtime
E)cost of hiring
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
75
What are total carrying costs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
76
What are total overtime costs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
77
The more __________ demand is, the more the aggregate plan will tend to reflect the ____________ strategy.

A)Stable; Level
B)Aggregated; Outsourcing
C)Variable; Chase
D)Complex; Uncommitted
E)Both A and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
78
What are total costs for each period?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
79
What is the projected on hand inventory at the end of period 2?

A)14
B)32
C)12
D)20
E)impossible to say without additional information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
80
What are total regular time costs?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 81 في هذه المجموعة.