Deck 7: Work Design and Measurement

ملء الشاشة (f)
exit full mode
سؤال
Ergonomics is the use of computers and robots in the workplace.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
"Self-directed teams" help other work groups make changes to their processes.
سؤال
Job enrichment involves an increase in the level of responsibility for planning and coordinating tasks.
سؤال
"Self-directed teams" are allowed to make changes in the work processes under their control.
سؤال
Job design relates to people therefore technology has little impact.
سؤال
One potential disadvantage of "self-directed teams" is higher training costs.
سؤال
Job enrichment involves giving a workers a greater share of the total task which is why they feel enriched.
سؤال
One therblig is the equivalent of one hour of sustained work by one average person.
سؤال
A flow process chart is helpful for visualizing the portions of a work cycle during which the operator and equipment are busy or idle.
سؤال
One of the potential benefits of "self-directed teams" is higher quality.
سؤال
Many lower level jobs are monotonous and boring.
سؤال
One important factor that influences productivity is trust between workers and managers.
سؤال
One disadvantage of specialization is worker dissatisfaction.
سؤال
One of the potential benefits of "self-directed teams" is higher productivity and greater worker satisfaction.
سؤال
The quickest, most effective way to improve an employee's job satisfaction is increase his or her compensation.
سؤال
Methods analysis cannot be done for new jobs (ones that do not yet exist) since it requires observation of the process.
سؤال
Ergonomics is an important part of job design to consider when we automate the system.
سؤال
Motivation influences quality and productivity, but not the work environment.
سؤال
Specialization is one of the sources of disagreement between the efficiency and behavioral approaches to job design.
سؤال
Trust is a factor influencing productivity.
سؤال
A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate - doing the job quicker than normal.
سؤال
One factor in determining how many cycles to time in a time study is the degree of variation that is present in the observed times.
سؤال
Work measurement concentrates on how long the tasks take to accomplish.
سؤال
Work sampling involves the use of some method of randomizing the observations.
سؤال
Predetermined time standards are usually based on observing one very efficient worker performing the task.
سؤال
Predetermined time standards use historical data from a company's own files.
سؤال
An advantage of work sampling, compared to a stopwatch time study, is that observations are spread out over a period of time in work sampling.
سؤال
For purposes of obtaining good time standards using a stopwatch time study, the analyst should try to avoid having the worker discover he or she is being observed.
سؤال
Studies on worker efficiency and time of day suggest the greatest efficiency is at the end of the day when workers are 'warmed up'.
سؤال
The most widely used method of work measurement is work sampling.
سؤال
The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
سؤال
Therbligs are basic elemental motions.
سؤال
Predetermined time standards involve the use of published data regarding how long various activities are expected to take.
سؤال
We incorporate the average seriousness of accidents by measuring the number of lost-time accidents per million labor-hours worked.
سؤال
Work sampling can be used to estimate the proportion of time a machine is idle.
سؤال
No stopwatch is required in a work sampling study.
سؤال
The normal time in time study is obtained by multiplying the observed time by the performance rating.
سؤال
The design of work systems, because objective standards are used, avoids most ethical issues.
سؤال
Ergonomics is important for preventing common workplace injuries such as back injuries and repetitive-motion injuries.
سؤال
The normal time for a job is multiplied by the performance rating to obtain the standard time for the job.
سؤال
A worker-machine chart can be used to determine how many machines an operator can manage.
سؤال
Micromotion studies should be limited to periodic activities where breakthrough improvements are possible.
سؤال
A worker-machine chart can help identify non-productive parts of a process.
سؤال
Many management compensation systems are being revised to reflect increased emphasis on quality and customer service.
سؤال
Which of the following is not generally considered an advantage of specialization?

A)high productivity
B)low wage costs
C)ease of training employees
D)low equipment costs
E)all are advantages
سؤال
Methods analysis and motion study techniques do not directly consider behavioral aspects of jobs.
سؤال
Process chart symbols don't include ________.

A)Delay
B)Inspection
C)Operation
D)Rejection
E)Storage
سؤال
Increasing compensation is always a way to improve worker satisfaction.
سؤال
A pay system that rewards workers who undergo training that increases their skills is called a "knowledge-based pay system."
سؤال
Behavioral approaches to job design include:

A)Specialization
B)Ergonomics
C)Job Rotation
D)Flow Process Charts
E)SIMO Charts
سؤال
Work sampling provides both quick and accurate estimates of activity times.
سؤال
Measured day work refers to an output-based system.
سؤال
Management compensation should be based primarily on organizational output.
سؤال
Work sampling provides a detailed elemental breakdown of a task for purposes of establishing reliable time standards.
سؤال
A major advantage of job specialization in business is increased _________.

A)motivation
B)opportunity for advancement
C)opportunity for self-fulfillment
D)productivity
E)job enrichment
سؤال
"Knowledge-based pay systems" pay higher wages or salaries to workers who have completed college than to those who just finished high school.
سؤال
It would be acceptable to use a group incentive plan for an assembly line operation.
سؤال
"Output-based systems" compensate employees according to the amount of output they produce, thereby tying pay directly to performance.
سؤال
"Time-based systems" compensate employees according to the time the employee has worked and the amount of output they produce.
سؤال
The Occupational Safety and Health Act (OSHA) is a regulatory burden that has been proven to have little impact on the safety and welfare of workers.
سؤال
In methods analysis, a "therblig" is a:

A)charting method of analysis
B)job enrichment technique
C)dummy task
D)basic elemental motion
E)fraction (.0006) of a minute
سؤال
In a stopwatch time study, the number of cycles that must be timed is a function of:

A)the variability of observed times
B)the desired accuracy for the estimated job time
C)the desired confidence for the estimated job time
D)all of the above
E)none of the above
سؤال
The methods analysis chart which describes the movements of both hands at the same time is a:

A)flow process chart
B)worker-machine chart
C)gang process chart
D)simultaneous-motion (SIMO) chart
E)time/efficiency chart
سؤال
The symbols for operation, storage, transportation, inspection, and delay would usually be found on which type of chart?

A)Flow process
B)Gantt
C)Simultaneous motion
D)Worker-machine
E)Delay analysis
سؤال
The chart used to review the overall sequence of an operation by focusing on either the movements of the operator or materials is called a _________.

A)SIMO-chart
B)Gantt chart
C)Worker-materials chart
D)Flow process chart
E)Multi-activity chart
سؤال
Determining the number of cycles to observe is an element of ________.

A)Stop watch time study
B)Standard elemental times
C)Predetermined time standards
D)Work sampling
E)MTM tables
سؤال
Which of the following concerns is not one that job designers focus on?

A)what will be done in a job
B)who will do the job
C)how the job will be done
D)when should the job be completed
E)where the job will be done
سؤال
A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time.Normal time for the job in minutes is:

A)3.20
B)3.84
C)4.00
D)4.80
E)5.00
سؤال
Which of the following most closely describes job enlargement?

A)horizontal loading
B)increasing the level of responsibility associated with a job
C)transferring workers through a series of jobs to increase their scope of experience
D)increasing the amount of workspace assigned to a worker
E)assigning two jobs to the same worker
سؤال
The methods analysis chart which describes the portions of a work cycle during which an operator and equipment are busy or idle is a:

A)flow process chart
B)worker-machine chart
C)gang process chart
D)simultaneous-motion (SIMO) chart
E)time/efficiency chart
سؤال
What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?

A)increases
B)decreases
C)unaffected
D)may increase or decrease, depending on the sample standard deviation
E)impossible to say without additional information
سؤال
One form of long term team that is increasingly being used, especially in lean production settings, is:

A)Quality circle
B)Product Design
C)Self-directed
D)Self-improvement
E)Mandatory
سؤال
When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?

A)allowance factors
B)MTM
C)methods analysis
D)performance rating
E)analysis of therbligs
سؤال
Which is not a requirement for an effective team?

A)talent and skills to meet goals.
B)one or more members representing supervision.
C)a system of reinforcement and celebration.
D)clearly stated and commonly held vision and goals.
E)effective and skilled interpersonal relations.
سؤال
A SIMO chart includes:

A)Delay
B)Storage
C)Transportation
D)Left/Right hand movements
E)Inspection
سؤال
In a stopwatch time study, the average time it takes a given worker to perform a task a certain number of times is the:

A)observed time
B)normal time
C)standard time
D)allowance time
E)performance rating time
سؤال
A behavioral approach to job design which increases responsibility for planning and coordinating tasks is job:

A)enlargement
B)rotation
C)enrichment
D)involvement
E)enhancement
سؤال
The chart used to focus on busy and idle portions of a work cycle is a:

A)Worker-machine chart
B)Gantt chart
C)SIMO-chart
D)Idle chart
E)Flow process chart
سؤال
Which of the following is not a potential benefit of the use of self-directed teams?

A)higher quality
B)higher productivity
C)greater worker satisfaction
D)greater satisfaction for middle managers
E)lower turnover
سؤال
The methods analysis chart which describes the overall sequence of operations, transportation, storage, delays, and inspection is a:

A)flow process chart
B)worker-machine chart
C)gang process chart
D)simultaneous-motion (SIMO) chart
E)time/efficiency chart
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/151
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Work Design and Measurement
1
Ergonomics is the use of computers and robots in the workplace.
False
2
"Self-directed teams" help other work groups make changes to their processes.
False
3
Job enrichment involves an increase in the level of responsibility for planning and coordinating tasks.
True
4
"Self-directed teams" are allowed to make changes in the work processes under their control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
5
Job design relates to people therefore technology has little impact.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
6
One potential disadvantage of "self-directed teams" is higher training costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
7
Job enrichment involves giving a workers a greater share of the total task which is why they feel enriched.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
8
One therblig is the equivalent of one hour of sustained work by one average person.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
9
A flow process chart is helpful for visualizing the portions of a work cycle during which the operator and equipment are busy or idle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
10
One of the potential benefits of "self-directed teams" is higher quality.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
11
Many lower level jobs are monotonous and boring.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
12
One important factor that influences productivity is trust between workers and managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
13
One disadvantage of specialization is worker dissatisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
14
One of the potential benefits of "self-directed teams" is higher productivity and greater worker satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
15
The quickest, most effective way to improve an employee's job satisfaction is increase his or her compensation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
16
Methods analysis cannot be done for new jobs (ones that do not yet exist) since it requires observation of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
17
Ergonomics is an important part of job design to consider when we automate the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
18
Motivation influences quality and productivity, but not the work environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
19
Specialization is one of the sources of disagreement between the efficiency and behavioral approaches to job design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
20
Trust is a factor influencing productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
21
A performance rating of less than 1.0 means that the observed worker was judged to be working at a faster than normal rate - doing the job quicker than normal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
22
One factor in determining how many cycles to time in a time study is the degree of variation that is present in the observed times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
23
Work measurement concentrates on how long the tasks take to accomplish.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
24
Work sampling involves the use of some method of randomizing the observations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
25
Predetermined time standards are usually based on observing one very efficient worker performing the task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
26
Predetermined time standards use historical data from a company's own files.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
27
An advantage of work sampling, compared to a stopwatch time study, is that observations are spread out over a period of time in work sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
28
For purposes of obtaining good time standards using a stopwatch time study, the analyst should try to avoid having the worker discover he or she is being observed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
29
Studies on worker efficiency and time of day suggest the greatest efficiency is at the end of the day when workers are 'warmed up'.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
30
The most widely used method of work measurement is work sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
31
The standard time for a job can be obtained by multiplying the normal time by an appropriate allowance factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
32
Therbligs are basic elemental motions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
33
Predetermined time standards involve the use of published data regarding how long various activities are expected to take.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
34
We incorporate the average seriousness of accidents by measuring the number of lost-time accidents per million labor-hours worked.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
35
Work sampling can be used to estimate the proportion of time a machine is idle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
36
No stopwatch is required in a work sampling study.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
37
The normal time in time study is obtained by multiplying the observed time by the performance rating.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
38
The design of work systems, because objective standards are used, avoids most ethical issues.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
39
Ergonomics is important for preventing common workplace injuries such as back injuries and repetitive-motion injuries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
40
The normal time for a job is multiplied by the performance rating to obtain the standard time for the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
41
A worker-machine chart can be used to determine how many machines an operator can manage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
42
Micromotion studies should be limited to periodic activities where breakthrough improvements are possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
43
A worker-machine chart can help identify non-productive parts of a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
44
Many management compensation systems are being revised to reflect increased emphasis on quality and customer service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
45
Which of the following is not generally considered an advantage of specialization?

A)high productivity
B)low wage costs
C)ease of training employees
D)low equipment costs
E)all are advantages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
46
Methods analysis and motion study techniques do not directly consider behavioral aspects of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
47
Process chart symbols don't include ________.

A)Delay
B)Inspection
C)Operation
D)Rejection
E)Storage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
48
Increasing compensation is always a way to improve worker satisfaction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
49
A pay system that rewards workers who undergo training that increases their skills is called a "knowledge-based pay system."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
50
Behavioral approaches to job design include:

A)Specialization
B)Ergonomics
C)Job Rotation
D)Flow Process Charts
E)SIMO Charts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
51
Work sampling provides both quick and accurate estimates of activity times.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
52
Measured day work refers to an output-based system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
53
Management compensation should be based primarily on organizational output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
54
Work sampling provides a detailed elemental breakdown of a task for purposes of establishing reliable time standards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
55
A major advantage of job specialization in business is increased _________.

A)motivation
B)opportunity for advancement
C)opportunity for self-fulfillment
D)productivity
E)job enrichment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
56
"Knowledge-based pay systems" pay higher wages or salaries to workers who have completed college than to those who just finished high school.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
57
It would be acceptable to use a group incentive plan for an assembly line operation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
58
"Output-based systems" compensate employees according to the amount of output they produce, thereby tying pay directly to performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
59
"Time-based systems" compensate employees according to the time the employee has worked and the amount of output they produce.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
60
The Occupational Safety and Health Act (OSHA) is a regulatory burden that has been proven to have little impact on the safety and welfare of workers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
61
In methods analysis, a "therblig" is a:

A)charting method of analysis
B)job enrichment technique
C)dummy task
D)basic elemental motion
E)fraction (.0006) of a minute
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
62
In a stopwatch time study, the number of cycles that must be timed is a function of:

A)the variability of observed times
B)the desired accuracy for the estimated job time
C)the desired confidence for the estimated job time
D)all of the above
E)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
63
The methods analysis chart which describes the movements of both hands at the same time is a:

A)flow process chart
B)worker-machine chart
C)gang process chart
D)simultaneous-motion (SIMO) chart
E)time/efficiency chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
64
The symbols for operation, storage, transportation, inspection, and delay would usually be found on which type of chart?

A)Flow process
B)Gantt
C)Simultaneous motion
D)Worker-machine
E)Delay analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
65
The chart used to review the overall sequence of an operation by focusing on either the movements of the operator or materials is called a _________.

A)SIMO-chart
B)Gantt chart
C)Worker-materials chart
D)Flow process chart
E)Multi-activity chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
66
Determining the number of cycles to observe is an element of ________.

A)Stop watch time study
B)Standard elemental times
C)Predetermined time standards
D)Work sampling
E)MTM tables
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following concerns is not one that job designers focus on?

A)what will be done in a job
B)who will do the job
C)how the job will be done
D)when should the job be completed
E)where the job will be done
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
68
A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time.Normal time for the job in minutes is:

A)3.20
B)3.84
C)4.00
D)4.80
E)5.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
69
Which of the following most closely describes job enlargement?

A)horizontal loading
B)increasing the level of responsibility associated with a job
C)transferring workers through a series of jobs to increase their scope of experience
D)increasing the amount of workspace assigned to a worker
E)assigning two jobs to the same worker
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
70
The methods analysis chart which describes the portions of a work cycle during which an operator and equipment are busy or idle is a:

A)flow process chart
B)worker-machine chart
C)gang process chart
D)simultaneous-motion (SIMO) chart
E)time/efficiency chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
71
What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?

A)increases
B)decreases
C)unaffected
D)may increase or decrease, depending on the sample standard deviation
E)impossible to say without additional information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
72
One form of long term team that is increasingly being used, especially in lean production settings, is:

A)Quality circle
B)Product Design
C)Self-directed
D)Self-improvement
E)Mandatory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
73
When performing a time study, the analyst converts the observed time into the time an "average" worker would require working at an acceptable pace by using which of the following?

A)allowance factors
B)MTM
C)methods analysis
D)performance rating
E)analysis of therbligs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
74
Which is not a requirement for an effective team?

A)talent and skills to meet goals.
B)one or more members representing supervision.
C)a system of reinforcement and celebration.
D)clearly stated and commonly held vision and goals.
E)effective and skilled interpersonal relations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
75
A SIMO chart includes:

A)Delay
B)Storage
C)Transportation
D)Left/Right hand movements
E)Inspection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
76
In a stopwatch time study, the average time it takes a given worker to perform a task a certain number of times is the:

A)observed time
B)normal time
C)standard time
D)allowance time
E)performance rating time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
77
A behavioral approach to job design which increases responsibility for planning and coordinating tasks is job:

A)enlargement
B)rotation
C)enrichment
D)involvement
E)enhancement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
78
The chart used to focus on busy and idle portions of a work cycle is a:

A)Worker-machine chart
B)Gantt chart
C)SIMO-chart
D)Idle chart
E)Flow process chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which of the following is not a potential benefit of the use of self-directed teams?

A)higher quality
B)higher productivity
C)greater worker satisfaction
D)greater satisfaction for middle managers
E)lower turnover
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
80
The methods analysis chart which describes the overall sequence of operations, transportation, storage, delays, and inspection is a:

A)flow process chart
B)worker-machine chart
C)gang process chart
D)simultaneous-motion (SIMO) chart
E)time/efficiency chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 151 في هذه المجموعة.